DE443717C - Bending device for iron bars, especially those for installation in reinforced concrete ceilings - Google Patents

Bending device for iron bars, especially those for installation in reinforced concrete ceilings

Info

Publication number
DE443717C
DE443717C DEL61432D DEL0061432D DE443717C DE 443717 C DE443717 C DE 443717C DE L61432 D DEL61432 D DE L61432D DE L0061432 D DEL0061432 D DE L0061432D DE 443717 C DE443717 C DE 443717C
Authority
DE
Germany
Prior art keywords
iron
rod
bent
lever
bending device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEL61432D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DEL61432D priority Critical patent/DE443717C/en
Application granted granted Critical
Publication of DE443717C publication Critical patent/DE443717C/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D11/00Bending not restricted to forms of material mentioned in only one of groups B21D5/00, B21D7/00, B21D9/00; Bending not provided for in groups B21D5/00 - B21D9/00; Twisting
    • B21D11/10Bending specially adapted to produce specific articles, e.g. leaf springs
    • B21D11/12Bending specially adapted to produce specific articles, e.g. leaf springs the articles being reinforcements for concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Bending Of Plates, Rods, And Pipes (AREA)

Description

Die Erfindung betrifft eine Biegevorrichtung für Stabeisen, und zwar insbesondere für die bei Eisenbetonbauten zur Armierung der Decken bestimmten Eisenstäbe, die bekanntlich an beiden Enden "L-förmig gebogen und mit je einem Haken versehen werden. Es sind für die Biegung dieser Eisenstäbe bereits Vorrichtungen bekannt, bei denen das Eisen um zwei Zapfen gebogen wird; dieseThe invention relates to a bending device for bar iron, and in particular for the iron bars intended for reinforcing the ceilings in reinforced concrete buildings, which are known "L-shaped bent at both ends and each provided with a hook. Es devices are already known for the bending of these iron rods, in which the Iron is bent around two tenons; these

ίο Vorrichtungen sind aber verhältnismäßig schwer und nicht auf der Decke selbst zu verwenden, sondern sie müssen auf einer Platte oder Werkbank aufgeschraubt werden, können also nur auf dem Bauplatz oder in der Werkstätte aufgestellt werden. Die Biegung erfolgt in wagerechter Ebene.ίο Devices are proportionate difficult and not to use on the ceiling itself, but they have to be on one Plate or workbench can only be screwed on on the construction site or in the workshop. The bend takes place in a horizontal plane.

Diesen Vorrichtungen gegenüber betrifft der Erfindungsgegenstand eine äußerst einfache, leichte Biegevorrichtung, die auf der zuCompared to these devices, the subject matter of the invention relates to an extremely simple, lightweight bending device that is on the too

so bauenden Decke selbst verwendet werden kann. Die in die Decke einzulegendem Eisenstäbe werden auf die Decke verteilt, jeder Stab liegt also in ungebogenem Zustand auf seinem richtigen Platz und wird dann mittels der Vorrichtung an Ort und Stelle gebogen, ohne daß er einmal herumgedreht zu werden braucht.so building ceiling itself can be used. The iron rods to be inserted into the ceiling are distributed on the ceiling, each rod lies so in the unbent state in its correct place and is then by means of the device bent in place without needing to be turned around.

Die Vorrichtung besteht in der Hauptsache aus einer der Form der gebogenen Deckeneisen entsprechend geformten Fußplatte mit einer darauf verstellbar angeordneten Platte, an dereine ebenfalls den D eckeneisen entsprechend gebogene, mit Handhebel versehene Schiene von .I-förmigem Querschnitt drehbar angeordnet ist, deren unterer wagerechter Steg eine Aussparung besitzt.The device consists mainly of one of the shape of the curved ceiling irons appropriately shaped base plate with an adjustable plate arranged on it the one rail, which is also curved to match the ceiling iron and provided with a hand lever of .I-shaped cross-section is rotatably arranged, the lower horizontal web a Has recess.

Der Erfindungsgegenstand ist auf der Zeichnung beispielsweise dargestellt.The subject of the invention is shown in the drawing, for example.

Abb. ι zeigt die Vorrichtung in Ansicht.Fig. Ι shows the device in view.

Abb. 2 zeigt deren hinteren Teil im Längsschnitt. Abb. 3 zeigt die Vorrichtung im Grundriß.Fig. 2 shows its rear part in longitudinal section. Fig. 3 shows the device in plan.

Abb. 3a zeigt eine andere Ausführungsform. Fig. 3a shows another embodiment.

