DE476374C - Device for depositing, stacking and counting blanks cut from an endless web - Google Patents

Device for depositing, stacking and counting blanks cut from an endless web

Info

Publication number
DE476374C
DE476374C DEU9828D DEU0009828D DE476374C DE 476374 C DE476374 C DE 476374C DE U9828 D DEU9828 D DE U9828D DE U0009828 D DEU0009828 D DE U0009828D DE 476374 C DE476374 C DE 476374C
Authority
DE
Germany
Prior art keywords
slide
board
carrier
boards
endless
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEU9828D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Universelle Cigarettenmaschinen Fabrik JC Mueller and Co
Original Assignee
Universelle Cigarettenmaschinen Fabrik JC Mueller and Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Universelle Cigarettenmaschinen Fabrik JC Mueller and Co filed Critical Universelle Cigarettenmaschinen Fabrik JC Mueller and Co
Priority to DEU9828D priority Critical patent/DE476374C/en
Application granted granted Critical
Publication of DE476374C publication Critical patent/DE476374C/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H33/00Forming counted batches in delivery pile or stream of articles
    • B65H33/14Forming counted batches in delivery pile or stream of articles by diverting batches to separate receivers

Landscapes

  • Forming Counted Batches (AREA)
  • Stacking Of Articles And Auxiliary Devices (AREA)

Description

Vorrichtung zum Ablegen, Stapeln und Zählen von einer endlosen Bahn abgetrennter Zuschnitte Die Erfindung bezieht sich auf eine Vorrichtung zum Ablegen und Stapeln der von einer endlosen Stoffbahn abgetrennten Zuschnitte in einen mit Tragbrettern für die abzulegenden und zu stapelnden Zuschnitte versehenen endlosen Träger.Device for filing, stacking and counting from an endless track severed blanks The invention relates to a device for depositing and stacking the cut-offs cut from an endless web of fabric in one with Carrying boards for the blanks to be deposited and stacked are provided endless Carrier.

Im Gegensatz zu bekannten Anordnungen, bei welchen die Fortschaltung des Trägers um je eine Blattstärke vom Messerkörper aus geschieht, durch welchen die Zuschnitte von der Stoffbahn abgetrennt werden, und bei welchen der Träger nach Erreichung der Stapelhöhe vom Messerkörper aus plötzlich um ein größeres Maß weitergeschaltet wird, besteht die vorliegende Erfindung darin, daß bei Erreichung einer vorbestimmten Stellung das den fertigen Stapel tragende Brett von seinem Träger abgleitet und auf einen Schlitten o. dgl. niedersinkt, durch dessen Verschiebung der fertige Stapel aus der Bahn des Trägers entfernt wird. Bei dieser Anordnung ist die Schaltung des Trägers unabhängig vom Schneidmesser, und es findet auch nicht eine absatzweise Schaltung des Trägers selbst statt, um den Abstand des fertigen Stapels von dem neuen Brett, welches zur Aufnahme eines neuen Stapels bestimmt ist, zu gewinnen, sondern es findet eine gleichförmige Schaltung des Trägers statt, wobei nunmehr das den fertigen Stapel tragende Brett auf eine feste Unterlage abgesetzt und von dieser durch einen Schieber aus der Bahn des Trägers entfernt wird.In contrast to known arrangements in which the switching of the carrier happens by a blade thickness from the knife body, through which the blanks are separated from the fabric web, and in which the carrier after Reaching the stack height from the knife body suddenly switched to a greater extent is, the present invention is that upon reaching a predetermined Position the board carrying the finished stack slides off its carrier and Sinks down onto a sledge or the like, the displacement of which causes the finished stack removed from the web of the carrier. In this arrangement, the circuit of the Carrier independent of the cutting knife, and it does not find a paragraph-wise either Circuitry of the carrier itself takes place to the distance of the finished stack from the win a new board, which is intended to hold a new pile, instead there is a uniform switching of the carrier, with now the board carrying the finished stack is placed on a solid base and from this is removed from the path of the carrier by a slider.

Nach Erreichung der Stapelhöhe wird ein frisches Brett in den Träger an der Stelle eingelegt, wo sich vorher das obere Ende des fertigen Stapels befand.After the stacking height has been reached, a fresh board is placed in the carrier inserted at the point where the upper end of the finished stack was previously.

