Process for the construction of endless wooden pipes made from stavesInfo
- Publication number
- DE631761C DE631761C DES111698D DES0111698D DE631761C DE 631761 C DE631761 C DE 631761C DE S111698 D DES111698 D DE S111698D DE S0111698 D DES0111698 D DE S0111698D DE 631761 C DE631761 C DE 631761C
- Authority
- DE
- Germany
- Prior art keywords
- staves
- pipe
- stirrups
- reinforcement
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27H—BENDING WOOD OR SIMILAR MATERIAL; COOPERAGE; MAKING WHEELS FROM WOOD OR SIMILAR MATERIAL
- B27H5/00—Manufacture of tubes, coops, or barrels
- B27H5/02—Building up with staves
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Mechanical Engineering (AREA)
- Wood Science & Technology (AREA)
- Forests & Forestry (AREA)
- Reinforcement Elements For Buildings (AREA)
Description
Verfahren zum Bau von aus Dauben hergestellten endlosen Holzrohren Bekanntlich bestehen die endlosen Holzdaubenrohre aus hölzernen Dauben, die den eigentlichen Rohrkörper bilden, und aus Bewehrungsbügeln aus Eisen oder einem anderen Metall, mit denen die Dauben zusammengehalten werden und welche den Innendruck des Rohres aufnehmen. Der Bau dieser Rohre geht folgendermaßen vor sich: Zuerst wird der eigentliche Rohrkörper aus den einzelnen Dauben zusammengestellt, was mit Hilfe von Außen- und Innenschablonen geschieht, sodann wird dieser zusammengestellte Rohrkörper mit den Bügeln bewehrt. Dafür gibt es verschiedene Verfahren. Das einfachste ist, wenn die Enden der Bügel, die eine runde Form haben, auseinandergezogen und quer zur Rohrachse über das Rohr gegeben werden. Die Enden der Bügel werden dann mit den vorgesehenen Einrichtungen (meist Spannschuhe) verbunden und darauf die Bügel angezogen. Dieses Verfahren kann aber nur dann angewendet werden, wenn die Bügel so beschaffen sind, daß sie beim Auseinanderstehen der Enden, was notwendig ist, um sie über das Rohr geben zu können, nicht leiden. Dies wird nur dann der Fall sein, wenn sie nicht zu stark sind, wobei auch natürlich der Durchmesser des Rohres maßgebend ist, so wird sich z. B. ein Bügel aus i z mm starkem Rundeisen über ein Rohr von i m Querschnitt auf diese Weise noch aufbringen lassen; bei einem Rohr von 0,5 m Querschnitt geht dies aber nicht mehr. Der Bügel wird dann einen Knick bekommen, der erst wieder ausgerichtet werden müßte, damit er gleichmäßig am Rohr anliegt.Process for the construction of endless wooden pipes made of staves As is known, the endless wooden stave pipes consist of wooden staves, which form the actual pipe body, and of iron or other metal reinforcement stirrups with which the staves are held together and which absorb the internal pressure of the pipe. The construction of these pipes is as follows: First, the actual pipe body is assembled from the individual staves, which is done with the help of outer and inner templates, then this assembled pipe body is reinforced with stirrups. There are different procedures for doing this. The simplest is when the ends of the stirrups, which have a round shape, are pulled apart and placed across the pipe across the pipe axis. The ends of the stirrups are then connected to the devices provided (usually clamping shoes) and the stirrups are tightened on them. However, this method can only be used if the stirrups are designed so that they do not suffer when the ends stand apart, which is necessary in order to be able to pass them over the pipe. This will only be the case if they are not too strong, and of course the diameter of the pipe is decisive. B. a bracket made of iz mm thick round iron over a tube of in cross-section in this way can still be applied; However, this is no longer possible with a pipe with a cross-section of 0.5 m. The bracket will then get a kink that would first have to be realigned so that it rests evenly on the pipe.
Allgemeine Regeln, in welchen Fällen die Bügel auf die beschriebene Weise aufgebracht werden können, lassen sich nicht geben, da dies nicht nur vom Verhältnis der Stärke des Bügels zum Rohrdurchmesser, sondern auch von den verschiedenen Eigenschaften des Bügelmaterials (Elastizität, Sprödigkeit o. dgl.) abhängt.General rules in which cases the bracket on the described Wise can be applied, can not be given, as this is not only dated Ratio of the strength of the stirrup to the pipe diameter, but also of the different Properties of the ironing material (elasticity, brittleness or the like) depends.
