DE678805C - Method for producing a breakout - Google Patents

Method for producing a breakout

Info

Publication number
DE678805C
DE678805C DEG96660D DEG0096660D DE678805C DE 678805 C DE678805 C DE 678805C DE G96660 D DEG96660 D DE G96660D DE G0096660 D DEG0096660 D DE G0096660D DE 678805 C DE678805 C DE 678805C
Authority
DE
Germany
Prior art keywords
helix
strand
break
spiral
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEG96660D
Other languages
German (de)
Inventor
Wilhelm Loebbe
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gewerkschaft Eisenhutte Westfalia GmbH
Original Assignee
Gewerkschaft Eisenhutte Westfalia GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gewerkschaft Eisenhutte Westfalia GmbH filed Critical Gewerkschaft Eisenhutte Westfalia GmbH
Priority to DEG96660D priority Critical patent/DE678805C/en
Application granted granted Critical
Publication of DE678805C publication Critical patent/DE678805C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D3/00Raising shafts, i.e. working upwards from the bottom

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)

Description

Verfahren zur Herstellung eines Aufbruches Beim Herstellen beispielsweise eines, dreitrumigen Aufbruches ist es üblich, den einen Trum des Ausbaues mit Schalhölzern o. dgl. auszuschlagen und als Steinkasten für die fortzuschaffenden Berge zu verwendA-.n. In den mittleren Trum wird gewöhnlich eine Seilförderung eingehängt, und der dritte Trum nimmt die Wetterlutten, D@ruckluftrohre, Fahrten usw. auf. Der Abtransport der Berge durch den Steinkasten gibt jedoch vielfach zu Betriebsstörungen Anlaß. Es reißen sich Teile der Ausschalun:g los, die sich querstellen und das Nach,-leiten der Berge verhindern. Zur Beseitigung dieses Nachteiles wurde schon vorgeschlagen, beim Aufbrechen eines Schachtes ein Bergeabwurfrohr nachzubauen, durch welches die Berge zur Sohle ,geschafft werden sollen. Dieses Rohr soll mit dem Fortschreiten des Aufbruches schußweise nachgeführt werden. Ist der Aufbruch hochgebracht, so wird der Steinkasten oder das Bergeabwurfrohr entfernt, damit für die Förderung des Abbaugutes eine Seilförderung «eingehängt werden kann. Auch hat man bereits früher beim Aufbrechen von Blinds,rhächten u. dgl. eine zweietagige Hilfsbühne verwandt, bei welcher die beiden Etagen durch Hebezeuge miteinander verbunden sind. Durcli wechselndes Hochdrücken der oberen und Nachziehen der unteren Etage, oder umgekehrt, kann- die gesamte Bühne hoch- oder abwärts bewegt werden. Auch bei der Verwendung dieser Einrichtung wird erst nach der Fertigstellung des Aufbruches das endgültige Fördermittel für das Abbaugut eingehängt. In neuerer Zeit wird als Fördermittel vielfach statt einer Gefäßförderung ein Schachtwendel benutzt.Method of making a breakup When making, for example of a three-part departure, it is common, the one part of the expansion with formwork timbers or the like to be knocked out and used as a stone box for the mountains to be removed. In the middle strand, a rope conveyor is usually hung, and the third Trum records the weather ducts, compressed air pipes, journeys, etc. The removal However, the mountains through the stone box often give rise to operational disruptions. Parts of the formwork tear themselves loose, which are positioned across and which lead afterwards prevent the mountains. To eliminate this disadvantage it has already been proposed that when breaking open a shaft to build a mine discharge pipe through which the Mountains to the bottom, should be made. This tube is said to keep up with progression the departure can be tracked by shots. If the departure is brought up, so the stone box or the discharge pipe is removed so that it can be used for the promotion of the dismantled material a rope conveyor «can be attached. Also one already has earlier when breaking the blinds, rächten and the like. a two-story auxiliary stage was used, in which the two floors are connected to each other by hoists. Durcli alternately pushing up the upper floor and pulling the lower floor, or vice versa, - the entire stage can be moved up or down. Even when using it this facility will only become the final one after the departure has been completed Funding for the dismantled material is attached. In more recent times it is used as a subsidy a shaft helix is often used instead of a vessel conveyance.

Gemäß der Erfindung wird bei der Herstellung des Aufbruches in der Weise verfahren, daß mit dem Fortschritt des Aufbruches, das heißt also nach dem Einbringen des Ausbaues, ein Schachtwendel nachgebaut wird. Während der Herstellung des Aufbruches werden die Berge durch dieses Wendel abwärts geschafft, und später dient es der normalen Förderung.According to the invention, in the preparation of the breakup in the Proceed wisely that with the progress of the departure, that is So after the expansion has been introduced, a helical shaft is rebuilt. While The mountains are brought down through this spiral before the start is made, and later it is used for normal promotion.

