DE735484C - Device for installing and removing electrical high-voltage devices - Google Patents

Device for installing and removing electrical high-voltage devices

Info

Publication number
DE735484C
DE735484C DES137165D DES0137165D DE735484C DE 735484 C DE735484 C DE 735484C DE S137165 D DES137165 D DE S137165D DE S0137165 D DES0137165 D DE S0137165D DE 735484 C DE735484 C DE 735484C
Authority
DE
Germany
Prior art keywords
base frame
scaffolding
support rod
support
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DES137165D
Other languages
German (de)
Inventor
Josef Behringer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Priority to DES137165D priority Critical patent/DE735484C/en
Application granted granted Critical
Publication of DE735484C publication Critical patent/DE735484C/en
Expired legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B3/00Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Power Engineering (AREA)
  • Gas-Insulated Switchgears (AREA)

Description

Einrichtung zum Ein- und Ausbau von elektrischen Hochspannungsgeräten Um elektrische Hoch: bzw. Höchstspannungsgeräte, wie Leistungsschalter, Stützer, Prüftransformatoren o. dgl., z. B. für einen geschlossenen Bahntransport geeignet zu machen bzw. um zugleich die Herstellung von Porzellanisolatoren zu erleichtern, ist es bekannt, derartige Hochspannungsgeräte mit mehrteiligen Stützern auszuführen, die so zerlegt werden können, daß das Bahnprofil nicht überschritten wird. Der Ein- und Ausbau derartiger Hochspannungsgeräte ist normalerweise mit erheblichen Schwierigkeiten verknüpft, da die aus Porzellan ausgeführten Stützer für derartige Geräte so schwer sind, daß man auf Transport- bzw. Hebemittel angeiviesen ist, die meistens nicht zur Verfügung stehen. Der Ein- und Ausbau der Hochspannungsgeräte war bisher insbesondere bei Freiluftanlagen deswegen schwierig und zeitraubend, weil man im wesentlichen auf Gerüste, Freileitungen bzw. Sammelschienen als Stützpunkte- zum Aufhängen von Flaschenzügen o. dgl: angewiesen war-Erst recht ist aber der Ein- und Ausbau von elektrischen Hochspannungsgeräten bei neuzeitlichen Freiluftanlagen, bei denen überhaupt keine Gerüste über den Schaltern o. dgl. vorgesehen werden. mit Schwierigkeiten und Zeitverhisten verknüpft.Equipment for the installation and removal of electrical high-voltage devices To electrical high: or high voltage devices, such as circuit breakers, supporters, Test transformers or the like, e.g. B. suitable for closed rail transport to make or at the same time to facilitate the production of porcelain insulators, it is known to design such high-voltage devices with multi-part supports, which can be dismantled so that the track profile is not exceeded. The one and removal of such high-voltage equipment is usually with considerable difficulty because the porcelain supports are so heavy for such devices are that one is dependent on transport or lifting equipment, which mostly not be available. The installation and removal of high-voltage devices has been special up to now so difficult and time-consuming in open-air systems because one essentially on scaffolding, overhead lines or busbars as support points for hanging up Pulley blocks or the like: was instructed - but the installation and removal of is even more important electrical high-voltage devices in modern open-air systems, in which at all no scaffolding above the switches or the like are provided. with difficulty and timing linked.

