DE583186C - Railway body, consisting of several rockfall layers built up on a bed of sand or slag - Google Patents

Railway body, consisting of several rockfall layers built up on a bed of sand or slag

Info

Publication number
DE583186C
DE583186C DES94128D DES0094128D DE583186C DE 583186 C DE583186 C DE 583186C DE S94128 D DES94128 D DE S94128D DE S0094128 D DES0094128 D DE S0094128D DE 583186 C DE583186 C DE 583186C
Authority
DE
Germany
Prior art keywords
layers
sand
stone
layer
gravel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DES94128D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DESIDER SINKOVICH DIPL ING
Original Assignee
DESIDER SINKOVICH DIPL ING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DESIDER SINKOVICH DIPL ING filed Critical DESIDER SINKOVICH DIPL ING
Priority to DES94128D priority Critical patent/DE583186C/en
Application granted granted Critical
Publication of DE583186C publication Critical patent/DE583186C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/001Track with ballast

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Description

Bahnkörper, bestehend aus mehreren auf einem Sand oder Schlackenbett aufgebauten Steinschlagschichten Zweck der Erfindung ist unter Anwendung von Steinschlag einen festen und standhaften Eisenbahnkörper zu schaffen, der bei entsprechender Nachgiebigkeit eine sichere Lagerung der Schwellen und Schonung des Oberbaues und des fahrenden Gutes ermöglicht, sowie auch nur geringe Unterhaltungskosten erfordert.Railway body consisting of several on a sand or slag bed The purpose of the invention is to use rockfall layers to create a solid and steadfast railroad body, which with appropriate Resilience a secure storage of the sleepers and protection of the superstructure and of the moving goods, as well as requiring only low maintenance costs.

Dies wird durch eine eigenartige Verdichtung der Bettung in Verbindung mit einer unteren, druckverteilenden Sand- oder Schlackenlage dadurch erreicht, daß die Steinelemente, welche schichtenweise verlegt sind, mit eingestampftem hartkörnigem Baustoff (beispielsweise Steingruß) völlig ausgefüllt sind und über die derart verdichtete Bettung in der Höhe der Schwellenunterkanten eine Ausgleichschicht aus Steingrus aufgetragen ist, auf welcher die Schwellen unmittelbar aufliegen.This is related to a peculiar compaction of the bedding achieved with a lower, pressure-distributing sand or slag layer, that the stone elements, which are laid in layers, with pulped hard-grained Building material (for example stone cast) are completely filled and about the compacted in this way Bedding at the level of the lower edges of the sleeper is a leveling layer of stone gravel is applied, on which the sleepers rest directly.

Es sind bereits Bestrebungen zur Erzielung einer mehr oder weniger verdichteten Bettung bekannt. So wurde vorgeschlagen, bei Walzbettungen eine Zwischenschicht von mit feinem Kies oder Sand vermischtem Steinschlag anzuwenden. Andererseits wurde bei in bisheriger Weise aus Steinschlagschichten (ohne Ausfüllung der Lücken) ausgeführten Walzbettungen als oberste Schicht eine ausgleichende Grusschicht aufgebracht. Auch ist .es bekannt, zur Vermeidung der Verschlannnung allmählich von grobem zu feinein Packstoff überzugehen, sowie zur Erzielung eines besseren Haltes die Zwischenräume der gröberen Packlagesteine zu verzwicken.There are already efforts to achieve a more or less compacted bedding known. It has been proposed to use an intermediate layer in the case of roller beds to use from stone chips mixed with fine gravel or sand. On the other hand was in the previous manner from rockfall layers (without filling in the gaps) A compensating gravel layer is applied as the topmost layer on roller beds. Even it is known to gradually go from coarse to fine in order to avoid slackening To transfer packaging material, as well as the gaps to achieve a better hold to tangle with the coarser packing stones.

