DE658243C - Circuit arrangement for command and signal systems - Google Patents

Circuit arrangement for command and signal systems

Info

Publication number
DE658243C
DE658243C DE1930658243D DE658243DD DE658243C DE 658243 C DE658243 C DE 658243C DE 1930658243 D DE1930658243 D DE 1930658243D DE 658243D D DE658243D D DE 658243DD DE 658243 C DE658243 C DE 658243C
Authority
DE
Germany
Prior art keywords
relay
contact
circuit
switchgear
switching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE1930658243D
Other languages
German (de)
Inventor
Paul Mattejat
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Normalzeit Lehner & Co
Tenovis GmbH and Co KG
Original Assignee
Normalzeit Lehner & Co
Telefonbau und Normalzeit GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Normalzeit Lehner & Co, Telefonbau und Normalzeit GmbH filed Critical Normalzeit Lehner & Co
Application granted granted Critical
Publication of DE658243C publication Critical patent/DE658243C/en
Expired legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00034Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Description

Schaltungsanordnung für Befehls- und Signalanlagen In Fernsprechanlagen und Befehls- oder Signalanlagen mit weitverzweigten Netzen ist es bekannt, zur besseren Ausnutzung der Leitungen und damit zur Erhöhung der Wirtschaftlichkeit eine Dezentralisation durch Unterteilung der Anlagen in Haupt-, Knoten-und Unterstellen vorzunehmen. Zu diesem Zweck sind im Umkreis einer Zentralstelle mit dieser über Leitungen verbundene Knotenstellen vorgesehen, von denen wiederum Verbindungsleitungen zu entfernt liegenden Unterstellen führen. Direkte, wegen der erforderlichen Länge kostspielige Verbindungsleitungen von der Zentralstelle zu den Unterstellen sind dabei nicht vorhanden, es werden daher Verbindungen zwischen diesen Stellen über die Knotenstellen hergestellt, deren von der Zentralstelle aus gesteuerte Wähler zu diesem Zweck Zugang zu den nach den Unterstellen führenden Verbindungsleitungen haben.Circuit arrangement for command and signal systems in telephone systems and command or signal systems with widely ramified networks, it is known for better Utilization of the lines and thus decentralization to increase profitability by subdividing the systems into main, node and sub-stations. to for this purpose are in the vicinity of a central office connected to this via lines Nodes provided, from which in turn connecting lines to distant ones Lead. Direct connecting lines, which are expensive because of the length required from the central office to the subordinate offices are not available, there will be therefore connections are established between these points via the nodes whose Voters controlled by the central office for this purpose have access to the Subordinate leading connecting lines.

Bei Fernsteuer- und Signalanlagen in weitverzweigten elektrischen Verteilungsnetzen treten bei der Dezentralisation hinsichtlich der Steuerung der Verteilerschaltwerke Schwierigkeiten auf, die sich aus dem Erfordernis der Hin- und Rücksendung von Signalen zur Steuerung und Quittierung von Schaltvorgängen ergeben bzw. aus der Notwendigkeit, ungewollte Veränderungen von Schalterstellungen von den Unterstellen in der Zentralstelle anzuzeigen. Eine Steuerung der Wähler in der bei dezentralisierten Fernsprechanlagen und einfachen Befehls- oder Signalanlagen üblichen Art läßt sich daher bei Fernsteueranlagen mit Hin- und Rücksendung von Signalen nicht ohne weiteres anwenden. Man hat bei bekannten Fernsteueranlagen der letzteren Art diese Schwierigkeit dadurch zu beheben versucht, daß bediente Knotenstellen vorgesehen wurden, an welchen die Befehle von der Zentralstelle zunächst aufgenommen und von dem Bedienungspersonal an die Unterstellen weitergeleitet wurden. Hierbei wird jedoch der Vorteil der Dezentralisation durch den Aufwand der Kosten für das Bedienungspersonal in den Knotenstellen zum großen Teil wieder aufgehoben.In remote control and signaling systems in widely ramified electrical ones Distribution networks occur in the case of decentralization with regard to the control of the Distribution switchgear encounter difficulties arising from the requirement to and sending back signals for control and acknowledgment of switching processes or from the need to avoid unwanted changes in switch positions to notify the subordinate units in the central office. A control of the voters in the for decentralized telephone systems and simple command or signal systems usual type can therefore be with remote control systems with outward and return of Do not simply use signals. One has the known remote control systems the latter type tries to overcome this problem by serving nodes were provided, at which the commands from the central office were initially recorded and have been forwarded by the operating personnel to the subordinate units. Here however, the benefit of decentralization is reduced by the expense of the Most of the operating personnel in the nodes were lifted again.

Es ist schon vorgeschlagen worden, eine Dezentralisation für Fernsteuer- und Signalanlagen mit Hin- und Rücksendung von Signalen zur Steuerung und Quittierung von Schaltvorgängen und mit Meldung ungewollter Veränderungen von Schalterstellungen von den Unterstellen zu der Zentralstelle auch für nicht bediente Knotenstellen zu ermöglichen. Erfindungsgemäß wird dies dadurch erreicht, daß sowohl bei einer von der Zentralstelle aus erfolgten Einstellung der Schaltwerke zwecks Übermittlung eines Befehls von der Zentralstelle in eine an die Verteilerschaltwerke des Knotenpunktes angeschlossene Unterstelle als auch bei Abgabe eines Signals von einer derartigen Unterstelle zu der Zentrale stets erst die Schaltwerke in der als Knotenpunkt ausgebildeten Unterstelle auf die zu der fraglichen Unterstelle führende Leitung in bekannter Weise eingestellt werden und anschließend Schaltmittel zur Weiterleitung der dann jeweils von der Zentralstelle ausgesandten Stromstöße über die Leitung wirksam werden.It has already been proposed to decentralize remote control and signal systems with sending and returning of signals for control and acknowledgment of switching processes and with notification of unwanted changes to switch positions from the sub-stations to the central station also for non-serviced nodes to enable. According to the invention this is achieved in that both a from the central office setting of the switching mechanisms for the purpose of transmission a command from the central office in one to the distribution switchgear of the node connected substation as well as when outputting a signal from such a Substitute to the control center always only the switchgear in the designed as a node Substitute on the line leading to the substation in question in known Way to be set and then switching means for forwarding the then The current impulses emitted by the central office take effect via the line.

Die Erfindung ist in der Zeichnung (Abb. i und 2) an einem Schaltungsbeispiel dargestellt, in welchem die Einstellung der Schaltwerke des Knotenpunktes E erfolgt. Die allgemeine Anordnung des Netzes ist in Abb.3 veranschaulicht, in der mit S die Zentralstelle bezeichnet ist, von der aus Leitungen zu zwei Knotenpunkten E führen. Von den Knotenpunkten E führen nun wiederum Leitungen zu den UnterstellenÜ1, UZ usw. Diese Leitungen können als Ringleitung, jedoch auch als Stichleitung geführt sein.The invention is shown in the drawing (Figs. I and 2) using an example circuit shown, in which the setting of the switching mechanisms of node E takes place. The general arrangement of the network is illustrated in Figure 3, in which S denotes Central point is designated, from which lines lead to two nodes E. From the nodes E, in turn, lines lead to the sub-stations Ü1, UZ etc. These lines can be routed as a ring line, but also as a stub line be.

Die Befehlsgabe und die Überwachung erfolgt lediglich in der Zentralstelle S. Von hier aus werden die Schaltwerke in den Knotenpunkten E verstellt, über die in den Knotenpunkten selbst Schaltvorgänge ferngesteuert werden können. Sie können jedoch auch die Verbindung zu den Unterstellen U herstellen, so daß diese Unterstellen dann ebenfalls unter den Einfluß der Befehle der Zentralstelle S kommen. Die Ausführung dieser Befehle o. dgl, wird ebenfalls selbsttätig über den Knotenpunkt hinweg an die Zentralstelle zurückgemeldet.The issuing of commands and monitoring takes place only in the central office S. From here, the switching mechanisms in the nodes E are adjusted, via the switching operations can be remotely controlled in the nodes themselves. You can however, also establish the connection to the subordinate units U, so that these subordinate units then also come under the influence of the commands of the central office S. Execution these commands or the like is also automatically activated across the node reported back to the central office.