Man könnte sich dadurch helfen, daß man die Bügel zweiteilig macht, d. h. daß also die Bügel aus je zwei Halbkreisen bestehen, welche aber natürlich auch zwei Verbindungen erfordern. Die Anwendung solcher Bügel würde den Bau von Holzrohren aber unnötig verteuern.You could help yourself by making the hangers in two parts, d. H. so that the stirrups each consist of two semicircles, but which of course also require two connections. The application of such stirrups would reduce the construction of But make wooden pipes unnecessarily expensive.
Wenn also einteilige Bügel verwendet werden müssen, die sich nicht auf die vorbeschriebene Art aufbringen lassen, weil sie sich wegen ihrer Stärke nicht auseinanderziehen lassen, so bleibt keine andere Möglichkeit, als die rund gebogenen Bügel von vorn auf das fertige Rohrstück aufzuschieben. Dies kann wieder auf verschiedene Arten geschehen, so z. B., indem die Bügel auf das schon fertig bewehrte Rohr geschoben werden, und zwar so viele Bügel, als für das nächste vorzubauende Rohrstück gebraucht werden, und diese dann nach. dem Vorbau gewissermaßen von hinten nach vorn in der Richtung der Rohrachse gezogen werden, oder aber, indem erst ein weiterer Satz Dauben vorgebaut wird und dann die Bügel von vorn auf dieses neue vorgebaute Rohrstück aufgeschoben werden. Allen diesen Verfahren haftet der gemeinsame Mangel an, daß während der Zeit; in der die Bügel von vorn aufgeschoben iv den, weitere Dauben natürlich nicht vörebaut werden können und der Bau un'te; brochen werden muß. Auch ist das Verschie-@ :ben der Bügel auf dem Rohrkörper längs zur Achse ziemlich zeitraubend, da ja das Rohr in gewissen Abständen, z. B. 'alle 4 m, aufliegt und auch das eben vorgebaute. Eiide durch eine Außenschablone geschützt werden muß. Es wird sich -.also häufig nicht vermeiden lassen, daß das Rohr von diesen Unterlagen abgehoben werden muß, um jeweils einen Bügel auf die andere Seite der Unterlage zu verschieben. Besonders schwierig und zeitraubend wird dies Verfahren, wenn es sich nicht um einfache Unterlagen handelt, sondern um Böcke, welche das Rohr auf mindestens 1/3 der Höhe umspannen, oder wenn überhaupt keine Unterlagen vorhanden sind und das Rohr unmittelbar auf -dem Boden aufliegt.So if one-piece brackets have to be used that are not in the manner described above, because they differ because of their strength do not allow it to be pulled apart, there is no other option than the round one Push the bent bracket onto the finished pipe section from the front. This can be done again done in different ways, such as B. by placing the bracket on the already done reinforced pipe can be pushed, namely as many stirrups as for the next one to be pre-assembled Piece of pipe are needed, and then after. the stem from behind, so to speak be pulled forward in the direction of the pipe axis, or by first adding a Another set of staves is built in front and then the stirrups from the front this new pre-built pipe section can be pushed on. The common lack of that during time; in which the bracket pushed on from the front iv that, of course, further staves cannot be built and the building is un'te; must be broken. The shifting of the bracket on the tube body is also longitudinal to the axis quite time-consuming, since the pipe at certain intervals, z. B. 'all 4 m, and also the one that has just been built in front. Egg protected by an external template must become. It can thus often not be avoided that the pipe of These documents must be lifted off, each with a bracket on the other side to move the document. This procedure is particularly difficult and time-consuming, if it is not about simple documents, but about bucks that Clamp the pipe to at least 1/3 of the height, or if there are no supports at all are available and the pipe rests directly on the floor.