Die Erfindung ermöglicht, das Ein- und Ausbauen von .elektrischen Hochspannungsgeräten weitestgehend zu erleichtern. Zu diesem Zweck sind erfindungsgemäß am Gerätegrundrahmen Gelenke vorgesehen, auf die ein mit einer Hebe- und Senkvorrichtung versehenes, zugleich als eine Leiter aus-ebildetes, nach beiden Seiten um seine mittlere La z-e kippbares Baugerüst abnehmbar angebracht ist, dessen Neigung in bezog auf den Grund- rahmen durch Längenveränderung von Stütz- stangen verstellbar ist, die so umschwenkbar angeordnet sind. daß die Teile des eIck- trischen Gerätes-mindestens von z«-ei gegen- übe#-lie1-etiden Seiten des Grundrahmens ge- hoben oder gesenkt werden können. Hier- durch wird ein besonders schnelles Ein- und Ausbauen von elektrischen Hochspannttngs- geräten ermöglicht, zumal die Stützpunkte für die eigentliche Hebe- und Senkvorrichtung unverändert bleiben. Es ist dabei ferner mög- lich, eilt und d:,selbe abnehmbar an denn Gruitdrahiiicti vorgesehene Hebe- und Seinlz- vorriclitting z. B. für verschiedene Schalter gleicher Type zu verwenden. In der Zcichnunig ist ein Ausführungsbei- spiel gern@il'a der Erlindung dargestellt. Es zcigcn: Fig. i eine perspektivische Ansicht der an einem Fahrgestell angebrachten Einr:.chtung, Fig.2 die Aufrichtung der Barteinrichtung mittels Flaschenzüge o. d-1., Fig.3 bis 6 die einzelnen Stellungen der Einrichtung während des Ein- oder Ausbaus und Fig.; das Absenk;n der Baneinrichtung zum abbauen. Bei dem Ausführungsbeispiel ist eine ein- polige Hoclispannungsschaltanordnung mit We, -istungsschaltern, z. B. Espans:onsschal- z * Le b tcrn, gezeigt. li!it r und 2 sind die feststehen- den, z. B. aus Porzellan bestehenden Stützcr 1>ezciclniet, die die eigentlichen Lcistun-s- schalter ; bzw. 4. mit dem dazugehörigen Schaftgetriebe tragen. Zwischen den Stüt- z ern i und z kann ein um seine Längsachse drehbarer Stützen 5 vorgesehen werden. Der , obere Teil des Stützens 5 trägt eine Welle-" die bei dem dargestellten Ausführungsbeispiel gleichztiti` zur t"bertragung des 1?inschalt- drehmonieiites auf die Schaltgetriebe der Lei- stungsschalter und zur Stromführung dient. An beiden Seiten des Fahrgestells i o sind 7apfci- i i und 1 ; und in der Mitte des Fahr- gestells durch Ösen und Bolzen gebildete Ge- lenke 12 vorgesehen, an denen mittels Bolzen Träger 1.1 drehbar und abnehmbar ange- bracht sind. die zusammen mit den verstell- baren Stützstangen 2 1 und 23 die eigentliche Hinrichtung zum Ein- und Ausbau der Hoch- leistui:@sscii:ilter und Stützen bilden. Jeder der Träger i.;- kann vorteilhaft aus Rohren i @, 16 zusaminengcsetzt werden, die mittels Stre- ben i; versteift sind. An den Streben i;, und zwar senkr,-cht zti diesen, sind Sprossen 18 vorgesühen, so da].> die beiden das Bati-eriisi bildenden Träger 14. mit den Sprossen als Leiter dienen. Am oberen Teil des Baugerüstes ist e:nc 1lel)c-- und Senkvorrichtung i9 vorgesehen, die aus einem Rollen- oder Flaschenzug be- stelicn kann, dessen Zugmittel .mittels eines Ha!cens und Ketten o. dgl. ivg1. z. B. Fig, und !@: zum Hehein bnv. Senken der Stutzer, Lcistun<-sschalter o. dgl. benutzt wird. Die Schwenkun- der Tr::ger 1.1. ulll die Ge- lenke 12 erfolgt mittels der mit den Trägerei 14 ein Baugerüst bildenden Stützstangen. 2 r bis -23, die in ihrer Länge verändert «-erden können, Jede solche Stiitzstange 2 r his 2 " kann u. a. je zwei Gewindebolzen 22 und 2 enthalten, die auf den Zapfen 11 bzw, 1 3 aus- wechselbar angebracht und über die als ein an beiden Enden Innengewinde auf@@-ea@°n- des Rohr ausgebildete Stützstange 21 mitein- ander verbunden sind. Der Bolzen 23 steht mit dem Trägt» 1.1 mittels eines Gelenkes Vc-r leindun` Die beiden 2_, 2; so«-ie die entsprechenden Endteac des @-cr- bindungsrohres 21 besitzen hierbei gegcii- läuli`e Gewinde, so daß durch Drehen des Rohres 21 mittels einer Ratsche .30 i1. d-1. die Entfernung zwischen dem Gelenk 6 und dein La e rzapf"n i i bzw. 1 der Stützstange n e2 -ind somit die Schwenkung des Ti-i- # 'iiidcrt i gers 1.1 um das Gelenk 12 herbeigeführt wer- den kann. Zum Anlieb:n oder Absenken der Trä"ci- 14. sind an i:isen einzuhängende H:Ifsgestäi3@c 25. 26 vorgesehen, deren Verbindungsbolzen einen Bolzen tragen, an dem eine Hebe- vorrichtung, z. B. ein Flaschenzug 2-- zuin Aufrichten oder Abbauen der Hebeeinrichtung angreifcii kann. Bevor di.- Stützen 1, 5 und 2 oder die Schalter 3 und 4. ein- oder ausgebaut «erden. ist es notwendig, die Hebeeinrichtung aufzu- bauen.. Das geschieht etwa wie folgt. Zunächst wird die aus den Tra-gerüsten i und Stützstangen 21 bestehende Hcitceiiiricii- tun_g an den Gelenken 12 einbehängt. Hicr- a'uf -werden die Hilfsgestänge 25, 26 mit dein Flascliciizug 2; an dem Fahrrahmen io an- <uebracht. Mittels des Flaschenzuges 2; wird die flcbeeinrichtung 14., 21 so tt-e:t aufgerich- tet, bis die Stützstangen 21 in die am Fahr- gesiell io vorgesehenen Tragzapfen i i cinbe- führt werden können. Nunmehr wird die au dein Ililfsgcstänge und dem Flaschenzug be- stehende lIebevorrichtung 25 bis 2; entferne, so daß mit dem eigentlichen Ein- oder Aus- bauen begonnen werden kann. Durch die Veränderung des Abstandes z«-i- schen dem Gelenkpunkt 6 und dem Zapfen i r wird die Hebeeinrichtung in die gewünschte Stellung, z.111. beim Ausbau oberhalb des Stellung, 3 bzw. Stützens i. gebracht. worauf der