DE4207412A1 - Ski jump track marker as profiled part - has side hollow shaft for cables, and hooks to hold steel netting taking track surface - Google Patents
Ski jump track marker as profiled part - has side hollow shaft for cables, and hooks to hold steel netting taking track surfaceInfo
- Publication number
- DE4207412A1 DE4207412A1 DE19924207412 DE4207412A DE4207412A1 DE 4207412 A1 DE4207412 A1 DE 4207412A1 DE 19924207412 DE19924207412 DE 19924207412 DE 4207412 A DE4207412 A DE 4207412A DE 4207412 A1 DE4207412 A1 DE 4207412A1
- Authority
- DE
- Germany
- Prior art keywords
- track
- hooks
- profiled part
- cables
- hollow shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63C—SKATES; SKIS; ROLLER SKATES; DESIGN OR LAYOUT OF COURTS, RINKS OR THE LIKE
- A63C19/00—Design or layout of playing courts, rinks, bowling greens or areas for water-skiing; Covers therefor
- A63C19/10—Ice-skating or roller-skating rinks; Slopes or trails for skiing, ski-jumping or tobogganing
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63C—SKATES; SKIS; ROLLER SKATES; DESIGN OR LAYOUT OF COURTS, RINKS OR THE LIKE
- A63C2201/00—Use of skates, skis, roller-skates, snowboards and courts
- A63C2201/04—Ski jumping
Abstract
Description
Zur Schaffung einer dauerhaften Anlaufspurgrundlage für Sommerskisprungschanzen wird vorgeschlagen, als Grundlage ein Bauelement aus verzinktem Stahlblech mit in Fig. 1 ge zeigter Profilierung der vorgeschriebenen Mattenspurbreite und einer Länge von ca. 2,5 m zu verwenden, das, in der nötigen Länge aneinandergereiht, die Spurgrundlage bildet.To create a permanent inrun track basis for summer ski jumps, it is proposed to use as a basis a component made of galvanized sheet steel with the profiling shown in FIG. 1 of the prescribed mesh track width and a length of approx Forms the basis of the track.
Die Befestigung der einzelnen Elemente auf der in der Regel betonierten Anlauf- und Absprungstrecke kann mit üblichen Dübeln und rostfreien Schrauben erfolgen.The fastening of the individual elements on the usually concreted run-in and take-off sections can be done with usual Dowels and stainless screws are used.
Da das jeweils seitliche obere Ende des Profils scharfkantig ist, werden zur Sicherheit im Sportbetrieb sowie zur Stabi lisierung des Profils Seitenwangen (1) aus Holz in ent sprechender Stärke und etwas größerer Höhe als der des Blech elementes verwendet.Since the respective upper side of the profile is sharp-edged, for safety in sports and for stabilizing the profile side walls ( 1 ) made of wood in appropriate strength and somewhat greater height than that of the sheet metal element.
Der dadurch zwischen Bauelement und Seitenwangen entstehende Hohlraum (2) kann als wetterfester und geschützter Kabelschacht zur Aufnahme der notwendigen Sprech- und Signalverbindungen zwischen Anlauf- und Kampfrichterturm hergenommen werden. Es ist zu empfehlen, die Wassersprühanlage zum Befeuchten der Kunststoffmatten direkt an die Holzseitenwangen zu mon tieren.The resulting cavity ( 2 ) between the component and the side panels can be used as a weatherproof and protected cable duct to accommodate the necessary speech and signal connections between the start and judge tower. It is recommended to mount the water spray system directly on the wooden side panels to moisten the plastic mats.
In die Spurbahnen des Bauelements werden Hakengruppen (3) ein genietet. In diese werden dann die entsprechend abgelängten Estrichbaustahlgewebestücke (4) als Träger und als Befesti gungsmöglichkeit für die eigentliche Spurlauffläche (5) einge hängt (Fig. 2 + 3).Hook groups ( 3 ) are riveted into the track of the component. In this, the correspondingly cut screed steel fabric pieces ( 4 ) as a carrier and as a fastening option for the actual track surface ( 5 ) is inserted ( Fig. 2 + 3).