Abb. 4 und 5 stellen die Biegevorrichtung dar in der Anfangs- und Ends teilung beim Biegen der Endhaken,Fig. 4 and 5 show the bending device in the beginning and end division at Bending the end hooks,

Abb. 6 und 7 beim Biegen der "L-Form der Stäbe.Fig. 6 and 7 when bending the "L-shape of the Bars.

Die Vorrichtung ist nicht für starke Stabeisensorten, wie solche in Eisenbeton-trägem usw. verwendet werden, bestimmt, sondern insbesondere für Deckeneisen, die aus 10 bis 12 cm starkem Rundeisen hergestellt werden.The device is not designed for strong types of iron bars, such as those in reinforced concrete etc. are intended to be used, but in particular for ceiling irons that are from 10 to 12 cm thick round iron.

Die aus starkem Flacheisen bestehende Fußplatte α ist der "l_-förmigen Form der Dekkeneisen entsprechend und am hinteren Ende rechtwinklig nach unten abgebogen, so daß sie mit wagerechtem unteren Flansch b und hinterem Ende c auf dem Boden aufliegt. The base plate α made of strong flat iron is the "l_-shaped shape of the ceiling iron and bent downwards at right angles at the rear end so that it rests on the floor with horizontal lower flange b and rear end c.

Auf dem oberen Flansch d ist mittels zweier Schraubene eine Platte/ derart befestigt, daß ihr Abstand von der Platte/ mittels über die Schrauben auswechselbar zu schiebender Unterlagscheiben oder Rohrstückchen g der jeweili-A plate / is attached to the upper flange d by means of two screws e in such a way that its distance from the plate / by means of washers or pieces of pipe g of the respective

gen Stärke der zu biegenden Eiseinstäbe entspricht. An dem zu einem Auge Λ ausgebildeten vorderen Ende dieser Platte ist drehbar eine der Form der Deckenejsen und der Fußplatte« entsprechend gebogene Schiene/ von zweckentsprechend JL-förmigem Querschnitt angeordnet, die mittels eines langen Flacheisenhebels k bewegt werden kann. Zur Versteifung ist das Ende der Schiene/ mit dem ίο Hebel k durch ein Flac'heisen/ verbunden.gen strength of the iron rods to be bent. At the front end of this plate designed to form an eye is rotatably arranged a rail corresponding to the shape of the ceiling jets and the base plate / of appropriately JL-shaped cross-section, which can be moved by means of a long flat iron lever k . For stiffening, the end of the rail / is connected to the ίο lever k by a flat iron /.

Der wagerechte untere Flansch tn der Druckschiene i besitzt gegen das Auge Λ zu auf einer oder beiden Seiten eine Aussparung n, die so' groß sein muß, daß ihre untere Begrenzungsfläche im der Anfangsstellung mit der oberen Kante des Flansches d in eine Ebene fällt. Der Vorgang beim Biegen eines Stabes ist folgender: Der zu biegende Eisensitabs wird zwischen Platte/ und Flanschd der Fußplatte und durch die Aussparung« der niedergelegten Druckschiene ζ geschoben bis zu einer gewissen Länge, nachdem die der Eisens täxke entsprechend hohen Ringe g !eingesetzt wurden (Abb. 4). Hierauf wird der Hebel k nach hinten umgelegt, bis er auf der Platte/ aufliegt; dabei wird das freie Ende des Eisenstabes durch den wagerechten Flansch m der Druckschiene /■ (mit herumgezogen und zum Haken gebogen (Abb. 5). Der Eisenstab wird nun seitlich herausgenommen, 'die Vorrichtung um i8o° herumgedreht und der Eisenstab s wieder eingeschoben;, jedoch so, daß der angebogene Haken t an dem. senkrechten Steg c der Fußplatte liegt. Dabei muß vor dem Einlegen des Stabes der Hebel k hochgehoben werden, damit der Flansch m der Druckschiene/ über dem Stab liegt (Abb. 6), Hebel k wird nun abwärts gedruckt und der Stab s dadurch in die gewünschte "L-Form gebogen (Abb. 7).The horizontal lower flange tn of the pressure rail i has against the eye Λ on one or both sides a recess n, which must be so 'large that its lower boundary surface in the initial position coincides with the upper edge of the flange d in a plane. The process of bending a rod is as follows: The iron tab to be bent is pushed between plate / and flange d of the base plate and through the recess "of the pressure rail ζ laid down to a certain length, after the rings g !" (Fig. 4). The lever k is then turned backwards until it rests on the plate /; The free end of the iron rod is pulled through the horizontal flange m of the pressure rail / ■ (pulled around and bent into a hook (Fig. 5). The iron rod is now removed from the side, the device is turned around 180 ° and the iron rod is pushed back in; , but so that the bent hook t lies on the vertical web c of the base plate. Before inserting the rod, the lever k must be lifted so that the flange m of the pressure rail / lies above the rod (Fig. 6), lever k is now printed downwards and the rod s is bent into the desired "L-shape" (Fig. 7).