Der Träger besteht aus zwei mit Abstand voneinander angeordneten endlosen Bändern oder Ketten mit parallellaufenden und im gleichen Sinne bewegten senkrechten Trägern, an denen Auflager für die zwischen den einander zugekehrten Trumen einzubringenden Tragbretter angeordnet sind.The carrier consists of two spaced-apart endless ones Belts or chains with parallel running and vertical movements moving in the same direction Beams on which supports are to be introduced between the facing strands Support boards are arranged.

Die frischen Bretter werden von einem Stapel durch einen Schieber entnommen, der durch ein gemeinschaftliches Gestänge mit dem Schieber gesteuert wird, welcher das den fertigen Stapel tragende Brett aus der Bahn des endlosen Trägers entfernt.The fresh boards are taken from a pile by a pusher taken, which is controlled by a common linkage with the slide which is the board carrying the finished stack from the path of the endless carrier removed.

Der Schieber befördert die frischen Bretter auf Auflager, die durch winkelförmige Ausschnitte an den Enden von Schwinghebeln gebildet werden, die zweckmäßig auf die Achsen der oberen Leitwalzen der endlosen Ketten oder Bänder drehbar gesetzt und durch ein gemeinschaftliches Steuergestänge verbunden sind, derart, daß durch eine Ausschwingung der Hebel nach außen das von ihnen getragene frische Brett freigegeben wird und auf die in Bereitschaftsstellung befindlichen Auflager der endlosen Ketten oder Bänder niederfällt.The pusher conveys the fresh boards onto supports, which through angular cutouts are formed at the ends of rocker arms, which is expedient rotatably set on the axes of the upper guide rollers of the endless chains or belts and connected by a common control linkage, such that by an oscillation of the levers outwards that carried by them fresh Board is released and on the support that is in readiness who falls down on endless chains or ribbons.

Auf der von einem -Schubkurbelgetriebe mit Hilfe eines Schaltklinkengesperres absatzweise gedrehten Hauptwelle, von welcher aus durch Schneckenradgetriebe die Kettenräder angetrieben werden, ist eine Steuerscheibe vorgesehen, die an ihrem Umfang als Hubkurve ausgebildet ist und durch die das Gestänge für die Ausschwingung der Bretterträgerhebel bewegt wird, während andererseits ein an der Scheibe vorgesehener Anschlag einen Schwinghebel zum Ausschlag bringt, der mit seinem einen Ende an dem Steuerschieber für die Zuführung der frischen Bretter angreift und an seinem anderen Ende als Zahnsektor ausgebildet ist und mit einem Stirnrad in Verbindung steht, durch dessen Verdrehung ein weiteres Stirnrad verdreht wird, welches im Eingriff mit einer an der Unterseite des Schiebers vorgesehenen Verzahnung steht, welcher die den fertigen Stapel tragenden Bretter aus der Bahn der Trägerketten entfernt.On the from a push crank gear with the help of a ratchet locking mechanism intermittently rotated main shaft, from which the Sprockets are driven, a control disc is provided on her The scope is designed as a lifting curve and through which the linkage for the swing out the board carrier lever is moved, while on the other hand a provided on the disc Stop brings a rocker arm to the rash, one end of which is attached to the Control slide for the supply of fresh boards attacks and on his other The end is designed as a toothed sector and is connected to a spur gear, by the rotation of which another spur gear is rotated, which is in engagement with a toothing provided on the underside of the slide, which removes the boards carrying the finished stack from the path of the carrier chains.

Ein Ausführungsbeispiel der neuen Vorrichtung ist auf der Zeichnung dargestellt, und zwar in Abb. = in einer Vorderansicht.An embodiment of the new device is on the drawing shown, in Fig. = in a front view.

Abb. 2 ist eine Seitenansicht dazu.Fig. 2 is a side view thereof.

Die Abb. 3 ist eine Oberansicht in schematischer Darstellung.Figure 3 is a schematic top view.

Die Abb. 4 schließlich zeigt den Träger in der Stellung, wo das den fertigen Stapel tragende Brett gerade auf die feste Unterlage abgesetzt wird, von welcher der Schieber das Brett samt dem Stapel entfernt.Finally, Fig. 4 shows the carrier in the position where the finished stack of load-bearing board is just deposited on the solid base of which the pusher removes the board and the stack.

