DE507688C - Process for the production of a concrete ceiling with frame cells between iron girders - Google Patents
Process for the production of a concrete ceiling with frame cells between iron girdersInfo
- Publication number
- DE507688C DE507688C DEP60728D DEP0060728D DE507688C DE 507688 C DE507688 C DE 507688C DE P60728 D DEP60728 D DE P60728D DE P0060728 D DEP0060728 D DE P0060728D DE 507688 C DE507688 C DE 507688C
- Authority
- DE
- Germany
- Prior art keywords
- concrete
- girders
- ceiling
- frame cells
- production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
- E04B5/23—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
- E04B5/29—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated the prefabricated parts of the beams consisting wholly of metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
Verfahren zur Herstellung einer Betondecke mit Rahmenzellen zwischen eisernen Trägern Nach dieser Erfindung soll eine Betondecke mit eisernen Trägern hergestellt werden, bei denen Rahmenzellen (oder ähnliche leichte Körper) eine solche Form für den Betonquerschnitt ergeben, daß der eiserne Träger allseitig mit Beton umhüllt wird. Außerdem soll erzielt werden, daß unter dem mit Beton umhüllten Träger eine durchlaufende Luftschicht entsteht.Method of making a concrete ceiling with frame cells between iron girders According to this invention, a concrete ceiling with iron girders can be produced in which frame cells (or similar light bodies) have such a Shape for the concrete cross-section show that the iron girder is covered with concrete on all sides is wrapped. In addition, it should be achieved that under the concrete encased carrier a continuous layer of air is created.
Es ist bekannt, zwischen eisernen Trägern Betondecken mit Hohlzellen oder Steineisendecken in den verschiedensten Formen herzustellen. Solche Betondecken oder Steineisendecken zwischen eisernen Trägern haben aber den Mangel, daß. ohne besondere Maßnahme kein genügender Rost- und Feuerschutz an der Unterseite des Trägers vorhanden ist, und daß solche Decken auch nur eine mangelhafte Isolierung gegen Schall-, Kälte- und Wärmeübertragung und Schwitzwasserbildung besitzen. Diese Mängel werden bei der hier beschriebenen Deckenbauweise vermieden. Die Erfindung ist auf beiliegender Zeichnung dargestellt.It is known, between iron girders, concrete ceilings with hollow cells or to produce stone iron ceilings in a wide variety of shapes. Such concrete ceilings or stone iron ceilings between iron girders have the defect that. without special measure no adequate rust and fire protection on the underside of the girder is present, and that such ceilings are also poorly insulated against Have sound, cold and heat transfer and condensation. These shortcomings are avoided with the ceiling construction described here. The invention is on shown in the accompanying drawing.
Die Abb. i zeigt einen Querschnitt und die Abb.2 einen Längsschnitt der Decke für Linoleumbelag o. dgl. mit Darstellung des Auflagers. Die Abb.3 zeigt einen Querschnitt, die Abb.4 einen Längsschnitt mit Auflagerbildung der Decke mit Holzfußbodenbelag. Die Abb. 5 stellt einen waagerechten Schnitt durch die Auflagerausbildung gemäß Abb. 2 und 4 dar.Fig. I shows a cross section and Fig. 2 shows a longitudinal section the ceiling for linoleum covering or the like with a representation of the support. Figure 3 shows a cross-section, Fig.4 a longitudinal section with support formation of the ceiling Wood flooring. Fig. 5 shows a horizontal section through the support formation according to Fig. 2 and 4.
Die Herstellung der in den Abb. i und 2 dargestellten Decke geschieht wie folgt: Nachdem die I-Träg er im richtigen Abstand verlegt sind, werden zunächst die kleinen Zellenkörper i unter den Trägern aufgehängt. Hierauf werden die Einrüstungshölzer 2 unter den Trägern mit Drähten 6 befestigt, worauf die Einrüstungsbretter 3, 4, 5 verlegt werden. Auf der Einrüstung werden jetzt die Rahmenzellen oder leichte Hohlkörper ähnlicher Bauart 7 eingebaut. Dadurch ist jetzt die Form für die Betondecken und die Trägerummantelung fertiggestellt. Der Beton 8 mit den Querbewehrungen 9 wird eingebracht, und die Decke ist fertig. Nach Erhärtung des Betons wird die Einrüstung weggenommen und der Deckenputz. aufgebracht. Dieser ist jetzt durch die kleine Zelle i und die Rahmenzellen 7 von den eigentlichen tragenden Teilen weitgehend losgelöst.The production of the ceiling shown in Figs. I and 2 is done as follows: After the I-beams have been laid at the correct distance, first the small cell bodies i hung under the girders. The scaffolding timbers are then placed on it 2 fastened under the beams with wires 6, after which the scaffolding boards 3, 4, 5 to be relocated. The frame cells or light ones are now placed on the scaffolding Hollow body of similar design 7 installed. This is now the shape for the concrete ceilings and the carrier cladding completed. The concrete 8 with the transverse reinforcements 9 is put in and the ceiling is ready. After the concrete has hardened, the scaffolding taken away and the ceiling plaster. upset. This is now through the small cell i and the frame cells 7 largely detached from the actual load-bearing parts.