Es wird nicht ein Stab nach dem anderen fertiggebogen. Das würde zu viel Zeit beanspruchen. Es wird vielmehr wie folgt verfahren: Auf der zu bauenden Decke werden sämtliche erforderlichen Eisenstäbe verteilt hingelegt, so daß jeder Stab an seiner bestimmten Stelle liegt, an der er eingebettet werden soll. Der Arbeiter schreitet nur die ganze Deckenlänge ab und macht dabei an jeden Stab mit Kreide meinen Strich an denjenigen Stellen, bis zu deinen die Stäbe zum. Biegen jeweils in die Vorrichtung geschoben werden müssen. Hierauf biegt der Arbeiter mit der Vorrichtung auf einer Seite an sämtliehen Stäben nacheinander die Endhaken an (Abb. 4 und 5). Ist er am Ende der Decke angelangt, so dreht er seine Vorrichtung um und geht damit zurück, dabei jeden Stab in die "L-förmige Form biegend (Abb. 6 und 7). Damit sind sämtliche Stäbe auf einer Seite fertiggebogen. Der Arbeiter begibt sich nun mit der Vorrichtung auf die andere Deckenseite und verfährt in gleicher Weise.One rod after the other is not finish-bent. That would take too much time. Rather, the procedure is as follows: All the necessary iron rods are distributed on the ceiling to be built laid down so that each rod lies in its specific place where it is embedded shall be. The worker only walks the entire length of the ceiling and turns on each stick with chalk my line on that one Place, up to yours the bars to. Bending each pushed into the device Need to become. The worker then bends all of them with the device on one side Stick the end hooks one after the other (Fig. 4 and 5). When he has reached the end of the ceiling, he turns his device over and goes back with it, bending each rod into the "L-shaped" shape (Figs. 6 and 7). This means that all rods are bent on one side. The worker now goes with the device on the other side of the ceiling and proceed in the same way.

Die ganze Arbeit geht infolge der leichten Bauart und der einfachen Handhabung der Biegevorrichtung äußerst rasch vonstatten. Es ist nicht mehr nötig, die Deckeneisen, in der Werfestätte vorher zu biegen, wobei sie mehrmals in die Hand genommen und gedreht werden müssen; auch das Aufbringen der Eisenstäbe ist in.ungebogenem Zustande viel leichter als in gebogenem Zustand.All of the work is due to the lightweight design and ease of use of the The bending device works extremely quickly. It is no longer necessary to put the ceiling iron in To bend Werfeststätte beforehand, taking them several times in the hand and turning them have to; The application of the iron rods is also much easier in the unbent condition than in a bent state.

Die Biegevorrichtung kann noch weiter dadurch vervollkommnet werden, daß auf der Platte / und dem Hebel k zwei Sitahlbacken ο angeordnet werden, so daß sie gleichzeitig zum Abschneiden der Eisenstäbe benutzt werden kann. In Abb. 1 bis 3 ist dies beispielsweise dargestellt.The bending device can be still further improved by the fact that on the plate / and the lever k be two Sitahlbacken ο arranged so that they can be used simultaneously for cutting the iron rods. In Fig. 1 to 3 this is shown for example.

Die Biegevorrichtung kann ferner auch in anderem Werkstoff, beispielsweise Stahl- oder Temperguß, hergestellt werden, wodurch die äußere Formgebung derselben eine entsprechende Änderung erfahren würde, wie Abb. 3a zeigt. Die Handhabung und Wirkungsweise bleibt genau dieselbe wie bei der Ausführung in Schmiedeeisen, dagegen würde sich die Herstellung vereinfachen und dadurch verbilligen.The bending device can also be made of another material, for example steel or Malleable cast iron, are produced, whereby the outer shape of the same a corresponding Change, as shown in Fig. 3a. The handling and mode of action remains exactly the same as in the execution in wrought iron, on the other hand, the production would be simplified and therefore cheaper.