In Abb. i des Schaltungsbeispiels ist die Zentralstelle S der Fernbefehls- und Signalisierungsanlage dargestellt. Abb.2 zeigt den als Zwischenstelle ausgebildeten Knotenpunkt E und die Schaltung einer der Unterstellen U1, U2, die über die Verbindungsleitungen VL, und VL, mit dem Knotenpunkt E verbunden ist. Zur Fernsteuerung des Knotenpunktes, beispielsweise zur Einschaltung eines dort aufgestellten Ölschalters 0, dreht der Bedienungsbeamte in der Zentralstelle S (Abb. i) den Schalter B ein. Er veränlaßt dadurch die Vorbereitung zur Ferneinschaltung des Olschalters0. Bei Drehen des Schalters B wird der Stromkreis geschlossen: +, Schalter B, 6o1/2, Relais ioi Wicklung 1, ioia/6, i07/6, iog/4, 3o1/3, Relais i11, -. In diesen Stromkreis spricht Relais 111 sowohl wie der leichte .Anker des Doppelankerrelais ioi an. Der Kontakt 111/2 erregt das verzögerte Relais 1o8, welches mit seinem Kontakt 1o8/4 den DrehmagnetenDSS des Sendeschaltwerkes SS anläßt: -f-, Unterbrecher RU, i07/2, 1o8/4, Relais x06, Drehmagnet DSS. Durch den Unterbrecher RU wird der Drehmagnet DSS stoßweise zusammen mit Relais 1o6 -erregt und dreht das Schaltwerk SS so lange vorwärts, bis sein Arm d den mit Potential gekennzeichneten Kontakt findet. Durch die Betätigung des leichten Ankers des Relais ioi wurde in diesem Falle mittels Kontakt ioi l/4 der Kontakt 3 der d-Kontak-tbank des Sendeschaltwerks gekennzeichnet. Nach dreimaliger Erregung von Magnet DSS und Relais i06 wird daher ein Stromkreis über den Arm d geschlossen: -(-, 1o8/6, Relais i07, Arm d, Kontakt 3, 1o11/4, Relais ioi Wicklung s, -, in welchem Stromkreis jedoch nur Relais i07 erregt werden kann.In Fig. I of the circuit example, the central point S of the remote command and signaling system is shown. Figure 2 shows the node E, designed as an intermediate point, and the circuit of one of the sub-points U1, U2, which is connected to the node E via the connecting lines VL and VL. To remotely control the node, for example to switch on an oil switch 0 set up there, the operator turns switch B in the central station S (Fig. I). It thereby changes the preparation for the remote activation of the oil switch0. Turning switch B closes the circuit: +, switch B, 6o1 / 2, relay ioi winding 1, ioia / 6, i07 / 6, iog / 4, 3o1 / 3, relay i11, -. In this circuit, relay 111 responds as well as the light armature of the double armature relay ioi. The contact 111/2 excites the delayed relay 1o8, which with its contact 1o8 / 4 starts the rotary magnet DSS of the transmitting switchgear SS: -f-, interrupter RU, i07 / 2, 1o8 / 4, relay x06, rotary magnet DSS. Through the interrupter RU, the rotary magnet DSS is energized intermittently together with relay 1o6 and rotates the switching mechanism SS forward until its arm d finds the contact marked with potential. By actuating the light armature of relay ioi, contact 3 of the d-contact bank of the transmitter switchgear was identified in this case by means of contact ioi l / 4. After energizing magnet DSS and relay i06 three times, a circuit is closed via arm d: - (-, 1o8 / 6, relay i07, arm d, contact 3, 1o11 / 4, relay ioi winding s, -, in which circuit however, only relay i07 can be energized.

Inzwischen sind durch die Kontakte 11i/4, 1o6/6, 1o8/2. die a-, b-Äste der Verbindungsleitung VL, überbrückt worden und dadurch Relais 21o im Knotenpunkt E (Abb. 2) erregt worden: +, 2o3/5, VLI. Ast b iio/6, 1o6/6, 111/4, 1o8/2, iio/2, VL, Ast a, 203/2, Relais 21o, -. Relais 21o spricht an und erregt mittels des Kontakts 21o/2 Relais 2o1 und dieses mittels Kontakt 2o1/6 das verzögerte Relais 202. Beim dreimaligen Abfall des Relais 21o durch die mittels Kontakt i06/6 hervorgerufenen Schleifenunterbrechungen wird, der Stromkreis: -f-, 21o/6, 2o6/4, 20i/2, 2o7/6 Relais 2o6, Drehmagnet DEE, - dreimal geschlossen und so das Empfangsschaltwerk EE auf den dem Sendeschaltwerk SS entsprechenden Kontakt 3 eingestellt. In der dann folgenden Abfallzeit des Relais 2o2 besteht der Stromkreis: -E-, 214/6, 2o2/2, Relais 207, Arm d von EE, Kontakt 3, Relais 213, 4o1/1, -. Das ansprechende Relais 207 schaltet mit Kontakt 2o7/6 den Stromkreis für die Einstellung des Schaltwerks EE aus und schließt mit Kontakt 2o7/2 einen Teil seiner hochohmigen Wicklung kurz, so daß das unempfindliche Relais 213 ebenfalls ansprechen kann. Dieses schließt seinen Kontakt 213/2 und schafft sich damit über den geschlossenen Kontakt 0, des offenen Ölschalters einen Haltestromkreis unter gleichzeitigem Kurzschluß des Relais 207. Inzwischen ist auch, eingeleitet durch den Abfall von Relais 21o, Relais 2o2 abgefallen und schloß mit seinem Kontakt 2o2/6 den Rücklaufstromkreis für das Schaltwerk EE über den geschlossenen Wellenkontakt we": ;-, RU, 2o3/6, 2o2/6, we", Drehmagnet DEE, -. Mittlerweile sind durch Ansprechen des Relais 107 in der Sendestelle die Kontakte dieses Relais umgelegt worden. Kontakt i07/2 öffnete den Weiterlaufstromkreis für das Sendeschaltwerk beim Erreichen des Kontaktes 3, Kontakt 1o7/6 den Stromkreis für das Relais iii .und damit für das verzögert abfallende Relais 1o8. Auch die Schleife über die a-, b-Adern der Verbindungsleitung VL, wird dann durch Kontakt io8J2 undiii/4 geöffnet und dadurch in derEmpfangsstelle weitere Schaltvorgänge durch den Abfall des Relais 21o bewirkt. Mittels Kontakt 1o7/4 wird ein Teil von dessen hochohmiger Wicklung kurzgeschlossen und der Strom über die d-Bürste derart verstärkt, daß die Wicklung s des Relais ioi genügend erregt werden kann, um auch die Kontakte io= s/2 und ioi s/6 umlegen zu können. Kontakt iois/2 schafft dabei über den Schalter B einen Kurzschluß für das Relais f07, welches verzögert abfallen muß. Relais ioi s hält sich über den Schalter B, bis es bei seiner Weiterschaltung oder seiner späteren Erregung des Relais 60i wieder aberregt wird. Über Kontakt i08/4 wird der Heimlaufstromkreis des Schaltwerks SS geschlossen, der über den eigenen umgelegten Wellenkontakt wsll verläuft. Der geöffnete Kontakt iois/6 verhindert ein Wiedereinschalten des Relais iii nach dem Heimlauf des Schaltwerks SS und gibt damit die Möglichkeit, weitere Schaltvorgänge, etwa über eine Taste MT oder einen zweiten Schalter B, vorzubereiten.Meanwhile, through the contacts 11i / 4, 1o6 / 6, 1o8 / 2. the a-, b-branches of the connecting line VL, have been bridged and thus relay 21o in node E (Fig. 2) has been energized: +, 2o3 / 5, VLI. Ast b iio / 6, 1o6 / 6, 111/4, 1o8 / 2, iio / 2, VL, Ast a, 203/2, relay 21o, -. Relay 21o responds and energizes relay 2o1 via contact 21o / 2 and the delayed relay 202 via contact 2o1 / 6. When relay 21o drops three times due to the loop interruptions caused by contact i06 / 6, the circuit: -f-, 21o / 6, 2o6 / 4, 20i / 2, 2o7 / 6 relay 2o6, rotary solenoid DEE, - closed three times and thus the receiving switching mechanism EE is set to the contact 3 corresponding to the transmitting switching mechanism SS. In the then following fall time of relay 2o2 the circuit exists: -E-, 214/6, 2o2 / 2, relay 207, arm d of EE, contact 3, relay 213, 4o1 / 1, -. The responding relay 207 switches off the circuit for setting the switchgear EE with contact 2o7 / 6 and short-circuits part of its high-resistance winding with contact 2o7 / 2 so that the insensitive relay 213 can also respond. This closes its contact 213/2 and thus creates a holding circuit via the closed contact 0, the open oil switch, while simultaneously shorting the relay 207. In the meantime, relay 2o2 has also dropped out, initiated by the fall of relay 21o, and closed with its contact 2o2 / 6 the return circuit for the switching mechanism EE via the closed shaft contact we ":; -, RU, 2o3 / 6, 2o2 / 6, we", rotary solenoid DEE, -. In the meantime, the contacts of this relay have been switched over by the response of the relay 107 in the transmitting station. Contact i07 / 2 opened the circuit for the transmission switchgear when reaching contact 3, contact 1o7 / 6 the circuit for relay iii. And thus for the delayed releasing relay 1o8. The loop over the tip and ring wires of the connecting line VL is then opened by contacts io8J2 and iii / 4 and further switching operations are thereby caused in the receiving station by the drop-out of the relay 21o. A part of its high-resistance winding is short-circuited by means of contact 1o7 / 4 and the current is amplified via the d-brush in such a way that the winding s of the relay ioi can be excited enough to also make the contacts io = s / 2 and ioi s / 6 to be able to kill. Contact iois / 2 creates a short circuit for relay f07 via switch B, which must release with a delay. Relay ioi s remains on switch B until it is deenergized again when it is switched on or when relay 60i is subsequently energized. The home circuit of the switching mechanism SS is closed via contact i08 / 4, which runs via its own shifted shaft contact wsll. The open contact iois / 6 prevents the relay iii from being switched on again after the switching mechanism SS has run home and thus enables further switching operations, for example via a button MT or a second switch B, to be prepared.

In dem Knotenpunkt E bewirkte die Erregung des Relais 213 eine Rückmeldung zum Bedienungsbeamten in die Hauptstelle, daß die vorbereitende Anschaltung des einzuschaltenden Ölschalters 0 richtig vollzogen wurde.In the node E, the excitation of the relay 213 caused a feedback to the operator in the main office that the preparatory connection of the the oil switch 0 to be switched on has been carried out correctly.

Kontakt 213/4 schloß nämlich einen Stromkreis: -f-, 213/4, 503s/6, Relais 503, Wicklung 1, 502/z, 5i3/6, Relais 507, - und erregt dabei die Wicklung 1 des Doppelankerrelais 503. Dieses legt seinen Kontakt 5o31/4 um und damit Potential an Kontakt i eines Signalschaltwerks ES der Empfangsstelle.Contact 213/4 closed a circuit: -f-, 213/4, 503s / 6, relay 503, winding 1, 502 / z, 5i3 / 6, relay 507, - and energizes winding 1 of the double armature relay 503. This puts its contact 5o31 / 4 around and thus potential at contact i of a signal switching mechanism ES of the receiving station.

