DE493935C - Process for the production of hollow drill steels - Google Patents

Process for the production of hollow drill steels

Info

Publication number
DE493935C
DE493935C DEF62328D DEF0062328D DE493935C DE 493935 C DE493935 C DE 493935C DE F62328 D DEF62328 D DE F62328D DE F0062328 D DEF0062328 D DE F0062328D DE 493935 C DE493935 C DE 493935C
Authority
DE
Germany
Prior art keywords
workpiece
pipe
hollow
filler
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEF62328D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fagersta Bruks AB
Original Assignee
Fagersta Bruks AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fagersta Bruks AB filed Critical Fagersta Bruks AB
Application granted granted Critical
Publication of DE493935C publication Critical patent/DE493935C/en
Expired legal-status Critical Current

Links

Description

Verfahren zur Herstellung von hohlen Bohrerstählen Die Herstellung von hohlen Bohrerstählen ist bisher gewöhnlich in der Weise geschehen, daß in ein im voraus in dem Bohrerstahlwerkstück gemachtes Loch, das entweder ganz durchgebohrt und dann an einem Ende zugeschlossen oder das nicht ganz durchgebohrt «-orden ist, so daß ein Boden entsteht, ein geeigneter Füllstoff, wie Silbersand, zermahlene Kohle oder eine Mischung davon, eingefüllt worden ist, wonach das Loch auch am anderen Ende zugeschlossen und das Werkstück bis an die gewünschte Abmessung ausgewalzt und endlich die Füllung entfernt worden ist.Process for the production of hollow drill steels The production of hollow drill steels has so far usually been done in such a way that in a Hole made in advance in the drill steel workpiece which is either drilled all the way through and then locked at one end or that is not completely drilled through "-order, so that a bottom is created, a suitable filler, such as silver sand, ground up Charcoal or a mixture thereof has been poured in, after which the hole on the other The end is closed and the workpiece is rolled out to the desired dimensions and finally the filling has been removed.

Dieses Verfahren bringt aber den Nachteil mit sich; daß die Innenfläche des Bohrerstahles mehr oder weniger narbig wird, was Anlaß zu Brüchen geben kann.However, this method has the disadvantage; that the inner surface of the drill steel becomes more or less pitted, which can give rise to fractures.

Um diesen Nachteil zu vermeiden, ist vorgeschlagen worden, den obenerwähnten Füllstoff durch einen festen Kern aus Metall, beispielsweise Kupfer, zu ersetzen, welcher zusammen mit dem Bohrerstahlwerkstück ausgewalzt worden ist und .dem Stahl eine glatte Innenfläche gegeben hat.In order to avoid this disadvantage, it has been proposed the above-mentioned one Replace filler with a solid core made of metal, e.g. copper, which has been rolled out together with the drill steel workpiece and .the steel has given a smooth inner surface.

Dieser feste Kern muß aber, wie andere Füllstoffe, nach dem Walzen entfernt werden, was eine bestimmte Zusammensetzung des Kernstoffes voraussetzt und in vieler< Fällen Schwierigkeiten bieten kann, und außerdem werden die Herstellungskosten größer als bei dem älteren Verfahren.However, like other fillers, this solid core must after rolling be removed, which requires a certain composition of the core material and in many <cases it may present difficulties, and also the manufacturing cost larger than the older method.

Es ist= auch bisher vorgeschlagen worden, das Bohi-erstahlw erkstück durch Gießen des Stahles um ein eisernes Rohr herzustellen, wonach das somit erhaltene Loch mit Sand angefüllt und dann das Werkstück zusammen mit dem eingegossenen Rohr und dem Sandkern ausgewalzt wird.The Bohi steel workpiece has also been proposed so far by casting the steel to make an iron pipe, after which the one thus obtained Hole filled with sand and then the workpiece together with the poured pipe and the sand core is rolled out.

