DE438527C - Construction elevator - Google Patents
Construction elevatorInfo
- Publication number
- DE438527C DE438527C DEP51841D DEP0051841D DE438527C DE 438527 C DE438527 C DE 438527C DE P51841 D DEP51841 D DE P51841D DE P0051841 D DEP0051841 D DE P0051841D DE 438527 C DE438527 C DE 438527C
- Authority
- DE
- Germany
- Prior art keywords
- guide
- mast
- load carrier
- guide body
- construction elevator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
- B66B9/16—Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure
- B66B9/187—Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure with a liftway specially adapted for temporary connection to a building or other structure
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Transportation (AREA)
- Automation & Control Theory (AREA)
- Types And Forms Of Lifts (AREA)
Description
Bauaufzug. Es sind Lastenaufzüge für Neubauten bekannt, bei denen ein Führungskörper an einem einzigen aus aufeinandergesetzten Rohren, U-Eisen usw. bestehenden Führungsmast auf und ab gleitbar angeordnet ist, wobei der Lastenbehälter seinerseits wieder an dem Führungskörper drehbar oder verstellbar angebracht ist, um einerseits den Führungsmast möglichst nahe an dem Baugerüst bzw. der Gebäudemauer aufstellen zu können, was in mehrfacher Hinsicht von Vorteil ist, und trotzdem durch Umschwenken des Lastenträgers in die Entladestellung eine bequeme und gefahrlose Entladung zu ermöglichen. Die Notwendigkeit der Anordnung von der Förderlast entsprechend kräftig zu bemessenden beweglichen Verbindungsmitteln zwischen Lastenträger und Führungskörper hat hierbei, abgesehen von den hohen Herstellungskosten, eine erhebliche Erhöhung des Gewichtes des ganzen FördergesteHes im Gefolge.Construction elevator. There are freight elevators for new buildings known where a guide body on a single tube, U-iron, etc. existing guide mast is arranged to be slidable up and down, the load container in turn is rotatably or adjustably attached to the guide body again, on the one hand to place the guide mast as close as possible to the scaffolding or the building wall To be able to set up, which is advantageous in several ways, and still get through Swiveling the load carrier into the unloading position is convenient and safe Allow discharge. The need to arrange the load accordingly powerfully dimensioned movable connecting means between the load carrier and In this case, apart from the high manufacturing costs, guide body has a considerable Increase in the weight of the entire conveying structure in the wake.
Die Erfindung erreicht dasselbe Ziel - Mög- lichkeit der Aufstellung des Führungsmastes dicht am Baugerüst, Hochziehen der Last außerhalb der Gerüstböden und Einschwenkbarkeit des Lastenträgers an der Entladeste.Ue auf den Gerüstboden - insofern auf wesentlich einfachere Weise, als der Führungskörper mit dem Lastenträger starr verbunden ist.The invention achieves the same goal - possibility of erecting the guide mast close to the scaffolding, pulling the load up outside the scaffolding floors and pivoting the load carrier on the unloading floor - in a much simpler way, as the guide body is rigidly connected to the load carrier is.
Dieses Ziel wird nacl-i der Erfindung dadurch erreicht, daß der Führungskörper selbst zwar nach wie vor an dem Führungsmast im allgemeinen zwangläufig, d. h. gegen Drehung gesichert, geführt wird, jedoch an der jeweiligen Entladestelle nach Entfernen der abnehrnbar einze ' richteten Führungsteile vom Mast- niitsamt dem an ihm. befestigten Lastenträger in die Entladestellung eingeschwenkt werden kann.This object is achieved according to the invention in that the guide body itself is still generally inevitably attached to the guide mast, i.e. H. is secured against rotation, guided, but directed at the respective unloading station after removal of the abnehrnbar individually and also com 'guide parts niitsamt from the mast to it. attached load carrier can be pivoted into the unloading position.
