DE7405892U - Support for laying ceiling tiles - Google Patents

Support for laying ceiling tiles

Info

Publication number
DE7405892U
DE7405892U DE7405892U DE7405892DU DE7405892U DE 7405892 U DE7405892 U DE 7405892U DE 7405892 U DE7405892 U DE 7405892U DE 7405892D U DE7405892D U DE 7405892DU DE 7405892 U DE7405892 U DE 7405892U
Authority
DE
Germany
Prior art keywords
pipe part
support
screw
pipe
support according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE7405892U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LEVERMANN A
Original Assignee
LEVERMANN A
Publication date
Publication of DE7405892U publication Critical patent/DE7405892U/en
Expired legal-status Critical Current

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Description

Alex Levermann 2306 Krummbek,den 15.2.74Alex Levermann 2306 Krummbek, February 15, 1974

Stütze für das Verlegen von Deckenplatten.Support for laying ceiling tiles.

Die vorliegende Neuerung betrifft eine Stütze für das Verlegen von Deckenplatten.Das Verlegen von Deckenplatten in den Räumen z.B. eines Neubaus erfolgte bisher in der Weise,daß ein Handwerker eine Deckenplatte z.B. aus Gips gegen die Deckenbalken hielt,wahrend ein anderer Handwerker die Justierung ler Platte vornahn und nach erfolgter Justierung die Platte mit Nägeln an dei Deckenbalken befestigte.Die Verlegung der Deckenplatten nahm auf diese eise viel Zeit in Anspruch und wurde außerdem sehr teuer.The present innovation relates to a support for laying The laying of ceiling tiles in the rooms, e.g. of a new building, has so far been carried out in such a way that a craftsman A ceiling plate, e.g. made of plaster, was holding against the ceiling joists, while another craftsman was adjusting the plate the plate with nails to the front and after the adjustment The laying of the ceiling tiles began this also took a long time and was also very expensive.

Die Neuerung will die vorher angegebenen Mangel bei der Verlegung von Deckenplatten beseitigen.Mit der Stütze nach der Neuerung soll die Verlegung vor. Deckenplatten schneller und billiger als bisher erfolgen.Die ;tütze hält die Deckenplatte,nachdem sie kurze Zeit von einer Hilfeperson gehalten und sie daraufhin ungefähr in ihrem Schwerpunkt mit dem Kopfteil der Stütze und mit dem ?ußteil der stütze abgestützt ist,federnd an den Deckenbalken.Für die Justi.runo kann die Deckenplatte noch etwiia hin- und hergerückt und nach ier Justierung mit Nägeln an den Deckenbalken festgenagelt werden.Die Stütze wird danach durch federndes Anheben und geitliches Schwenken von der festgenagelten Deckenplatte entfernt. Die nächste Deckenplatte wird in gleicher ».'eise verlegt.The innovation wants the previously indicated deficiency in the laying Remove from ceiling tiles. With the support after the innovation should the laying before. Ceiling panels faster and cheaper than before. The support holds the ceiling tile after it held by a helper for a short time and then approximately in their center of gravity with the head part of the support and with the outer part of the support is supported, resiliently on the ceiling joist. For Justi.runo can move the ceiling tile back and forth a little and after this adjustment nailed to the ceiling joists with nails The support is then removed from the nailed-down ceiling plate by lifting it up and swiveling it sideways. The next ceiling tile is laid in the same way.

Die itütze nach der Neuerung ist dadurch gekennzeichnet,daß sie aus drei ineinander verschiebbaren Rohrteilen besteht,daß derThe support according to the innovation is characterized in that it consists of three telescopic tube parts that the

eine Rohrteil in einem mittleren Rohrteil federnd angeordnet ist und einen Kopfteil trägt,der andere Rohrteil in demselben mittleres Rohrteil in seiner Lange in verschiedene Stöllüügeu einstellbar und mit einer Flügelschraube in einer dieser Stellungen feststellbar ist.a pipe part is resiliently arranged in a central pipe part and carries a head part, the other pipe part in the same central pipe part is adjustable in its length in different Stöllüüuu and can be locked with a wing screw in one of these positions.

In Fig.1 und 2 ist ein Ausführungebeispiel der Neuerung dargestellt.An exemplary embodiment of the innovation is shown in FIGS.