Durch dieses bekannte Verfahren wird eine innige Zusammenschweißung des Bohrerstahlwerkstückes und des eingesetzten Rohres und gleichzeitig auch ein Ausgleich des Kohlengehaltes bewirkt, so daß das Rohr mit dein Bohrerstahl tatsächlich ein Ganzes bilden wird. Die beim Auswalzen durch den Füllstoff herbeigeführten Eindrücke an der Innenseite des Rohres können wie bisher Anlaß zu Brüchen geben, und diese Brüche werden infolge des innigen Zusammenhanges zwischen dem Rohr und dem Bohrerstahl während der Anwendung des Bohrerstahles zu diesem unbehindert fortgepflanzt. In dieser Beziehung entspricht somit dieses Verfahren genau dem oben beschriebenen älteren Verfahren, wo der Füllstoff unmittelbar in das Bohrerstahlwerkstück angebracht wurde. Die Erfindung bezweckt, nur die Vorteile der-eben angegebenen Verfahren auszunutzen, und besteht im wesentlichen darin, daß in ein im voraus in dem Werkstück gemachtes Loch ein Rohr aus eisen oder einem anderen geeigneten Metall oder einer Metallegierung angebracht wird, welches an einem Ende im Zusammenhang mit der Schließung des Loches des Werkstückes oder unabhängig davon zugeschlossen wird oder auch, falls das Loch im Werkstück nicht durchgebohrt ist, am fraglichen Ende offen gelassen werden kann. Dieses Rohr wird mit einem geeigneten Stoff, z. B. Sand, gefüllt und am Einfüllende geschlossen, wonach die Auswalzung bis zur gewünschten Abmessung erfolgt und dann die Füllung entfernt wird.This known method creates an intimate weld the drill steel workpiece and the inserted pipe and at the same time also a Balancing the carbon content causes the pipe with your drill steel to actually work will form a whole. The impressions caused by the filler during rolling on the inside of the pipe can give rise to breaks as before, and these Breaks occur as a result of the intimate connection between the pipe and the drill steel during the application of the drill steel propagated to this unimpeded. In In this relationship, this method corresponds exactly to that described above older method where the filler is applied directly into the drill steel workpiece became. The aim of the invention is to only take advantage of the advantages just given Method to exploit, and consists essentially in that in a in advance in Hole made in the workpiece is a pipe of iron or other suitable metal or a metal alloy attached, which is related at one end with the closure of the hole in the workpiece or independently thereof or, if the hole in the workpiece has not been drilled through, is the one in question End can be left open. This tube is covered with a suitable material, e.g. B. sand, filled and closed at the end of the filling, after which the rolling out to the desired Dimensioning is done and then the filling is removed.

Hierdurch werden die oben angegebenen nachteiligen Wirkungen ganz ausgeschlossen, und zwar aus dem Grunde, weil das Rohr und der Bohnerstahl zwei getrennte Teile bilden, so daß ein Bruch im Material des Rohres, der meistenfalls nicht vermieden werden kann, unter keinen Umständen zu dem Material des Bohnerstahles fortgepflanzt werden kann. Die Innenfläche des Bohnerstahles wird beim Auswalzen von der schädlichen Wirkung des Füllstoffes ganz unberührt und bleibt glatt.This eliminates the adverse effects noted above excluded, for the reason that the pipe and the polishing steel are two separate parts so that a break in the material of the pipe, in most cases cannot be avoided under any circumstances to the material of the polishing steel can be propagated. The inner surface of the polishing steel is rolled out completely unaffected by the harmful effects of the filler and remains smooth.

Das als Schutzhülle dienende Rohr, welches nach dem Auswalzen eine dünne Schale bilden wird, bleibt im Bohnerstahl sitzen.The tube serving as a protective cover, which after rolling out a will form a thin shell, remains in the polishing steel.

