DE4405571A1 - Method of assembling and dismantling scaffolding platform - Google Patents

Method of assembling and dismantling scaffolding platform

Info

Publication number
DE4405571A1
DE4405571A1 DE4405571A DE4405571A DE4405571A1 DE 4405571 A1 DE4405571 A1 DE 4405571A1 DE 4405571 A DE4405571 A DE 4405571A DE 4405571 A DE4405571 A DE 4405571A DE 4405571 A1 DE4405571 A1 DE 4405571A1
Authority
DE
Germany
Prior art keywords
console
scaffold
scaffolding
basket
transport basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE4405571A
Other languages
German (de)
Other versions
DE4405571B4 (en
Inventor
Hans-Wilhelm Schweitzer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huennebeck Deutschland GmbH
Original Assignee
Thyssen Huennebeck GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Thyssen Huennebeck GmbH filed Critical Thyssen Huennebeck GmbH
Priority to DE4405571A priority Critical patent/DE4405571B4/en
Publication of DE4405571A1 publication Critical patent/DE4405571A1/en
Application granted granted Critical
Publication of DE4405571B4 publication Critical patent/DE4405571B4/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/06Consoles; Brackets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G19/00Auxiliary treatment of forms, e.g. dismantling; Cleaning devices
    • E04G19/003Arrangements for stabilising the forms or for moving the forms from one place to another
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/06Consoles; Brackets
    • E04G5/062Consoles; Brackets specially adapted for attachment to building walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G2005/008Hoisting devices specially adapted as part of a scaffold system

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Warehouses Or Storage Devices (AREA)

Abstract

The method uses, as a first step, a combination (1) made from a scaffolding frame (2) and a releasably attached delivery basket (3) raised by a crane. In the second step frame supports (10) are mounted on the wall surface (30). In the third step, the combination is suspended in the frame supports and finally in the fourth step, the delivery basket is released and lowered by the crane hook (26).

Description

Die Erfindung betrifft ein Verfahren zur Montage/Demontage von Gerüst­ teilen, insbesondere Gerüstkonsolen mit den Merkmalen des Oberbegriffs des Patentanspruchs 1 sowie eine Vorrichtung zur Durchführung des Ver­ fahrens mit den Merkmalen des Patentanspruchs 2.The invention relates to a method for assembling / disassembling scaffolding share, especially scaffold consoles with the features of the generic term of claim 1 and a device for performing the Ver driving with the features of claim 2.

Gerüstteile, insbesondere Gerüstkonsolen werden üblicherweise mittels Konsollager lösbar an Wänden oder dergleichen befestigt. Zur Montage der Konsollager ist es zunächst nötig, in der Wand eine sogenannte An­ kerstelle vorzusehen. In dieser Ankerstelle werden Schrauben, Bolzen oder dergleichen mit angeformtem Kopf verbracht. In diese Befestigungs­ mittel werden anschließend die Konsollager eingehakt. Die zu befesti­ genden Gerüstteile wie Gerüstkonsolen werden anschließend mittels eines Krans angehoben und in die Konsollager eingehängt. Soll die Gerüstkon­ sole an eine höhere Stelle der Wand verbracht werden, ist es bisher nötig, die höherliegenden Konsollager dadurch zu montieren, daß eine auf der Gerüstkonsole lagernde Leiter gegen die Wand gestellt wird. Die Montage der Konsollager erfolgt dann von der Leiter aus. Zum Versetzen der Gerüstkonsole ist es dann notwendig, diese wiederum an einen Kran zu befestigen und sie hochzufahren. Zur Demontage der nun darunterlie­ genden Konsollager war es bisher nötig, vor dem Höherfahren der Gerüst­ konsole an die Gerüstkonsole eine Nachlaufbühne zu montieren, von der aus dann die Demontage der sich unter der Gerüstkonsole befindenden Konsollager stattfinden konnte.Scaffolding parts, in particular scaffolding consoles, are usually used Console storage releasably attached to walls or the like. For assembly the console warehouse is initially necessary, a so-called in the wall to be provided. In this anchor point are screws, bolts or the like with a molded head. In this attachment The console warehouse is then hooked on. To fasten the scaffolding parts such as scaffolding consoles are then Crane raised and hung in the console warehouse. Should the scaffold con So far it has been brought to a higher position on the wall necessary to assemble the higher-lying console warehouse in that a ladder on the scaffold console is placed against the wall. The The bracket warehouse is then assembled from the ladder. To move the scaffold console then needs to be attached to a crane to attach and start it up. To dismantle the now underneath Before the scaffolding had to be lifted, it was necessary to use the console store to attach a caster to the scaffold console from which then the disassembly of those located under the scaffold console Console warehouse could take place.