Leistungsschalter bzw. Stutzer ein- zeln ang,-hoben und nach denn erfolgten Ati, schwenken mittels der insbesondere -als ein Flaschenzug ausgebildeten Vorrichtung i9 abgesetzt wird.The invention makes it possible to largely facilitate the installation and removal of electrical high-voltage devices. For this purpose, according to the invention, joints are provided on the device base frame, onto which a lifting and lowering device, which is also designed as a ladder, is attached. on both sides around its middle face tiltable scaffolding attached detachably whose inclination in relation to the basic frame by changing the length of support rods is adjustable, which can be swiveled so are arranged. that the parts of the corner tric device - at least from two to one practice # -lie1-etiden sides of the basic frame can be raised or lowered. Here- through is a particularly fast entry and Removal of electrical high-voltage devices, especially since the bases for the actual lifting and lowering device remain unchanged. It is also possible lich, hurries and d:, same detachable then Gruitdrahiiicti intended lifting and lowering Vorriclitting z. B. for different switches of the same type to be used. In the Zcichnunig is an execution example like to play @ il'a depicted of the invention. It zcigcn: Fig. I is a perspective view of the device attached to a chassis:. Fig. 2 the erection of the beard device using pulley blocks or d-1., Fig. 3 to 6 the individual positions of the Setup during installation or removal and Fig .; the lowering of the ban device to dismantle. In the embodiment, a single pole high voltage switching arrangement with We, circuit breakers, e.g. B. Espans: onsschal- z * Le b tcrn, shown. li! it r and 2 are the fixed the, z. B. made of porcelain support cr 1> ezciclniet, which is the actual Lcistun-s- counter ; or 4. with the associated Wear shaft gear. Between the stud z ern i and z can be one about its longitudinal axis rotatable supports 5 are provided. Of the , upper part of the support 5 carries a shaft - " in the illustrated embodiment at the same time for the transmission of the 1? drehmonieiites on the gearbox of the line power switch and is used to conduct electricity. Both sides of the chassis are ok 7apfci- ii and 1; and in the middle of the frame formed by eyes and bolts links 12 are provided on which by means of bolts Carrier 1.1 rotatable and detachable are brought. which together with the adjustable ble support rods 2 1 and 23 the actual Execution for the installation and expansion of the building Leistui: @sscii: form filters and supports. Everyone the carrier i.; - can advantageously be made from tubes i @, 16 are put together, which by means of stress ben i; are stiffened. On the struts i ;, and Although vertical, rungs are 18 planned so there].> the two the bati-eriisi forming support 14. with the rungs as Serve ladder. At the top of the scaffolding is e: nc 1lel) c and lowering device i9 provided, which are loaded from a pulley or pulley can stelicn whose traction means Ha! Cens and chains or the like ivg1. z. B. Fig , and! @: to the Hehein bnv. Lowering the trunks, Lcistun <switch or the like is used. The pivoting trolleys 1.1. ulll the steering 12 takes place by means of the with the carrier 14 supporting rods forming a scaffolding. 2 r to -23, which are changed in length can, any such support rod 2 r to 2 " can include two threaded bolts 22 and 2 included, which are on the pin 11 or, 1 3 exchangeably attached and over the as a female thread at both ends on @@ - ea @ ° n- of the tube formed support rod 21 with one- connected to each other. The bolt 23 is standing with the carrying »1.1 by means of a joint Vc-r leindun` The two 2_, 2; so «-ie the corresponding end teac of @ -cr- connecting pipe 21 have running thread, so that by turning the Tube 21 by means of a ratchet. 30 i1. d-1. the Distance between the joint 6 and your La e rzapf "nii or 1 of the support rod n e2 - are thus the pivoting of the Ti-i- # 'iiidcrt i gers 1.1 to be brought about the joint 12 can. To keep: n or lowering the tears 14. H: Ifsgestäi3 @ c to be attached to i: isen 25. 26 provided, their connecting bolts carry a bolt on which a lifting device, e.g. B. a pulley 2 - zuin Erecting or dismantling the lifting device attacking cii can. Before di.- props 1, 5 and 2 or the Earth switches 3 and 4 installed or removed. it is necessary to open the lifting device build .. This is done something like this. First of all, the i and support rods 21 existing Hcitceiiiricii- tun_g hung on the joints 12. Hicr- a'uf - the auxiliary rods 25, 26 with your Flascliciizug 2; on the chassis io <u brought. By means of the pulley system 2; will the flcbe device 14., 21 so tt-e: t upright- until the support rods 21 in the gesiell io provided lifting pin ii cinbe- leads can be. Now the au your auxiliary rods and the pulley standing love device 25 to 2; remove, so that with the actual on or off build can be started. By changing the distance z «-i- between the pivot point 6 and the pin ir the lifting device will be in the desired position Position, e.g. 111. when expanding above position, 3 or support i. brought. whereupon the circuit breaker or socket tent ang, -lifted and after then done Ati, pivot by means of the device i9 designed in particular as a pulley system.

