DE60045129D1 - Simulation, modellierung und planung von stapelverarbeitungsprozessen in produktionseinrichtungen mit hilfe von prozesszeit-intervallen - Google Patents
Simulation, modellierung und planung von stapelverarbeitungsprozessen in produktionseinrichtungen mit hilfe von prozesszeit-intervallenInfo
- Publication number
- DE60045129D1 DE60045129D1 DE60045129T DE60045129T DE60045129D1 DE 60045129 D1 DE60045129 D1 DE 60045129D1 DE 60045129 T DE60045129 T DE 60045129T DE 60045129 T DE60045129 T DE 60045129T DE 60045129 D1 DE60045129 D1 DE 60045129D1
- Authority
- DE
- Germany
- Prior art keywords
- modeling
- sequence
- unit operations
- process time
- planning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 title abstract 8
- 238000004519 manufacturing process Methods 0.000 title abstract 2
- 238000004088 simulation Methods 0.000 title 1
- 238000010977 unit operation Methods 0.000 abstract 5
- 238000010586 diagram Methods 0.000 abstract 2
- 238000010923 batch production Methods 0.000 abstract 1
- 229960000074 biopharmaceutical Drugs 0.000 abstract 1
- 238000002360 preparation method Methods 0.000 abstract 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B17/00—Systems involving the use of models or simulators of said systems
- G05B17/02—Systems involving the use of models or simulators of said systems electric
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41885—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by modeling, simulation of the manufacturing system
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32361—Master production scheduling
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32364—Simulate batch processing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- General Engineering & Computer Science (AREA)
- Quality & Reliability (AREA)
- General Factory Administration (AREA)
- Multi-Process Working Machines And Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/373,794 US6662061B1 (en) | 1997-02-07 | 1999-08-13 | System and method for simulation and modeling of batch process manufacturing facilities using process time lines |
US09/373,793 US7043414B2 (en) | 1997-06-20 | 1999-08-13 | System and method for simulating, modeling and scheduling of solution preparation in batch process manufacturing facilities |
PCT/US2000/022104 WO2001013319A1 (en) | 1999-08-13 | 2000-08-14 | Simulation, modeling and scheduling of batch process manufacturing facilities using process time lines |
Publications (1)
Publication Number | Publication Date |
---|---|
DE60045129D1 true DE60045129D1 (de) | 2010-12-02 |
Family
ID=27006309
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE60045129T Expired - Lifetime DE60045129D1 (de) | 1999-08-13 | 2000-08-14 | Simulation, modellierung und planung von stapelverarbeitungsprozessen in produktionseinrichtungen mit hilfe von prozesszeit-intervallen |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP1244995B1 (de) |
AT (1) | ATE485566T1 (de) |
AU (1) | AU6767800A (de) |
DE (1) | DE60045129D1 (de) |
WO (1) | WO2001013319A1 (de) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004092852A2 (en) * | 2003-04-09 | 2004-10-28 | Brown Peter G | The use of sub (partial) cycles, nested cluster cycles, and lot cycles for determining equipment capacities in a batch manufacturing facility |
WO2018229802A1 (en) * | 2017-06-16 | 2018-12-20 | Ge Healthcare Bio-Sciences Ab | Method for predicting outcome of and modelling of a process in a bioreactor |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0437634B1 (de) * | 1989-08-10 | 1996-11-20 | Fujitsu Limited | Steuerungssystem für herstellungsverfahren |
AU8261798A (en) * | 1997-06-20 | 1999-01-04 | Peter G. Brown | System and method for simulation, modeling and scheduling of process support operations in biopharmaceutical batch process manufacturing facilities |
-
2000
- 2000-08-14 AU AU67678/00A patent/AU6767800A/en not_active Abandoned
- 2000-08-14 DE DE60045129T patent/DE60045129D1/de not_active Expired - Lifetime
- 2000-08-14 AT AT00955475T patent/ATE485566T1/de not_active IP Right Cessation
- 2000-08-14 WO PCT/US2000/022104 patent/WO2001013319A1/en active Application Filing
- 2000-08-14 EP EP00955475A patent/EP1244995B1/de not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
EP1244995A4 (de) | 2007-06-13 |
ATE485566T1 (de) | 2010-11-15 |
WO2001013319A1 (en) | 2001-02-22 |
EP1244995A1 (de) | 2002-10-02 |
AU6767800A (en) | 2001-03-13 |
EP1244995B1 (de) | 2010-10-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Chang | RESQUE: A resource based simulation system for construction process planning. | |
CA2236229A1 (en) | Application program and documentation generator system and method | |
DK0811199T3 (da) | Fremgangsmåde og apparat til fremstilling af genstande, som har optimerede responskarakteristikker | |
WO2004038535A3 (en) | Method and system for operating a hydrocarbon production facility | |
DE60323252D1 (de) | Vorrichtung und Verfahren zur verteilten Fehlerbesitigung in einem Kommunikationssystem | |
ATE385637T1 (de) | Verfahren zum aufbau und abbau einer dienstverbindung zwischen einem drahtlosen lokalen netz und benutzerendgerät | |
ATE223383T1 (de) | Verfahren zur herstellung von 3-haloalkyl-1h- pyrazole | |
MY143002A (en) | Method and apparatus for color management | |
WO2001022271A3 (en) | Method for distributed agent-based non-expert simulation of manufacturing process behavior | |
WO2003094082A3 (en) | Architecture for real-time maintenance of distributed mission plans | |
CN109657927A (zh) | 一种全过程造价进度监管系统及方法 | |
WO2001010082A3 (en) | A system, method and article of manufacture for network performance modeling | |
ATA14722002A (de) | Verfahren zur rechnergestützten erstellung von prognosen für operative systeme sowie system zur erstellung von prognosen für operative systeme | |
DE60045129D1 (de) | Simulation, modellierung und planung von stapelverarbeitungsprozessen in produktionseinrichtungen mit hilfe von prozesszeit-intervallen | |
DE50203417D1 (de) | Kommunikationsnetzplanungssystem, Verfahren zur Erzeugung von Kommunikationsnetzplänen und Steuerungsprogramm für ein Kommunikationsnetzplanungssystem | |
JPS58201105A (ja) | 工程管理方式 | |
CN110674546B (zh) | 一种建筑构件的cdm建模方法 | |
WO2004092852A3 (en) | The use of sub (partial) cycles, nested cluster cycles, and lot cycles for determining equipment capacities in a batch manufacturing facility | |
ATE225967T1 (de) | Verfahren und system für die planung von betriebsmittel-anforderungen und zum erzeugen eines produktionsplans mit hilfe eines uniformen datenmodells | |
ATE390671T1 (de) | Verfahren zur automatischen erstellung eines arbeitsplans | |
ATE450003T1 (de) | Komputergesteuerte verfahren und system zum implementieren von verteilten anwendungen | |
DE50003376D1 (de) | Verfahren zur erzeugung eines steuerbausteins und steuerbaustein | |
ATE197195T1 (de) | Verfahren zur prozesssteuerung und gerätesteuersystem | |
DE68900948D1 (de) | Vorgefertigte brueckendecken und verfahren zu ihrer herstellung. | |
Fritz et al. | An open software architecture for batch process simulation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8327 | Change in the person/name/address of the patent owner |
Owner name: BROWN, PETER G., MANCHESTER, MASS., US |