Doch ist es bei all den Vorveröffentlichungen weder angestrebt noch verwirklicht worden, eine vollständig feste unverrückbare Lagerung der Schwellen dadurch herzustellen, daß der Steingrus beim Bau der Bettung zielbewußt und auf technisch richtige Weise in die Zwischenräume sämtlicher Bettungselemente hineingebracht wird, wodurch - im Gegensatz zu den bisher beim Bettungsbau allgemein befolgten Grundsätzen - die Lükken im ganzen Querschnitt der Bettung vollständig und festgerammt ausgefüllt werden.But it is neither intended nor intended for all the prior publications realized, a completely solid immovable bearing of the sleepers to produce by the fact that the stone gravel in the construction of the bedding purposefully and on technically correct way brought into the spaces between all bedding elements as a result of which - in contrast to the previously generally followed for bedding construction Principles - the gaps in the entire cross-section of the bedding completely and rammed into place fill out.

Dies läßt sich aber weder durch vorheriges Vermischen des Schotters mit feinem Baustoff, insbesondere wenn in hohen Schichten gewalzt wird, noch durch nachträgliches Aufschütten von Grus erreichen, da dieser in die offenen unteren Fugen versinkt.However, this cannot be done by mixing the ballast beforehand with fine building material, especially when rolling in high layers Achieve subsequent pouring of grus, since this in the open lower Joint sinks.

Es wird deshalb gemäß der Erfindung nach Ausbreiten der unteren Sand- oder Schlacken= sohle die Steinschlagbettung schichtenweise hergestellt und für die einzelnen Schichten ein Steinschlag von möglichst gleicher Korngröße gewählt, wobei in jeder Schicht die Steine in nur je einer Reihe nebeneinander verlegt werden; nach Auftragen je einer Schicht Steine wird diese mit Steingrus überstreut und so lange gestampft, bis alle Lücken vollständig ausgefüllt sind; darauf folgt das Auftragen der nächsten Schicht unter Anwendung desselben Vorganges usw.It is therefore according to the invention after spreading the lower sand or slag = bottom the rockfall bed is made in layers and for the individual layers a stone chipping of the same grain size as possible, the stones are laid next to each other in only one row in each layer; after applying one layer of stones each, this is sprinkled with stone gravel and so on long stomped up all Gaps are completely filled; thereon the next layer is applied using the same process, etc.

In den einzelnen Schichten soll, wie ausgeführt, ein Schotter aus gleichgroßen Steinen angewendet werden. Die aufeinanderfolgenden Schichten können jedoch Steinelemente von schichtenweise verschiedener (aufwärts abnehmender) Korngröße enthalten. Von Belang ist, daß die Lücken stets gehörig ausgefüllt sind, so daß alle Steinelemente wie in einem Mauerwerk gegen Lockerwerden gesichert sind, wobei aber die derart aufgebaute Bettung immerhin nicht wasser- und luftundurchlässig sein wird, also keineswegs eine starre Unterlage bildet. Die Federung wird übrigens auch noch durch die Anwendung der unteren Sandsohle erhöht. .As stated, the individual layers should be made of gravel stones of the same size can be used. The successive layers can however stone elements of different (upwardly decreasing) grain size in layers contain. It is important that the gaps are always properly filled so that all stone elements are secured against loosening like in a masonry, whereby but the bedding constructed in this way is not impermeable to water or air will be, so in no way forms a rigid base. The suspension is by the way also increased by the use of the lower sand sole. .