Die drei ineinander verschiebbaren Rohrteile sind mit 1,2,3 bezeichnet.Der Rohrteil 1,der in dem mittleren Rohrteil 2 federnc angeordnet ist,trägt einen beweglichen Kopfteil 4.Der Rohrteil 3 in dem mittleren Rohrteil 2 ist in seiner Länge in verschiedenen Stellungen 13,i3a,13b,13e,13d einstellbar und mit einer Flügelschraube 14,16,17 in einer dieser Stellungen feststellbar.Der bewegliche Kopfteil am Rohrteil 1 besteht aus einem Winkeleisen 4.Die Beweglichkeit wird durch eine Schaftschraube 11 erreicht, die in einen einschraubbaren Einsatz 12 im Rohrteil 1 einge -schraubt ist und die mit Spiel 22,23 in dem Winkeleisen-Kopf -teil 4 sitzt.Der Kopfteil 4 wird am Verdrehen gegenüber dem Rohr teil 1 durch einen rohrförmigen Ansatz 10 am Rohrteil 1 gehindert. Der Ansatz 10 ist mit rechtwinkligen Ausnehmungen versehen. Das Federn des Rohrteils 1 in dem Rohrteil 2 wird durch eine Zylinderdruckfeder 6 bewirkt,die in einem Topf sitzt,der aus dem Rohrteil 5 besteht,der fest über einen ringförmigen Einsatz 13 mit dem Rohrteil 2 verbunden und mit einem einschraubbaren Einsatz 7 abgeschlossen ist.Gegen fliesen Einsatz legt sich die eine Seite des Sprengrings 8 an dem Rohrteil 1 bei entspannter Fe-The three pipe parts that can be slid into one another are marked with 1,2,3 The pipe part 1, which springs c in the middle pipe part 2 is arranged, carries a movable head part 4 in the middle tubular part 2 is adjustable in length in various positions 13, i3a, 13b, 13e, 13d and can be fixed in one of these positions with a wing screw 14,16,17 The movable head part on the pipe part 1 consists of an angle iron 4. The mobility is achieved by a set screw 11, which is screwed into a screw-in insert 12 in the pipe part 1 and which sits with play 22,23 in the angle iron head part 4. The head part 4 is twisted relative to the pipe Part 1 prevented by a tubular extension 10 on the pipe part 1. The approach 10 is provided with right-angled recesses. The springs of the pipe part 1 in the pipe part 2 is caused by a cylinder compression spring 6, which sits in a pot that consists of the Pipe part 5 is made, which is fixed over an annular insert 13 connected to the pipe part 2 and completed with a screw-in insert 7. Against the tile insert, one side of the snap ring 8 rests on the pipe part 1 when the feet are relaxed.

der 6 an.Auf die andere Seite des Sprengringe θ stutzt sich die Feder 6 ab.Die FlUgelschraube 14,16,17 ist mit einer Schel Is 15,mit einer Kette IS und einer öse 19 gegen Verlieren gesichert. Die FlUgelechraube ist über eine durchgehende Bohrung im Rohrteil 2 in durchgehende Bohrungen 13,13a,13b,13c,13d im Rohrteil 3 einsteckbar und in ein Auge 24 am Rohrteil 2 einschraubbar. Die durchgehenden Bohrungen 13,13a,13b,13c,13d sind in gleichen Abständen im Rohrteil 3 angeordnet„der unten mit einem Einsatz 22 abgeschlossen ist.The spring 6 is braced on the other side of the snap ring θ. The wing screw 14,16,17 is secured against loss with an IS 15 bracket, an IS chain and an eyelet 19. The wing screw can be inserted into through bores 13, 13a, 13b, 13c, 13d in the pipe part 3 via a through hole in the pipe part 2 and screwed into an eye 24 on the pipe part 2. The through bores 13, 13a, 13b, 13c, 13d are arranged at equal intervals in the tube part 3, which is closed with an insert 22 at the bottom.

Claims (5)