Um die oben angegebenen Vorteile zu erreichen, muß darauf geachtet werden, daß beim Auswalzen ein Verschweißen des eingesetzten Rohres mit dem Bohnerstahl verhindert wird, weil anderenfalls, wie erwähnt, die unvermeidliche Rissebildung in -dem Rohrmaterial sich zum Bohnerstahl selbst fortpflanzt, wodurch die Lebensdauer des Bohnerstahles erheblich herabgesetzt wird.Care must be taken to achieve the above advantages be that when rolling a welding of the pipe used with the polishing steel is prevented because otherwise, as mentioned, the inevitable crack formation in -the pipe material propagates to the polishing steel itself, reducing the service life of the polishing steel is significantly reduced.

Dies kann z. B. dadurch vermieden werden, daß beim Auswalzen eine so niedrige Temperatur verwendet wird, daß eine Verschweißung ganz ausgeschlossen ist. Man kann auch die Oberfläche des eingesetzten Rohres derart behandeln oder mit einem solchen geeigneten Mittel bestreichen, daß auch bei ziemlich hohen Temperaturen (über die Schweißhitze) eine Verscliweißung nicht zustande kommt.This can e.g. B. can be avoided that when rolling out a so low a temperature is used that welding is completely excluded is. You can also treat the surface of the tube used in this way or Brush with such a suitable agent that even at fairly high temperatures A seal does not come about (via the welding heat).

Das Rohr, welches, wie erwähnt, aus einem beliebigen Metall oder aus einer Metallegierung bestehen kann, kann entweder in das Loch im Bohrerstahlwerkstück dicht eingepaßt oder, wie erwähnt, mit einem Mittel, beispielsweise einer Mischung von Leinöl und Graphit, bestrichen werden, welche ein Verschweißen des Rohres- an der Lochwand verhindert Rind den Füllstoff daran hindert, beim Einfüllen zwischen Rohr und Lochwand zu gelangen. Es ist einleuchtend, daß, falls erwünscht, der Füllstoff in das Rohr vor dessen Anbringung in das Loch des Bohrerstahlwerkstückes eingeführt ,werden kann.The tube, which, as mentioned, is made of any metal or a metal alloy can either be in the hole in the drill steel workpiece tightly fitted or, as mentioned, with an agent, for example a mixture linseed oil and graphite, which weld the pipe the hole wall prevents beef preventing the filler from being filled in between Pipe and perforated wall. It will be understood that, if desired, the filler inserted into the tube in the hole of the drill steel workpiece prior to its attachment ,can be.

Claims (1)

PATENTANSPRÜCHE: i. Verfahren zur Herstellung von hohlen Bohnerstählen durch Auswalzen eines hohlen, mit einer Füllmasse gefüllten Werkstückes. dadurch gekennzeichnet, daß in die Bohrung des hohlen Werkstückes ein aus einem beliebigen Metall oder aus einer Metallegierung bestehendes Rohr eingesetzt wird, welches seinerseits mit Silbersand, zermahlener Kohle oder einem ähnlichen Stoff angefüllt und dann verschlossen wird, worauf das hohle Werkstück mit eingesetztem Rohr und mit Füllstoff bis zur gewünschten Abmessung ausgewalzt und endlich der-Füllstoff entfernt wird. ' z. Verfahren nach Anspruch i, dadurch gekennzeichnet, daß das im Bohrerstahlwerkstück eingesetzte Rohr in das Loch des erwähnten Werkstückes dicht eingepaßt wird. 3. -Verfahren nach Anspruch i, dadurch gekennzeichnet, daß das Rohr vor dem Einwalzen in das Bohrerstahlwerkstück mit einer Mischung von Graphit und Leinöl oder einem ähnlichen Mittel bestrichen wird, welches beim Eimvalzen ein Verschweißen des Rohres an der Lochwand im Bohrerstahlwerkstücl@ verhindert. PATENT CLAIMS: i. Process for the production of hollow polishing steels by rolling out a hollow workpiece filled with a filling compound. characterized in that a tube made of any metal or a metal alloy is inserted into the bore of the hollow workpiece, which in turn is filled with silver sand, ground coal or a similar substance and then closed, whereupon the hollow workpiece with inserted tube and with The filler is rolled out to the desired dimensions and finally the filler is removed. 'z. Method according to claim i, characterized in that the tube inserted in the drill steel workpiece is tightly fitted into the hole of the workpiece mentioned. 3. Method according to claim i, characterized in that the pipe is coated with a mixture of graphite and linseed oil or a similar agent prior to rolling into the drill steel workpiece, which prevents the pipe from being welded to the hole wall in the Bohrerstahlwerkstücl @ during Eimvalzen.
DEF62328D 1926-10-09 1926-10-28 Process for the production of hollow drill steels Expired DE493935C (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SE493935X 1926-10-09