Das Relais 507 erregt in ähnlicher Weise, wie oben bei Erregung des Relais iii beschrieben, mit Kontakt 5o7/6 das verzögerte Relais Sog und bewirkt dadurch, daß im Stromkreis: +, RU, 5o2/6, 5o9/4, Relais 50i, Drehmagnet DES, - das Schaltwerk ES so lange fortgeschaltet wird, bis über Kontakt i der d-Kontaktbank ein Stromkreis geschlossen wird: -E-, 5o9/6, Relais 5o2, d-Arm von ES, Kontakt i, 5o31/4, Relais 503 Wicklung S, 503s/2, 4o1/4, --; Relais 502 spricht an, schaltet mit Kontakt 5o2/6 diesen Fortschaltestromkreis ab und öffnet ferner mit Kontakt 5o2/2 den Stromkreis für das Anlaßrelais 507.The relay 507 energizes in a similar way as described above with energization of the relay iii, with contact 5o7 / 6 the delayed relay suction and thereby causes that in the circuit: +, RU, 5o2 / 6, 5o9 / 4, relay 50i, rotary magnet DES, - the switching mechanism ES is advanced until a circuit is closed via contact i of the d contact bank: -E-, 5o9 / 6, relay 5o2, d-arm of ES, contact i, 5o31 / 4, relay 503 Winding S, 503s / 2, 4o1 / 4, -; Relay 502 responds, switches off this switching circuit with contact 5o2 / 6 and also opens the circuit for starting relay 507 with contact 5o2 / 2.

Inzwischen werden auch die a-, b-Adern der Verbindungsleitung VL2 im Knotenpunkt E mittels der Kontakte 509/2, 5o7/2 und 50i/4 überbrückt, so daß in der Sendestelle Relais 61o auf einem nicht näher zu beschreibenden Wege erregt werden konnte. Es wird durch Kontakt 50i/4 im selben Rhythmus stoßweise aberregt, in dem der Drehmagnet DES des Knotenpunktes E aberregt wird, und stellt in ähnlicher Weise, wie bei Einstellung des Schaltwerks EE beschrieben, das Schaltwerk SE in der Zentralstelle auf den Kontakt :i ein. Dann wird dort ein Stromkreis geschlossen: +, 62o/2, 6o6/2, 6o5/2, 611/2, Relais 612, Arm d von SE, Kontakt i, Relais 6o4, -.In the meantime, the a-, b-wires of the connecting line VL2 in the node E are bridged by means of the contacts 509/2, 5o7 / 2 and 50i / 4, so that relay 61o could be energized in the transmitting station in a way that is not to be described in detail. It is de-energized intermittently by contact 50i / 4 in the same rhythm in which the rotary magnet DES of node E is de-energized, and in a manner similar to that described for setting the switching mechanism EE, it sets the switching mechanism SE in the central unit to contact: i . Then a circuit is closed there: +, 62o / 2, 6o6 / 2, 6o5 / 2, 611/2, relay 612, arm d of SE, contact i, relay 6o4, -.

Das ansprechende Relais 612 schließt mit seinem Kontakt 612/4 einen Teil seiner hochohmigen Wicklung kurz, so daß dann das. niedrigohmige Relais 604 in diesen Stromkreis ansprechen kann. Dieses schafft sich über Kontakt 30Z/6, 60z/4, 8o3/4 und den eigenen Kontakt 6o4/4 einen Haltestromkreis unter gleichzeitigen Kurzschluß von Relais 612. Sowie die Stromstöße über die Verbindungsleitung VL2 aufhören, fällt auch nach einiger Zeit Relais 607 ab und bringt die noch vorbereitend angeschaltet gewesenen Schaltmittel der Sendestelle mit Ausnahme von Relais 604 zur Ruhe.The responding relay 612 short-circuits part of its high-resistance winding with its contact 612/4, so that the low-resistance relay 604 can then respond in this circuit. This creates a holding circuit via contact 30Z / 6, 60z / 4, 8o3 / 4 and its own contact 6o4 / 4 with a simultaneous short-circuit of relay 612. As soon as the current impulses via the connecting line VL2 cease, relay 607 also drops after some time and brings the switching means of the transmitting station that were switched on in preparation to rest, with the exception of relay 604.

Mit Kontakt 6o4/6 - wird der Stromkreis für die Lampe VDL geschlossen, an welcher der Bedienungsbeamte der Hauptstelle erkennt, daß die Schaltvorgänge zur Vorbereitung der Einschaltung des Ölschalters 0, also die Erregung des Relais 213, in der fernen Stelle richtig ausgeführt wurden.With contact 6o4 / 6 - the circuit for the lamp VDL is closed, at which the operator of the main unit recognizes that the switching operations in preparation for switching on the oil switch 0, i.e. energizing the relay 213, were correctly executed in the remote location.

Die endgültige Einschaltung erfolgt, wenn der Beamte die Taste Ein drückt. Dadurch legt er das Relais 3o8 an die c-Ader der Verbindungsleitung VL und erregt in der Empfangsstelle das Relais 408 über Erde, Relais 3o8, Kontakt 2 des Schalters Ein, iio/4, c-Ader von VLl, 203/4, 402/Z, Relais 4o8, Erde. Der Kontakt 4o8/4 schaltet über den noch betätigten Kontakt 2Z3/6 den Einschaltschütz SCH ein, der endgültig die Umschaltung des Ölschalters vornimmt. Dabei wird der Ruhekontakt 0, des Ölschalters geöffnet und der Haltestromkreis für Relais 213 unterbrochen.The final activation takes place when the officer presses the On button. As a result, he puts the relay 3o8 on the c-wire of the connection line VL and energizes the relay 408 via earth, relay 3o8, contact 2 of the switch on, iio / 4, c-wire of VLl, 203/4, 402 / Z, relay 4o8, earth. The contact 4o8 / 4 switches on the switch-on contactor SCH via the still activated contact 2Z3 / 6, which finally switches over the oil switch. The normally closed contact 0 of the oil switch is opened and the holding circuit for relay 213 is interrupted.

Beim Auflaufen des Schaltwerkes ES auf den Kontakt i war bekanntlich Relais 502 erregt worden. Es schloß mit seinem Kontakt 5o2/4 einen Teil seiner Wicklung kurz und bewirkte dadurch erst die wirksame Erregung der Wicklung s des Relais 503. Dieses schaffte sich mit seinem Kontakt 503s15 über den Kontakt 5o4/6, 514/6 und 4o1/6 einen Haltestromkreis unter gleichzeitigem Kurzschluß des Relais 5o2. Dieses fiel ab und bewirkte das Zurruhekommen der allgemein vorgesehenen, eingestellten Schaltmittel.As is known, when the switching mechanism ES hit contact i, relay 502 was energized. It short-circuited part of its winding with its contact 5o2 / 4 and only thereby caused the effective excitation of winding s of relay 503. This created a holding circuit with its contact 503s15 via contact 5o4 / 6, 514/6 and 4o1 / 6 with simultaneous short-circuit of relay 5o2. This dropped out and caused the generally intended, set switching means to come to a standstill.

Fällt nach Einschalten des Ölschalters 0 der Kontakt 213/4 wieder in die Ruhelage, so wird nunmehr der Stromkreis geschlossen: -f-, 213/4, 514/2 504a/3, 503/1 Relais 504, Wicklung 1 5o2/2 513/6 Relais 507, -.If contact 213/4 falls back into the rest position after switching on the oil switch 0, the circuit is now closed: -f-, 213/4, 514/2 504a / 3, 503/1 relay 504, winding 1 5o2 / 2 513 / 6 relays 507, -.

Relais 507 erregt, wie bereits beschrieben, Relais 5o9, welches mittels Kontakt 5o9/4 den Stromkreis für den Drehmagneten DES schließt. Das Schaltwerk ES läuft so lange, bis es den über Kontakt 5o41/4 und die Wicklung s des Relais 504 mit Potential gekennzeichneten Kontakt 2 findet. Wiederum wird gleichzeitig das Schaltwerk SE in der Zentralstelle synchron mitbewegt, so' daß in dem Knotenpunkt nach Ansprechen des Relais 5o2 die Wicklung s des Relais 504 miterregt wird und in der Sendestelle nach Ansprechen des Relais 612 Relais 603 erregt wird. Beide Relais 504 und 6o3 schaffen sich selbst einen Haltestromkreis unter gleichzeitigem Kurzschluß der Relais 5o2 bzw. 612. Letztere bewirken den Rücklauf der eingestellten Schaltwerke und den Rückfall der allgemein vorgesehenen Relais.Relay 507 energizes, as already described, relay 5o9, which closes the circuit for the rotary magnet DES by means of contact 5o9 / 4. The switching mechanism ES runs until it finds contact 2 marked with potential via contact 5o41 / 4 and the winding s of relay 504. Again, at the same time, the switching mechanism SE in the central station is moved synchronously, so that the winding s of the relay 504 is also excited in the node after the relay 502 has responded and relay 603 is excited in the transmitting station after the relay 612 has responded. Both relays 504 and 6o3 create a holding circuit for themselves with simultaneous short-circuiting of relays 5o2 and 612, respectively. The latter cause the set switching mechanisms to return and the relays generally provided to drop out.