Alex Levermann 2306 Krummbek,den 15.2.74Alex Levermann 2306 Krummbek, February 15, 1974 1. Stütze für das Verlegen von Deckenplatten,dadurch gekenn zeichnet,daß die Stütze aus drei ineinander verschiebbaren Rohrteilen ( 1,2,3) besteht,wobei der Rohrteil (1) mit beweglichem Kopfteil (4) in dem Rohrteil (2) federnd (Zylinderdruckfeder (6)) angeordnet,der Rohrteil (3) in dem Rohrteil (2) in seiner Länge in verschiedene Stellungen (13,13a,13b, 13cp13d) einstellbar und mit einer Flügelschraube (14,16,17) in einer dieser Stellungen feststellbar isty 1. Support for laying ceiling tiles, characterized in that the support consists of three telescoping pipe parts (1,2,3), the pipe part (1) with a movable head part (4) in the pipe part (2) resilient ( Cylinder compression spring (6)) arranged, the tube part (3) in the tube part (2) in its length in different positions (13,13a, 13b, 13c p 13d) adjustable and with a wing screw (14,16,17) in one of these Positions can be determined by y 2. Stütze nach Anspruch !,dadurch gekennzeichnet,daß die Zylinderdruckfeder (6) in einem Topf sitzt,bestehend aus dem Rohrteil (5),der fest über einen Ring (19) mit dem Rohrteil (2) verbunden und mit einem einschraubbaren iCinsatB (7) abge schlossen ist,gegen den sich die eine Seite des Sprengrings (8) an dem Rohrteil (1) bei entspannter Feder (6) anlegt,die sich auf die andere Seite des Sprengrings (8) abstützt./2. Support according to claim!, Characterized in that the cylinder compression spring (6) sits in a pot, consisting of the pipe part (5), which is fixed to the pipe part (2) via a ring (19) connected and closed with a screw-in iCinsatB (7) is against which one side of the snap ring (8) rests on the tubular part (1) when the spring (6) is relaxed, the is supported on the other side of the snap ring (8). / 3. Stütze nach Anspruch 1 und 2,dadurch gekennzeichnet,daß der Rohrteil (1) mit einem einschraubbaren Einsatz (12) ver schlossen ist,in dem eine Schaftschraube (11) eingeschraubt ist,die mit Spiel (22,23) in dem V/inkeleisen-Ropfteil (4) sitzt und daß der Kopfteil (4) am Verdrehen gegenüber dem Rohrteil (1) durch einen rohrförmigen Ansatz (10) mit rechtwinkligen Ausnehmungen gehindert ist./3. Support according to claim 1 and 2, characterized in that the Pipe part (1) with a screw-in insert (12) is closed ver, in which a screw (11) is screwed is the one with play (22,23) in the V / ankle iron head part (4) sits and that the head part (4) on rotation with respect to the tubular part (1) by a tubular extension (10) with right-angled Recesses is prevented / 4. Stütze nach Anspruch 1 bis 3,dadurch gekennzeichnet,daß die4. Support according to claim 1 to 3, characterized in that the Flügelschraube (H,16,17) mit einer Schelle (15),einer Kette (18) und einer Öse (19) gegen Verlieren gesichert,über eine durchgehende 3ohrung im Rohrteil (2) in durchgehende Bohrungen (13,13a,13b,13c,i3d) im Rohrteil (3) einsteckbar und in ein Auge am Rohrteil (2) einschraubbar istv Wing screw (H, 16,17) secured against loss with a clamp (15), a chain (18) and an eyelet (19), via a continuous 3hole in the pipe part (2) in continuous bores (13,13a, 13b, 13c , i3d) can be inserted into the pipe part (3) and screwed into an eye on the pipe part (2) v 5..'tütze nach Anspruch 1 bis 4,dadurch gekennzeichnet,daß der Rohrteil (3) in gleichen Abständen durchgehende Bohrungen (13, 13a,13b,13ct13d) aufweist und an seinem unteren Ende mit einem Einsatz (22) abgeschlossen5 .. 'support according to claim 1 to 4, characterized in that the tubular part (3) has continuous bores (13, 13a, 13b, 13c t 13d) at equal intervals and is terminated at its lower end with an insert (22)
DE7405892U Support for laying ceiling tiles Expired DE7405892U (en)

Publications (1)

Publication Number Publication Date
DE7405892U true DE7405892U (en) 1974-06-20

Family

ID=1302169

Family Applications (1)

Application Number Title Priority Date Filing Date
DE7405892U Expired DE7405892U (en) Support for laying ceiling tiles

Country Status (1)

Country Link
DE (1) DE7405892U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19529989A1 (en) * 1995-08-16 1997-02-27 Rainer Glueck Support for raising panels, boards and laths up to ceiling

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19529989A1 (en) * 1995-08-16 1997-02-27 Rainer Glueck Support for raising panels, boards and laths up to ceiling
DE19529989C2 (en) * 1995-08-16 1999-07-22 Rainer Glueck Support for laying panels, boards and slats on the ceiling

Similar Documents

Publication Publication Date Title
DE7405892U (en) Support for laying ceiling tiles
DE816147C (en) Teaching for the building of walls, partitions and chimneys
DE7203557U (en) PREFABRICATED SANITARY BLOCK
DE829788C (en) Device for the joint and dimensionally correct bricklaying of bricks
DE1484963A1 (en) Spacer for reinforcement bars
DE19617747A1 (en) Frame for groups of paving stones laid on ground
EP0816745B1 (en) Levelling stand
DE3400392C2 (en) Device for setting measuring points and for setting distances and directions
GB1526752A (en) Edge form or shuttering for use in the laying of concrete or like settable material
DE806486C (en) Plastic cladding panel
DE813589C (en) Formwork-free ceiling made of hollow concrete blocks
DE1965941U (en) WATER ROOF CORNIC ANGLED.
JPH0111779Y2 (en)
DE2931768A1 (en) Wall facing blocks alignment laying aid - has guiding wires stretched on frame, spaced away from bearing joints
DE1609654C (en) Verge cladding for flat roofs made from 1255277
DE1991195U (en) Screed Plamer Abziehge rat
AT118475B (en) Method and device for the production of walls from shaped stones.
DE879011C (en) Tiled roof
SU842174A1 (en) Form for rendering monolithic the vertical joints of ferroconcrete elements
DE2458986C3 (en) Anchoring device in combustion chambers
DE1917974U (en) SKIRTING.
DE7246657U (en) Pedestal for stilting large-format terrace slabs
DE29518235U1 (en) Thermo wall dehumidifier
DE6923087U (en) PLUMMET
DE1201532B (en) Detachable railing post for makeshift guardrails