In der Zeichnung ist ein senkrechter Querschnitt durch einen Stapel dargestellt. Dabei ist der obere Teil des Stapels links neben dem Unterteil gezeichnet. Der Aufbruch a ist dreitrumig aufgebrochen. In dem ersten schmalen Trum b sind die Fahrten c, Bewetterungslutten, Druckluftleitung u. dgl. untergebracht. In dem zweiten Trum d ist an der einen Seite die Schachtwendel f eingebaut. In dem Raun davor wird das Seil g - für die in dem dritten Trum lt hängende Seilförderung i hochgeführt. Das Seil ist dabei über eine wandernde Korbrolle h geführt. Der Korb m dient zur Seilfahrt und für den Transport von Gez.ähe. Größere Stücke wie die Jochhölzer der Ausbaurahmen jt oder die einzelnen Wendelabschnitte o können gegebenenfalls mit Seilen und Haken p unter den Korb m gehängt werden.The drawing shows a vertical cross section through a stack. The upper part of the stack is drawn to the left of the lower part. The departure a has broken out in three parts. The journeys c, ventilation ducts, compressed air lines and the like are accommodated in the first narrow strand b. In the second strand d, the shaft helix f is installed on one side. In the space in front of it, the rope g - for the rope conveyance i hanging in the third strand lt is brought up. The rope is guided over a wandering basket roll h. The basket m is used for rope travel and for the transport of gear close by. Larger pieces such as the yokes of the extension frame jt or the individual spiral sections o can, if necessary, be hung under the basket m with ropes and hooks p.

In einiger Entfernung unter der Korbrolle k ist eine Übergabebühne g angeordnet. An dieser Stelle können die Wendelabschnitte o oder die Jochhölzer aus dem Trum h herübergeholt werden in den mittleren Trum d. Von der Übergabebühne werden diese Teile dann durch eine kleine Handwinde r, deren Rolle s unter .der Schießbühne t gelagert ist, so weit hochgezogen, nie der Ausbau reicht. Einige Rahmen unter der Schießbühne t wird noch eine Sicherungsbühne zt eingebaut, von welcher aus die mittels der Handwinde Y hochgezogenen Teile vom Seil abgeschlagen und dann eingebaut werden.A transfer platform g is arranged some distance under the basket roller k. At this point, the spiral sections o or the yoke timbers can be brought over from the strand h into the middle strand d. These parts are then pulled up from the transfer platform by a small hand winch r, the roll s of which is stored under the shooting platform t, so far that the removal is never sufficient. A safety platform is installed in some frames under the shooting platform t, from which the parts that are pulled up by means of the hand winch Y are cut off the rope and then installed.

Erfindungsgemäß wird die Wendelsäule f sogleich mit dem Einbringen des Ausbaues hochgeführt. Es wird also, sobald der erforderliche Raum wieder frei ist, ein Wendelabschnitt o oben auf die Säule gesetzt und gegebenenfalls gleichzeitig in geeigneter Weise an denAusbaurahmen ft befestigt. Die Wendelabschnitte besitzen dabei vorteilhaft eine Höhe, die in dem Abstand .der Rah-. men h, der durch die Bolzen v bestimmt wird, aufgeht.According to the invention, the helical column f becomes immediately with the introduction of the expansion. So it will be free again as soon as the required space is available is, a coil section o is placed on top of the column and, if necessary, at the same time attached to the extension frame ft in a suitable manner. Have the helical sections a height that is advantageous in the distance .der Rah-. men h who by the Bolt v is determined, opens.

Nachdem der Ausbau und die Wendelsäule hinreichend hoch nachgeführt ist, wird die Handwinde r mit .der Seilscheibe s entfernt und von der Schießbühne t aus ein weiterer Abschlag gebohrt und abgeschossen. Vor dem Sprengen wird vorteilhaft das Rolloch iv in der Schießbühne t durch einen Rost abgedeckt. Zweckmäßig findet dabei ein Rost Anwendung, der aus einzelnen losen Roststäben besteht, die in geringer Entfernung unter der Öffnung w auf zwei Querstangen gelegt und einzeln durch Zurücktreiben entfernt werden können. Unter diesem Rost wird eine überleitschurre angebracht, welche das Haufwerk zur Seite des Schachtwendels f herüberleitet in einen Hilfsaufsatz, der trichterförmig in die Wendelöffnung hineinragt. Dieser Hilfsaufsatz ist zweckmäßig derart zusammengezogen, daß er den engsten Teil des ganzen Förderweges des Haufwerkes bis zum Wendelaustrag darstellt. Besonders sperrige Stücke des Haufwerkes bleiben also in dem Hilfsaufsatz hängen und können von der Sicherungsbühne ,tt aus bequem beseitigt oderzerkleinert werden, so daß ein Festsetzen in der Wendelsäule mit Sicherheit vermieden wird.After the expansion and the helical column are tracked high enough is, the hand winch r is removed with the pulley s and from the shooting platform t drilled and shot down from another tee. Before blasting will be beneficial the blind hole iv in the shooting platform t is covered by a grate. Finds useful a grate application, which consists of individual loose grate bars, which in lower Distance under the opening w placed on two transverse rods and pushed back one at a time can be removed. A transfer chute is installed under this grate, which leads the pile over to the side of the shaft helix f in an auxiliary attachment, which protrudes funnel-shaped into the helix opening. This auxiliary attachment is useful so drawn together that it covers the narrowest part of the entire conveying path of the debris represents up to the spiral discharge. Particularly bulky pieces of the debris remain So hang in the auxiliary attachment and can easily from the safety platform, tt be eliminated or crushed, so that it is sure to get stuck in the helical column is avoided.