Soll beim Ausbau z. B. der Stützer 5 abgebaut werden, so wird der Träger 1.1 durch Verlängern der Stützstangen 21 nach der Mitte des Schalters geschwenkt, so daß, der Flaschenzug 19 die Stellung über dem Stützer 5 einnimmt. Der Stützer 5 wird angehoben und durch die Verkürzung der Stützstangen 21 so weit herausgeschwenkt, daß er ebenfalls ab= gesetzt werden' kann.Should z. B. the support 5 are dismantled, the Carrier 1.1 pivoted to the middle of the switch by lengthening the support rods 21, so that the pulley system 19 assumes the position above the support 5. The supporter 5 is raised and swiveled out by shortening the support rods 21 so that that it can also be 'set off'.

Nach der erfolgten Absenkung des Stützers 5 wird durch Verlängern der Stützstangen 2 i die Hebeeinrichtung wieder in die Mitte des Schalters gebracht. In dieser Stellung werden die Stützstangen 21 mit ihren Gewindebolzen 23 nacheinander vom Zapfen i i auf den Zapfen 13 übertragen. (Fig. 5 zeigt eine Zwischenstellung, in der eine Stützstange z" i bis 23 noch auf dem Zapfen i i und die andere Stützstange 2i bis 23 bereits auf dem Zapfen 13 sich befindet.) .After the support 5 has been lowered, it is extended by extending it of the support rods 2 i brought the lifting device back to the center of the switch. In this position, the support rods 21 with their threaded bolts 23 are successively transferred from pin i i to pin 13. (Fig. 5 shows an intermediate position, in which one support rod z "i to 23 is still on the pin i i and the other support rod 2i to 23 is already on the pin 13.).

Von der in Fig.6 angegebenen Stellung aus wird der Leistungsschalter 4. bzw. Stützes 2 in gleicher Weise, wie oben beschrieben, abgebaut.From the position indicated in Fig. 6, the circuit breaker 4. or support 2 in the same way as described above, dismantled.