Die bisherigen Verfahren zur Montage von Gerüstkonsolen oder derglei­ chen machten hohe Rüstzeiten erforderlich. Zudem ist das Anstellen ei­ ner Leiter auf einer Gerüstkonsole gegen eine Wand eine nicht ungefähr­ liche und laut UVV nicht erlaubte Maßnahme, da es durch Rutschen oder Kippen der Leiter leicht zu Unfällen kommen kann.The previous methods for assembling scaffold consoles or the like This made long set-up times necessary. The hiring is also egg A ladder on a scaffold console against a wall is not a coincidence Measure that is not permitted according to the UVV, as it can be caused by slipping or Tipping the ladder can easily lead to accidents.

Der Erfindung liegt daher die Aufgabe zugrunde, die Montage/Demontage von Gerüstteilen, wie Gerüstkonsolen schneller und sicherer zu gestal­ ten.The invention is therefore based on the task of assembly / disassembly of scaffolding parts, such as scaffolding consoles, faster and safer ten.

Diese Aufgabe wird erfindungsgemäß mit einem Verfahren mit den Merkma­ len des kennzeichnenden Teils des Patentanspruchs 1 gelöst.This object is achieved with a method with the characteristics len of the characterizing part of claim 1 solved.

Weitere vorteilhafte Ausgestaltungen der Erfindung sind Gegenstand der Unteransprüche.Further advantageous embodiments of the invention are the subject of Subclaims.

