- mast
- fastening device
- studs
- crossbar
- braid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/20—Spatial arrangements or dispositions of lines or cables on poles, posts or towers
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/24—Cross arms
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/08—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/08—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
- F16L3/12—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing comprising a member substantially surrounding the pipe, cable or protective tubing
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Clamps And Clips (AREA)
Abstract
Description
Die vorliegende Erfindung betrifft eine Befestigungsvorrich tung für eine Traverse an einem Freileitungen tragenden Zopf eines Masts, mit einem Gewinde tragenden Zugband und einem U-förmigen Klemmbügel.The present invention relates to a fastening device device for a traverse on a braid carrying overhead lines of a mast, with a threaded tension band and a U-shaped clamp.
Die Erfindung findet Anwendung bei Masten aus Holz und Stahl für Starkstrom-Freileitungen und für Nachrichten-Leitungen.The invention applies to masts made of wood and steel for overhead power lines and for communication lines.
Zur Befestigung einer elektrische Isolatoren tragenden Tra verse an einem Freileitungsmast aus Holz sind Vorrichtungen bekannt, die aus einem U-förmigen Zugband und einem Klemmbü gel bestehen. Das Zugband weist zwei endständige, zueinander parallele Gewindestangen auf und wird um den Zopf des Masts gelegt. Der Klemmbügel ist ebenfalls U-förmig ausgebildet und besitzt zwei U-Schenkel mit hervorstehenden Nasen, er wird am Mast so angeordnet, daß die U-Schenkel parallel zu den Gewin destangen des Zugbands sind und seine U-Basis zwischen den Gewindestangen am Mast anliegt. Die zu befestigende Traverse ist eine U-Profil-Schiene und weist zwei Löcher auf, die mit den Gewindestangen des Zugbands korrespondieren. Die Traverse wird auf die überstehenden Gewindestangen aufgesteckt und an den Mast herangeschoben, bis der Klemmbügel mit seinen zwei hervorstehenden Nasen in das zum Mast hin geöffnete U-Profil der Traverse eingreift. Auf die Gewindestangen, die aus den Löchern der Traverse hervorstehen, werden Unterlagscheiben gesetzt und Schraubenmuttern aufgeschraubt, bis ein bestimm tes Anzugsmoment erreicht ist. Das Anzugsmoment ist so ge wählt, daß zwischen dem Holzmast und dem Zugband sowie dem Klemmbügel eine kraftschlüssige Verbindung erzeugt wird, die eine feste und dauerhafte Halterung der Traverse am Mast gewährleistet.To attach an electrical insulator-carrying tra Verses on a wooden transmission tower are devices known, which consists of a U-shaped drawstring and a clamp gel exist. The drawstring has two end-to-end parallel threaded rods and is around the braid of the mast placed. The clamp bracket is also U-shaped and has two U-legs with protruding noses, he is on Mast arranged so that the U-legs parallel to the profit of the drawstring and its U-base between the Threaded rods abut the mast. The crossbar to be attached is a U-profile rail and has two holes with correspond to the threaded rods of the drawstring. The traverse is attached to the protruding threaded rods and attached pushed the mast up until the clamp with its two protruding noses in the U-profile open towards the mast the crossbar engages. On the threaded rods that come from the Holes protrude from the crossbar, become washers set and screwed on nuts until a certain Tightening torque is reached. The tightening torque is so ge chooses that between the wooden mast and the drawstring as well as the Clamping bracket creates a positive connection that a firm and permanent mounting of the crossbar on the mast guaranteed.
Der bisherige Einsatz von Leitungsmasten aus Holz ist aus ökologischen Gründen sehr umstritten, da zur Erzielung einer ausreichenden Lebensdauer des Holzes Imprägniermittel einge setzt werden müssen. Besonders umweltschädlich sind Nachimprä gnierungen der Masten, da dabei die Imprägniermittel in den Boden sowie in das Grundwasser gelangen und somit zu erhebli chen Umweltbelastungen führen. Dagegen stellen verzinkte Masten aus Stahlrohren eine bessere und umweltfreundliche Lösung dar.The previous use of wooden masts is over ecological reasons very controversial, because to achieve a sufficient durability of the wood impregnation agent must be set. Nachimprä are particularly harmful to the environment decorations of the masts, since the impregnating agents in the Soil as well as get into the groundwater and thus to erhebli cause environmental pollution. In contrast, galvanized Poles made of steel pipes a better and environmentally friendly Solution.