Der Kontakt 6o3/2 schließt vorübergehend den Stromkreis für die Lampe DL, zur Kennzeichnung in der Hauptstelle, daß auch das Einschaltsignal angekommen ist und ausgeführt wird. Das Relais 6o3 schaltet mit seinem Kontakt 6o3/4 den Haltestromkreis des Relais 604 aus, welches abfällt und damit die Lampe VOL zum Erlöschen bringt, Auch im Knotenpunkt öffnet der Kontakt 504s/6 den Haltestromkreis für das Relais 503, so daß dieses abfällt.The contact 6o3 / 2 temporarily closes the circuit for the lamp DL, to indicate in the main unit that the switch-on signal has also arrived and is being carried out. The relay 6o3 switches off the holding circuit of the relay 604 with its contact 6o3 / 4, which drops out and thus causes the lamp VOL to go out, also in the node point the contact 504s / 6 opens the holding circuit for the relay 503, so that it drops out.

Hat der Ölschalter umgeschaltet und den Arbeitskontakt OZ geschlossen, so legt er Pluspotential über Kontakt 2 an die Wicklung L des Doppelankerrelais 505 und erregt diese über Kontakt 5x4/2 im bekannten Anlaßstromkreis. Das Schaltwerk ES läuft wieder an, um nunmehr den Kontakt 3 zu suchen, der über Kontakt 505Z/4 und die Wicklung s von Relais 505 mit Potential gekennzeichnet ist. Synchron mit dem Schaltwerk ES bewegt sich wieder das Schaltwerk SE auf Kontakt :,3 und erregt, wie wiederholt beschrieben, jetzt über den Kontakt 60Z/6 des Relais 6o2.If the oil switch has switched over and the normally open contact OZ has closed, it applies positive potential via contact 2 to winding L of the double armature relay 505 and excites it via contact 5x4 / 2 in the known starting circuit. The switching mechanism ES starts up again to look for contact 3, which is identified by potential via contact 505Z / 4 and the winding s of relay 505 . Synchronous with the switching mechanism ES, the switching mechanism SE moves again to contact:, 3 and, as repeatedly described, now excites via contact 60Z / 6 of relay 6o2.

Im Knotenpunkt wird zugleich Wicklung s des Relais 5o5 erregt. Dieses schaltet mit Kontakt 505s/2 das Relais 514 ein. Relais 514 ist nun mit einer derartigen mechanischen Verriegelung versehen, -daß es beim Ansprechen gesperrt wird, dabei aber das entsprechende Relais 514 für die Wiederauslösung des Ölschalters 0, das bis dahin durch die gleiche Verriegelung mechanisch gesperrt blieb, freigibt und es für die folgende Ausschaltung bereitstellt. Zu der Zeit, in der das Rückmeldeschaltwerk ES nicht belegt wird, bestehen daher keine örtlichen Stromkreise.At the node, winding s of relay 5o5 is excited at the same time. This switches on relay 514 with contact 505s / 2. Relay 514 is now with such a mechanical locking provided, -that it is blocked when responding, thereby but the corresponding relay 514 for releasing the oil switch 0, the until then remained mechanically locked by the same lock, releases and makes it available for the following shutdown. At the time when the feedback switchgear ES is not used, there are therefore no local circuits.

In der Zentralstelle wird durch Erregung des Relais 6o2 das Relais box mittels Kontakt 6o2/4 erregt und verriegelt sich ebenfalls mechanisch unter gleichzeitiger Auslösung des der Ausschaltstellung des Olschalters entsprechenden, bis jetzt verriegelt gehaltenen Relais. Es schaltet mit Kontakt 60I/6 den Erregerstromkreis -für Relais 612 und 6o2 aus und bewirkt mit Kontakt 6o1/4 und 60i/2, daß an Stelle der Lampe DL nunmehr die Lampe EL am Platz des Bedienungsbeamten eingeschaltet wird. Der Bedienungsbeamte erkennt, daß die Einschaltung des Olschalters ordnungsgemäß ausgeführt wurde und kann nach Kenntnisnahme, beispielsweise durch Weiterschalten seines Schalters B, die Lampe EL wieder abschalten.In the central station, the relay box is energized by energizing the relay 6o2 by means of contact 6o2 / 4 and is also locked mechanically while simultaneously triggering the relay that corresponds to the off position of the oil switch and has been kept locked up to now. It switches off the excitation circuit for relays 612 and 6o2 with contact 60I / 6 and causes with contacts 6o1 / 4 and 60i / 2 that the lamp EL is now switched on at the operator's place instead of the lamp DL. The operator recognizes that the switching on of the oil switch has been carried out properly and can switch off the lamp EL again after taking notice, for example by switching his switch B further.

In entsprechender Weise könnten natürlich auch ein oder mehrere eingeschaltete Ölschalter im Knotenpunkt ausgeschaltet werden, wobei dann zur endgültigen Ausschaltung nach der Vorbereitung die Taste Aus zu drücken ist. Über die Verbindungsleitung VLl können auch Messungen vorgenommen werden, denn nämlich, wenn nach Einstellung der Schaltwerke SS und EE auf einen bestimmten Kontakt, beispielsweise auf den Kontakt 2, die Rückstellung der Schaltwerke durch geeignete Schaltmaßnahmen verhindert wird, bis die Messung vorgenommen ist.In a corresponding manner, one or more switched on could of course also be used Oil switch in the junction are switched off, and then to the final switch-off press the Off button after preparation. Via the connection line VLl measurements can also be made, namely, if after setting the switching mechanisms SS and EE on a specific contact, for example on the contact 2, the resetting of the switching mechanisms is prevented by suitable switching measures, until the measurement is taken.

Von der eingehenden Beschreibung der zum Zwecke der Messung eintretenden Schaltvorgänge wird abgesehen, um so mehr, als ganz ähnliche Vorgänge bei der folgenden Beschreibung einer Fernsteuerung eines Ölschalters in der Unterstation U1 stattfinden.From the detailed description of the occurring for the purpose of measurement Switching operations are disregarded, all the more so as very similar operations in the following Description of remote control of an oil switch take place in substation U1.

An bestimmten Kontakten des Schaltwerkes EE ist die Verbindungsleitung VL4 angeschlossen, über die Befehle von der Zentralstelle aus an Unterstationen U1, U2 USW-gegeben werden können. Die Rücksignalisierung der in den Unterstationen U1, U2 USW, ausgeführten Befehle erfolgt über die Leitung VL6, die ebenfalls an besondere Kontakte des Rückmeldeschaltwerks ES geführt ist.The connection line VL4 is connected to certain contacts of the switchgear EE, via which commands can be given from the central station to substations U1, U2, USW. The return signaling of the commands executed in the substations U1, U2 USW takes place via the line VL6, which is also led to special contacts of the feedback switchgear ES.

In den Unterstationen befinden sich je zwei Schaltwerke vom bekannten Typ der Selektoren. Diese Schaltwerke können von einer entfernten Stelle aus fortgeschaltet werden, benötigen daher zu ihrem Betrieb keine Ortsbatterie. Im Fall des Beispiels werden die Selektoren an der Verbindungsleitung VL4 von der Batterie des Knotenpunktes aus, die an der Leitung TTLS von der Batterie der Zentralstelle aus erregt.In each of the substations there are two switching mechanisms of the known type Type of selectors. These switching mechanisms can be advanced from a remote location therefore do not require a local battery to operate. In the case of the example the selectors on the connection line VL4 from the battery of the node off, which is excited on the TTLS line from the battery of the central station.

Um Fernschaltungen, beispielsweise die Einschaltung des Ölschalters 01, in der Unterstation U1 vorzunehmen, dreht der Bedienungsbeamte in der Zentralstelle seinen Befehlsschalter A, so daß der Stromkreis geschlossen wird: +, Schalter A, 624/2, Relais 115, I16/4, ==g/2, 117/6, 3o1/4, Relais 113, -. Mit Kontakt 1x3/4 wird dann der Stromkreis geschlossen: +, 3O2/2, 113/4 Relais 103, 1o2/4, I07/6, 109/4 301/3 Relais 1Z1, -. Relais I11 läßt das Schaltwerk SS an, welches in bekannter Weise so lange fortgeschaltet wird, bis es den Kontakt findet, der über 1o3/4 und Relais 102 mit Minuspotential gekennzeichnet ist. Bei Ansprechen des Relais I02 wird für Relais 103 der neue, von Kontakt 1o7/6 unabhängige Stromkreis gebildet: -E-, 3o2/2, 113/4, Relais 103, 1o2/4, 111/6, 3o1/3, Relais ==i, -.To make remote switching, for example switching on the oil switch 01, in the substation U1, the operator in the central station turns his command switch A so that the circuit is closed: +, switch A, 624/2, relay 115, I16 / 4, = = g / 2, 117/6, 3o1 / 4, relay 113, -. The circuit is then closed with contact 1x3 / 4: +, 3O2 / 2, 113/4 relay 103, 1o2 / 4, I07 / 6, 109/4 301/3 relay 1Z1, -. Relay I11 starts the switching mechanism SS, which is advanced in a known manner until it finds the contact that is identified via 1o3 / 4 and relay 102 with negative potential. When relay I02 responds, the new circuit independent of contact 1o7 / 6 is created for relay 103 : -E-, 3o2 / 2, 113/4, relay 103, 1o2 / 4, 111/6, 3o1 / 3, relay = = i, -.