Bei dem erfindungsgemäßen Verfahren wird eine mit einem Beförderungs­ korb lösbar verbundene Gerüstkonsole mittels Kran angehoben. Von dem Beförderungskorb aus nimmt ein Monteur die Anlage der Ankerstellen und die Montage der Konsollager vor. Zur Anlage mehrerer Ankerstellen und mehrerer Konsollager brauchen Beförderungskorb und Gerüstkonsole ledig­ lich seitlich verschwenkt werden. Nach der Montage der Gerüstkonsolla­ ger erfolgt das Einhängen der Konsole in die Konsollager. Zur Demontage von höher- bzw. tieferliegenden Konsollagern ist es lediglich nötig, die Gerüstkonsole aus den Konsollagern zu lösen und zu den zu demontie­ renden Konsollagern hoch- bzw. runterzufahren. Eine Montage einer Nach­ laufbühne an die Gerüstkonsole zur Demontage tieferliegender Konsolla­ ger ist nicht nötig. Als Rüstzeiten fallen nunmehr nur noch die Zeiten zur Befestigung des Korbes an die Gerüstkonsole, das Einhängen des Kranhakens in dafür vorgesehene Befestigungspunkte des Transportkorbes sowie das Lösen des Korbes von der Gerüstkonsole und das Entfernen des Korbes von der Gerüstkonsole an. Das Lösen und Entfernen des Korbes von der Gerüstkonsole ist nötig, um ein bequemes und störungsfreies Arbei­ ten auf der Gerüstkonsole zu ermöglichen. Durch dieses Verfahren kann auch die Zeit zur Demontage und zum Verschließen der Ankerstelle ver­ kürzt werden, da es bisher nötig war, das Konsollager auszuhaken, von der Leiter zu steigen, das Konsollager auf der Gerüstkonsole abzulegen, wieder auf die Leiter zu steigen und die Ankerstelle zu verschließen. Nunmehr ist es möglich, das Konsollager auszuhaken, unter sich in den Korb zu legen und die Ankerstelle sofort zu verschließen. Auch hier­ durch kann die Rüstzeit erheblich verkürzt werden. In the method according to the invention, one with a transport Basket detachably connected scaffold console raised by crane. Of the Carrier from a fitter takes the installation of the anchor points and the assembly of the console warehouse. To create multiple anchor points and several console warehouses only need the transport basket and scaffold console be swiveled laterally. After assembling the scaffold bracket The console is hung into the console warehouse. For disassembly from higher or lower console warehouses, it is only necessary to remove the scaffold console from the console stores and to disassemble to ramp up or down the consoles. An assembly of an after Platform to the scaffold console for dismantling the lower console ger is not necessary. Now only the times fall as set-up times for attaching the basket to the scaffold console, hanging the Crane hooks in the designated attachment points of the transport basket as well as detaching the basket from the scaffolding console and removing the Basket from the scaffold console. Detaching and removing the basket from the scaffolding console is necessary to make work comfortable and trouble-free enable on the scaffold console. Through this procedure also the time to disassemble and close the anchor point be shortened, since it was previously necessary to unhook the console warehouse from to climb the ladder, to put the console store on the scaffold console, get back on the ladder and lock the anchor point. Now it is possible to unhook the console warehouse, among themselves in the Lay the basket and close the anchorage immediately. Here too the set-up time can be shortened considerably.  

Mit dem erfindungsgemäßen Verfahren ist es also möglich, Konsollager schnell und sicher zu montieren/demontieren.With the method according to the invention it is therefore possible to use console storage assemble / disassemble quickly and safely.

Die erfindungsgemäße Vorrichtung zur Durchführung des Verfahrens wird nachstehend an Hand des in der Zeichnung dargestellten Ausführungsbei­ spiels erläutert, die
die perspektivische Ansicht eines bevorzugten Ausführungsbeispiels der Vorrichtung gemäß der Erfindung zeigt.
The inventive device for performing the method is explained below with reference to the game Ausführungsbei shown in the drawing
the perspective view of a preferred embodiment of the device according to the invention shows.