Es vergeht daher eine geraume Zeit, bis wieder weiter vorgebaut werden kann. Dies kann erst dann geschehen, wenn die Dauben des Rohrendes, um das weiter vorgebaut werden soll, schon durch Bewehrungsbügel fest zusammengespannt sind. -Zweck der vorliegenden Erfindung ist, die vorbezeichneten Mängel zu beseitigen, d. h. die Zeitspanne, welche von der Beendigung"des Zusammenbaues eines Satzes Dauben bis zum Beginn - des Zusammenbaues eines neuen Satzes Dauben vergehen muß, abzukürzen. Zu diesem Zweck werden die Bewehrungsbügel nicht, wie vorbeschrieben, auf - die zusammengebauten Dauben aufgebracht, sondern es werden zuerst die Bewehrungsbügel vor dem- bereits- fertigen Rohrstück aufgestellt- und - dann die Dauben in diese Bügel hineinmontiert. Nach Fertigstellung des Zusammenbaues eines Satzes Dauben befinden sich also dann die Ringe schon auf dem Rohrkörper.It therefore takes a long time before further building work is carried out can. This can only happen when the staves of the pipe end to the further is to be built in front, are already firmly clamped together by reinforcement stirrups. -Purpose of the present invention is to eliminate the aforementioned deficiencies, i. H. the length of time from the completion of "assembling a set of staves until the beginning - the assembly of a new set of staves has to pass. For this purpose, the reinforcement stirrups are not, as described above, on - the assembled staves are applied, but the reinforcement stirrups are applied first erected in front of the already-finished pipe section and then the staves into it Bracket mounted in it. After completing the assembly of a set of staves so then the rings are already on the pipe body.
Z. B. bedient man sich zur Aufstellung der Bewehrungsbügel vor dem fertigen Rohrende eines besonders gebauten Gestells, mit dessen Hilfe es möglich ist, die Bewehrungsbügel in der Lage festzuhalten, die es. gestattet, die Dauben im Innern der Bewehrungsbügel zusammenzubauen. Hierbei wird das Gestell zweckmäßig so konstruiert, daß sowohl die Bügel in einer solchen Entfernung vom Rohrende festgehalten werden können; so daß sie nach dem Zusammenbau der Dauben nicht mehr verschoben zu werden brauchen, als äuch die Möglichkeit vorgesehen wird, die Bügel an einer anderen Stelle als an dem endgültigen Platz festzuhalten, da manchmal der Fäll eintritt; daß die Bügel an der endgültigen Stelle bei der Montage stören; in diesem Falle ist es zweckmäßig, die Möglich-#keit vorzusehen,. sie auch an einer anderen Welle festzuhalten, von der aus sie leicht Erch seitliche Verschiebung oder auf andere `eise auf den richtigen Platz gebracht werden können.For example, to set up the reinforcement stirrups in front of the finished pipe end of a specially built frame, with the help of which it is possible is to be able to hold the reinforcement stirrups in place. allowed the staves assemble inside the reinforcement stirrups. The frame is useful here Designed so that both the stirrups are held at such a distance from the end of the pipe can be; so that they are no longer moved after the staves have been assembled need to be, as also the possibility is provided, the bracket on a hold other than the final place, as fall sometimes occurs; that the bracket interfere at the final point during assembly; in this case it is appropriate to provide the possibility. they also on another wave to hold on, from which they can easily erch sideways or onto others can be brought to the right place.
In der beiliegenden Zeichnung wird ein Ausführungsbeispiel für das Gestell gegeben. Abb. i zeigt das Gestell a, an welchem die Holzlatten b befestigt -sind; diese Holzlatten besitzen Einkerbungen c, in welchen die Bewehrungsbügel d aufgestellt werden können. Der Abstand der Einkerbungen c voneinander richtet sich nach der Anzahl der aufzustellenden Bügel. Man kann aber auch Latten verwenden, bei denen beispielsweise auf je 5 cm eine Einkerbung kommt, so daß es nicht erforderlich ist, für die Rohre, bei denen die Bügel nicht immer den gleichen Abstand voneinander haben, jedesmal neue Latten anzufertigen. Eine andere Ausführungsform, die es erlaubt, den Abstand der Bügel voneinander zu variieren und auch die Bügel seitlich zu verschieben, ist in Abb.2 und 3 dargestellt. In Abb. 2 ist b eine obere Latte des Gestells; auf der Latte sitzt der Winkele, welcher auf der einen Seite eine Schraubet trägt, mittels derer man den Winkel e an die Latte b anpressen kann. Auf der anderen Seite des Winkels e befindet sich eine z. B. aus federndem Stahl bestehende Klammer g, in welcher der Bewehrungsbügel eingeklemmt wird.An exemplary embodiment for the frame is given in the accompanying drawing. Fig. I shows the frame a to which the wooden slats b are attached; These wooden slats have notches c in which the reinforcement stirrups d can be set up. The distance between the notches c depends on the number of stirrups to be erected. But you can also use slats in which there is, for example, a notch every 5 cm, so that it is not necessary to make new slats each time for the tubes, where the brackets are not always the same distance from each other. Another embodiment, which makes it possible to vary the distance between the brackets from one another and also to move the brackets laterally, is shown in FIGS. In Fig. 2, b is an upper slat of the frame; The angle sits on the lath, which has a screw on one side, by means of which one can press the angle e onto the lath b. On the other side of the angle e there is a z. B. consisting of resilient steel bracket g, in which the reinforcement stirrup is clamped.