Kontakt 1o3/4 hält die Erregung des Relais 1o2 aufrecht, so daß dieses mit seinen Kontakten 1o2/2 und 1o2/5 die an die Kontakte i der Arme a und b des Schaltwerks angeschlossene Leitung durchschaltet und sie unter den Einfluß der Kontakte 118/4 und 12o/2 setzt. Kontakt 1o2/5 schließt den Stromkreis zur Erregung des Relais ==o, welches seinerseits mit den Kontakten iio/2 und iio/6 die Adern a, b der Verbindungsleitung VLl durchschaltet. Durch Kontakt I02/1 wird dann das verzögerte Relais i20 erregt. Dieses läßt mit Kontakt 12o/3 im Stromkreis: +, RU, ii9/6, 120/3, Relais 118, Drehmagnet DSU, - das Schaltwerk SU an, welches den Kontakt sucht, der über 115/4 und Relais 116 an Potential gelegt ist. Wenn dieser erreicht ist, spricht Relais iig an und öffnet sofort mit Kontakt iig/6 den Fortschaltestromkreis für das Schaltwerk SU. Für das Relais 115 wird dann unabhängig von Kontakt iig/2 ein neuer Stromkreis geschlossen: -E-, Schalter A, 624/2, Relais 115, 116/4, 113/6, 3o1/4, Relais 113, -.Contact 1o3 / 4 maintains the excitation of relay 1o2, so that this with its contacts 1o2 / 2 and 1o2 / 5 switches through the line connected to contacts i of arms a and b of the switchgear and it under the influence of contacts 118/4 and 12o / 2 places. Contact 1o2 / 5 closes the circuit to excite the relay == o, which in turn switches through the wires a, b of the connecting line VLl with the contacts iio / 2 and iio / 6. The delayed relay i20 is then energized by contact I02 / 1. This starts with contact 12o / 3 in the circuit: +, RU, ii9 / 6, 120/3, relay 118, rotary solenoid DSU, - the switching mechanism SU, which searches for the contact that is connected to potential via 115/4 and relay 116 is. When this is reached, relay iig responds and immediately opens the switching circuit for switchgear SU with contact iig / 6. A new circuit is then closed for relay 115 independently of contact iig / 2: -E-, switch A, 624/2, relay 115, 116/4, 113/6, 3o1 / 4, relay 113, -.

In der Zentralstelle wurden somit nacheinander die beiden Schaltwerke SS und SU auf den Kontakt i eingestellt und damit zuerst mit Kontakt i06/6 und dann mit Kontakt 118/4 je eine Stromstoßreihe von einem Stromstoß über die Verbindungsleitung VLl gesandt. Die erste Stromstoßreihe hat in bekannter Weise im Knotenpunkt die Einstellung des Schaltwerks EE zur Folge, welches sich mit dem Schaltwerk SS synchron auf Kontakt i einstellt und den Stromkreis schließt: +, 214/6, 2o6/4, 2o2/2, Relais 2o7, Arm d von EE, Kontakt i, Relais 211, -.In the central station, the two switching mechanisms SS and SU were set one after the other to contact i and thus a series of rushes of one rush current were sent via the connecting line VL1 first with contact i06 / 6 and then with contact 118/4. The first series of impulses results in the setting of the switching mechanism EE at the junction, which synchronously adjusts itself to contact i with the switching mechanism SS and closes the circuit: +, 214/6, 2o6 / 4, 2o2 / 2, relay 2o7, Arm d of EE, contact i, relay 211, -.

Da über +, 211/5, 401/3, 2o5/4, Relais 203, - Relais 203 erregt wurde, kann sich Relais 211 im Stromkreis -E-, 203/i, 211/i, Relais 2ii, -halten. Es schließt mit seinen Kontakten 211/2, 211/4 die Verbindungsleitung VL, an die Kontakte i der Kontaktbank a und b des Schaltwerks EE an. Ebenso wird mit Kontakt 211/6 eine dritte Ader der Verbindungsleitung VL, über den Schaltarm c von EE durchgeschaltet. Since relay 203 was energized via +, 211/5, 401/3, 2o5 / 4, relay 203, - relay 203 can remain in circuit -E-, 203 / i, 211 / i, relay 2ii, -. With its contacts 211/2, 211/4 it connects the connecting line VL to the contacts i of the contact bank a and b of the switching mechanism EE. Likewise, a third wire of the connecting line VL is switched through with contact 211/6 via the switching arm c of EE.

Kontakt z11/3 öffnet den Erregerstromkreis für das während der Einstellzeit des Schaltwerks EE erregt gehaltene Relais 204, so daß der Kurzschluß mittels Kontakt 2o4/4 in der Verzögerungszeit des Relais 204 bestehen bleibt und Spannungsunterschiede zwischen den a- und b-Ästen der Verbindungsleitung VL, ausgeglichen werden und diese nicht über die angeschaltete Verbindungsleitung VL4 auf die empfindlichen Schaltwerke in den Unterstationen U1, U, usw. wirksam werden.Contact z11 / 3 opens the excitation circuit for the during the setting time of the switching mechanism EE kept energized relay 204, so that the short circuit by means of contact 2o4 / 4 remains in the delay time of relay 204 and voltage differences between the a- and b-branches of the connecting line VL, are balanced and this not to the sensitive switchgear via the connected connection line VL4 take effect in the substations U1, U, etc.

Synchron mit dem Schaltwerk SU in der Sendestelle werden dann durch die zweite Stromstoßreihe alle an der Verbindungsleitung VL, parallel angeschlossenen Selektoren UE gemeinsam verstellt. Denn inzwischen war, wie beschrieben, außer Relais iio auch Relais 203 durch Kontakt 211/5 erregt worden und hat auch im Knotenpunkt die Verbindungsleitung VL, auf die Kontaktarme a und b der Schaltwerke SS bzw. EE geschaltet. Der Erregerstromkreis für die Schaltwerke in den Unterstationen verläuft daher wie folgt: + Batterie der Zentralstelle, 12o/2, 118/4, 102/2, Kontakt i, Arm a von SS, iio/2, a-Ader der VLl, 2o3/2, Arm a von EE, Kontakt i, 2ii/2, VL, Magnet DUE des Schaltwerks UE, Relais 70i, VL4, 21z/4, Kontakt i, Arm b von EE,- 20375, b-Ader der VL, iio/6, Arm b von SS, Kontakt i, 1o2/5, - Batterie in der Zentralstelle. Der Schaltarm des Selektors UE wird entsprechend dem Befehl zur Einschaltung des Ölschalters 01 der Unterstation U1 auf den Kontakt i eingestellt und schließt so den Stromkreis: Erde, 70i/6, Schaltwerk UE, Kontakt i, Relais 703, Relais 705, 707/4, dritte Ader von VL, 211/6, Kontakt i, c-Arm von EE, Relais 208, 203/4, c-Ader der VLI, iio/4, c-Arm von SS, Kontakt i, W 113, 119I1, 113/2, Batterie in der Zentralstelle, Erde.All selectors UE connected in parallel to the connecting line VL are then adjusted jointly by the second series of impulses in synchronism with the switching unit SU in the transmitting station. Because in the meantime, as described, in addition to relay iio, relay 203 was also excited by contact 211/5 and has also switched the connection line VL to the contact arms a and b of the switchgear SS and EE at the junction. The excitation circuit for the switchgear in the substations therefore runs as follows: + battery of the central station, 12o / 2, 118/4, 102/2, contact i, arm a of SS, iio / 2, a-wire of the VLl, 2o3 / 2, arm a of EE, contact i, 2ii / 2, VL, magnet DUE of the switching mechanism UE, relay 70i, VL4, 21z / 4, contact i, arm b of EE, - 20375, b-wire of the VL, iio / 6, arm b of SS, contact i, 1o2 / 5, - battery in the central office. The switching arm of the selector UE is set to contact i according to the command to switch on the oil switch 01 of the substation U1 and thus closes the circuit: earth, 70i / 6, switchgear UE, contact i, relay 703, relay 705, 707/4, third wire of VL, 211/6, contact i, c-arm of EE, relay 208, 203/4, c-wire of VLI, iio / 4, c-arm of SS, contact i, W 113, 119I1, 113 / 2, battery in the central office, earth.

Nach der zweiten Stromstoßreihe bleibt Relais 118 abgefallen, Relais i20 jedoch erregt, so daß somit Relais 70i der Unterstation Ul über die Kontakte 118/4, 12o/2 erregt bleibt. Es muß nämlich bemerkt werden, daß am Kontakt i sämtlicher Schaltwerke UE der Unterstationen U1, UZ und mit Ausnahme des Selektors in der Unterstation U1 kein Anschluß liegt, so daß lediglich über diesen Selektor der letztgenannte Stromkreis eingeschaltet wird.After the second series of impulses, relay 118 remains de-energized, relay i20, however, energized, so that relay 70i of the substation Ul via the contacts 118/4, 12o / 2 remains energized. It must be noted that at the contact i all Switching units UE of the substations U1, UZ and with the exception of the selector in the substation U1 is not connected, so that only the latter is via this selector Circuit is switched on.

Das über die dritte Ader der Leitung VL, ansprechende Relais 2o8 bereitet unter Vermittlung des Relais Zog die Erregung des Relais 205 vor und damit die Rückschaltung der in der Empfangsstelle eingestellten Schaltwerke bei ausgeführter Fernschaltung.The relay 2o8, which responds via the third wire of the line VL, prepares, through the intermediary of the relay Zog, the excitation of the relay 205 and thus the switching back of the switching mechanisms set in the receiving station when remote switching is carried out.