Auf das gemäß der Zeichnung entsprechend abgedachte Planurn kommt vorerst eine Sand-oder Schlackenlage z von vorteilhaft 15 bis ;2o cm Stärke zu liegen, welche festgestampft wird. Auf diese werden sodann die Schottersteinlagen so dünn wie möglich ausgebreitet und jede für sich mit Steingrus oder sonstigem hartkörnigem Baustoff eingestampft. Sämtliche Schichten liegen parallel zur Abschrägung des Planums und sind -daher gegen die Seiten des Bahndammes zu abfallend. Es können je nach Bedarf zwei oder mehrere Steinschichten aufgetragen werden. Je zwei Schichten ,ollen aber vorteilhaft aus gleich großen Steinelementen bestehen. Beim dargestellten Ausführungsbeispiel sind die beiden unteren Schichten 2 und 3 und die beiden oberen Schichten 4 und 5 verschiedener Stärke. Allenfalls kommt oben eine dünne Ausgleichschicht 6 aus Steingrus, deren obere Fläche in derHöhenlage derUnterkanten der Schwellen 7 waagerecht liegt. Auf diese Weise wird <las bisher übliche Unterschlagen (Krampen) der Schwellen, wodurch diese leicht beschädigt werden, ohne daß eine sichere und gleichmäßige Abstützung erreicht werden könnte, vermieden.On the plan, which is covered according to the drawing initially a sand or slag layer z advantageously 15 to 20 cm thick, which is tamped down. The gravel stone layers are then so thin on this Spread out as possible and each one with stone gravel or other hard-grained material Building material pulped. All layers are parallel to the slope of the subgrade and are therefore too sloping towards the sides of the embankment. It can depending on If necessary, two or more layers of stone can be applied. Two layers each, ollen but advantageously consist of stone elements of the same size. In the illustrated embodiment are the two lower layers 2 and 3 and the two upper layers 4 and 5 different strengths. At most, a thin compensating layer 6 is sufficient at the top Stone gravel, the upper surface of which is horizontal at the level of the lower edges of the sleepers 7 lies. In this way <the hitherto customary knocking down (staples) of the sleepers, whereby these are easily damaged without a secure and even support could be achieved, avoided.

Bei der dargestellten Ausführung sind die zwei unteren Schichten aus je 7 bis 8 cm starken und die zwei weiteren Schichten aus je 3 bis 4 cm starken Schottersteinen gedacht. Auf der Ausgleichschicht 6 werden sodann die Schwellen 7 verlegt und nachdem sich die Bettung genügend gefestigt hat und etwaige Höhenunterschiede bei einzelnen Schwellen durch Unterschüttung von Grus ausgeglichen sind, werden die Schwellen in den Zwischenräumen und vor Kopf mit einem Schotter von vorteilhaft kleiner Korngröße verfüllt, welcher ebenfalls schichtenweise aufgetragen und jede Steinlage mit Grus festgestampft wird.In the embodiment shown, the two lower layers are off each 7 to 8 cm thick and the two other layers each 3 to 4 cm thick Gravel stones thought. The thresholds are then placed on the compensation layer 6 7 and after the bedding has solidified sufficiently and any differences in height at individual thresholds are balanced by an underfill of grus the sleepers in the gaps and in front of the head with a gravel of advantageous small grain size, which is also applied in layers and each Stone layer is tamped down with grus.

Bei der auf diese Weise hergestellten Bettung wird somit einerseits das Eindringen von größeren Wassermengen und das Entstehen von sogenanntenWassersäcken imInnern oder unterhalb der Bettung verhütet, so daß ein Aufweichen des Unterbaues und Versinken der unteren Steine nicht eintreten kann, und andererseits wird erreicht, daß die Schwellen eine vollständig gleichmäßige, unveränderliche Abstützung erhalten und, da die, obere Grusschicht nicht in die verdichtete Bettun g versinken kann, niemals mit den groben Schottersteinen inBerührungkommen können, was bisher bei Holzschwellen ein Ausfressen und bei Betonschwellen ein Ausbrechen der Kanten zur Folge hatte.In the case of the bedding produced in this way, on the one hand the penetration of larger amounts of water and the formation of so-called water sacs inside or below the bedding, so that the substructure does not soften and sinking of the lower stones cannot occur, and on the other hand it is achieved that the sleepers receive a completely uniform, unchangeable support and, since the upper gravel layer cannot sink into the compacted bedding, never be able to come into contact with the coarse gravel stones, which was previously the case with Wooden sleepers can erode and, in the case of concrete sleepers, the edges break off Had a consequence.

Auch die Bahnunterhaltungskosten sind bei dieser festen, mauerartigen Bettung erheblich verringert und es wird somit infolge der besseren Lagerung auch beträchtliche Schonung des Oberbaues erzielt. Außerdem, je fester der Unterbau, um so wirksamer'sind die angewendeten Wanderschutzmittel und um so mehr wird das Zusammenschweißen der Schienen auf großen Längen ermöglicht.The railway maintenance costs are also fixed, wall-like with this one Bedding is reduced considerably and it is therefore also due to the better storage considerable protection of the superstructure achieved. In addition, the more solid the substructure, the more effective are the anti-migration agents used and the more it becomes The rails can be welded together over great lengths.