Auf einer Welle = sitzt ein Schaltgetriebe, das von dem fest auf der Welle = angeordneten Schaltrad 2 und dem drehbar auf der Welle = vorgesehenen Schaltklinkanträger 3 mit der Schaltklinke 4 gebildet wird. Der Schaltklinkenträger 3 ist an einer Schubstange 5 angelenkt, die von einem Exzenter 6 angetrieben wird.On a shaft = there is a gearbox, which is firmly attached to the Shaft = arranged ratchet wheel 2 and the ratchet carrier that is rotatable on the shaft = provided 3 is formed with the pawl 4. The pawl carrier 3 is on a push rod 5 articulated, which is driven by an eccentric 6.

Auf der Welle i sitzt eine Schnecke 7, die mit einem Schneckenrad 8 im Eingriff steht, welches auf einer Achse 9 angeordnet ist. Auf der Achse 9 sitzt ein Kettenräderpaar io, über welches eine endlose Kette =i läuft, die über ein zweites, senkrecht über dem Kettenräderpaar io angeordnetes Kettenräderpaar =2 geführt ist. Eine zweite endlose Kette 13 wird über untere Kettenräder 14 auf einer Achse 15 geführt. Auf der Welle 9 bzw. 15 sitzende Schraubenräder 17 bzw. 2o kämmen mit Schraubenrädern 16 bzw i9 auf einer Welle 18, welche von der Hauptwelle i absatzweise angetrieben wird.On the shaft i sits a worm 7, which is connected to a worm wheel 8 is in engagement, which is arranged on an axis 9. Sitting on the axis 9 a pair of sprockets io, over which an endless chain = i runs, which runs over a second, sprocket pair = 2 arranged vertically above the sprocket pair io. A second endless chain 13 is mounted on an axle 15 via lower chain wheels 14 guided. On the shaft 9 or 15 seated helical gears 17 or 2o mesh with helical gears 16 or i9 on a shaft 18 which is driven intermittently by the main shaft i will.

Auf den Achsen 21 der oberen Kettenräderpaare der Förderbänder ix und 13 sitzen drehbar Schwinghebel a2, deren freie Enden 23 winkelförmig ausgeschnitten sind. Mit den Winkelhebeln 22 sind Steuerstangen 24 verbunden, die bei 25 gelenkig miteinander vereinigt sind und von einer Schubstange 26 gesteuert werden, die in senkrechten Führungen 27 gleiten kann. Die Schubstange 26 steht mit einer als Hubkurve ausgebildeten Steuerscheibe 28 im Eingriff, die fest auf der Achse 18 angeordnet und so ausgebildet ist, daß die Schubstange 26 gehoben und gesenkt wird, wodurch die freien Enden 23 der Schwinghebel 22 einander genähert oder voneinander entfernt werden. Dabei ist zweckmäßig eine Feder 29 vorgesehen, die einerseits am Maschinengestell, andererseits am Gestänge 24 angreift.On the axes 21 of the upper pairs of sprockets of the conveyor belts ix 13 and 13 are rotatably seated rocker arms a2, the free ends 23 of which are cut out at an angle are. Control rods 24 are connected to the angle levers 22 and are articulated at 25 are combined and controlled by a push rod 26, which in vertical guides 27 can slide. The push rod 26 has a lifting curve formed control disk 28 in engagement, which is fixedly arranged on the axis 18 and is formed so that the push rod 26 is raised and lowered, whereby the free ends 23 of the rocker arms 22 approached or removed from each other will. In this case, a spring 29 is expediently provided, which on the one hand on the machine frame, on the other hand, engages the linkage 24.

An der Flanke der Steuerscheibe 28 ist ein Anschlag 30 vorgesehen, welcher bei der Drehung der Steuerscheibe 28 gegen einen Anschlag 31 trifft, der an einem Zahnsektor 32 angeordnet ist. Der Zahnsektor 32 schwingt um einen ortsfest angeordneten Zapfen 33 und weist einen Fortsatz 34 auf, welcher an einem wagerecht hin und her gehenden Schieber 35 angelenkt ist.On the flank of the control disk 28, a stop 30 is provided which, when the control disk 28 rotates, strikes a stop 31 which is arranged on a toothed sector 32. The toothed sector 32 swings around a stationary pin 33 and has an extension 34 which is articulated to a slide 35 that moves horizontally back and forth.