Eine Konsolen/Beförderungskorb-Kombination (1) besteht aus einer Klapp- oder Hängegerüstkonsole (2) und einem Beförderungskorb (3). Die Gerüst­ konsole (2) weist Querträger (4) auf, die über eine Lauffläche (7) mit­ einander verbunden sind. Vorteilhafterweise kann die Lauffläche die Form von Laufbrettern aufweisen. Rechtwinklig von den Trägern (4) ab­ stehende Streben (5) stützen sich mit Stützlagern (16) gegen eine nur schematisch dargestellte Wand (30) ab. Zur Verfestigung der Streben (5) sind diese durch Querstreben (8) mit den Trägern (4) der Gerüstkonsole (2) verbunden. Am oberen Ende einer Strebe (5) ist jeweils ein Träger­ kopf (14) angeformt. Der Trägerkopf (14) ist beim Klappgerüst (2) über ein Trägerscharnier (15) mit dem Träger (4) verbunden. An dem der Wand (30) zugewandten Seite des Trägerkopfes (14) ist an diesen ein Kopf­ stück (9) angeformt. Das Kopfstück (9) weist rechtwinklig von diesem abstehende Zapfen (13) auf, die in entsprechende Ausnehmungen eines Konsollagers (10) eingreifen. Durch den Pfeil (19) wird angedeutet, daß die Gerüstkonsole (2) senkrecht in das Konsollager (10) verbracht wird. Das Konsollager (10) weist ein Ankerwiderlager (11) für einen Ankerbol­ zen (12) auf; der Pfeil (17) deutet an, daß der Ankerbolzen (12) in eine Ankerstelle (31) zu verbringen ist. Üblicherweise ist der Anker­ bolzen (12) als Gewindekonus ausgestaltet, der vor der Montage des Kon­ sollagers (10) in die Ankerstelle (31) einbetoniert wird.A console / transport basket combination ( 1 ) consists of a folding or suspended scaffold console ( 2 ) and a transport basket ( 3 ). The scaffold console ( 2 ) has cross members ( 4 ) which are connected to one another via a running surface ( 7 ). The tread can advantageously have the shape of running boards. Struts ( 5 ) standing at right angles from the supports ( 4 ) are supported with support bearings ( 16 ) against a wall ( 30 ) which is only shown schematically. To solidify the struts ( 5 ), these are connected to the supports ( 4 ) of the scaffold console ( 2 ) by cross struts ( 8 ). At the upper end of a strut ( 5 ) a support head ( 14 ) is formed. The support head ( 14 ) in the folding scaffold ( 2 ) is connected to the support ( 4 ) via a support hinge ( 15 ). On the side of the support head ( 14 ) facing the wall ( 30 ), a head piece ( 9 ) is molded onto it. The head piece ( 9 ) has pins ( 13 ) protruding from it at right angles, which engage in corresponding recesses in a console bearing ( 10 ). The arrow ( 19 ) indicates that the scaffold console ( 2 ) is moved vertically into the console store ( 10 ). The console bearing ( 10 ) has an anchor abutment ( 11 ) for an anchor bolt ( 12 ); The arrow ( 17 ) indicates that the anchor bolt ( 12 ) is to be placed in an anchor point ( 31 ). Usually, the anchor bolt ( 12 ) is designed as a thread cone, which is concreted into the anchor point ( 31 ) before the assembly of the con bearing ( 10 ).

Zur Arbeitssicherung weist die Gerüstkonsole (2) auf der der Wand abge­ wandten Seite ein Geländer (6) auf. Das Geländer (6) kann zum besseren Transport durch ein Geländerscharnier (18) an die Gerüstkonsole ange­ klappt werden. Durch Aushängen der Querstrebe (8) ist es zwecks besse­ ren Transportes auch möglich, die Strebe (5) durch das Trägerscharnier (15) gegen die Gerüstkonsole (2) anzuklappen.For safety at work, the scaffold console ( 2 ) has a railing ( 6 ) on the side facing away from the wall. The railing ( 6 ) can be folded for better transport by a railing hinge ( 18 ) on the scaffold console. By unhooking the cross strut ( 8 ), it is also possible for better transport to fold the strut ( 5 ) through the carrier hinge ( 15 ) against the scaffold bracket ( 2 ).