Werden anstelle von Holzmasten Stahlmasten eingesetzt, so zeigt sich, daß die bekannten Vorrichtungen zur Befestigung von Traversen, wie vorstehend beschrieben, nicht für Stahlmas ten geeignet sind. Derartige Vorrichtungen sind nur für Mas ten anwendbar, deren Material, wie bei Holz, bei den angewand ten Anzugskräften nachgibt und auf diese Weise eine sichere Fixierung der Traverse am Mast gewährleistet.If steel poles are used instead of wooden poles, so shows that the known devices for attachment of trusses as described above, not for steel mas ten are suitable. Such devices are only for Mas applicable, the material of which, as with wood, is used in the yields tensile forces and in this way a safe Fixing the crossbar to the mast ensured.
Um während der Umstellungsphase von Holzmasten auf Stahlmas ten die noch in großer Zahl vorhandenen bekannten Vorrichtun gen einsetzen zu können, ist es wünschenswert, daß sowohl das Zugband als auch der Klemmbügel bei einer neuen Befestigungs einrichtung verwendet werden können. Dies vereinfacht insbe sondere die Lagerhaltung.To move from wooden masts to steel masts during the transition phase the known devices still available in large numbers To use gene, it is desirable that both Tension band as well as the clamping bracket with a new fastening device can be used. This simplifies in particular especially warehousing.
Es ist die Aufgabe der Erfindung, unter Verwendung des bekann ten Zugbands und des zugehörigen, bekannten Klemmbügels eine Befestigungsvorrichtung zu konzipieren, die sowohl bei konven tionellen Masten aus Holz sowie bei Masten aus Stahl einsetz bar ist und sowohl das Verrutschen wie auch das Verdrehen der Traverse gegenüber dem Mast wirksam verhindert. It is the object of the invention using the known ten drawstring and the associated, known clamp a To design fastening device that both at konven use traditional wooden masts and steel masts bar and both slipping and twisting the Traverse to the mast effectively prevented.
Zur Lösung der Aufgabe wird von einer Befestigungsvorrichtung der eingangs erwähnten Art ausgegangen, und gelöst wird die Aufgabe durch eine den Zopf des Masts umfassende, zur Auflage der Traverse dienende Ringscheibe, mit auf einer Kreislinie vorgesehenen Reihe Stehbolzen, die zum Eingriff des Klemmbü gels dienen. Die Ringscheibe bietet eine feste Auflage für die Traverse und verhindert deren Abrutschen nach unten. Gleichzeitig nehmen je zwei der auf der Ringscheibe angeordne ten Stehbolzen über den Klemmbügel die auf die Traverse wir kenden horizontalen Kräfte auf und verhindern somit ein Ver drehen der Traverse.To solve the problem is a fastening device of the type mentioned at the beginning, and the problem is solved Feed through a braid covering the mast the washer serving the washer, with on a circular line provided row of stud bolts which are used to engage the clamp serve gels. The washer offers a firm support for the traverse and prevents it from sliding down. At the same time take two of the arranged on the ring disc th studs over the clamp that are on the crossbar horizontal forces and thus prevent ver turn the traverse.
Bevorzugt sind die Stehbolzen paarweise nebeneinander angeord net und jeder U-Schenkel des montierten Klemmbügels greift zwischen ein Paar von Stehbolzen ein. Diese Ausgestaltung ermöglicht den Ausgleich von Fertigungstoleranzen des Klemm bügels und der Ringscheibe. Gleichzeitig wird hierdurch die Sicherung des Klemmbügels gegen eine Drehung gegenüber dem Mast verbessert.The studs are preferably arranged in pairs next to one another net and each U-leg of the assembled clamp bracket grips between a pair of studs. This configuration enables compensation of manufacturing tolerances of the clamp bracket and the washer. At the same time, the Securing the clamp against rotation relative to the Mast improved.
In einer vorteilhaften Ausführungsform der Erfindung ist der Abstand zwischen den Stehbolzen und dem Mantel des Masts geringfügig größer als die Dicke des Zugbands. Durch dieses Merkmal kann das Zugband zwischen den Stehbolzen und den Mast bei der Montage leicht eingefügt werden.In an advantageous embodiment of the invention Distance between the studs and the jacket of the mast slightly larger than the thickness of the drawstring. Because of this Characteristic can be the tension band between the studs and the mast can be easily inserted during assembly.