Der Zahnkranz 36 des Sektors 32 steht mit einem Zahnrad 37 im Eingriff, welches frei drehbar auf der Achse 18 sitzt. Mit dem Zahnrad 37 steht ein weiteres Zahnrad 38 im Eingriff, das fest auf einer parallel zur Achse 18 laufenden _ Achse 39 vorgesehen ist. Auf der Achse 39 sitzt nun ein Zahnrad 4o, welches mit einem Zahnrad 41 im Eingriff steht, das sich frei auf der Achse 18 drehen kann. Das Zahnrad 41 greift in eine Zahnstange 42 ein, welche an der Unterseite eines wagerecht hin und her gehenden Schiebers 43 befestigt ist.The ring gear 36 of the sector 32 meshes with a gear 37, which sits freely rotatable on the axis 18. With the gear 37 is another Gear 38 in engagement, which is fixed on an axis running parallel to axis 18 39 is provided. On the axis 39 is now a gear 4o, which with a Gear 41 is engaged, which can rotate freely on the axis 18. The gear 41 engages a toothed rack 42 which is horizontal on the underside of a and forth going slide 43 is attached.

Die beiden Schieber 35 und 43 sind nun so angeordnet, daß der obere Schieber 35 in den Bereich der freien Enden z3 der Schwinghebel 22 eintritt, während der untere Schieber 43 zwischen die beiden parallellaufenden Förderbänder ix und 13 geführt wird. Wenn also die Steuerscheibe 28 in Richtung des Pfeiles in Abb. 2 umläuft, so wird beim Auftreffen des Anschlages 3o auf den Anschlag 31 der Sektor 32 derart ausgeschwungen, daß er den oberen Schieber 35 in Richtung nach dem Schwinghebel 22 befördert, während gleichzeitig der untere Schieber 43 aus dem Bereich der endlosen Förderbänder ii und 13 entfernt wird.The two slides 35 and 43 are now arranged so that the upper Slide 35 enters the area of the free ends z3 of the rocker arm 22 while the lower slide 43 between the two parallel conveyor belts ix and 13 is performed. So if the control disk 28 in the direction of the arrow in Fig. 2 revolves, when the stop 3o hits the stop 31, the sector becomes 32 swung out in such a way that it moves the upper slide 35 in the direction of the rocker arm 22 conveyed, while at the same time the lower slide 43 out of the range of the endless Conveyor belts ii and 13 is removed.

Sobald der Anschlag 3o am Anschlag 31 vorübergegangen ist, kann der Sektor 32 frei zurückschwingen.As soon as the stop 3o has passed the stop 31, the can Sector 32 swing back freely.

In der Bahn des Schiebers 35 ist ein Stapelbehälter 44 für die bekannten Tragbretter 45 vorgesehen, dessen Wandungen nahe dem Boden einen Schlitz 46 von der Breite eines Brettes aufweisen, so daß der Schieber 35 das jeweils unterste Brett aus dem Stapelbehälter 44 entfernen und dem gesteuerten Schwinghebel 22 übergeben kann. Dabei werden die Schwinghebel 22 von der Steuerscheibe 28 derart gesteuert, daß die Schenkel 47 der Winkelausschnitte Auflager für das Tragbrett 45 bilden, während die Schenkel 48 der Winkelausschnitte seitliche Anschläge darstellen.In the path of the slide 35 is a stacking container 44 for the known Support boards 45 provided, the walls of which have a slot 46 of near the bottom the width of a board, so that the slide 35 is the lowest Remove the board from the stacking container 44 and transfer it to the controlled rocker arm 22 can. Thereby the rocker arm 22 from the control disk 28 controlled so that the legs 47 of the angular cutouts support for the support board 45 form, while the legs 48 of the angular cutouts represent lateral stops.

Die endlosen Bänder =i und 13 sind nun mit gleichmäßig über den Umfang der Bänder verteilten Trägern 49 ausgerüstet, auf welche sich das bisher von den Schwinghebeln 22 gehaltene Tragbrett auflegen kann, sobald die Schwinghebel 22 infolge der entsprechenden Ausbildung der Steuerscheibe 28 mittels des Gestänges 24 voneinander entfernt werden, so daß das Tragbrett frei herunterfällt. Es ruht nunmehr auf zwei gegenüberstehenden Trägern 49 der beiden Förderbänder und bildet eine Auflage für die abzulegenden und zu stapelnden Zuschnitte.The endless bands = i and 13 are now with evenly over the circumference of the bands distributed carriers 49 equipped, on which the so far from the Rocker arms 22 held support board can hang up as soon as the rocker arm 22 as a result the corresponding formation of the control disk 28 by means of the linkage 24 from each other removed so that the support board falls freely. It now rests on two opposite supports 49 of the two conveyor belts and forms a support for the blanks to be deposited and stacked.