Claims (1)

Patentanspruch :Claim: Biegevorrichtung für Eisenstäbe, insbesondere solche für den Einbau in Eisenbetondecken, gekennzeichnet durch eine der "L-Form der Stäbe entsprechend geformte Fußplatte (0) mit einer darauf befestigten, entsprechend der Stabstärke verstellbaren Platte (/), an deren vorderem Ende ^eine mit Handhebel {k) versehene, der Fußplatte (a) entsprechend gebogene Druckschiene (i) von1* _l_-förmigem Querschnitt drehbar gelagert ist, deren wagerechter unterer Flansch (m) auf einer oder beiden Seiten vor dem Drehpunkt der Schiene eine Aussparung (li) besitzt, durch welche das Ende des zu biegenden Stabes (s) geschoben und durch Umlegen des · Hebels (Ji) zu einem Hakens (έ) gebogen wird, während nach Umdrehung der Vorrichtung um i8o° durch Niederdrücken des Hebels (k) hinter dem Haken dem Stab die gewünschte "L-förmige Abkröpfung gegeben wird, zum Zwecke, die auf der im Bau befindlichen Betondecke verteilt liegenden geraden Eisenstäbe an Ort und Stelle nacheinander biegen zu können.Bending device for iron rods, especially those for installation in reinforced concrete ceilings, characterized by a base plate (0) shaped according to the "L-shape of the rods, with a plate (/) attached to it, adjustable according to the rod thickness, at the front end ^ one with a hand lever {k) provided, the foot plate (a) correspondingly curved pressure rail (i) of 1 * _l_-shaped cross-section is rotatably mounted, the horizontal lower flange (m) has a recess (li) on one or both sides in front of the pivot point of the rail , through which the end of the rod (s) to be bent is pushed and bent into a hook (έ) by turning the lever (Ji) , while after turning the device by 180 ° by pressing down the lever (k) behind the hook the Rod is given the desired "L-shaped bend, for the purpose of being able to bend the straight iron rods distributed on the concrete ceiling under construction one after the other on the spot. Hierzu 1 Blatt Zeichnungen:1 sheet of drawings:
DEL61432D 1924-10-17 1924-10-17 Bending device for iron bars, especially those for installation in reinforced concrete ceilings Expired DE443717C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEL61432D DE443717C (en) 1924-10-17 1924-10-17 Bending device for iron bars, especially those for installation in reinforced concrete ceilings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEL61432D DE443717C (en) 1924-10-17 1924-10-17 Bending device for iron bars, especially those for installation in reinforced concrete ceilings

Publications (1)

Publication Number Publication Date
DE443717C true DE443717C (en) 1927-05-07

Family

ID=7280351

Family Applications (1)

Application Number Title Priority Date Filing Date
DEL61432D Expired DE443717C (en) 1924-10-17 1924-10-17 Bending device for iron bars, especially those for installation in reinforced concrete ceilings

Country Status (1)

Country Link
DE (1) DE443717C (en)

Similar Documents

Publication Publication Date Title
DE803433C (en) Extendable formwork support for concrete ceilings or the like.
DE2145809B2 (en) Device for bending welded wire mesh
CH568457A5 (en) Frame for concrete ceiling mfr - has trimming pole drawn over rails with level determined by spindle and pipe on formwork
DE2104272A1 (en) Connecting piece
DE2721453A1 (en) Easily erected and demolished structures, such as the hall, as well as the assembly process for it
DE443717C (en) Bending device for iron bars, especially those for installation in reinforced concrete ceilings
DE2111812C3 (en) Straightening device for vehicles deformed by accident
DE325345C (en) Connection for the wall panels of double-walled, dismountable structures
DE887108C (en) Roll-up formwork
DE814652C (en) Roof trusses
DE1907715A1 (en) Formwork frame for the production of recesses in concrete walls or the like., In particular for door and window openings
DE1960222B2 (en) Wall
DE2143167C3 (en) Spacers for concrete reinforcement
DE539020C (en) Holder for curtain strips
DE2843457A1 (en) External wall cladding panel base hook - has cut=out on top attachment for insertion in rail slot, engaging edge
DE202021104872U1 (en) Spacer for a formwork
DE557160C (en) Process for the production of tubs with an upper bead pointing towards the interior of the tub
DE876799C (en) Form piece for machines and devices for bending rod inserts for reinforced concrete
DE531237C (en) Formwork beams
DE661981C (en) Work scaffolding for buildings, especially for house facades
DE495702C (en) Device for bending rods, strips or the like iron with the aid of a bending plate
DE562655C (en) Spreading and supporting device for a flexible formwork for the production of cavities in concrete structures
DE266834C (en)
DE1858432U (en) CLAMP FOR PILLAR FORMWORK.
DE1864712U (en) DEVICE FOR CUTTING AND BENDING WIRE MATS, IN PARTICULAR STRUCTURAL STEEL MATS.