Die Ringscheibe kann einteilig ausgebildet und an den Zopf des aus einem Stahlrohr bestehenden Masts angeschweißt sein.The washer can be made in one piece and attached to the braid of the mast consisting of a steel tube.
Durch diese Maßnahme wird die Herstellung der Befestigungsvor richtung beträchtlich vereinfacht.By this measure, the manufacture of the fasteners direction considerably simplified.
Die Ringscheibe kann auch zweiteilig ausgebildet sein, und am Innenrand je eine halbkreisformige, angeschweißte Befesti gungsschelle tragen. Diese zweiteilige Ringscheibe läßt sich vorteilhaft direkt vor Ort auch am stehenden Mast montieren. The washer can also be formed in two parts, and on Inside a semicircular, welded fastener wear the clamp. This two-piece washer can be It is also advantageous to mount it on the standing mast directly on site.
In einer bevorzugten Ausgestaltung sind die Stehbolzen zylind risch ausgebildet. Dadurch kann für die Stehbolzen massiver Rundstahl verwendet werden, der in korrespondierende Bohrun gen der Ringplatte eingesetzt und dann verschweißt wird. Auf diese Weise sind nur einfache Verbindungstechniken erforder lich.In a preferred embodiment, the stud bolts are cylindrical trained. This can make the stud bolts more solid Round steel can be used in the corresponding hole inserted against the ring plate and then welded. On this way, only simple connection techniques are required Lich.
In der Ringscheibe können zur Aufnahme von Abspannhaken Löcher vorgesehen sein. Diese Löcher ermöglichen das Einhän gen von Abspannhaken mit wenigstens einem gewundenen Ende. Solche Abspannhaken dienen beispielsweise zum Anhängen einer Strebe, eines Abspannseils oder auch einer zusätzlichen Frei leitung.In the ring disc can be used to hold guy hooks Holes may be provided. These holes allow hanging of guy hooks with at least one tortuous end. Such guy hooks are used, for example, to attach a Strut, a guy rope or an additional free management.
Die Erfindung wird nachstehend unter Bezugnahme auf die beige fügten Zeichnungen näher erläutert. Es zeigen:The invention is described below with reference to the beige added drawings explained in more detail. Show it:
Fig. 1 Eine Draufsicht auf eine am Zopf eines rohrförmigen Stahlmasts anmontierte und eine Traverse tragende Befestigungsvor richtung, mit einer geteilten Ring scheibe, in etwas verkleinerter Darstel lung; und Fig. 1 is a plan view of a mounted on the braid of a tubular steel mast and a crossbar carrying fastening device, with a split washer, in somewhat reduced presen- tation; and
Fig. 2 eine perspektivische Darstellung einer an den Zopf des Masts angeschweißten, einteiligen Ringscheibe, in ebenfalls verkleinerter Darstellung. Fig. 2 is a perspective view of a welded to the braid of the mast, one-piece washer, also in a reduced view.
Die Befestigungsvorrichtung nach der vorliegenden Erfindung dient zur Anbringung einer Traverse 1 an einem Mast 2 aus Stahl, so daß die Traverse 1 sowohl gegen Abrutschen entlang der Achse des Masts 2 wie gegen Verdrehen senkrecht zur Achse des Masts 2 gesichert ist.The fastening device according to the present invention is used to attach a crossbar 1 to a steel mast 2 , so that the crossbar 1 is secured both against slipping along the axis of the mast 2 and against rotation perpendicular to the axis of the mast 2 .
In der Fig. 1 ist die komplette Befestigungsvorrichtung dargestellt, die ein Zugband 3, einen Klemmbügel 4 und eine Ringscheibe 5 umfaßt. Mit dieser Befestigungsvorrichtung ist die im Querschnitt U-förmige zum Anbringen von Isolatoren dienende Traverse 1 an dem kreisförmigen Umriß aufweisenden Mast 2 anmontiert.In Fig. 1, the complete fastening device is shown, which comprises a drawstring 3 , a clamping bracket 4 and an washer 5 . With this fastening device, the cross-section U-shaped for attaching insulators 1 is mounted on the circular outline of the mast 2 .
