DE514272C DEL73264D DEL0073264D DE514272C DE 514272 C DE514272 C DE 514272C DE L73264 D DEL73264 D DE L73264D DE L0073264 D DEL0073264 D DE L0073264D DE 514272 C DE514272 C DE 514272C
Authority
DE
Germany
Prior art keywords
glass
ceiling
glass body
concrete
air insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEL73264D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DEL73264D priority Critical patent/DE514272C/en
Application granted granted Critical
Publication of DE514272C publication Critical patent/DE514272C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/46Special adaptation of floors for transmission of light, e.g. by inserts of glass

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Description

Glasbetondecke mit Luftisolierräumeu Bei der Glasbetondoppeldecke nach dem Hauptpatent 513 619 ist vorgeschlagen, die wärmeisolierenden Lufträume zwischen den beiden Einzeldecken mittels winkelförmiger Rahmen zii bilden. die bei der Herstellung der Betonsprossen von den Formrahmen getragen werden und sowohl zur Abstützung der Glaskörper der tragfähigen Hauptdecke als auch der Glaskörper der Hilfsdecke dienen. Die Herstellung der Doppeldecke wird durch die Verwendung der winkelförmigen Rahmen erschwert und das Gewicht der Decke erhöht.Glass-concrete ceiling with air insulation rooms For the glass-concrete double ceiling according to the main patent 513 619 is proposed, the heat-insulating air spaces Form between the two individual ceilings by means of an angular frame zii. the at the manufacture of the concrete rungs are supported by the mold frame and both to support the glass body of the load-bearing main ceiling as well as the glass body serve the auxiliary ceiling. The production of the double ceiling is done by using the angular frame makes it difficult and increases the weight of the ceiling.

Dies ist nach der Erfindung dadurch vermieden, daß zur Bildung des Luftisolierrauines die Glaskörper der tragfähigen Glasbetondecke an ihren Rändern mit abwärts gerichteten Ansätzen versehen sind, die über die auf den Betonträgern' gelagerten Hilf sglaskörper greifen und sich auf die Betonträger abstützen, wobei die Glaskörper so mit Ansätzen versehen sind, daß sie Lufträume zwischen sich belassen. Zur Schaffung der Luftisolierräume dienen also Ansätze an den Glaskörpern selbst, so daß die Metallrahmen in Fortfall kommen. Die Entlastung der Hilfsglaskörper gegen die senkrechten Drücke beim Begehen der Decke ist dabei durch die Abstützung der übergreifenden Ränder der Hauptglaskörper auf den Betonglaskörper erreicht. Zugleich sind dadurch die Luftisolierräume nach außen abgedichtet, und bei der Herstellung der Decke ist der Eintritt von Beton in die Luftisolierräume verhütet.This is avoided according to the invention in that to form the Luftisolierrauines the glass body of the load-bearing glass concrete ceiling at its edges are provided with downwardly directed lugs, which over the on the concrete girders' grab the stored auxiliary glass body and support yourself on the concrete girders, whereby the glass bodies are provided with approaches that they leave air spaces between them. Approaches to the glass bodies themselves are used to create the air insulation spaces, so that the metal frames are no longer needed. The relief of the auxiliary glass body against the vertical pressures when walking on the ceiling is due to the support of the overlapping edges of the main glass body reached on the concrete glass body. Simultaneously the air insulation spaces are thereby sealed from the outside, and during manufacture the ceiling prevents concrete from entering the air insulation rooms.

Zur Sicherung der Abstützung der Hauptglaskörper auf die Betonsprossen kann zwischen den Glaskörpern Spiel gelassen werden, oder es werden zwischen die Glaskörper der Hilfsdecke und die Glaskörper der Hauptdecke nachgiebige Dichtungsglieder, z. B. Asbestschnüre, eingeschaltet.To secure the support of the main glass body on the concrete bars play can be left between the glass bodies, or it can be between the The glass body of the auxiliary ceiling and the glass body of the main ceiling flexible sealing members, z. B. Asbestos cords turned on.

Auf der Zeichnung sind zwei Ausführungsformen der Glasbetondoppeldecke nach der Erfindung dargestellt.On the drawing are two embodiments of the glass concrete double ceiling shown according to the invention.