Der Beförderungskorb (3) ist an seiner Unterseite mit Trägern (21) ver­ bunden, diese verlaufen parallel zu den Laufbrettern (7) und liegen auf diesen auf. Die Träger (21) können auch in der Bodenkonstruktion des Korbes integriert sein. Die Träger (21) können vorteilhafterweise die Form von Doppel-L-Trägern aufweisen. Zur Verbindung des Beförderungs­ korbes (3) mit der Gerüstkonsole (2) dienen in die Laufbretter (7) ein­ gelassene Kranösen (22). Zum behinderungsfreien Arbeiten auf der Ge­ rüstkonsole (2) sind die Kranösen (22) durch eine Versenkung (28) in die Laufbretter (7) abgesenkt. Zur Befestigung der Gerüstkonsole (2) mit dem Beförderungskorb (3) werden die Kranösen (22) aus der Versen­ kung (28) nach oben gezogen, wobei Befestigungsmittel (27) sicherstel­ len, daß die Kranösen (22) nicht über einen bestimmten Punkt hinaus aus den Laufbrettern (7) herausgezogen werden können, und über die Träger (21) des Beförderungskorbes (3) gelegt. Um die Kranösen (22) mit den Trägern (21) zu sichern, können Sicherungsbolzen (23) vorgesehen sein.The transport basket ( 3 ) is connected on its underside with carriers ( 21 ), these run parallel to the running boards ( 7 ) and rest on them. The carriers ( 21 ) can also be integrated in the base construction of the basket. The carriers ( 21 ) can advantageously have the shape of double L-carriers. To connect the transport cage ( 3 ) with the scaffold console ( 2 ) serve in the running boards ( 7 ) a relaxed crane eyelets ( 22 ). For unobstructed work on the scaffolding console ( 2 ), the crane eyes ( 22 ) are lowered into the running boards ( 7 ) by a countersink ( 28 ). To attach the scaffold bracket ( 2 ) with the transport basket ( 3 ), the crane eyelets ( 22 ) are pulled upwards from the recess ( 28 ), fastening means ( 27 ) ensuring that the crane eyelets ( 22 ) do not exceed a certain point can be pulled out of the running boards ( 7 ), and placed over the carrier ( 21 ) of the transport basket ( 3 ). To secure the crane eyelets ( 22 ) with the supports ( 21 ), securing bolts ( 23 ) can be provided.

Der allseitig geschlossene Beförderungskorb (3) besitzt an den erfor­ derlichen Stellen Arbeitsöffnungen und weist Seitenteile (20) auf, wo­ bei ein Seitenteil einen Einstieg (24) aufweisen kann. Der Beförde­ rungskorb (3) weist eine Aufhängung (25) auf, in die ein Kranhaken (26) eingehängt werden kann. In der Zeichnung ist die Aufhängung (25) nur schematisch angedeutet; sie kann den Erfordernissen entsprechend ge­ wählt werden.The transport basket ( 3 ), which is closed on all sides, has working openings at the required points and has side parts ( 20 ), where a side part can have an entry ( 24 ). The promotion basket ( 3 ) has a suspension ( 25 ) into which a crane hook ( 26 ) can be hung. In the drawing, the suspension ( 25 ) is only indicated schematically; it can be selected according to the requirements.

Durch die einfache Verbindung des Beförderungskorbes (3) mit der Ge­ rüstkonsole (2) mittels Trägern (21) und Kranösen (22) ist einerseits eine sichere Verbindung des Beförderungskorbes (3) mit der Gerüstkon­ sole (2) und eine schnelle und bequeme Montage/Demontage des Beförde­ rungskorbes (3) gewährleistet. Zudem ist durch die Konsolen/Beförde­ rungskorb-Kombination (1) ein schnelles und sicheres Montieren/Demon­ tieren von Konsollagern (10) einerseits und von Gerüstkonsolen (2) an­ dererseits möglich; denn zum einen können die Konsollager vom Beförde­ rungskorb (3) aus schnell und sicher montiert/demontiert und die Anker­ stellen (31) schnell und sicher angelegt bzw. verschlossen werden und zum anderen ist es nunmehr möglich, ohne Umrüsten der Konsole bzw. des Krans die Konsole (2) nach der Montage von Konsollagern (10) in diese einzuhängen.The simple connection of the transport basket ( 3 ) with the scaffolding console ( 2 ) by means of brackets ( 21 ) and crane eyelets ( 22 ) on the one hand ensures a secure connection of the transport basket ( 3 ) with the scaffold bracket ( 2 ) and quick and easy assembly / Disassembly of the transport basket ( 3 ) guaranteed. In addition, the bracket / transport basket combination ( 1 ) enables quick and safe assembly / disassembly of bracket bearings ( 10 ) on the one hand and scaffold brackets ( 2 ) on the other; Because, on the one hand, the console warehouse can be quickly and safely assembled / disassembled from the transport cage ( 3 ) and the anchoring points ( 31 ) can be quickly and securely attached or closed, and on the other hand it is now possible without having to change the console or the crane hang the bracket ( 2 ) into the bracket brackets ( 10 ).