Das Zugband 3 weist einen breiten, flachen Haltegurt 6 auf, der etwa die Hälfte des Masts 2 umgreift. Die beiden Enden des Haltegurts 6 gehen in je eine lange Gewindestange 7 über. Die Gewindestangen 7 sind parallel zueinander angeordnet und stehen tangential zum Mast 2. Die freien Enden 8 der Gewinde stangen 7 ragen ein Stück über den Umfang des Masts 2 hinaus.The tension band 3 has a wide, flat tether 6 , which engages around half of the mast 2 . The two ends of the tether 6 each merge into a long threaded rod 7 . The threaded rods 7 are arranged parallel to one another and are tangent to the mast 2 . The free ends 8 of the threaded rods 7 protrude a little beyond the circumference of the mast 2 .
Der Klemmbügel 4 aus Stahl ist im wesentlichen U-förmig ausge bildet. Zur Montage wird der Klemmbügel 4 zwischen die Gewin destangen 7 des Zugbands 3 eingesetzt, so daß seine konkav gekrümmte Basis 9 an der Außenseite des Masts 2 anliegt. Die Basis 9 des Klemmbügels 4 geht in zwei Schenkel 10 über, die annähernd parallel zueinander stehen. An jeden Schenkel 10 ist eine Nase 11 angeformt, die zur Spitze hin abgesetzt ist.The clamp 4 made of steel is substantially U-shaped. For assembly, the clamp 4 is inserted between the threaded rods 7 of the tension band 3 , so that its concavely curved base 9 rests on the outside of the mast 2 . The base 9 of the clamping bracket 4 merges into two legs 10 which are approximately parallel to one another. A nose 11 is formed on each leg 10 and is offset towards the tip.
Das Zugband 3 und der Klemmbügel 4 stehen auf der Ring scheibe 5, die den Mast 2 umgreift. An der Ringscheibe 5 sind auf einer zum Mast 2 koaxial verlaufenden Kreislinie sechzehn nach oben weisende Stehbolzen 12 angesetzt. Die Stehbolzen 12 stehen in Zweiergruppen bzw. Paaren nebeneinander. Jeweils zwischen zwei benachbarten, äquidistant angeordneten Paaren von Stehbolzen 12 ist ein Loch 13 vorgesehen. Diese Löcher 13 sind somit gleichfalls auf einer zum Mast 2 koaxial verlaufen den Kreislinie angeordnet. Im Ausführungsbeispiel gemäß Fig. 1 sind acht Löcher 13 dargestellt, die unter gleichen Zentri winkeln stehen.The tension band 3 and the clamping bracket 4 are on the ring disc 5 , which engages around the mast 2 . Sixteen upright stud bolts 12 are attached to the annular disc 5 on a circular line coaxial with the mast 2 . The stud bolts 12 stand side by side in groups of two or pairs. A hole 13 is provided between each two adjacent, equidistant pairs of stud bolts 12 . These holes 13 are thus likewise arranged on a circular line running coaxially with the mast 2 . In the embodiment of FIG. 1, eight holes 13 are shown, which are at the same Zentri angles.
Im Ausführungsbeispiel der Fig. 1 ist eine zweiteilige Ring scheibe 5 gezeigt, die aus zwei gleich ausgebildeten, halb kreisförmigen Teilen zusammengesetzt ist. Am Innenrand jedes dieser Teile ist rechtwinklig eine Befestigungsschelle 14, 14′ angeschweißt. Diese, den Mast 2 umgreifenden Befestigungs schellen 14, 14′ tragen je zwei abgebogene Flansche 15 und sind durch diese parallel zueinander stehenden Flansche 15 hindurchgesteckte Schraubverbindungen 16 am Mast 2 ange klemmt. Zum besseren Halt der Ringscheibe 5 gegen Abrutschen sind am Mast kleine angeschweißte Auflagezapfen 17 vorgesehen (siehe Fig. 2), die nach außen zeigen. Diese Auflagezap fen 17 erleichtern die Montage der zweiteiligen Ringscheibe 5. Bei der zweiteiligen Ringscheibe 5 mit den Befestigungs schellen 14, 14′ ist die Auflagefläche zwischen dem Mast 2 und der Befestigungsvorrichtung, das heißt dem Haltegurt 6, der Basis 9 des Klemmbügels 4 und den Befestigungsschellen 14 so weit vergrößert, daß eine zuverlässige Sicherung der Tra verse 1 gegen Verdrehen zur Achse des Masts 2 gewährleistet ist.In the embodiment of Fig. 1, a two-part ring disc 5 is shown, which is composed of two identically designed, semi-circular parts. At the inner edge of each of these parts, a mounting bracket 14 , 14 'is welded at right angles. This, the mast 2 encompassing fastening clamps 14 , 14 'each carry two bent flanges 15 and 15 through these parallel flanges 15 inserted screw connections 16 on the mast 2 is clamped. To better hold the ring disk 5 against slipping, small welded support pins 17 are provided on the mast (see FIG. 2), which point outwards. This Aufzap fen 17 facilitate the assembly of the two-piece washer 5th In the two-piece washer 5 with the fastening clamps 14 , 14 ', the bearing surface between the mast 2 and the fastening device, that is, the tether 6 , the base 9 of the clamp 4 and the fastening clamps 14 is enlarged so that a reliable securing of the tra verse 1 is guaranteed against rotation to the axis of the mast 2 .