Abb. i zeigt einen Längsschnitt durch eine Ausführungsform der Decke bei ihrer Herstellung nach der Linie A-B der Abb. a, die eine abgebrochene Draufsicht der Abb. i ist. Abb.3 zeigt einen Längsschnitt durch die Decke nach Abb. i in fertigem Zustand. Abb. 4. ist ein Längsschnitt durch eine Abänderungsform, und Abb. 5 ist ein Teil eines Längsschnittes durch eine weitere Ausführungsform.Fig. I shows a longitudinal section through an embodiment of the ceiling in their manufacture according to the line A-B of Fig. a, which is a broken plan view of Fig. i is. Fig.3 shows a longitudinal section through the ceiling according to Fig. I in the finished State. Fig. 4 is a longitudinal section through an alteration form, and Fig. 5 is part of a longitudinal section through a further embodiment.

Bei der Herstellung der Doppeldecke werden wie beim Hauptpatent auf einer Verschalung 7 die Formrahmen 6 aneinandergereiht, so daß sich kreuzende Hohlkehlen ergeben. Auf die oberen Kanten der Formrahmen «erden unmittelbar die Glaskörper der Hilfsdecke gelegt, die zur Sicherung ihrer Lage auf ihrer Unterseite an den Rändern mit ringsum laufenden Aussparungen 25 versehen sind. Auf der Oberseite sind an den Rändern ringsum laufende Ansätze 26 vorgesehen, deren Höhe derjenigen des wärmeisolierenden Hohlraumes 5 entspricht. Die Glaskörper 3 der Hauptdecke haben an ihren Rändern ebenfalls ringsum laufende Ansätze 27, die abwärts gerichtet sind und über die Ansätze 26 nach außen greifen, also in den über den Hohlkehlen der Formrahmen 6 liegenden Raum zwischen den Glaskörpern (Abb. i).In the manufacture of the double ceiling, as with the main patent a formwork 7, the mold frames 6 lined up so that intersecting fillets result. The glass bodies are grounded directly on the upper edges of the mold frames the Auxiliary blanket placed to secure their location on their underside at the edges are provided with recesses 25 running all around. On the top are at the Edges all around running lugs 26 provided, the height of which is that of the heat insulating Cavity 5 corresponds. The glass body 3 of the main ceiling have on their edges also all around running approaches 27, which are directed downwards and over the approaches 26 reach outwards, that is to say in the areas above the fillets of the mold frames 6 Space between the vitreous (Fig. I).

Wird nun in die Formrahmen 6 Beton gegossen, so füllt dieser auch den Raum zwischen den in der Ebene der Decke nebeneinanderliegenden Glaskörperpaaren 3, 4 aus, kann aber nicht in die durch die beiden über-Glaskörper 3, 4 gebildeten Hohlräume 5 eindringen, da die Ansätze 26, 27 ringsum laufen und einander übergreifen (Abb. 3).If concrete is now poured into the mold frame 6, this also fills the space between the glass body pairs lying next to one another in the plane of the ceiling 3, 4 from, but cannot be moved into the one formed by the two over-glass bodies 3, 4 Penetrate cavities 5, since the lugs 26, 27 run all around and overlap one another (Fig. 3).

Die Glaskörper 4 stützen sich nunmehr unmittelbar auf die Betonkörper der Sprossen i, 2 ab. Die Glaskörper 3 stützen sich aber mit ihren Ansätzen 27 auf dem Beton der Sprossen ab. Die Glaskörper 4, die erheblich schwächer gehalten werden können als die Glaskörper 3 der tragfähigen Hauptdecke, sind somit von den auf die Hauptdecke ausgeübten Drücken, die insbesondere beim Begehen der Decke auftreten, entlastet. Ein Zerspringen der Glaskörper 4 ist dadurch vermieden.The glass body 4 is now based directly on the concrete body the rungs i, 2 off. The glass bodies 3, however, are supported with their projections 27 the concrete of the rungs. The glass body 4, which are kept considerably weaker can be used as the glass body 3 of the load-bearing main ceiling, are therefore of the Pressures exerted on the main ceiling, which occur particularly when walking on the ceiling, relieved. This prevents the glass body 4 from shattering.