Das kann je nach Jahreszeit eine übliche Kunststoffmatte oder auch ein für die winterliche Schneeauflage geeigneter Kunst stoff- oder Gummibelag sein.Depending on the season, this can be a conventional plastic mat or also an art suitable for the winter snow cover be fabric or rubber covering.
Bei Kunststoffmatten für den Sommerbetrieb werden ganze Mattenteile von der überhöhten Seitenwange bis an den Mittel steg in ca. 10 cm Abstand in den Baustahl eingehängt.With plastic mats for summer use whole Mat parts from the raised side cheek to the middle The web is hung into the structural steel at a distance of approx. 10 cm.
Um eine optimale Skiführung zu erreichen, hängt man halbe Mattenteile über den Mittelsteg, um eine Baustahlgewebe breite versetzt, ein. In order to achieve optimal ski guidance, you hang half Mat parts over the center bar to a steel mesh wide offset, a.
Dadurch fließen die Kunststoffmatten besser ineinander. Es entsteht ein normaler Wulst, ähnlich einer einwand freien Anlaufspur im Schnee.As a result, the plastic mats flow into each other better. A normal bead is created, similar to a flawless one free inrun track in the snow.
Um die Feuchtigkeit der Kunststoffmatten besser zu ge währleisten, sollte zwischen Bauelementen und Estrich baustahlgewebematten ein handelsüblicher Baufließ gelegt werden.To better dampen the plastic mats ensure, should between building elements and screed steel mesh mats placed a commercial construction tile will.
Mit der vorgezeigten Konstruktion wird eine vergleichs weise einfach zu errichtende Spurgrundlage von hoher Lebensdauer geschaffen.With the construction shown is a comparison wise easy to build track base of high Lifetime created.
Die einzelnen Grundelemente sowie die Gitterauflage und der jeweils verwendete Belag lassen sich rasch und problem los austauschen.The individual basic elements as well as the grid support and the covering used can be quickly and easily start exchanging.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19924207412 DE4207412A1 (en) | 1992-03-09 | 1992-03-09 | Ski jump track marker as profiled part - has side hollow shaft for cables, and hooks to hold steel netting taking track surface |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19924207412 DE4207412A1 (en) | 1992-03-09 | 1992-03-09 | Ski jump track marker as profiled part - has side hollow shaft for cables, and hooks to hold steel netting taking track surface |
Publications (1)
Publication Number | Publication Date |
---|---|
DE4207412A1 true DE4207412A1 (en) | 1993-09-16 |
Family
ID=6453579
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19924207412 Withdrawn DE4207412A1 (en) | 1992-03-09 | 1992-03-09 | Ski jump track marker as profiled part - has side hollow shaft for cables, and hooks to hold steel netting taking track surface |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE4207412A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004003515A1 (en) * | 2004-01-23 | 2005-12-08 | Lutz Elges | Universal inrun track for ski jump comprises of right sliding section, left sliding section and central section having accident-proof smooth surfaces without hole or slot screw connection edges |
DE102004023086A1 (en) * | 2004-05-11 | 2005-12-08 | ETEC Gesellschaft für technische Keramik mbH | Inrun track used in ski jump installations, has ski sliding sections whose surface areas are provided with polymer materials or ceramic burl materials, and drainage groove system formed at top side of each surface area |
DE102005062711A1 (en) * | 2005-12-28 | 2007-07-05 | Rehau Ag + Co. | Skiing groove for e.g. ski jump system, has surfaces that stay in contact with ski and are partially made of fluoropolymer, where thickness of fluoropolymer layer is greater than specific picometers |
DE102005062710A1 (en) * | 2005-12-28 | 2007-07-05 | Rehau Ag + Co. | Ski device e.g. ski jump device, has structural unit with surfaces that are connected with each other by side wall, which stays in connection with supporting unit and is arranged at certain distance from base frame |