Zum Anbringen der Traverse 1 ist das Zugband 3 so auf die Ringscheibe 5 aufgelegt, daß der Haltegurt 6 zwischen den Stehbolzen 12 und dem Mast 2 steht. Zwischen den beiden Gewin destangen 7 steht der Klemmbügel 4, dessen Schenkel 10 zwi schen je einem Paar der Stehbolzen 12 durchgreifen. Dabei ist der Abstand zwischen zwei Stehbolzen 12 so groß gewählt, daß Fertigungstoleranzen ausgeglichen werden. Dar Klemmbügel 4 umgreift in der in Fig. 1 dargestellten Ausführung vier Stehbolzen 12. Auf die Gewindestangen 7 des Zugbands 3 und die Nasen 11 der Schenkel 10 des Klemmbügels 4 ist die mit zwei hierfür vorgesehenen Aussparungen 18 versehene Tra verse 1 auf gesteckt. Dabei greifen die Gewindestangen 7 durch die Aussparungen 18 und die Nasen 11 der Schenkel 10 ragen in das zum Mast 2 hin geöffnete U-Profil der Traverse 1. An der Rückseite der Traverse 1 sind Unterlagscheiben 19 und Schrau benmuttern 20 auf die Enden 8 der Gewindestangen 7 auf ge schraubt, wodurch nach erfolgtem Anziehen eine formschlüssige Wirkverbindung zwischen dem Zugband 3, dem Klemmbügel 4 und dem Mast 2 erzielt wird. Die Ringscheibe 5 übernimmt dabei die Funktion einer Auflage und stellt, bedingt durch die Stehbolzen 12, gleichzeitig eine Verdrehsicherung dar. To attach the crossbar 1 , the drawstring 3 is placed on the washer 5 so that the tether 6 is between the studs 12 and the mast 2 . Between the two threads at least 7 is the clamp 4 , the legs 10 between each rule a pair of the studs 12 reach through. The distance between two stud bolts 12 is chosen so large that manufacturing tolerances are compensated for. The clamp 4 encompasses four stud bolts 12 in the embodiment shown in FIG. 1. On the threaded rods 7 of the tension band 3 and the lugs 11 of the legs 10 of the clamp 4 , the provided with two recesses 18 provided for this verse 1 is inserted. The threaded rods 7 reach through the recesses 18 and the lugs 11 of the legs 10 protrude into the U-profile of the crossbar 1 , which is open towards the mast 2 . At the back of the crossbar 1 , washers 19 and screw nuts 20 are screwed onto the ends 8 of the threaded rods 7 , so that after tightening a positive connection between the tension band 3 , the clamping bracket 4 and the mast 2 is achieved. The washer 5 takes on the function of a support and, due to the stud bolts 12 , also represents an anti-rotation device.