Um sicher zu verhüten, daß sich die Glaskörper 3 auf die Glaskörper 4 abstützen, und um dem ungleichmäßigen Setzen und Schwinden des Betons Rechnung zu tragen, werden zweckmäßig vor dem Auflegen der Hauptglaskörper 3 zwischen die Ansätze 26 der unteren Glaskörper ,4 und die oberen Glaskörper Abstandhalter eingelegt. Es wird dann Beton bis etwas über die Unterseite der Ansätze. 27 der oberen Glaskörper 3 eingefüllt. Ist diese Betonmasse erhärtet, dann werden die Glaskörper 3 abgenommen, die Abstandhalter werden fortgenommen, und die Glaskörper 3 werden wieder mit ihren Ansätzen 2;, auf die Betonsprossen i, 2 gesetzt. Es befindet sich dann zwischen den Ansätzen 26 und dem Glaskörper 3 genügend Spiel, um zu verhüten, daß beim Begehen der Decke die Glaskörper 4 wesentlich belastet werden.To be sure to prevent the glass body 3 on the glass body 4, and to take account of the uneven setting and shrinkage of the concrete to wear, are expedient before placing the main glass body 3 between the Approaches 26 of the lower glass body, 4 and the upper glass body spacers inserted. It is then concrete up just above the bottom of the lugs. 27 of the upper vitreous 3 filled. If this concrete mass has hardened, then the glass bodies 3 are removed, the spacers are removed, and the glass body 3 are again with their Approaches 2 ;, placed on the concrete rungs i, 2. It is then located between the approaches 26 and the glass body 3 enough play to prevent that when walking the ceiling the glass body 4 are significantly stressed.

Bei der Ausführungsform der Doppeldecke nach Abb. 4 sind zwischen den Glaskörpern 3 und 4 Asbestschnüre 28 oder andere nachgiebige Dichtungsglieder, z. B. Bleikabel, eingelegt, so daß sich die übereinanderliegenden Glaskörper auch nicht unmittelbar berühren. Die Asbestschnüre 28 können dadurch gehalten sein, daß in den Ansätzen 26 der Glaskörper 4. ringsum laufende Rillen 29 eingegossen sind. Wird die Hauptdecke begangen, so werden infolge der Nachgiebigkeit der Asbestschnüre 28 die Drücke zunächst durch die Glaskörper 3 auf den Betonkörper der Sprossen i, 2 übertragen, wodurch ein Zerspringen der Glaskörper weiter verhütet ist.In the embodiment of the double ceiling according to Fig. 4 are between the glass bodies 3 and 4 asbestos cords 28 or other flexible sealing members, z. B. lead cable, inserted so that the superimposed glass bodies also do not touch directly. The asbestos cords 28 can be held in that 4. Grooves 29 running all around are cast in the lugs 26 of the glass body. If the main ceiling is walked on, the asbestos cords give way 28 the pressures initially through the glass body 3 on the concrete body of the rungs i, 2 transferred, whereby a cracking of the glass body is further prevented.

Als Glaskörper 4 der Hilfsdecke dienen bei der Ausführungsform nach Abb.5 einfache dünne Glasscheiben, die auf den Betonsprossen x, 2 liegen. Die Glaskörper 3 der Hauptdecke sind mit ringsum laufenden, abwärts gerichteten Ansätzen 30 versehen, an die sich nach außen die Ansätze -27 anschließen, welche über die Glasscheiben nach außen greifen und sich auf die Betonsprossen abstützen. Die Glaskörper 3 stutzen sich also bei der Herstellung der Doppeldecke mit den Ansätzen 30, 31 unter Einschaltung der Asbeststreifen auf die Glasscheiben 4 ab.In the embodiment according to FIG. 5, simple thin glass panes, which lie on the concrete bars x, 2, serve as the glass body 4 of the auxiliary ceiling. The glass bodies 3 of the main ceiling are provided with all around, downwardly directed lugs 30 , to which the lugs -27 adjoin to the outside, which reach out over the glass panes and are supported on the concrete bars. During the production of the double ceiling, the glass bodies 3 are therefore trimmed with the shoulders 30, 31 with the asbestos strips being interposed on the glass panes 4.