Die Zuschnitte selbst werden in bekannter Weise von einem Messer 50 von einer fortlaufenden Stoffbahn 51 abgetrennt, welche über einen Tisch 52 geführt ist.The blanks themselves are separated in a known manner by a knife 50 from a continuous web of material 51 which is guided over a table 52.

Auf dem ständig absatzweise weitergeschalteten Tragbrett befindet sich nun der Zuschnittstapel, bis schließlich das Tragbrett an den Scheiteln der unteren Kettenräderpaare =o und 14 anlangt, bei welchen die Förderbänder mit dem Träger 49 umgeleitet werden, so daß das Tragbrett mit dem Blätterstapel an den Auflageflächen 53 der Träger 49 abgleitet und sich auf eine feste Unterlage 54 aufsetzt. Es entsteht dabei ein größerer Abstand a zwischen dem obersten Blatt des auf dem abgesetzten Tragbrett ruhenden Stapels und dem darüber befindlichen Tragbrett des nächsten Stapels, der noch nicht seine vorschriftsmäßige Höhe erreicht hat (vgl. Abb. 4).Located on the support board, which is continuously switched stepwise now the stack of blanks until finally the support board at the vertices of the lower pairs of sprockets = o and 14 arrives, in which the conveyor belts with the Carrier 49 are diverted so that the support board with the stack of sheets on the support surfaces 53 the carrier 49 slides off and sits down on a solid base 54. It arises thereby a greater distance a between the top sheet of the deposited Support board of stationary stack and the support board above it for the next stack, which has not yet reached its prescribed height (see Fig. 4).

Das Entfernen des abgesetzten Brettes geschieht nun in der beschriebenen Weise durch den Sektor 32, welcher vom Anschlag 3o der Steuerscheibe 28 zum Ausschwingen gebracht wird, wobei durch den an den Fortsatz 34 des Sektors 32 angelenkten Schieber 35 gleichzeitig ein neues Tragbrett in den Bereich des Schwinghebels 22 gebracht wird.The removed board is now removed in the manner described Way through the sector 32, which from the stop 3o of the control disk 28 to swing out is brought by the hinged to the extension 34 of the sector 32 slide 35 brought a new support board into the area of the rocker arm 22 at the same time will.

Das Schaltrad 2 hat eine bestimmte Zähnezahl, die wiederum in einem bestimmten Verhältnis zum Schaltvorschub steht. Beispielsweise sind am Umfang des Schaltrades 2 250 Zähne angeordnet. Das Schneckenübersetzungsverhältnis von Welle i zur Achse 9 ist i : 2o. Somit ist die Gesamtübersetzung beim Vorschub von nur einem Zahn 1 : 2,50 X 1 : 20 = 1 : 5000, folglich wird die Brettausstoßung und die Bretteinlage nach 5ooo Umdrehungen der Kurbelwelle erfolgen. Somit liegen also auf jedem Stapel genau 5000 Zuschnitte. Wird der Vorschub des Schaltrades 2 so geändert, daß 2 Zähne verdreht werden, so werden nur (i : X i : 2o) = 25oo Zuschnitte auf jedes Stapelbrett gelegt werden.The ratchet wheel 2 has a certain number of teeth, which in turn is in a certain ratio to the switching feed. For example, 250 teeth are arranged on the circumference of the ratchet wheel. The worm gear ratio of shaft i to axis 9 is i: 2o. Thus, the total gear ratio is 1: 2.50 X 1: 20 = 1: 5000 when only one tooth is fed, consequently the board ejection and the board inlay will take place after 5,000 revolutions of the crankshaft. So there are exactly 5000 blanks on each stack. If the feed of ratchet 2 is changed so that 2 teeth are rotated, only (i: X i: 2o) = 25oo blanks are placed on each stacking board.