Durch die spezielle Anordnung der Stehbolzen 12 sind im Aus führungsbeispiel der Fig. 1 acht verschiedene Winkeleinstel lungen der Traverse 1 bei Einstellschritten von jeweils 45 Winkelgraden möglich. Es ist auch denkbar, nur einzelne Steh bolzen 12 in äquidistanten Abständen zueinander anzubringen, wobei wenigstens zwei Stehbolzen 12 zwischen den Schenkeln 10 des Klemmbügels 4 vorgesehen sind. Die Anzahl der Stehbol zen 12 ist unabhängig von ihrer einzelnen oder paarweisen Anordnung direkt proportional zur Anzahl der möglichen Winkel einstellungen der Traverse 1. In der Traverse 1 sind vier Vierkantlöcher 21 vorgesehen, die zum Anbringen von (nicht dargestellten) Isolatoren dienen. Alle Teile der Befestigungs vorrichtung sowie die Traverse 1 und der Mast 2 sind aus Stahl gefertigt und anschließend feuerverzinkt.Due to the special arrangement of the stud bolts 12 in the exemplary embodiment from FIG. 1, eight different angle settings of the crossmember 1 are possible with setting steps of 45 degrees each. It is also conceivable to mount only individual stud bolts 12 at equidistant intervals from one another, at least two stud bolts 12 being provided between the legs 10 of the clamping bracket 4 . The number of bolts 12 is, regardless of their individual or paired arrangement, directly proportional to the number of possible angle settings of the traverse 1 . In the traverse 1 four square holes 21 are provided, which are used to attach insulators (not shown). All parts of the fastening device as well as the crossbar 1 and the mast 2 are made of steel and then hot-dip galvanized.
In der Fig. 2 ist die an einen Mast 2 angeschweißte, eintei lige Ringscheibe 5 ohne die weiteren zur Befestigungsvorrich tung zugehörigen Teile wiedergegeben. Die Anordnung der Steh bolzen 12 und der Löcher 13 ist deutlich erkennbar. Die in der Ringscheibe 5 vorgesehenen Löcher 13 dienen zur Aufnahme von Abspannhaken 22. Diese Abspannhaken 22 werden zwecks Stabilisierung des Masts 2 zum Anhängen von Stahlseilen oder Streben (nicht dargestellt) eingesetzt.In Fig. 2 the welded to a mast 2 , one-piece washer 5 is reproduced without the other parts associated with the fastening device. The arrangement of the stud 12 and the holes 13 is clearly visible. The holes 13 provided in the annular disk 5 serve to receive guy hooks 22 . These guy hooks 22 are used to stabilize the mast 2 for attaching steel cables or struts (not shown).
Verzeichnis der BezugsziffernList of reference numbers
1 Traverse
2 Mast
3 Zugband
4 Klemmbügel
5 Ringscheibe
6 Haltegurt (von 3)
7 Gewindestange
8 Enden von 7
9 Basis von 4
10 Schenkel von 4
11 Nase von 10
12 Stehbolzen
13 Loch
14, 14′ Befestigungsschelle
15 Flansch
16 Schraubverbindung
17 Auflagezapfen
18 Aussparung von 1
19 Unterlagscheibe
20 Schraubenmutter
21 Vierkantloch
22 Abspannhaken
1 traverse
2 mast
3 drawstring
4 clamps
5 washer
6 tether (of 3 )
7 threaded rod
8 ends of 7
9 base of 4
10 legs of 4
11 nose of 10
12 studs
13 holes
14, 14 ' mounting bracket
15 flange
16 screw connection
17 support pins
18 recess of 1
19 washer
20 nut
21 square hole
22 guy hooks
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19934302609 DE4302609A1 (en) | 1993-01-30 | 1993-01-30 | Fastener for girder on overhead cable masts |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19934302609 DE4302609A1 (en) | 1993-01-30 | 1993-01-30 | Fastener for girder on overhead cable masts |
Publications (1)
Publication Number | Publication Date |
---|---|
DE4302609A1 true DE4302609A1 (en) | 1994-08-04 |
Family
ID=6479270
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19934302609 Withdrawn DE4302609A1 (en) | 1993-01-30 | 1993-01-30 | Fastener for girder on overhead cable masts |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE4302609A1 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2000017979A1 (en) * | 1998-09-22 | 2000-03-30 | Siemens Aktiengesellschaft | Device for fastening a cable to the pole of an overhead line (stay device) |