Der Erfindungsgedanke sei an Hand eines Ausführungsbeispieles näher erläutert. In der Zeichnung sind die hauptsächlichsten Teile eines Aufzuges gemäß der Erfindung dargestellt, und zwar zeigt Abb. i einen Längsschnitt, Abb. 2 eine Ansicht von vorn und Abb. 3 die wesentlichsten Teile von oben, teilweise im Schnitt. Es stellt m den Führungsmast dar. Derselbe kann aus niehreren aufeinandergesetzten Teilstücken bestehen. Er besitzt senkrecht übereinanderliegende Durchbrechungen o, die in dem gezeichneten Anwendungsbeispiel als Doppelösen ausgebildet sind zwecks Befestigung von Führungsteilen u, W, die als Nocken, Rollen oder auch - etwa unter Benutzung von zwei benachbarten Durchbrechungen o - 'als kurze Schienen ausgebildet sein können.The idea of the invention will be explained in more detail using an exemplary embodiment. In the drawing the main parts of an elevator according to the invention are shown, namely Fig. 1 shows a longitudinal section, Fig. 2 shows a view from the front and Fig. 3 shows the main parts from above, partly in section. It represents m the guide mast. The same can consist of separate parts placed one on top of the other. It has vertically superimposed openings o, which are designed as double eyelets in the application example shown for the purpose of attaching guide parts u, W, which can be designed as cams, rollers or - for example using two adjacent openings o - 'as short rails.
Um diesen Führungsmast rn ist nun der mit einem durchgehenden Führungsschlitz 1 versehene Führungskörper k des Lastenträgers 1 angeordnet, der im Gegensatz zu bekannten ähnlichen Einrichtungen auf dem Führungsmast nicht allein in der Längsrichtung verschiebbar, sondern auch um denselben drehbar ist, sobald in irgendeiner Höhenstellung die den Körperk gegen Drehung sichernden Führungsteile entferntsind. DerLastentr'agerl braucht nun, um in die Entladestellung auf das Baugerüstg bewegt werden zu können, nicht mehr mittels besonderer Einrichtungen mit dem Führungskörper drehbar oder verstellbar verbunden zu sein, er kann vielmehr, wie in dem gezeichneten Ausführungsbeispiel, mit dem Führungskörperk starr verbunden sein, da er mitsamt diesem Führungskörper nach beiden Richtungen um den Führungsmastm gedreht werden kann. Es soll aber natürlich nicht ausgeschlossen sein, die Verbindung des Lastenträgers 1 mit dein Führungskörperk lösbar - etwa mittels Verschraubung - zu gestalten, um so, je nach der besonderen Art der zu befördernden Lasten, !den Lastenträger auswech-sehl zu können.Around this guide mast rn is now provided with a continuous guide slot 1 guide body k of the load carrier 1 , which, in contrast to known similar devices on the guide mast is not only displaceable in the longitudinal direction, but can also be rotated around the same as soon as the Guide parts that secure the body against rotation are removed. In order to be able to move into the unloading position onto the scaffolding, the load carrier no longer needs to be rotatably or adjustably connected to the guide body by means of special devices; since it can be rotated around the guide mast in both directions together with this guide body. Of course, it should not be ruled out that the connection between the load carrier 1 and the guide body can be made detachable - for example by means of a screw connection - in order to be able to replace the load carrier depending on the particular type of loads to be transported.
Der Führungskörper k mit dem Lastenträger 1 wird nun durch das am obersten Ende des Führungsmastes rn über die Rolle r laufende Förderseil s getragen. Die Rolle r ist in der auf dem Führungsmastm drehbar gelagerten Haube h gelagert, damit beim Drehen des Lastenträgers in die Entladestellung die Roller der Lage des Befestigungspunktes/ des Förderseiless folgen kann. Diese drelibare Lagerung der Haube k ist aber - besonders f ür nur vorübergehend aufgestellte Bauaufzüge - kein unbedingtes Erfordernis, da praktisch nur eine Drehung von höchstens i8o' nach beiden Dreb:richtungen in Betracht kommt und abweichend von der gedrängten zeichnerischen Darstellung die Roller schon aus anderen praktischen Gründen mindestens 5in über der höchsten Entladestelle zu liegen kommt.The guide body k with the load carrier 1 is now carried by the conveyor rope s running over the pulley r at the top end of the guide mast rn. The roller r is mounted in the hood h, which is rotatably mounted on the guide mast, so that when the load carrier is rotated into the unloading position, the roller can follow the position of the fastening point / the hoisting rope. This floating mounting of the hood k is, however , not an absolute requirement - especially for building elevators that are only temporarily set up - since practically only a rotation of at most i8o 'in both directions comes into consideration and, in contrast to the concise graphic representation, the scooters from others for practical reasons it should be at least 5in above the highest unloading point.