Abb. 3 zeigt die gleiche Vorrichtung in der Aufsicht. Bei Anwendung der in Abb. 2 und 3 dargestellten Vorrichtung können die Einkerbungen der unteren Latte fortfallen, da die Bügel durch die Klammern genügend festgehalten werden. Das Gestell wird zweckmäßig so konstruiert, daß man die Latten abnehmbar gestaltet, so daß das Gestell von dem fertigen Rohr leicht entfernt werden kann.Fig. 3 shows the same device in plan. When applied the device shown in Fig. 2 and 3, the notches of the lower Do not use the lath, as the brackets are held firmly in place by the clamps. The frame is expediently constructed in such a way that the slats are made removable, so that the frame can be easily removed from the finished pipe.
Um den Einbau der Dauben in den aufgestellten Bewehrungsbügel nicht zu erschweren, ist es zweckmäßig, diese um ein gewisses Maß größer im Durchmesser zu machen, als es allein für die Zwecke der Bewehrung notwendig wäre, damit- auch dann, wenn die einzubauenden Dauben z._ B. nicht ganz gerade sind, genügend Platz vorhanden ist.Not about the installation of the staves in the erected reinforcement stirrups To make it more difficult, it is useful to make this a certain amount larger in diameter to make than it would be necessary for the purpose of reinforcement alone, so too if the staves to be installed are not completely straight, for example, there is enough space is available.
Verwendet man zum Festhalten der Bewehrungsbügel_ ein Gestell, so wird dieses am besten derart ausgebildet, daß es, nachdem es seinen Zweck erfüllt hat, d. h. nachdem das neu zusammengebaute Rohrstück schon zusammengepreßt und damit zum Vorbsu eines neuen Satzes Dauben. vorbereitet ist, schnell entfernt und wieder schnell aufgestellt werden kann. Hierbei bedient .man sich am besten einer Anzahl gleich ausgebildeter Gestelle, so daß immer schon eines aufgebaut ist, wenn ein Satz Dauben fertig zusammengebaut ist, und nicht darauf gewartet zu werden braucht, bis das zum Zusammenbau dieses eben fertig gewordenen Rohrstückes verwendete Gestell entfernt und vorwärts wieder aufgebaut ist.If a frame is used to hold the reinforcement stirrups in place, see this is best designed in such a way that after it fulfills its purpose has, d. H. after the newly assembled pipe section has already been pressed together and with it in preparation for a new set of staves. is prepared, quickly removed and returned can be set up quickly. It is best to use a number identically designed frames, so that one is always built up is, when a set of staves is assembled and not to be waited for needs until the used to assemble this just finished piece of pipe Frame removed and rebuilt forward.