Über den Widerstand W 113 erhält in letztgenanntem Stromkreis Relais 703 nicht genügend Strom, um erregt werden zu können. Es spricht daher in der Unterstation U1 in diesem Stromkreis lediglich das Relais 705 an. Es schließt seinen Kontakt 7o5/6, wodurch der Stromkreis zustande kommt: + im Knotenpunkt, 506s/5, VLS, Relais 80i, Drehmagnet D US, 7o5/6, VL, 506s/2, Relais 515, -Batterie des Knotenpunkts. Mit Kontakt 515/4 wird über Relais 506 Wicklung 2 der Anlaßstromkreis für das Schaltwerk ES durch Erregung des Relais 507 geschlossen. Relais 5o7 erregt über Kontakt 507/6 Relais 509, welches mit Kontakt 5o9/4 den Stromkreis: +, Unterbrecher RU, 5o2/6, 5o9/4, Relais 501, Drehmagnet DES, - schließt.In the last-mentioned circuit, relay 703 does not receive enough current via resistor W 113 to be able to be excited. It therefore only responds to relay 705 in substation U1 in this circuit. It closes its contact 7o5 / 6, which creates the circuit: + in the node, 506s / 5, VLS, relay 80i, rotary magnet D US, 7o5 / 6, VL, 506s / 2, relay 515, -battery of the node. With contact 515/4 the starting circuit for the switchgear ES is closed via relay 506 winding 2 by energizing relay 507. Relay 5o7 energizes relay 509 via contact 507/6, which with contact 5o9 / 4 closes the circuit: +, breaker RU, 5o2 / 6, 5o9 / 4, relay 501, rotary solenoid DES, - .

Synchron mit dem Schaltwerk ES im Knotenpunkt E läuft in bereits beschriebener Weise das Schaltwerk SE und stellt sich ebenfalls auf den Kontakt 4 ein. Dort wird der Stromkreis für Relais 613 geschlossen, welches mit Kontakt 613/6 im Stromkreis:--, 62o/6, 613/6, Relais 614, - Relais 614 erregt. Dieses schließt mit seinem Kontakt 614/2 den Erregerstromkreis für das verzögerte Relais 618. Jetzt ist der Stromweg über die Leitung VL, geschlossen: + in der Zentralstelle, 615/2, 616/4, 618/1, 613/4, 609/4 a-Ader der VL2, 511/4, 506s/2, VL4, 7o5/6, Drehmagnet DUS, Relais 80i, VZ", 506s/5, Kontakt 4, Arm a von ES, 511/6, b-Ader der VL2, 6o9/6, Arm a von SE, Kontakt 4, 6z3/5, 6=8/2, 6=7/2, - Batterie der Hauptstelle.Synchronous with the switching mechanism ES in node E runs in the already described Way the switchgear SE and also adjusts to contact 4. There will the circuit for relay 613 closed, which with contact 613/6 in the circuit: -, 62o / 6, 613/6, relay 614, - relay 614 energized. This closes with his contact 614/2 the excitation circuit for the delayed relay 618. Now is the current path via the line VL, closed: + in the central office, 615/2, 616/4, 618/1, 613/4, 609/4 a-wire of VL2, 511/4, 506s / 2, VL4, 7o5 / 6, rotary solenoid DUS, relay 80i, VZ ", 506s / 5, contact 4, arm a of ES, 511/6, b-wire of VL2, 6o9 / 6, arm a from SE, contact 4, 6z3 / 5, 6 = 8/2, 6 = 7/2, - battery of the main unit.

Nach der eisten über VL, gesandten Strom-Stoßreihe war nämlich Relais 511 im Knotenpunkt: -i--, 5o6s/i, 5r0/6, 40z/5, Relais 511, -erregt worden und hat, nachdem die Kontakte 506s/2 und 506s/5 umgeschaltet hatten, die a- und b-Ader der Verbindungsleitung VL2 über die Kontakte 51z/4 und 51z/6 durchgeschaltet. Ebenso war bei Erregung des Relais 613 in der Zentralstelle durch Kontakt 613/2 das Relais 6o9 erregt worden und hat seine Kontakte 6o9/4 und 6o9/6 umgelegt.After the first series of current bursts sent via VL, relay 511 was in the node: -i--, 5o6s / i, 5r0 / 6, 40z / 5, relay 511,-was excited and after contacts 506s / 2 and 506S 5 had switched /, the a and b wire of the connecting line VL2 across the contacts 51 z / 4 and 51z / switched through. 6 Likewise, when relay 613 in the central station was energized by contact 613/2, relay 6o9 was energized and its contacts 6o9 / 4 and 6o9 / 6 switched.

Durch Kontakt 614/6 war auch der Stromkreis geschlossen worden: -[-, Unterbrecher RU, 617/6, 6r5/4, 614/6, 618/5; Relais 616, Drehmagnet DSEU, -. The circuit was also closed by contact 614/6: - [-, breaker RU, 617/6, 6r5 / 4, 614/6, 618/5; Relay 616, rotary solenoid DSEU, -.

Das Schaltwerk SE U läuft nun so lange, bis der Stromkreis für Relais 617 geschlossen wird und es mit Kontakt 617/6 den Fortschaltestromkreis wieder öffnet. Bei jedem Stromstoß des Unterbrechers RU wird, zusammen mit dem Drehmagneten DSE U, Relais 616 erregt, welches mit Kontakt 616/4 den Stromkreis für denDrehmagneten D US der Unterstelle U1 unterbricht, so daß der Selektor US dieser Unterstelle synchron mit dem Schaltwerk SEU der Zentralstelle S fortgeschaltet wird. Sobald der Schaltarm a des Selektors US auf den durch das Ansprechen von Relais 7o5 mit Kontakt 705/2 vorbereitend angeschalteten Kontakt i auftrifft, wird der Stromkreis für Relais 617 geschlossen: Erde in Station U1, 8o1/6, Arm a von Schaltwerk US, 7o5/2, Wicklung I von 707, dritte Ader von VL, Relais 513, 511/2, c-Ader von VL, 6o9/2, Relais 617, Batterie der Zentralstelle, Erde.The switching mechanism SE U now runs until the circuit for relay 617 is closed and it opens the switching circuit again with contact 617/6. With each current surge of the interrupter RU, together with the rotary magnet DSE U, relay 616 is excited, which with contact 616/4 interrupts the circuit for the rotary magnet D US of the sub-unit U1, so that the selector US of this sub-unit is synchronized with the switchgear SEU of the central unit S is advanced. As soon as the switching arm a of the selector US hits the contact i, which has been switched on in preparation by the response of relay 7o5 with contact 705/2, the circuit for relay 617 is closed: Earth in station U1, 8o1 / 6, arm a of switching mechanism US, 7o5 / 2, winding I of 707, third wire from VL, relay 513, 511/2, c wire from VL, 6o9 / 2, relay 617, battery of the central unit, earth.

Mit Ansprechen des Relais 617 wird in der Zentralstelle ferner das verzögerte Relais 615 über die Wicklung I erregt und schafft sich über +r 618/6, 615/3, Wicklung II von Relais 615, - einen Haltestromkreis. Mit Kontakt 615/5 schaltet es Relais 62o ein: +, 615/5, 619/6, Relais 62o, -, welches den Anlaßstromkreis über Relais 614 durch Öffnen des Kontaktes 62o/6 endgültig öffnet. Mit Kontakt 615/1 schließt Relais 615 den Erregerstromkreis für Relais 621 über das eingestellte Schaltwerk SE U: -t-, 619/2, 615/i, Kontakt i von SU, Relais 621, -. Relais 621 hält sich über Kontakt 621/4, 623/6, 624/4, 3o1/6, selbst wenn nach kurzer Zeit das Schaltwerk SEU wieder in die Ruhelage gebracht wird.When relay 617 responds, delayed relay 615 in the central station is also excited via winding I and creates a holding circuit via + r 618/6, 615/3, winding II of relay 615, -. With contact 615/5 it switches on relay 62o: +, 615/5, 619/6, relay 62o, -, which finally opens the starting circuit via relay 614 by opening contact 62o / 6. With contact 615/1 relay 615 closes the excitation circuit for relay 621 via the set switching mechanism SE U: -t-, 619/2, 615 / i, contact i of SU, relay 621, -. Relay 621 is maintained via contacts 621/4, 623/6, 624/4, 3o1 / 6, even if the SEU switchgear is returned to the rest position after a short time.

Inzwischen fiel, durch Kontakt 62o/6 eingeleitet, Relais 618 verzögert ab und öffnete mit Kontakt 618/1. den Erregerstromkreis für Relais 8o1 der Unterstation U, Durch den Abfall von 8o1/6 wird auch der Erregerstromkreis für Relais 617 unterbrochen, so daß dieses abfällt. Relais 615 Wird ebenfalls aberregt,.-und es schließt 4t Kontakt 6i5/6 über 618/¢ 'und den Wellenkontakt wgiz"1 den Heimlaufstromkreis für das Schaltwerk SE U.In the meantime, relay 618 fell delayed, initiated by contact 62o / 6 and opened with contact 618/1. the excitation circuit for relay 8o1 of the substation U, The drop in 8o1 / 6 also interrupts the excitation circuit for relay 617, so that this falls off. Relay 615 is also de-energized, - and it closes 4t contact 6i5 / 6 via 618 / ¢ 'and the shaft contact wgiz "1 the home circuit for the switching mechanism SE U.

Mit Kontakt 62i/6 wird die Lampe VOLU eingeschaltet. Sie gibt dem Bedienungsbeamten das Signal, daß die Vorbereitung zur Einschaltung des Ölschalters 01 in der Unterstation Ui richtig erfolgt ist.The VOLU lamp is switched on with contact 62i / 6. She gives that The operator gave the signal that preparations were being made to turn on the oil switch 01 has been carried out correctly in the substation Ui.

Dort hielt sich bis jetzt Relais 707 über seine Wicklung II im Stromkreis über die dritte Ader von VL, und die c-Ader von VL, erregt.Until now, relay 707 has remained energized via its winding II in the circuit via the third wire from VL and the c wire from VL.

Zur endgültigen Einschaltung des Ölschalters 0, betätigt der Beamte wiederum die gemeinsame Einschalttaste Ein, bewirkt aber in diesem Falle über Kontakt 1 die Erregung des Relais 309, da durch den umgelegten Kontakt 11o/4 Relais 3o8 abgeschaltet bleibt.To finally switch on the oil switch 0, the officer again presses the common switch-on button, but in this case causes the relay 309 to be energized via contact 1, since relay 3o8 remains switched off by the folded contact 11o / 4.