Die Bemessungen der einzelnen Teile der Bettung sind dabei so gewählt, daß der Schwellendruck vollständig und gleichmäßig auf den Unterbau übertragen wird. Erfahrungsgemäß erfolgt die Druckübertragung in einer normalen Schotterbettung gemäß einem Winkel von etwa 6o°, während eine Sandschicht den Druck unter etwa 450 überträgt. Es ist gerechtfertigt, anzunehmen, daß bei dergefestigten Schotterbettung gemäß der Erfindung die Druckübertragung auch in Schotter noch bedeutend günstiger (kleiner als 6o°) sein wird. Daraus ergibt sich, daß besonders bei Anwendung einer starken Sandsohle eine erheblich geringere Bauhöhe für die Schotterbettung erforderlich wird als bei der bisherigen Bauweise, um eine gleichmäßige Belastung des Unterbaues zu erzielen. Es wird somit nicht nur an Arbeit, sondern auch an Baustoff, und zwar an wesentlich teuerem Steinbaustoff, gespart. Der Zeitaufwand beim immerhin große Sorgfalt erfordernden Aufbau wird daher durch die erzielten Ersparnisse und besonders durch die große Standhaftigkeit der Rettung reichlich aufgewogen.The dimensions of the individual parts of the bedding are chosen so that that the threshold pressure is completely and evenly transferred to the substructure. Experience has shown that the pressure transfer takes place in a normal ballast bedding according to an angle of about 60 ° while a layer of sand transfers the pressure below about 450. It is justified to assume that with the solidified ballast bedding according to the invention, the pressure transfer even in gravel is significantly cheaper (smaller than 6o °) will be. It follows that especially when using a strong Sand sole required a significantly lower overall height for the ballast bedding is more than with the previous design to ensure an even load on the substructure to achieve. It is therefore not just about work, but also about building material, namely in significantly expensive stone building material, saved. The time required for the after all great Construction requiring care is therefore made by the savings achieved and especially amply outweighed by the great steadfastness of salvation.

Claims (1)

PATENTANSPRi#cHrs: i. Bahnkörper, bestehend aus mehreren auf einem Sand- oder Schlackenbett aufgebauten Steinschlagschichten, dadurch gekennzeichnet, daß jede Schicht in Planumsneigung nur aus einer Reihe Steinschlag besteht, daß die Lücken zwischen den Steinen sämtlicher Schichten mit eingestampftem körnigem Baustoff (beispielsweise Steingrus) völlig ausgefüllt sind und auf der oberen Schicht eineAusgleich- Schicht aus Steingrus aufgetragen ist, auf welcher die Schwellen liegen. z. Bahnkörper nach Anspruch r, dadurch gekennzeichnet, daß die auf dem dem Planum entsprechend abgedachten Sand- oder Schlackenbett parallel verlegten unteren Schichten aus je einer Reihe bis 8 cm starken und die oberen Schichten aus je einer Reihe 3 bis 4 cm starken Schottersteinen bestehen, wobei jede Steinreibe besonders mit Steingrus o. dgl. festgestampft und darüber eine etwa 2 cm starke Ausgleichschicht aus Grus aufgetragen ist, während die Verfüllung der auf dieser Ausgleichschicht verlegten Schienenschwellen aus reichlich Grus enthaltenden und ebenfalls schichtenweise festgestampften Steinschlag besteht.PATENT CLAIMS: i. Track body, consisting of several on one Rockfall layers built up in a sand or slag bed, characterized in that that each layer on the subgrade consists of only one row of falling rocks, that the gaps between the stones of all layers with pulped granular Building material (e.g. stone gravel) are completely filled in and on the top layer a compensation Layer of stone gravel is applied on which the thresholds lie. z. Track body according to claim r, characterized in that those on the sand or slag bed, which are covered according to the planum, are parallel laid the lower layers from a row up to 8 cm thick and the upper layers consist of a row of 3 to 4 cm thick gravel stones, each stone grater especially tamped with stone gravel or the like and over it an approximately 2 cm thick Leveling layer of grus is applied while backfilling the on top of this Leveling layer laid rail sleepers made of plenty of grus and there are also layers of pounded rockfall.
DES94128D 1929-09-29 1929-09-29 Railway body, consisting of several rockfall layers built up on a bed of sand or slag Expired DE583186C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DES94128D DE583186C (en) 1929-09-29 1929-09-29 Railway body, consisting of several rockfall layers built up on a bed of sand or slag