Auch die in dem Anwendungsbeispiel gewählte Kugellagerung für den Fülirungskörperk ist unwesentlich. Statt ihrer kann auch Rollen-oder einfache Gleitführung in Betracht kommen, besonders bei Aufzügen leichterer Art.The ball bearing selected in the application example for the Fülirungskörperk is insignificant. Instead of it can also be roller or simple sliding guide come into consideration, especially in the case of lighter elevators.
Der Führungsmast m kann außerhalb des Bereiches der Entladestellen in bekannter Weise mittels am Mauerwerk befestigter (nicht ,-ezeichneter) Streben verankert werden, wobei die Befestigung der Streben mit dem Mast unter Benutzung der bereits beschriebenen DurchbrecU:ungen o bewirkt wird. Der Führungskörper k wird vermöge seines Schlitzes 1 durch diese Befestigungsstreben nicht in seiner Längsbewegung gehindert.The guide mast m can be anchored outside the area of the unloading points in a known manner by means of struts attached to the masonry (not shown), the struts being attached to the mast using the breakthroughs already described. Because of its slot 1, the guide body k is not hindered in its longitudinal movement by these fastening struts.
Die Befestigungsstellef des Förderseiles s mit dem Führungskörperk, die auch - etwa zwecks besserer Erfassung des Schwerpunktes - auf dem Lastenträger 1 liegen kann, kann auch in Kugeln drehbar gelagert sein, um eine bei gewissen einfacheren Bauarten des ganzen Aufzuges etwa auftretende Drillspannung des Förderseiles unwirksam zu machen.The fastening point of the hoisting rope s with the guide body, which - for the purpose of better recording of the center of gravity - can also lie on the load carrier 1 , can also be rotatably mounted in balls in order to ineffectively prevent any twisting tension of the hoisting rope that occurs in certain simpler designs of the entire elevator do.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEP51841D DE438527C (en) | 1925-12-03 | 1925-12-03 | Construction elevator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEP51841D DE438527C (en) | 1925-12-03 | 1925-12-03 | Construction elevator |
Publications (1)
Publication Number | Publication Date |
---|---|
DE438527C true DE438527C (en) | 1926-12-20 |
Family
ID=7385370
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DEP51841D Expired DE438527C (en) | 1925-12-03 | 1925-12-03 | Construction elevator |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE438527C (en) |
-
1925
- 1925-12-03 DE DEP51841D patent/DE438527C/en not_active Expired
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE1978365U (en) | TRANSPORT DEVICE. | |
DE1611809B2 (en) | WEIGHT COMPENSATION DEVICE FOR A HEIGHT-ADJUSTABLE DRAWING TABLE | |
DE1807169A1 (en) | Hydraulic lifting device for lifting trolleys | |
DE438527C (en) | Construction elevator | |
DE1279904B (en) | Outrigger mast for cranes | |
AT139924B (en) | Slewing crane. | |
DE1962895A1 (en) | Ship crane | |
AT62332B (en) | Device for bracing extension masts, booms or the like. By means of traction elements running in two or more directions, fastened to the upper end of the mast or the like, from drums and for supporting the chassis of such structures. | |
DE1781080C3 (en) | Twin slewing crane | |
DE450694C (en) | Goods lift, in particular for building purposes | |
DE899858C (en) | Circular saw with roller table | |
DE907344C (en) | Wicker peeling machine | |
DE855518C (en) | Device for extending and retracting telescopic lifts, e.g. B. od ship loading tubes. Like. | |
DE3634702A1 (en) | SLOPE LIFT, ESPECIALLY MATERIAL OR PERSONAL LIFT | |
AT228974B (en) | Jib crane | |
DE709788C (en) | Lifting jack, the telescopically interlocking shots of which are moved by cables | |
AT353619B (en) | CARAVANS | |
DE441850C (en) | Ball drive for paddle slides based on the balance beam principle | |
AT90581B (en) | Loading crane. | |
AT235516B (en) | Construction elevator | |
AT350228B (en) | LOAD ELEVATOR | |
AT354356B (en) | CONVEYOR | |
DE720771C (en) | Trough conveyor belt support | |
DE1807341C (en) | Guide for hydraulic hose lines on a telescopic and a sliding boom for cranes or similar devices | |
DE502359C (en) | Luffing crane with jib swinging through from one side of the crane frame to the other |