Der Stromkreis für die Erregung des Relais 309 war durch Relais 117 vorbereitet worden, welches in der Arbeitsstellung des Schaltwerks S U über Wellenkontakt wsasl3 erregt ist. Der Kontakt 117/2 erregt im Stromkreis: 309/e 302/6, 117/2, Relais 114, - das verzögerte Relais 114. Das Relais 309 wird beim Drücken der Taste Ein über die umgelegten Kontakte 114/z und 119/4 dem hochohmigen Widerstand W113 parallel gelegt und: bildet dadurch eine derartige Verstärkung des Haltestromkreises für Relais 7o7, daß auch das im gleichen Stromkreis liegende unempfindliche Relais 703 mit ansprechen kann. Mittels seines Ouecksilberkontaktes 7o3/4 schaltet es den nicht dargestellten Schaltschützen für den Ölschalter 01 ein. Relais 3o9 erregt über Kontakt3o9/2 das Relais 303 und dieses über Kontakt 3o3/4 Relais 302, das bei Kontakt 30z/6 den Stromkreis für Relais 114 unterbricht. Die Erregungsdauer des Relais 309 wird durch die Ansprechzeit dieser Kette mit dem verzögerten Relais 302 und 303 bestimmt, welche eine Erregung des Relais 309 nur bis zum Abfall des Verzögerungsrelais 114 gestattet. Dadurch wird ein einmaliger Befehlsstromstoß für die Schaltersteuerung in der Unterstation U1 gewährleistet.The circuit for the excitation of the relay 309 had been prepared by relay 117, which is excited in the working position of the switchgear SU via shaft contact wsasl3. The contact 117/2 energizes in the circuit: 309 / e 302/6, 117/2, relay 114, - the delayed relay 114. The relay 309 is dem high-resistance resistor W113 placed in parallel and: thereby forms such an amplification of the holding circuit for relay 7o7 that the insensitive relay 703 in the same circuit can also respond. By means of its Ouecksilberkontaktes 7o3 / 4 it switches on the contactor (not shown) for the oil switch 01. Relay 3o9 energizes relay 303 via contact 3o9 / 2 and relay 303 via contact 3o3 / 4 , which interrupts the circuit for relay 114 at contact 30z / 6. The duration of energization of the relay 309 is determined by the response time of this chain with the delayed relays 302 and 303 , which allows the relay 309 to be energized only until the delay relay 114 drops out. This ensures a single command current surge for the switch control in the substation U1.

Mit Kontakt 302/4 wird der Stromkreis für Relais 623 geschlossen: -r-, 302114, 621/2, Relais 6z3, -. Der Haltestromkreis für Relais 623 verläuft über -}-, 3o1/6, 624/4, 623/6, 622/6, Relais 623,-. Kontakt 623/2 schaltet die Lampe DLU zur Kennzeichnung, daß auch die endgültige Einschaltung vorgenommen wird, ein, da ja -Relais 3o9 angesprochen hat.The circuit for relay 623 is closed with contact 302/4: -r-, 302114, 621/2, relay 6z3, -. The hold circuit for relay 623 runs over -} -, 3o1 / 6, 624/4, 623/6, 622/6, relay 623, -. Contact 623/2 switches the lamp DLU to indicate that the final activation will also be carried out, because relay 3o9 has responded.

Zur Rücksignalisierung der Umschaltung des Ölschalters 0l befinden sich auf dem Ölschalter in bekannter Weise Hilfskontakte. Der Kontakt oII wird umgelegt und schließt dabei über das Relais 8o1 den Drehmagneten D LTS und 8o2,/6 wiederum die Brücke über die Verbindungsleitung VL., so daß das inzwischen zur Ruhe gekommene Schaltwerk ES durch Relais 515 angereizt wird und von neuem den Kontakt 4 in der beschriebenen Weise aufsucht, von neuem das ebenfalls inzwischen wieder heimgelaufene Schaltwerk SE der Zentralstelle auf Kontakt 4 einstellt, dann aber unter erneuter Einstellung des Schalters SEU in der Zentralstelle im Gleichlauf dazu das Schaltwerk US der Unterstation U1 auf den Kontakt 2 einstellt. Denn der Stromkreis für das Stillsetzungsrelais 617 verläuft jetzt über Erde, 8oi/6, Arm b von US, Kontakt 2, 8o2/2, Verriegelungsrelais 803, 0I (Einschaltstellung), dritte Ader von VZ," Relais 513, 51I/2, c-Ader von VL2, 6o9/2, Relais 617, Batterie der Zentralstelle, Erde.Auxiliary contacts are located on the oil switch in a known manner for back-signaling the changeover of the oil switch 0l. The contact oII is switched over and closes the rotary magnet D LTS via the relay 8o1 and 8o2, / 6 in turn the bridge via the connecting line VL seeks out in the manner described, again sets the switchgear SE of the central station, which has meanwhile returned home, to contact 4, but then sets the switchgear US of the substation U1 to contact 2 while again setting the switch SEU in the central station in synchronism. Because the circuit for the shutdown relay 617 now runs via earth, 8oi / 6, arm b from US, contact 2, 8o2 / 2, locking relay 803, 0I (switch-on position), third wire from VZ, "relay 513, 51I / 2, c -Wire from VL2, 6o9 / 2, relay 617, battery of the central station, earth.

Das Relais 8o2, welches in diesem Stromkreis für Relais 617 liegt, spricht mit an. Es ist mit Relais 8o2 für die Ausschaltstellung des Ölschalters 0l mechanisch in der Weise gekuppelt, daß es unter Auslösung der Verriegelung für die Kontakte des Relais 8o2 sich selbst in der angezogenen Stellung verriegelt hält. Kontakt 8o2/2 unterbricht sogleich den letztgenannten Stromkreis, so daß auch Relais 617 abfallen muß.The relay 8o2, which is in this circuit for relay 617, speaks to. It is equipped with relay 8o2 for the off position of the oil switch 0l mechanically coupled in such a way that it triggers the lock for the contacts of relay 8o2 keep themselves locked in the tightened position. Contact 8o2 / 2 immediately interrupts the last-mentioned circuit, so that also relays 617 must fall off.

Da mit dem Schaltwerk US in der Unterstation U1 das Schaltwerk SE U auf Kontakt 2 eingestellt wurde, wurde Relais 622 erregt. Es öffnete mit Kontakt 622/6 den Haltestromkreis für Relais 623 und schloß mit Kontakt 622/2 die Erregung für das Verriegelungsrelais 62q., welches mit dem- entsprechenden Relais für die Ausschaltstellung des Ölschalters 0, unter gegenseitiger Verriegelung gekuppelt ist. Es öffnet mittels des Kontaktes 624/q. den Haltestromkreis für Relais 623 an einer zweiten Stelle. Since the switchgear SE U was set to contact 2 with the switchgear US in the substation U1, relay 622 was energized. With contact 622/6 it opened the holding circuit for relay 623 and closed with contact 622/2 the excitation for the locking relay 62q., Which is coupled with the corresponding relay for the off position of the oil switch 0, with mutual locking. It opens by means of contact 624 / q. the holding circuit for relay 623 at a second location.

Nach der kurzzeitigen Erregung von Relais 617 werden die Stromkreise geschlossen für die Rückstellung der eingestellten Schaltwerke und aller noch erregten Relais in der Zentralstelle. Mit Kontakt 62q./2 wird der Anlaßstromkreis über den Schalter A und Relais 115 geöffnet. so daß Relais 115 abfällt und den Heimlauf des Schaltwerks SU veranlaßt.After the momentary energization of relay 617, the circuits will closed for resetting the set switching mechanisms and all still energized Relay in the central office. With contact 62q./2 the starting circuit is connected to the Switch A and relay 115 open. so that relay 115 drops out and the home run of the Rear derailleur SU caused.

Die Erregung des Relais 3o2 hatte gleich nach der Einschaltung von 0, durch Kontakt 3o2/2 durch Öffnen des Stromkreises für Relais 11i veranlaßt, daß das Schalwerk SS wieder in die Ruhelage zurückkehrte.The excitation of relay 3o2 immediately after switching on 0, through contact 3o2 / 2 by opening the circuit for relay 11i, caused the switchgear SS to return to the rest position.

Durch die Verriegelung gehalten, schaltete Relais 624 die Lampe EL U ein. Sie kennzeichnet dem Bedienungsbeamten, daß die Einschaltung des Ölschalters 01 der Unterstation U1 stattgefunden hat. Er kann sie, etwa durch Weiterschalten seines Schalters A, zum Erlöschen bringen.Held by the interlock, relay 624 switched on lamp EL U. It indicates to the operator that the switching on of the oil switch 01 of the substation U1 has taken place. He can make them go out, for example by switching his switch A further.

Werden die Selektoren an der Verbindungsleitung VL4 auf andere Kontakte eingestellt, so werden entsprechende Schaltmaßnahmen in den anderen Unterstationen U2 usw. vorgenommen oder etwa der eingeschaltete Ölschalter 01 ausgeschaltet.If the selectors on the connecting line VL4 are set to other contacts, corresponding switching measures are carried out in the other substations U2 etc. or the switched-on oil switch 01 is switched off.

Unabhängig von diesem Befehl zur Ausführung einer Schaltmaßnahme innerhalb einer Unterstation können von diesen auch Signale etwa zur Übermittlung von Störungen aus den Unterstationen zur Zentralstelle gesandt werden.Regardless of this command to carry out a switching action within A substation can also send signals from these, for example for the transmission of faults sent from the substations to the central office.