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DES94128D DE583186C (en) 1929-09-29 1929-09-29 Railway body, consisting of several rockfall layers built up on a bed of sand or slag

Publications (1)

Publication Number Publication Date
DE583186C true DE583186C (en) 1933-08-30

Family

ID=7518489

Family Applications (1)

Application Number Title Priority Date Filing Date
DES94128D Expired DE583186C (en) 1929-09-29 1929-09-29 Railway body, consisting of several rockfall layers built up on a bed of sand or slag

Country Status (1)

Country Link
DE (1) DE583186C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1104546B (en) * 1957-10-01 1961-04-13 Walter Schmidt Process for the production of a substructure for the ballast gravel that accommodates the sleepers
WO2002012627A1 (en) * 2000-08-10 2002-02-14 Ashby, David Multilayered railway structure
WO2023067535A1 (en) * 2021-10-22 2023-04-27 Rohmberg Sersa Deutschland Gmbh Rail for track-borne rail vehicles, and method for mounting it

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1104546B (en) * 1957-10-01 1961-04-13 Walter Schmidt Process for the production of a substructure for the ballast gravel that accommodates the sleepers
WO2002012627A1 (en) * 2000-08-10 2002-02-14 Ashby, David Multilayered railway structure
WO2023067535A1 (en) * 2021-10-22 2023-04-27 Rohmberg Sersa Deutschland Gmbh Rail for track-borne rail vehicles, and method for mounting it

Similar Documents

Publication Publication Date Title
DE2306428A1 (en) RAILWAY TRACK
DE2063727A1 (en) Method for stabilizing a ballast bed
DE583186C (en) Railway body, consisting of several rockfall layers built up on a bed of sand or slag
DE2901054A1 (en) PROVISIONAL REMOTE EXTENSION FOR CONSTRUCTION OPERATIONS IN ROUTES OF UNDERGROUND MINING
DE4236766C2 (en) Method for renovating a dam construction for a roadway
AT201640B (en) Mobile track tamping machine
DE19849266C2 (en) Fixed carriageway for a tram
AT409641B (en) Ballastless superstructure with prefabricated concrete support plates as well as a procedure for the replacement of the same
DE4423542A1 (en) Ballast for railway permanent way
DE9116841U1 (en) Fixed track for rail-bound traffic
AT310222B (en) Device for compacting the ballast of the railway superstructure
CH149940A (en) Railroad tracks made of stone chips for bedding railway sleepers.
DE974948C (en) Process to improve the load-bearing capacity of natural soil layers and artificial heaps by introducing load-bearing material under rocking
DE19605515A1 (en) Height adjustment of sleepers on railway line
DE10319298A1 (en) Construction method for permanent way for railways, with construction of track bed incorporating antifreeze layer, sub base, concrete sub base, and thin asphalt layer to compensate for unevenness
DE471991C (en) Mobile tamping machine for the production of track bedding for iron sleepers as well as flat tamping areas in railway and road construction
DE554240C (en) Process for the production of rail bedding from concrete
WO2006133785A1 (en) Method for the replacement of a rail laid in a fixed running track by means of ties, and lifting/directing tie to be used in said method
DE102007038461A1 (en) Method for rehabilitating a rail track and associated rail track
EP1298251A1 (en) Ballast-free railway track structure and method of building such structure
DE1104546B (en) Process for the production of a substructure for the ballast gravel that accommodates the sleepers
DE102021127502A1 (en) Track for track-guided rail vehicles and method for its construction
DE655920C (en) Pavement connection to rails
CH181194A (en) Method and device for compacting soil, in particular for the production of all types of roadways.
AT130446B (en) Process for the production of quarry stone paving.