Der Aufbau geht sinngemäß in umgekehrter Reihenfolge vor sich.The setup proceeds in reverse order.

Die erfindungsgemäße Einrichtung kann wiederholt zum Ein- oder Plusbau beliebiger Hochspannungsgeräte >verwendet werden.The device according to the invention can be used repeatedly for installation or plus construction Any high-voltage equipment> can be used.

Claims (7)

PATENTANSPRÜCHE i. Einrichtung zum Ein- und Ausbau von elektrischen Hochspannungsgeräten, insbesondere Hochleistungsschaltern, ' Isolierstützern o. d-1., dadurch gekennzeichnet, daß'am Gerätegrundrahmen (io) Gelenke (11, 12, 13) vorgesehen sind, auf die ein mit einer Hebe- und Senkvorrichtung (i 9) versehenes, zuglieich als eine Leiter ausgebildet, nach beiden Seiten um s°ine mittlere Lage kippbares Baugerüst (14, 21) ahnehmbar angebracht ist, dessen Neigung in bezug auf den Grundrahmen (io) durch Längenveränderung von Stützstangen (2f) verstellbar ist, die so umschwenkbar angeordnet sind, daß die Teile des elektrischen,Glerätes mindestensvon;zwe1 gegenüberliegenden Seiten des Grundrahmens gehoben oder gesenkt werden können. PATENT CLAIMS i. Device for installing and removing electrical High-voltage devices, especially high-performance switches, insulating supports, etc. d-1., characterized in that joints (11, 12, 13) on the device base frame (io) are provided, on which a lifting and lowering device (i 9) is provided, also designed as a ladder, on both sides by a middle layer tiltable scaffolding (14, 21) is perceptibly attached, its inclination with respect to the base frame (io) can be adjusted by changing the length of support rods (2f), which are arranged so that they can be swiveled, that the parts of the electrical device at least of two opposite sides of the base frame can be raised or lowered. 2. Einrichtung nach Anspruch i, dadurch gekennzeichnet, daß das Baugerüst aus zwei parallel zueinander verlaufenden, um Gelenke (12) am Gerätegrundrahmen (i o) schwenkbar gelagerten Trägern (14) besteht, denen je eine in ihrer Länge veränderbare, an den Zapfen des Gerätegrundrahmens abnehmbar anebrachte Stützstange (21) zugeordnet ist.' 3. 2. Device according to claim i, characterized in that the scaffolding consists of two parallel to each other, pivotable about joints (12) on the device base frame (i o) mounted carriers (14), each of which has a variable length, to the Pin of the device base frame is assigned detachably attached support rod (21). ' 3. Einrichtung nach Anspruch i und 2, dadurch gekennzeichnet, daß jede Stützstange (21) im wesentlichen aus einerr)&an den Enden gegenläufige Gewinde aufweisenden Verbindungsrohr besteht, das auf Gewindebolzen (22, 23)- aufgesetzt und mittels einer Ratsche (3o) o. dgl. so bewegbar ist, daß die Gesamtlänge der Stützstange, also einschließlich der Giewindebolzen, vergrößert oder verkleinert werden kann. ,l. Device according to Claims 1 and 2, characterized in that each support rod (21) consists essentially of a thread with opposing threads at the ends There is a connecting pipe that is placed on threaded bolts (22, 23) and by means of a ratchet (3o) or the like is movable so that the total length of the support rod, thus including the Giewindebolzen, can be enlarged or reduced. , l. Einrichtung nach Anspruch i bis 3, dadurch gekennzeichnet, daß die Träger (1.1) an den in der Mitte des Gerätegrundrahmens (i o) vorgesehenen äsen und die Stützstangen (21) an den an den Enden des Gerätegr undrahmens (i o) angebrachten Zapfen (i i bzw. -i3) angeordnet sind. Device according to claims i to 3, characterized in that the carriers (1.1) at the grooves in the middle of the device base frame (i o) and the support rods (21) on the pins (i i or -i3) are arranged. 5. Einrichtung nach Anspruch i bis dadurch gekennzeichnet, daß die Träger (14) nach Art von Gittermasten ° ausgebildet sind und Leitersprossen aufweisen. 5. Device according to claim i to characterized that the carrier (14) are designed in the manner of lattice masts and ladder rungs exhibit. 6. Einrichtung nach Anspruch i bis 5, dadurch gekciinzeichnet, daß zum Aufrichten oder Abbauen des- Baugerüstes (14, 21) ein Hilfsgestänge (25, 26) vorgesehen ist, das mit einer Hebe- und Senkvorrichtung (27), z. B. einem am Gerätegrundralim:en ho) abgestützen Flaschenzug, versehen ist. 6. Device according to claim i to 5, characterized in that for Erecting or dismantling the scaffolding (14, 21) an auxiliary rod (25, 26) is provided is that with a lifting and lowering device (27), for. B. one on the device basic: en ho) supported pulley. 7. Einrichtung nach Anspruch i bis 6, dadurch gekennzeichnet, daß die Hilfsgestänge (25, 26) an den Trägern (i-p des Baugerüstes abnehmbar angebracht sind.7. Device according to claim i to 6, characterized in that the auxiliary rods (25, 26) on the girders (i-p of the scaffolding are removably attached.
DES137165D 1939-05-18 1939-05-18 Device for installing and removing electrical high-voltage devices Expired DE735484C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DES137165D DE735484C (en) 1939-05-18 1939-05-18 Device for installing and removing electrical high-voltage devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DES137165D DE735484C (en) 1939-05-18 1939-05-18 Device for installing and removing electrical high-voltage devices