Die Ausführung nach der Abb.3 ist bis zum Einbringen des Betons genau so wie bei der Decke nach Abb. i und a, jedoch werden, bevor der Beton eingebracht wird, die Fußbodenlagerhölzer io verlegt. Diese dienen dann für die Einbringung des Betons gleichzeitig zur Aufnahme der Arbeitsbühne und für das Abziehen der Deckenplatte als Lehre.The execution according to Fig. 3 is accurate until the concrete is poured as with the ceiling according to fig. i and a, but before the concrete is poured is laid, the floor battens io. These are then used for the introduction of the concrete at the same time to accommodate the working platform and to remove the ceiling slab as a teaching.
Die Betonplatte bildet hier im wesentlichen nur eine massive Einschubdecke, während die Fußbodenlasten von den Lagerhölzern unmittelbar auf die I-Träger übertragen werden.The concrete slab essentially only forms a solid ceiling, while the floor loads are transferred directly from the wooden supports to the I-beams will.
Die Isolierung ist bei dieser Ausführungsform besonders günstig. Sie kann durch eine Sandschüttung i i noch verbessert werden.The insulation is particularly favorable in this embodiment. she can be further improved by a pouring of sand i i.
Die Wirtschaftlichkeit ist bei beiden Ausführungsformen äußerst günstig.The economy is extremely favorable in both embodiments.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEP60728D DE507688C (en) | Process for the production of a concrete ceiling with frame cells between iron girders |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEP60728D DE507688C (en) | Process for the production of a concrete ceiling with frame cells between iron girders |
Publications (1)
Publication Number | Publication Date |
---|---|
DE507688C true DE507688C (en) | 1930-09-19 |
Family
ID=7389511
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DEP60728D Expired DE507688C (en) | Process for the production of a concrete ceiling with frame cells between iron girders |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE507688C (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1036491B (en) * | 1955-12-23 | 1958-08-14 | Hans Schwoerer K G | Sound and heat insulating solid ceiling |
DE19712105A1 (en) * | 1997-02-24 | 1998-09-03 | D & W Stahl Und Anlagenbau Gmb | Deck for tall building |
-
0
- DE DEP60728D patent/DE507688C/en not_active Expired
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1036491B (en) * | 1955-12-23 | 1958-08-14 | Hans Schwoerer K G | Sound and heat insulating solid ceiling |
DE19712105A1 (en) * | 1997-02-24 | 1998-09-03 | D & W Stahl Und Anlagenbau Gmb | Deck for tall building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE1509028A1 (en) | Precast component | |
DE507688C (en) | Process for the production of a concrete ceiling with frame cells between iron girders | |
DE2235924A1 (en) | METHOD AND DEVICE FOR MANUFACTURING CONCRETE COMPONENTS | |
DE809961C (en) | Prefabricated component made of composite concrete | |
DE521060C (en) | Process for the production of reinforced concrete rib ceilings without formwork | |
DE807015C (en) | Reinforced concrete ceiling | |
DE606253C (en) | Process for the production of hollow stone ceiling beams | |
DE894753C (en) | Reinforced concrete beam ceiling to be produced without formwork with prestressed ceiling beams and floating floor slab made of reinforced concrete | |
DE821702C (en) | Process for the production of ceilings and roofs by means of plate-shaped components | |
DE849299C (en) | Method of making blankets | |
DE663645C (en) | Process for the production of sheltered shelter ceilings in existing rooms | |
DE844346C (en) | Process for the manufacture of reinforced concrete slab beam floors | |
DE493512C (en) | Process for the production of longitudinally and transversely reinforced stone iron ceilings using high-web? -Iron perforated in the web | |
DE886960C (en) | Ceiling hollow stone | |
DE838948C (en) | Process for the production of building structures, such as walls, ceilings and. Like., made of lightweight concrete | |
DE404964C (en) | Underpassing of tracks | |
AT212538B (en) | Process for the simultaneous production of plaster and a ceiling made of cast concrete, slag concrete or the like. | |
DE919135C (en) | Process for the production of ceilings from cylindrical or prismatic shells and reinforced in-situ concrete ribs | |
DE808158C (en) | Method of manufacturing load-bearing ceilings | |
DE825883C (en) | Process for the formwork-free production of concrete support floors | |
DE808640C (en) | Process for the production of a cast concrete ceiling with sound and heat insulating fillers | |
DE810660C (en) | Process for the production of floor slabs | |
AT150461B (en) | Multi-part concrete joist floor and process for its manufacture. | |
DE804031C (en) | Method of making ceilings of various spans | |
DE523058C (en) | Process for the production of room-enclosing components such as walls, ceilings and the like. like |