Claims (4)

PATENTANSPRÜCHE: i. Vorrichtung zum Ablegen, Stapeln und Zählen von einer endlosen Stoffbahn abgetrennter Zuschnitte in einen mit Tragbrettern für die abzulegenden und zu stapelnden Zuschnitte versehenen endlosen Träger, dadurch gekennzeichnet, daß das den fertigen Stapel tragende Brett bei Erreichung einer vorbestimmbaren Stellung auf einen Schieber (43) niedersinkt, durch dessen Verschiebung der fertige Stapel aus der Bahn des Trägers (49) entfernt wird, ohne daß die Maschine stillgesetzt zu werden braucht, während gleichzeitig ein zweiter Schieber (35) ein neues Brett heranführt und in eine Bereitschaftsstellung über dem jeweils in der Entstehung begriffenen Stapel bringt. PATENT CLAIMS: i. Device for filing, stacking and counting an endless web of cut blanks into one with support boards for the Endless carrier provided with blanks to be deposited and stacked, characterized in that that the board carrying the finished stack upon reaching a predeterminable Position on a slide (43) sinks, by moving the finished Stack is removed from the path of the carrier (49) without stopping the machine needs to be, while at the same time a second pusher (35) a new board and in a position of readiness above the one in the making realized pile brings. 2. Vorrichtung nach Anspruch i, dadurch gekennzeichnet, daß die leeren Bretter von einem Stapelbehälter (47) durch einen Schieber (35) entnommen werden, der durch ein gemeinschaftliches Gestänge (32) gleichzeitig mit dem Schieber (43) gesteuert wird, welcher das den fertigen Stapel tragende Brett aus der Bahn des endlosen Trägers (11, 13) entfernt. 2. Device according to claim i, characterized in that that the empty boards are removed from a stacking container (47) through a slide (35) by a common linkage (32) simultaneously with the slide (43) is controlled, which board carrying the finished stack off the track the endless carrier (11, 13) removed. 3. Vorrichtung nach Anspruch i und 2, dadurch gekennzeichnet, daß der Schieber (35) die leeren Bretter auf Auflager (47) befördert, die durch winkelförmige Ausschnitte (23) an den Enden von Schwinghebeln (22) gebildet werden, die auf die Achsen (21) der oberen Leitwalzen (=z) der endlosen Ketten (11, 13) oder Bänder drehbar gesetzt und durch ein gemeinschaftliches Steuergestänge (24) verbunden sind, derart, daß durch eine Ausschwingung der Hebel (22) nach außen das von ihnen getragene leere Brett freigegeben wird und auf die in Bereitschaftsstellung befindlichen Auflager (49) der endlosen Ketten (11, 13) oder Bänder niederfällt. 3. Apparatus according to claim i and 2, characterized characterized in that the pusher (35) conveys the empty boards on supports (47), formed by angular cutouts (23) at the ends of rocker arms (22) which are on the axes (21) of the upper guide rollers (= z) of the endless chains (11, 13) or hinges set rotatable and through a common control linkage (24) are connected in such a way that the lever (22) oscillates to the outside the empty board carried by them is released and on the ready position located support (49) of the endless chains (11, 13) or belts falls down. 4. Vorrichtung nach Anspruch i bis 3, dadurch gekennzeichnet, daß auf der von einem Schubkurbelgetriebe (5, 6) mit Hilfe eines Schaltklinkengesperres (2 bis 4) absatzweise gedrehten Hauptwelle (i), von welcher aus durch Schneckenradgetriebe (7, 8) und Schraubenräder (16, 17, =g, 2o) die Kettenräder (=o, 14) angetrieben werden, eine Steuerscheibe (28) vorgesehen ist, die an ihrem Umfang als Hubkurve ausgebildet ist und das Gestänge (24, 26) für die Ausschwingung der Brettertraghebel (22) bewegt, während andererseits ein an der Scheibe vorgesehener Anschlag (3o) einen Schwinghebel (32) zum Ausschlag bringt, der mit seinem einen Ende an dem Steuerschieber (35) für die Zuführung der leeren Bretter angreift und an seinem anderen Ende als Zahnsektor (36) ausgebildet ist und ferner mit einem Stirnrad (37) in Verbindung steht, durch dessen Verdrehung ein weiteres Stirnrad (4r) verdreht wird, welches im Eingriff mit einer an der Unterseite des Schiebers (43) vorgesehenen Verzahnung (42) steht, welcher die den fertigen Stapel tragenden Bretter aus der Bahn der Trägerketten (1i, 1.3) entfernt.4. Apparatus according to claim i to 3, characterized in that on the one Slider crank gear (5, 6) with the help of a ratchet locking mechanism (2 to 4) step by step rotated main shaft (i), from which by worm gear (7, 8) and Helical gears (16, 17, = g, 2o) the chain wheels (= o, 14) are driven, one Control disk (28) is provided, which is designed as a lifting curve on its circumference is and moves the rod (24, 26) for the swinging of the board support lever (22), while on the other hand a stop (3o) provided on the disk is a rocker arm (32) causes the deflection, one end of which is attached to the control slide (35) for feeding the empty boards attacks and his other End is designed as a toothed sector (36) and also connected to a spur gear (37) stands, by the rotation of which another spur gear (4r) is rotated, which in engagement with a toothing provided on the underside of the slide (43) (42), which the boards carrying the finished stack from the path of the carrier chains (1i, 1.3) removed.
DEU9828D 1927-08-05 1927-08-05 Device for depositing, stacking and counting blanks cut from an endless web Expired DE476374C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEU9828D DE476374C (en) 1927-08-05 1927-08-05 Device for depositing, stacking and counting blanks cut from an endless web