Publications (1)

Publication Number Publication Date
DE493935C true DE493935C (en) 1930-03-17

Family

ID=20310666

Family Applications (1)

Application Number Title Priority Date Filing Date
DEF62328D Expired DE493935C (en) 1926-10-09 1926-10-28 Process for the production of hollow drill steels

Country Status (1)

Country Link
DE (1) DE493935C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE876548C (en) * 1950-05-26 1953-05-15 Gussstahlwerk Witten Ag Manufacture of hollow drill steel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE876548C (en) * 1950-05-26 1953-05-15 Gussstahlwerk Witten Ag Manufacture of hollow drill steel

Similar Documents

Publication Publication Date Title
DE2920719A1 (en) PROCESS FOR MANUFACTURING FORGED PARTS WITH SELECTED CARBONIZED AREAS FROM METAL POWDER
DE493935C (en) Process for the production of hollow drill steels
DE2442146A1 (en) Coal pick with hard metal tip - has conical tip of steel shaft carrying granular hard metal layer
DE2331177A1 (en) METHOD FOR FORMING SURFACE DIFFUSION ALLOYS ON THE INNER WALL OF HOLLOW BODIES
DE2010337B1 (en) Exothermic riser for castings
DE2508007A1 (en) ROLLED LEADED STEEL BAR
DE590444C (en) Process for the treatment of metals, especially iron alloys, in the liquid state for the purpose of producing porous castings
DE427072C (en) Process for the production of metal electrodes for electric arc soldering
AT109260B (en) Process for the production of hollow drill steels.
DE2361712A1 (en) METHOD FOR MANUFACTURING HOLLOW VALVES FOR COMBUSTION ENGINES AND OTHER MACHINERY IN GENERAL, AS WELL AS HOLLOW VALVE MANUFACTURED HEREIN
DE651234C (en) Method and device for producing composite cast bearing shells
DE686214C (en) Process for the installation of sealing bodies made of alloys of iron in valve, cylinder or similar housings by shrinking them
AT220646B (en) Steel alloys for the manufacture of rock drilling tools
DE420083C (en) Process for the electrical welding of steels of various compositions
DE533025C (en) Process for soldering carbide tips or cutting edges into tools made of steel
DE327946C (en) Method for plating two or more metals by pressing together a heated workpiece formed by stacking a conical core and one or more conical metal shells
DE764815C (en) Solder for soldering high-speed steel or hard metal on steel
DE672316C (en) Method and device for casting hollow bars and other hollow cast bodies
DE903640C (en) Spark plug
DE1002485B (en) Process for electrical repair and surface welding on parts made of cast iron, in particular on chilled cast iron rollers and cloverleaf cones, using slag powder
DE333162C (en) Process for the production of tools with several knives or the like used.
DE748472C (en) Sulfur-sensitive iron or steel arc welding rod with a slag-forming envelope and process for its manufacture
DE581045C (en) Hollow steel for rock drill
DE725826C (en) Process for producing a metallic bond between the base body and the liner
DE931772C (en) Warming salt bath for carbonaceous, alloyed steels