-
1992
- 1992-03-09 DE DE19924207412 patent/DE4207412A1/en not_active Withdrawn
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004003515A1 (en) * | 2004-01-23 | 2005-12-08 | Lutz Elges | Universal inrun track for ski jump comprises of right sliding section, left sliding section and central section having accident-proof smooth surfaces without hole or slot screw connection edges |
DE102004023086A1 (en) * | 2004-05-11 | 2005-12-08 | ETEC Gesellschaft für technische Keramik mbH | Inrun track used in ski jump installations, has ski sliding sections whose surface areas are provided with polymer materials or ceramic burl materials, and drainage groove system formed at top side of each surface area |
DE102004023086B4 (en) * | 2004-05-11 | 2009-03-05 | ETEC Gesellschaft für technische Keramik mbH | Sliding surface element for ski jumping facilities |
DE102005062711A1 (en) * | 2005-12-28 | 2007-07-05 | Rehau Ag + Co. | Skiing groove for e.g. ski jump system, has surfaces that stay in contact with ski and are partially made of fluoropolymer, where thickness of fluoropolymer layer is greater than specific picometers |
DE102005062710A1 (en) * | 2005-12-28 | 2007-07-05 | Rehau Ag + Co. | Ski device e.g. ski jump device, has structural unit with surfaces that are connected with each other by side wall, which stays in connection with supporting unit and is arranged at certain distance from base frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3318414A (en) | Scaffolding | |
DE1459992A1 (en) | Building construction | |
DE4207412A1 (en) | Ski jump track marker as profiled part - has side hollow shaft for cables, and hooks to hold steel netting taking track surface | |
DE3030841C2 (en) | Under roof | |
DE2055959B2 (en) | Cattle shed arched resilient floor - is anchored to foundations by protrusions at lowest points of arches engaging in recesses in foundations | |
DE59813508D1 (en) | Method for producing a slab track for rail-bound traffic, and a slab track for carrying out the method | |
DE29912398U1 (en) | Platform system made of precast concrete | |
DE3443084C1 (en) | Process for the renovation of a brick wall of a building damaged by moisture and provided with a facade plaster | |
DE20004800U1 (en) | Device for holding and / or covering solar collectors | |
AT124457B (en) | Steel frameworks for walls, ceilings, etc. like | |
DE29915206U1 (en) | Frost apron made of polystyrene concrete | |
DE968628C (en) | Lost formwork for reinforced concrete ribbed ceilings | |
DE635642C (en) | Chain hanging frame | |
DE2043394A1 (en) | Support for a run-up track and landing area made of plastic for ski jumps | |
EP0384916A1 (en) | Anterior shell walls, ceilings, roofs and similar construction elements | |
DE965764C (en) | Cantilever construction panel for ceilings, roofs or the like. | |
DE807984C (en) | Reinforced concrete rib ceiling with prefabricated beams and placed reinforced concrete prefabricated panels | |
DE8402504U1 (en) | SHELL IRON FOR SCREEDING CEILING SHEETS OR RING ANCHORS WITH BRACKET | |
DE8209744U1 (en) | Device for fixing the heating coils of an underfloor heating system | |
DE1772221U (en) | SLAB ELEMENT MADE OF CONCRETE FOR THE PRODUCTION OF DOUBLE-LEAF CEILINGS AND ROOFS. | |
DE2537751A1 (en) | Windowsill or other wall top fitting fixture - with edge fillets in sealing bricks forming channel for cemented anchor ends | |
DE1062912B (en) | Solid ceiling with plaster support strips | |
CH430123A (en) | Process for producing a sound-absorbing concrete surface and profiled mat for carrying out the process | |
DE7904425U1 (en) | KIT OF COMPONENTS FOR A BASE CEILING | |
GB2261448A (en) | Supporting platform for thermal quilting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8139 | Disposal/non-payment of the annual fee |