Publications (1)

Publication Number Publication Date
DE735484C true DE735484C (en) 1943-05-15

Family

ID=7540517

Family Applications (1)

Application Number Title Priority Date Filing Date
DES137165D Expired DE735484C (en) 1939-05-18 1939-05-18 Device for installing and removing electrical high-voltage devices

Country Status (1)

Country Link
DE (1) DE735484C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3572637A (en) * 1968-09-06 1971-03-30 James P Mitchell Jr Aircraft crash recovery hoist
US4889465A (en) * 1987-06-27 1989-12-26 Brooks Richard E Self-loading sailboat trailer

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3572637A (en) * 1968-09-06 1971-03-30 James P Mitchell Jr Aircraft crash recovery hoist
US4889465A (en) * 1987-06-27 1989-12-26 Brooks Richard E Self-loading sailboat trailer

Similar Documents

Publication Publication Date Title
DE1928196C3 (en) Movable space formwork for concrete and reinforced concrete structures
DE3303848A1 (en) BRIDGE CRANE IN A COMPARTMENT OF A WORKING GAS TURBINE
DE1584525B1 (en) Battery formwork
DE735484C (en) Device for installing and removing electrical high-voltage devices
DE2549808C2 (en) Movable tunnel-shaped formwork for concrete and reinforced concrete structural components
DE2324646A1 (en) PROCEDURE FOR ASSEMBLING A BRIDGE AND THE BRIDGE TO BE ASSEMBLED ACCORDING TO THE PROCEDURE, IN PARTICULAR DISMOUNTABLE BRIDGE
DE2015940C3 (en) Device for adjusting sliding formwork
DE1144667B (en) Oil rig
DE69400159T2 (en) Scaffolding floor and assembly process for scaffolding with this floor
DE1684226B2 (en) FORMWORK SCAFFOLDING
DE1291079B (en) Collapsible crane with a telescopic mast
EP1377348A2 (en) Ice climbing tower
DE2423953C2 (en) Movable formwork device for concreting tunnel tubes
DE102017130190A1 (en) Overhead line and method for removing an overhead line
AT163024B (en) Scaffolding for outdoor and indoor scaffolding
DE3719508C2 (en)
DE586714C (en) Turning form
DE19653847C2 (en) System for enabling engagement at the end of a substantially horizontal arm attached to the shaft of a mast, particularly a high voltage pylon
DE515408C (en) Head equipment for masts for fastening insulators of electrical lines
AT371873B (en) METHOD FOR SETTING UP A HALL-SHAPED MULTIPURPOSE TENT
DE922015C (en) Tower crane
AT339407B (en) METHOD AND DEVICE FOR TENSIONING HIGH VOLTAGE LINES
DE446887C (en) Method for erecting roof trusses, beams, etc. Like. By means of their supports
DE842708C (en) Assembly construction method
EP0320855A2 (en) Wrecking arrangement for chimneys, particularly for convergent chimneys