Claims (2)

PATENTANSPRÜCHE: i. Glasbetondecke mit Luftisolierräuinen nach Patent 513 6i9, dadurch gekennzeichnet, daß die Glaskörper (3) der tragfähigen Glasbetondecke an ihren Rändern mit abwärts gerichteten Ansätzen (27) versehen sind, die über die auf den Betonträgern (i, 2) gelagerten Hilfsglaskörper (4) greifen und sich auf die Betonträger abstützen. PATENT CLAIMS: i. Glass concrete ceiling with air insulation rooms according to patent 513 6i9, characterized in that the glass body (3) of the load-bearing glass concrete ceiling are provided at their edges with downward lugs (27) which over the grab the auxiliary glass body (4) mounted on the concrete beams (i, 2) and get on support the concrete beams. 2. Decke nach Anspruch i, dadurch gekennzeichnet, daß zwischen die Hauptglaskörper (3) und die Hilfsglaskörper (4) nachgiebige Zwischenglieder (28, 31) eingelegt sind.2. Ceiling according to claim i, characterized in that flexible intermediate members (28, 31) are inserted between the main glass body (3) and the auxiliary glass body (4).
DEL73264D 1928-10-31 1928-10-31 Glass concrete ceiling with air insulation rooms Expired DE514272C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEL73264D DE514272C (en) 1928-10-31 1928-10-31 Glass concrete ceiling with air insulation rooms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEL73264D DE514272C (en) 1928-10-31 1928-10-31 Glass concrete ceiling with air insulation rooms

Publications (1)

Publication Number Publication Date
DE514272C true DE514272C (en) 1930-12-10

Family

ID=7283190

Family Applications (1)

Application Number Title Priority Date Filing Date
DEL73264D Expired DE514272C (en) 1928-10-31 1928-10-31 Glass concrete ceiling with air insulation rooms

Country Status (1)

Country Link
DE (1) DE514272C (en)

Similar Documents

Publication Publication Date Title
DE3003446A1 (en) Prefabricated concrete load bearing wall or ceiling construction - involves casting concrete in row of hollow boxes with linked cavities
DE514272C (en) Glass concrete ceiling with air insulation rooms
DE2115250C3 (en) Storey-high wall element
CH616196A5 (en) Process for producing a false floor
DE2644316B1 (en) SPACE CELL, PRE-FABRICATED GARAGE O.DGL. IN REINFORCED CONCRETE
DE1183929B (en) Method for producing high valley bridges from reinforced concrete, especially prestressed concrete
DE3202336C2 (en)
DE2422586A1 (en) Underground or sunken wall prefabricated concrete component - comprises integral panel and ribs at equal intervals
DE606253C (en) Process for the production of hollow stone ceiling beams
DE560333C (en) Ceiling beam hollow brick
DE609494C (en) Process and hollow body for the production of concrete components
DE888162C (en) Formwork for making a window sill from concrete
DE892233C (en) Ceiling formed by beams made of ceiling stones made of baked clay or similar brick material
DE811285C (en) Building wall made of factory-made prefabricated parts as well as processes for the production of the latter
DE734490C (en) Casting mold for the production of concrete or reinforced concrete ceilings
DE615934C (en) Hollow body ceiling without concrete overlay
DE838370C (en) Concrete wall
DE10152251A1 (en) Insulated prefabricated wall manufacturing process involves molding first wall body, flattening its surface, applying insulation boards, pressing them in and compacting
DE803420C (en) Concrete ceiling consisting of prefabricated hollow beams
DE596907C (en) Reinforced concrete ceiling with fillers between the lower and upper ceiling
DE2026191C (en) Prefabricated reinforced concrete slab
DE832668C (en) Construction for the production of walls between at the same time a formwork and a component of the finished wall forming panels made of concrete o.
DD240090A1 (en) WALL AND / OR CEILING CONSTRUCTION FOR RADIANT HAZARD PANELS / RADIATED ROOMS
AT364933B (en) FINISHED STAIR
DE2021848A1 (en) Concrete slab with spacers and steel reinforcement