CN102102457A (en) * | 2009-12-21 | 2011-06-22 | 常熟风范电力设备股份有限公司 | Cross arm connecting device |
CN102995946A (en) * | 2012-11-21 | 2013-03-27 | 广东电网公司东莞供电局 | Tooling metal fitting of power transmission and distribution composite crossarm |
CN105350817A (en) * | 2015-10-28 | 2016-02-24 | 国家电网公司 | Iron tower vacuum switch cross arm |
CN105350818A (en) * | 2015-10-28 | 2016-02-24 | 国家电网公司 | Single pole seat support |
CN105421863A (en) * | 2015-11-20 | 2016-03-23 | 国家电网公司 | Multi-loop transmission line steel tube tower |
-
1993
- 1993-01-30 DE DE19934302609 patent/DE4302609A1/en not_active Withdrawn
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2000017979A1 (en) * | 1998-09-22 | 2000-03-30 | Siemens Aktiengesellschaft | Device for fastening a cable to the pole of an overhead line (stay device) |
CN102102457A (en) * | 2009-12-21 | 2011-06-22 | 常熟风范电力设备股份有限公司 | Cross arm connecting device |
CN102995946A (en) * | 2012-11-21 | 2013-03-27 | 广东电网公司东莞供电局 | Tooling metal fitting of power transmission and distribution composite crossarm |
CN102995946B (en) * | 2012-11-21 | 2015-02-11 | 广东电网公司东莞供电局 | Tooling metal fitting of power transmission and distribution composite crossarm |
CN105350817A (en) * | 2015-10-28 | 2016-02-24 | 国家电网公司 | Iron tower vacuum switch cross arm |
CN105350818A (en) * | 2015-10-28 | 2016-02-24 | 国家电网公司 | Single pole seat support |
CN105421863A (en) * | 2015-11-20 | 2016-03-23 | 国家电网公司 | Multi-loop transmission line steel tube tower |
CN105421863B (en) * | 2015-11-20 | 2019-06-25 | 国家电网公司 | Multiple loop transmission line steel tube tower |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE7801720U1 (en) | Holder for linear bodies | |
DE3636943C2 (en) | ||
DE4302609A1 (en) | Fastener for girder on overhead cable masts | |
CH662677A5 (en) | CONNECTING PIECE FOR CONNECTING A LONG OBJECT TO A POST. | |
DE7617071U1 (en) | HANGING DEVICE FOR LONG RANGE OBJECTS | |
DE2441297A1 (en) | Universal pipe hanger - two semi circular clamp pieces and screw connection fitting to U shaped hanger | |
DE2946622A1 (en) | DEVICE FOR ATTACHING OBJECTS TO A PROFILE RAIL WITH FLANGES PROJECTING OUTSIDE IN OPPOSITE DIRECTIONS | |
DE3034270A1 (en) | CAVITY POLE FOR LIGHTING AND PERFORMANCE | |
EP1087077B1 (en) | Process and device for lifting and/or renovation of masts | |
DE9301276U1 (en) | Fastening device | |
DE2557241C2 (en) | Mounting bracket | |
DE2948954A1 (en) | MOUNTING SYSTEM FOR ELECTRICAL CONTACT RAILS | |
DE8523201U1 (en) | Bird protection set on overhead lines of medium-voltage line masts in the mast truss area | |
DE2902759C2 (en) | Device for fastening pipe profiles to load-bearing surfaces | |
DE348214C (en) | Assembly frame | |
DE2339417C3 (en) | Suspension chain for phase ropes on a cable pole | |
DE2000996C (en) | Hanging network for roof structures | |
DE2227755C2 (en) | Electrical isolator | |
DE3204506A1 (en) | Bracket for pipelines | |
DE8236059U1 (en) | Connection and tensioning fitting for linear elements, in particular for electrical cables and the like. | |
EP0740088B1 (en) | Wall support | |
DE4209331C2 (en) | Clamp connection for pipes and rods | |
DE2523922C3 (en) | Methods for installing manholes, ducts and the like | |
WO2000017979A1 (en) | Device for fastening a cable to the pole of an overhead line (stay device) | |
DE6929279U (en) | CARRIERS FOR ACCOMMODATION OF LIGHTING BODIES, IN PARTICULAR ROWS OF LIGHTING BODIES AND / OR ELECTRICAL SUPPLY DEVICES |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8127 | New person/name/address of the applicant |
Owner name: GRESCHBACH INDUSTRIE AG, 79336 HERBOLZHEIM, DE |
|
8127 | New person/name/address of the applicant |
Owner name: FORMTECHNIK IN SUEDBADEN GMBH & CO. HERSTELLUNGS- |
|
8139 | Disposal/non-payment of the annual fee |