Claims (6)

1. Verfahren zur Montage/Demontage von Gerüstteilen, insbesondere Ge­ rüstkonsolen, Klappgerüsten oder dergleichen, bei dem Konsollager auf unterschiedlicher Höhe an einer Wand montiert/demontiert werden und bei dem Gerüstkonsolen in die Konsollager ein- bzw. ausgehängt werden, dadurch gekennzeichnet, daß in einem ersten Schritt eine Kombination (1) aus einer Gerüstkonsole (2) und einem Beförderungskorb (3) angehoben wird, daß in einem zweiten Schritt Konsollager (10) an einer Wand (30) montiert wird, daß in einem dritten Schritt die Kombination (1) in die Konsollager (10) eingehängt wird und daß in einem vierten Schritt der Beförderungs­ korb (3) demontiert und abgesenkt wird.1. A method for assembling / disassembling scaffolding parts, in particular Ge scaffolding consoles, folding scaffolding or the like, are mounted / dismantled in the console storage at different heights on a wall and are hung or unhooked in the scaffolding consoles in the console storage, characterized in that in in a first step, a combination ( 1 ) of a scaffold bracket ( 2 ) and a transport basket ( 3 ) is raised, that in a second step bracket bracket ( 10 ) is mounted on a wall ( 30 ), that in a third step the combination ( 1 ) is suspended in the console warehouse ( 10 ) and that in a fourth step the transport basket ( 3 ) is dismantled and lowered. 2. Gerüstkonsole (2) mit horizontalen Querträgern (4) und rechtwinklig von den Querträgern (4) abstehenden und parallel zu einer Wand (30) sich erstreckenden Streben (5), mit einer auf den Querträgern (4) aufliegenden horizontalen Lauffläche (7), mit an die Streben ange­ formten Trägerkopf (14) mit Kopfstück (9) mit rechtwinklig von dem Kopfstück (9) abstehenden Zapfen (13) und mit in der Lauffläche (7) angeordneten Kranösen (22) zum Durchführen des Verfahrens nach An­ spruch 1, dadurch gekennzeichnet, daß auf der Gerüstkonsole (2) ein Beförderungskorb (3) angeordnet ist.2. Scaffold console ( 2 ) with horizontal cross members ( 4 ) and struts ( 5 ) projecting at right angles from the cross members ( 4 ) and extending parallel to a wall ( 30 ), with a horizontal running surface ( 7 ) resting on the cross members ( 4 ) , with the struts formed carrier head ( 14 ) with head piece ( 9 ) with right-angled from the head piece ( 9 ) projecting pin ( 13 ) and in the tread ( 7 ) arranged crane eyes ( 22 ) for performing the method according to claim 1 , characterized in that a transport basket ( 3 ) is arranged on the scaffold console ( 2 ). 3. Gerüstkonsole nach Anspruch 2, dadurch gekennzeichnet, daß der Be­ förderungskorb (3) lösbar auf der Gerüstkonsole (2) angeordnet ist.3. scaffold console according to claim 2, characterized in that the loading promotion basket ( 3 ) is detachably arranged on the scaffold console ( 2 ). 4. Gerüstkonsole nach einem der Ansprüche 1 und 2, dadurch gekenn­ zeichnet, daß an den Beförderungskorb (3) Träger (21) befestigt sind. 4. scaffold console according to one of claims 1 and 2, characterized in that on the transport basket ( 3 ) carrier ( 21 ) are attached. 5. Gerüstkonsole nach Anspruch 4, dadurch gekennzeichnet, daß die Trä­ ger (21) des Beförderungskorbes (3) an die Gerüstkonsole (2) durch die Kranösen (22) in senkrechter Richtung festlegbar sind.5. scaffold console according to claim 4, characterized in that the Trä ger ( 21 ) of the transport basket ( 3 ) to the scaffold console ( 2 ) by the crane eyelets ( 22 ) can be fixed in the vertical direction. 6. Gerüstkonsole nach einem der Ansprüche 4 und 5, dadurch gekenn­ zeichnet, daß die Träger (21) mit ein horizontales Herausrutschen aus den Kranösen (22) verhinderndes Sicherungsmittel (23) versehen sind.6. scaffolding console according to one of claims 4 and 5, characterized in that the carrier ( 21 ) with a horizontal slipping out of the crane eyelets ( 22 ) preventing securing means ( 23 ) are provided.
DE4405571A 1994-02-22 1994-02-22 Method for assembling scaffolding parts and device for carrying out the method Expired - Fee Related DE4405571B4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE4405571A DE4405571B4 (en) 1994-02-22 1994-02-22 Method for assembling scaffolding parts and device for carrying out the method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE4405571A DE4405571B4 (en) 1994-02-22 1994-02-22 Method for assembling scaffolding parts and device for carrying out the method