Der technische Fortschritt des Verfahrens liegt in der Beseitigung der in der Einleitung beschriebenen Mängel 'der bisherigen Bauweise. Man kann mit Hilfe des neuen Verfahrens jetzt beliebig starke Bügel für die Bewehrung der Rohre benutzen, ebenso ist es jetzt nicht mehr notwendig, den weiteren Vorbau des Rohres zu unterbrechen. Nach der bisherigen Methode mußte dies aber immer geschehen, denn solange der vorgebaute Satz Dauben, welche lediglich ein loses Bündel von Dauben ohne jeglichen Zusammenhalt darstellen und die sich häufig auch nicht einmal in der richtigen Lage befinden, nicht durch die Bügel zusammengehalten wurde, konnte nicht weitergebaut werden. Durch das beschriebene Verfahren werden diese Unterbrechungen, welche viel Zeit beanspruchen, gänzlich vermieden. Der Bau von Holzrohren wird durch das Verfahren gewissermaßen kontinuierlich gestaltet; durch die Anwendung des Verfahrens benötigt man zu dem Bau eines Holzrohres nur einen Teil der Zeit, welche nach der in der Einleitung beschriebenen, den Stand der Technik kennzeichnenden Bauweise für den Bau eines gleichlangen Holzrohres erforderlich war. Hierin liegt nicht nur ein erheblicher technischer Fortschritt, sondern auch ein wesentlicher wirtschaftlicher Fortschritt, da durch die Verkürzung der Bauzeit die Kosten verringert werden.The technical progress of the process lies in the elimination the deficiencies of the previous construction described in the introduction. You can go with With the help of the new process, stirrups of any thickness for the reinforcement of the pipes use, and it is no longer necessary to further stem the pipe to interrupt. According to the previous method, however, this always had to be done, because as long as the pre-built set of staves, which is just a loose bundle of staves without any cohesion and often not even in in the correct position, not held together by the stirrups not be built any further. These interruptions, which take up a lot of time, completely avoided. The construction of wooden pipes is carried out by the process is more or less continuous; by applying the procedure you only need a part of the time to build a wooden pipe, which after the State-of-the-art design described in the introduction was necessary for the construction of a wooden pipe of the same length. This is not just about a significant technical advance, but also a significant economic one Progress, as the reduction in construction time reduces costs.
Claims (1)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DES111698D DE631761C (en) | 1933-11-14 | 1933-11-14 | Process for the construction of endless wooden pipes made from staves |
FR810791D FR810791A (en) | 1933-11-14 | 1935-12-18 | Improvements to wooden pipes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DES111698D DE631761C (en) | 1933-11-14 | 1933-11-14 | Process for the construction of endless wooden pipes made from staves |
Publications (1)
Publication Number | Publication Date |
---|---|
DE631761C true DE631761C (en) | 1936-06-26 |
Family
ID=7531154
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DES111698D Expired DE631761C (en) | 1933-11-14 | 1933-11-14 | Process for the construction of endless wooden pipes made from staves |
Country Status (2)
Country | Link |
---|---|
DE (1) | DE631761C (en) |
FR (1) | FR810791A (en) |
-
1933
- 1933-11-14 DE DES111698D patent/DE631761C/en not_active Expired
-
1935
- 1935-12-18 FR FR810791D patent/FR810791A/en not_active Expired
Also Published As
Publication number | Publication date |
---|---|
FR810791A (en) | 1937-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE1289696B (en) | Loose flange connection for pressure pipes | |
DE631761C (en) | Process for the construction of endless wooden pipes made from staves | |
DE2009509C3 (en) | Machine for the continuous production of reinforcement cages for posts, masts or the like. made of reinforced concrete | |
DE2555179A1 (en) | AXIAL TENSION RELIEF CLAMP FOR A PIPE CONNECTION | |
DE633641C (en) | Connection sleeve for the longitudinal or cross connection of gas pipes in shelf construction | |
DE1917926C3 (en) | Pipe bending device | |
DE2607212A1 (en) | CASTING FORM FOR PLATE-LIKE ELEMENTS | |
DE894998C (en) | Heat exchanger with spiral channels | |
DE432893C (en) | Clamping piece for connecting supports with cross members, struts or the like. | |
DE820964C (en) | Adjustable tubular connecting strut for armaments | |
DE1089621B (en) | Shaped bodies for concrete iron bending machines | |
DE593816C (en) | Pipe connection, especially for cement pipes | |
DE869452C (en) | Welding socket pipe | |
DE586542C (en) | Welded gusset connection for tubular steel constructions | |
DE884239C (en) | Device for preparing the round bars for bracing concrete formwork | |
DE944683C (en) | Connection for building and other scaffolding as well as frames of all kinds | |
DE932199C (en) | Process for the production of distortion-free round bodies from wood | |
DE412312C (en) | Butt connection for hollow beams | |
DE532866C (en) | Locally reinforced carrier for lightweight structures, especially for airships | |
AT314786B (en) | Spacers for reinforcement and formwork in wall-like concrete parts, concrete columns and concrete beams as well as double-reinforced ceilings | |
DE2248932B1 (en) | Belting press - with extended lower shoulders on support struts to support heating tubes | |
DE518710C (en) | Reinforcement for two or more columns, pipes or the like made of lead | |
DE2230991B2 (en) | Tension band | |
DE626131C (en) | Method for bending wave-shaped bodies into a curve | |
AT101220B (en) | Method and device for fastening electrodes. |