Tritt nämlich irgendeine Unregelmäßigkeit in einer der Unterstationen, beispielsweise U,, auf, so werden Kontakte st I und st II umgelegt; st II schaltet die dritte Ader der Leitung VZ., an den c-Arm des Selektors US, beispielsweise über den Kontakt 3. Die Umschaltung von st I bewirkt wieder eine Einschaltung des Relais 515 im Knotenpunkt, da jetzt wieder Relais 8o1 und der Drehmagnet DUS des Selektors US in Brücke zur Leitung VZ, gelegt werden. Wieder läuft das Schaltwerk ES an, sucht den Kontakt 4, an dem die Leitung VZ,, mit der gestörten Station U1 liegt, und schaltet, wie bereits beschrieben, in der Zentralstelle zuerst das Schaltwerk SE auf Kontakt 4 und später das Schaltwerk SE Uzusammen mit dem Selektor US in entsprechender Weise auf Kontakt 3 fort, so daß eine dem unregelmäßigen Schaltvorgang in der Unterstation entsprechende Signalgabe in der Zentralstelle bewirkt wird. Nach Kenntnisnahme des Signals kann der Bedienungsbeamte dieses wieder ausschalten. um die nötigen Maßnahmen zur Bekämpfung der Störung zu treffen.If there is any irregularity in one of the substations, for example U ,, on, contacts st I and st II are switched over; st II switches the third wire of the line VZ., to the c-arm of the selector US, for example via contact 3. Switching st I causes relay 515 in the node to be switched on again, since relay 8o1 and the rotary magnet DUS are now again switched on of the US selector in a bridge to the VZ line. The switchgear ES starts up again, looks for contact 4 at which the line VZ ,, with the disturbed station U1 is, and, as already described, first switches the switchgear SE to contact 4 in the central station and later the switchgear SE U together with it the selector US continues in a corresponding manner on contact 3, so that a signaling corresponding to the irregular switching process in the substation is effected in the central station. After taking note of the signal, the operator can switch it off again. to take the necessary measures to combat the disorder.

Claims (1)

PATENTANSPRÜCHE: i. Schaltungsanordnung für Befehls- und Signalanlagen in weit verzweigten elektrischen Verteilungsnetzen, bei denen im Umkreis einer Zentralstelle Knotenpunkte vorgesehen sind, von denen Verbraucherleitungen mit ferngesteuerten Abzweigstellen ausgehen, in dem an bestimmte Kontakte von in den als Knotenpunkt ausgebildeten Unterstellen angeordneten Verteilerschaltwerke Leitungen angeschlossen werden, in denen jeweils mehrere mit als Schrittschaltwerke ausgebildeten Verteilerwählern ausgerüstete Unterstellen liegen, unter Verwendung von getrennten Befehls- und Rückmeldeleitungen, dadurch gekennzeichnet, daß sowohl bei einer von der Zentralstelle (S) aus erfolgten Einstellung der Schaltwerke (SS, SSU) zwecks Übermittlung eines Befehls von der Zentralstelle an eine an .die Verteilerschaltwerke des Knotenpunktes eingeschlossene Unterstelle (U1, U2) als auch bei Abgabe eines Signals von einer derartigen Unterstelle zu der Zentrale (S) stets erst die Schaltwerke (EE, ES) in der als Knotenpunkt ausgebildeten Unterstelle (E) auf die zu der fraglichen Unterstelle führenden Leitung (VL4, VZ,) in bekannter Weise eingestellt werden und anschließend Schaltmittel (11o/211, 511/6o9) zur Weiterleitung der dann jeweils von der Zentralstelle ausgesandten Stromstöße (mittels Relais i18 bzw. 616) über die Leitung wirksam werden. ?. Schaltungsanordnung nach Anspruch i, dadurch gekennzeichnet, daß zwecks wahlweiser Aussendung einer `oder mehrerer Stromstoßreihen in der Hauptstelle mehrere Sendeschaltwerke angeordnet sind, von denen das eine (S) bei Einstellung auf bestimmte Kontakte (i) ein weiteres Sendeschaltwerk (SU) zur Aussendung einer zusätzlichen Stromstoßreihe anreizt. 3. Schaltungsanordnung nach Anspruch i, dadurch gekennzeichnet, daß die zu mehreren Unterstellen von einem Knotenpunkt aus führenden Leitungen als Ringleitungen ausgebildet sind. q.. Schaltungsanordnung nach Anspruch i, dadurch gekennzeichnet, daß durch die Einstellung der Schaltwerke der Unterstellen der gewünschte Befehlsempfänger lediglich vorbereitend an eine gemeinsame Leitung gelegt wird, während der eigentliche Befehlsanreiz unmittelbar von der Zentralstelle aus gegeben wird. 5. Schaltungsanordnung nach Anspruch i und q., dadurch gekennzeichnet, daß durch die Signalschaltwerke sowohl Rückmeldungen über die vorbereitete Anregung der Befehlsempfänger als auch solche über die Ausführung der gesandten Befehle und über Störungen erfolgen. 6. Schaltungsanordnung nach Anspruch i, q. und 5, dadurch gekennzeichnet, daß außer den nach bestimmter Schrittzahl ausführbaren Schaltungen in der Unterstelle andere Kontakte der an der gemeinsamen Leitung liegenden Selektoren an Schaltmittel mehrerer Unterstellen angeschlossen sind zu dem Zweck, durch Aussendung einer bestimmten zusätzlichen Stromstoßreihe seitens der Zentralstelle Gruppenschaltungen über die gemeinsame Leitung einleiten zu können.PATENT CLAIMS: i. Circuit arrangement for command and signal systems in widely ramified electrical distribution networks, where in the vicinity of a central office Nodes are provided, from which consumer lines with remote-controlled Junction points go out in the to certain contacts of in the as a node trained sub-stations arranged distribution switchgear lines connected in each of which several distributor selectors designed as stepping mechanisms equipped sub-stations are located, using separate command and feedback lines, characterized in that both took place at one of the central office (S) Adjustment of the switching mechanisms (SS, SSU) for the purpose of transmitting a command from the Central point to one of the distribution switchgear of the node Sub-unit (U1, U2) as well as when a signal is output from such a sub-unit to the control center (S) always only the switchgear (EE, ES) in the designed as a node Substation (E) on the line leading to the substation in question (VL4, VZ,) can be set in a known manner and then switching means (11o / 211, 511 / 6o9) for forwarding the then sent out by the central office Power surges (by means of relay i18 or 616) take effect via the line. ?. Circuit arrangement according to claim i, characterized in that for the purpose of optional transmission one `or several series of impulses in the main station several transmitter switchgear arranged of which one (S) is another when adjusted to certain contacts (i) Transmitting switchgear (SU) stimulates the transmission of an additional series of current impulses. 3. Circuit arrangement according to Claim i, characterized in that the several Assuming lines leading from a node formed as ring lines are. q .. Circuit arrangement according to claim i, characterized in that by the setting of the switchgear of the subordinate units of the desired command receiver is merely placed on a common line in preparation, during the actual Command stimulus is given directly from the central office. 5. Circuit arrangement according to claims i and q., characterized in that by the signal switching mechanisms both feedback on the prepared stimulus from the command recipients and those about the execution of the commands sent and about malfunctions. 6th Circuit arrangement according to Claim i, q. and 5, characterized in that besides the circuits that can be executed after a certain number of steps in the substation other Contacts of the selectors on the common line to switching means of several Subordinates are connected for the purpose of sending out a certain additional series of current impulses on the part of the central office group circuits via the to initiate joint management.
DE1930658243D 1930-02-01 1930-02-01 Circuit arrangement for command and signal systems Expired DE658243C (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE658243T 1930-02-01

Publications (1)

Publication Number Publication Date
DE658243C true DE658243C (en) 1938-04-08

Family

ID=6582495

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1930658243D Expired DE658243C (en) 1930-02-01 1930-02-01 Circuit arrangement for command and signal systems

Country Status (1)

Country Link
DE (1) DE658243C (en)

Similar Documents

Publication Publication Date Title
DE658243C (en) Circuit arrangement for command and signal systems
DE656843C (en) Device for remote display of the train positions on railway lines, the positions of points and signals or the like.
DE661785C (en) Circuit arrangement for the transmission of regular incremental currents for clocks and alarm messages
DE655202C (en) Circuit arrangement for telex switching systems
DE648451C (en) Device for remote control and remote monitoring
DE700647C (en) Device for remote control and remote monitoring of adjustable organs
DE690039C (en) Device for remote reporting and remote control of moving organs
DE655886C (en) Remote control and monitoring device, in particular in electrical power distribution systems, with branches controlled by a main office
DE627883C (en) Telegraph system
DE876372C (en) Single-channel combination telecontrol system
DE890059C (en) Circuit arrangement for teleprinting systems in which more than two participants can be connected to one another at the same time
DE662174C (en) Device for securing the undisturbed transmission of messages about the position of remotely adjustable organs, in particular switches of an electrical power distribution system
DE661887C (en) Telegraph telephone exchange system
CH156236A (en) Remote control system with command and signal transmission.
DE744931C (en) Telecommunication and remote control equipment
DE713293C (en) Circuit arrangement for telephone systems with main and sub-offices
DE674856C (en) Circuit for the transmission of signals in telephone systems
DE903705C (en) Circuit arrangement for power supply for amplifier devices in telephone stations
DE645376C (en) Circuit arrangement for telephone systems with main and sub-offices and dialer operation
DE641630C (en) Remote control and telecommunication device
AT218575B (en) Line telephone system with electronic call transmission and identification
DE748745C (en) Circuit arrangement for remote control and remote reporting of moving organs
DE825703C (en) Remote control device for the transmission of messages, commands or the like, especially in railway security
DE602926C (en) Circuit arrangement for counting connections of different values in telephone systems
AT146323B (en) Telegraph telephone exchange system.