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEU9828D DE476374C (en) 1927-08-05 1927-08-05 Device for depositing, stacking and counting blanks cut from an endless web

Publications (1)

Publication Number Publication Date
DE476374C true DE476374C (en) 1929-07-09

Family

ID=7566963

Family Applications (1)

Application Number Title Priority Date Filing Date
DEU9828D Expired DE476374C (en) 1927-08-05 1927-08-05 Device for depositing, stacking and counting blanks cut from an endless web

Country Status (1)

Country Link
DE (1) DE476374C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3344347A1 (en) * 1983-12-08 1985-06-13 Süka Hermann Jung GmbH & Co KG, 7512 Rheinstetten Apparatus for the concertina-type delivery of continuous paper coming from high-speed printers
DE10045883A1 (en) * 2000-09-14 2002-03-28 Heidelberger Druckmasch Ag Boom for a machine that processes braided substrates

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3344347A1 (en) * 1983-12-08 1985-06-13 Süka Hermann Jung GmbH & Co KG, 7512 Rheinstetten Apparatus for the concertina-type delivery of continuous paper coming from high-speed printers
DE10045883A1 (en) * 2000-09-14 2002-03-28 Heidelberger Druckmasch Ag Boom for a machine that processes braided substrates
US6776411B2 (en) 2000-09-14 2004-08-17 Heidelberger Druckmaschinen Ag Delivery for a machine for processing flat printing materials with adjustable pile underlay inserter conveyor

Similar Documents

Publication Publication Date Title
CH641416A5 (en) DEVICE ON A PACKAGING MACHINE FOR FORMING URGENT GROUPS OF DISC-SHAPED OBJECTS.
DE2030165C3 (en) Device for forming multi-layer groups of cigarettes
DE68901863T2 (en) DEVICE FOR STACKING ITEMS IN CRATES.
DE2432579A1 (en) Equipment for stacking books - has movable stacking supports mounted on lifting device controlled by impulse sender
DE476374C (en) Device for depositing, stacking and counting blanks cut from an endless web
CH466126A (en) Device for forming groups of flat objects
DE507473C (en) Machine for casting hollow objects out of chocolate
DE2450934B2 (en) Transfer device for the simultaneous transfer of articles
DE1176555B (en) Cigarette loading system on cigarette packing machines
DE526453C (en) Method and device for further processing of workpieces
DE655802C (en) Device for mixing tobacco
DE555020C (en) Leaf feeder for machines for removing flesh from fibrous leaf plants
DE1456733A1 (en) Device for the orderly delivery of thin stickers
DE1560143C (en)
DE389128C (en) Machine for the production of nut sugar, especially nut chocolate sticks
DE513748C (en) Rusk cutting machine
DE971599C (en) Device for stacking bags, sacks and. Like workpieces
DE491768C (en) Height conveyor for sheaves
DE654734C (en) Cutting device for bricks or the like.
DE255319C (en)
DE962056C (en) Device for ejecting cigarettes conveyed in a chain of troughs
DE545289C (en) Machine for cutting glass tubes
DE319949C (en) Asparagus peeling machine with band saw-like cutting tool
DE547440C (en) Device for depositing the workpieces coming from printing, inserting, collating and similar machines into an overall stack
DE674233C (en) Method and device for the uninterrupted operation of various types of paper processing machines operating at different speeds