Die Wendelsäule f kann mit geschlossenem Mantel versehen sein und dann gleichzeitig für die Wetterführung nutzbar gemacht werden.The spiral column f can be provided with a closed jacket and can then be used for weather management at the same time.

Claims (3)

PATENTANSPRÜCHE: i.. Verfahren zur Herstellung eines ,Aufbruches, dadurch gekennzeichnet, daß mit dem Fortschritt des Aufbruches ein Schachtwendel (f) nachgebaut wird, der auch nach Fertigstellung des Aufbruches das Fördermittel für das Abbaugut bilden kann. PATENT CLAIMS: i .. Process for the production of a, break-up, characterized in that a shaft helix as the break-up progresses (f) is being rebuilt, which will receive the funding even after the break-up has been completed can form for the degraded material. 2. Verfahren nach Anspruch i, dadurch gekennzeichnet, daß beispielsweise durch eine in dem der Wendel (f) benachbarten Trum (h) eingehängte maschinell betriebene Seilförderung (g) die Wendelabschnitte (o) u. dgl. bis zu einer Hilfsbühne (g) gefördert und von hier aus mittels einer Seilwinde (r) weiter angehoben werden. 2. The method according to claim i, characterized in that that, for example, suspended by a strand (h) in the strand (h) adjacent to the helix (f) machine-operated rope conveyance (g) the spiral sections (o) and the like up to an auxiliary platform (g) and from here by means of a winch (r) be raised. 3. Öberleitschurre zwischen der Schießbühne und dem Fördermittel zur Ausführung des Verfahrens nach Anspruch i, dadurch gekennzeichnet, daß die überleitschurre eine Maulweite besitzt, die enger ist als der Wendeleinlauf. q.. Schachtwendel zur Ausführung des Verfahrens nach Anspruch i, dadurch gekennzeichnet, daß die Höhe der Wendelschüsse (o) in dem Abstand der Ausbaurahmen (n) aufgeht.3. Transfer chute between the shooting platform and the conveyor for carrying out the method according to claim i, characterized in that the transfer chute has a mouth width that is narrower than the spiral inlet. q .. manhole helix for Execution of the method according to claim i, characterized in that the height the spiral section (o) rises in the distance between the extension frame (n).
DEG96660D 1937-11-13 1937-11-13 Method for producing a breakout Expired DE678805C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEG96660D DE678805C (en) 1937-11-13 1937-11-13 Method for producing a breakout

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEG96660D DE678805C (en) 1937-11-13 1937-11-13 Method for producing a breakout

Publications (1)

Publication Number Publication Date
DE678805C true DE678805C (en) 1939-07-22

Family

ID=7140536

Family Applications (1)

Application Number Title Priority Date Filing Date
DEG96660D Expired DE678805C (en) 1937-11-13 1937-11-13 Method for producing a breakout

Country Status (1)

Country Link
DE (1) DE678805C (en)

Similar Documents

Publication Publication Date Title
DE278881C (en)
DE2245076A1 (en) METHOD AND DEVICE FOR MANUFACTURING POST AND UNDERGROUND PILE WALLS
DE3008380A1 (en) METHOD AND DEVICE FOR CONTINUOUSLY EXCAVATING SOIL AND CONVEYING THE EXCAVATION MATERIAL IN A VERTICAL DIRECTION
DE69124364T2 (en) FEED VEHICLE FOR A CONTINUOUSLY WORKING DEVICE
DE678805C (en) Method for producing a breakout
DE3729561C2 (en)
DE502329C (en) Mechanical device for coal extraction in longwall mining with a broad view
DE938543C (en) Schraembaggergeraet with shield for mining underground natural resources, preferably lignite
DE812063C (en) Schraemmaschine
DE1088898B (en) Process for the device and for the mining of coal layers
DE685891C (en) Method and device for conveying debris
AT79776B (en) Clay piercing machine. Clay piercing machine.
DE444654C (en) Device for picking up and conveying debris when driving routes
DE880883C (en) Device for mining with a scraper box, especially for ore mining
DE977137C (en) Guide and conveyor device for peeling extraction devices
DE974669C (en) Method and device for the extraction of coal and other minerals
DE828688C (en) Method and device for changing pipes or rods in boreholes
AT355850B (en) DARKENING DEVICE FOR GREENHOUSES
DE637177C (en) Movable belt conveyor for underground operation
DE404169C (en) Group building for Floeze in steep storage
DE633516C (en) Device for driving through loose bulk masses
DE940284C (en) Schraembaggergeraet with shield for the mechanical extraction of underground treasures from a guide line in the dismantling
AT243688B (en) Device for unloading vehicles, in particular vehicles with sugar beets, onto a conveyor
DE704946C (en) Rocker slide
DE593255C (en) Procedure for sinking sheep by imposition