Publications (2)

Publication Number Publication Date
DE4405571A1 true DE4405571A1 (en) 1995-08-24
DE4405571B4 DE4405571B4 (en) 2004-11-04

Family

ID=6510824

Family Applications (1)

Application Number Title Priority Date Filing Date
DE4405571A Expired - Fee Related DE4405571B4 (en) 1994-02-22 1994-02-22 Method for assembling scaffolding parts and device for carrying out the method

Country Status (1)

Country Link
DE (1) DE4405571B4 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103382767B (en) * 2013-07-31 2016-04-13 江苏高博智融科技有限公司 The support of basket of a kind of multiple orientation counterweight

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2802220A1 (en) * 1978-01-19 1979-07-26 Wolfgang Baumann Wall bracket for mounting catch net - has offset supports with arm swinging between positions for supporting boards or net

Also Published As

Publication number Publication date
DE4405571B4 (en) 2004-11-04

Similar Documents

Publication Publication Date Title
DE3832066A1 (en) SCAFFOLDING PART
WO2002103136A2 (en) Dismountable scaffolding
EP0308882B1 (en) Platform for scaffolds
DE20001948U1 (en) Protective scaffold to be used in construction
DE3925518A1 (en) Walkway attached to outside wall of building - can be positioned at any required height using bracket structure
DE19625545A1 (en) Connection device of a support bar
DE4405571A1 (en) Method of assembling and dismantling scaffolding platform
DE820963C (en) Scaffolding with stands made of tubes
CH666318A5 (en) FRAME ELEMENT.
EP0965289A2 (en) Knockdown storage rack
DE3122593A1 (en) Console rack, preferably for working on the outer wall or inner wall of ships
DE3922722C2 (en)
DE19821323A1 (en) Safety system for scaffolding operations
EP3967831A1 (en) Anti-fall device for reinforced soil
WO2023116965A1 (en) Arrangement of scaffolding components and method for assembling such an arrangement
DE4114328C2 (en) Device for hanging a bracket frame element
DE10157980B4 (en) Height-adjustable ladder or stepladder platform
DE20004389U1 (en) Set of components for a scaffold
EP0409051A2 (en) Scaffolding
DE102004020345B4 (en) Support system for a Konsolgerüst and Konsolgerüst having the carrier system
EP0758206B1 (en) Locking element for a plug-in stand or rack
DE4338654C2 (en) Device for handling building components
DE2531526A1 (en) Building scaffolding platform fall safety device - with swivelling flap on ladder to cover platform entry opening
DE10100963A1 (en) Bracket scaffolding, for suspension at a building to support a platform, has an extension at the holding members to support a wider platform
DE2063219A1 (en) Method for suspending working platforms on structures and suspended working platforms

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee