DE3925463C1 - Automatic barrier filling appts. - incorporates piston squeezing out contents of boiler - Google Patents

Automatic barrier filling appts. - incorporates piston squeezing out contents of boiler

Info

Publication number
DE3925463C1
DE3925463C1 DE19893925463 DE3925463A DE3925463C1 DE 3925463 C1 DE3925463 C1 DE 3925463C1 DE 19893925463 DE19893925463 DE 19893925463 DE 3925463 A DE3925463 A DE 3925463A DE 3925463 C1 DE3925463 C1 DE 3925463C1
Authority
DE
Germany
Prior art keywords
boiler
container
lifting platform
filling
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE19893925463
Other languages
German (de)
Inventor
Richard 8261 Aschau De Hojak
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Netzsch Newamatic GmbH
Original Assignee
Netzsch Newamatic GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Netzsch Newamatic GmbH filed Critical Netzsch Newamatic GmbH
Priority to DE19893925463 priority Critical patent/DE3925463C1/en
Application granted granted Critical
Publication of DE3925463C1 publication Critical patent/DE3925463C1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B67OPENING, CLOSING OR CLEANING BOTTLES, JARS OR SIMILAR CONTAINERS; LIQUID HANDLING
    • B67DDISPENSING, DELIVERING OR TRANSFERRING LIQUIDS, NOT OTHERWISE PROVIDED FOR
    • B67D7/00Apparatus or devices for transferring liquids from bulk storage containers or reservoirs into vehicles or into portable containers, e.g. for retail sale purposes
    • B67D7/02Apparatus or devices for transferring liquids from bulk storage containers or reservoirs into vehicles or into portable containers, e.g. for retail sale purposes for transferring liquids other than fuel or lubricants
    • B67D7/0227Apparatus or devices for transferring liquids from bulk storage containers or reservoirs into vehicles or into portable containers, e.g. for retail sale purposes for transferring liquids other than fuel or lubricants by an ejection plunger
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B39/00Nozzles, funnels or guides for introducing articles or materials into containers or wrappers
    • B65B39/12Nozzles, funnels or guides for introducing articles or materials into containers or wrappers movable towards or away from container or wrapper during filling or depositing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B69/00Unpacking of articles or materials, not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Basic Packing Technique (AREA)

Abstract

The arrangement is mounted on the end of a vehicle drive axle. It contains a tone wheel with a number of radially protruding teeth and devices which couple the tone wheel to rotate with the axle shaft. A casing rotatably mounted in a housing enclosing the shaft has devices on its outer end for coupling to the tone wheel and on its inner end for coupling to an axle drive bevel wheel for rotation of the casing. A sensor mounted in the housing wall near the periphery of the tone wheel, and sepd. from the wheel by a defined air gap, detects the passage of the teeth when the casing and tone wheel are driven by the bevel wheel. USE/ADVANTAGE - Esp. for anti-lock braking system. Likelihood of sensor damage is overcome by mounting sensor inboard of wheel in differential housing.

Description

Die Erfindung betrifft eine Kesselauspreß- und Gebinde­ füllvorrichtung mitThe invention relates to a boiler extrusion and container filling device with

  • - einer Hebebühne für einen Kessel, die heb- und senkbar an einem Gestell angeordnet ist,- A lift for a boiler that can be raised and lowered is arranged on a frame,
  • - einem Auspreßkolben , der über der Hebebühne senkrecht angeordnet und in den Kessel zum Auspressen von in ihm enthaltenem Füllgut absenkbar ist,- An ejector piston that is vertical over the lift arranged and in the kettle for squeezing out in it contained contents can be lowered,
  • - einem Standplatz für ein Gebinde und,- a stand for a container and,
  • - einem senkrechten Füllrohr, das über dem Standplatz angeordnet, am Gestell höheneinstellbar abgestützt und an einen bodennahen Auslaß des Kessels anschließbar ist.- A vertical filler pipe that is above the stand arranged, supported on the frame and adjustable a bottom outlet of the boiler can be connected.

Aus der DE 20 28 962 A ist eine Vorrichtung dieser Gattung bekannt, bei der die Hebebühne an einem Joch eines portal­ artigen Gestells aufgehängt ist, das auch eine hydrauli­ sche Hubvorrichtung für den Auspreßkolben trägt. Am Joch ist ferner ein Ausleger befestigt; an diesem ist eine Do­ siervorrichtung aufgehängt, deren Arbeitshöhe mittels Ver­ stellmuttern einstellbar ist. Die Dosiervorrichtung hat einen senkrechten Zylinder, der als Füllrohr bezeichnet werden kann. Die Hebebühne nimmt, damit ein gefüllter Kessel auf ihr abgesetzt werden kann, eine untere Stellung ein, aus der sie dann mit dem Kessel in eine Stellung an­ gehoben wird, in welcher der Auslaß des Kessels etwa in Höhe Oberkante des Gebindes steht. Sodann wird ein Paar Arretierstangen unter die Hebebühne geschoben, um ein Ab­ senken der Hebebühne beim Entleeren des Kessels zu verhin­ dern. Anschließend wird an den Auslaß des Kessels ein Ven­ til angeschlossen, das den Kessel mit der Dosiervorrich­ tung verbindet. Daraufhin wird der Auspreßkolben in den Kessel abgesenkt und beginnt, ein in diesem enthaltenes teigiges oder zähflüssiges Abfüllmedium durch das Füllrohr in das Gebinde zu pressen. Die Hebebühne bleibt mit dem Kessel in der angehobenen Stellung und wird erst dann ab­ gesenkt, wenn der Kessel nach dem Füllen einer mehr oder weniger großen Anzahl von Gebinden leer ist.DE 20 28 962 A is a device of this type known, in which the lift on a yoke of a portal is suspended like a frame, which is also a hydrauli cal lifting device for the ejector piston carries. On the yoke a boom is also attached; on this is a Thursday siervorrichtung hung, the working height by means of Ver lock nuts is adjustable. The dosing device has a vertical cylinder called a fill tube can be. The lift takes up a filled one Boiler can be placed on it, a lower position from which they then put the boiler in one position is lifted, in which the outlet of the boiler approximately in  Height of the top edge of the container. Then a couple Locking rods pushed under the lifting platform in order to to lower the lift when emptying the boiler other. Then a Ven is at the outlet of the boiler til connected to the boiler with the dosing device tung connects. Then the ejector piston is in the Kettle lowered and begins to contain one pasty or viscous filling medium through the filling pipe to press into the container. The lift stays with the Boiler in the raised position and only then will it come off lowered when the kettle after filling one more or less large number of containers is empty.

Es sind auch Gebindefüllvorrichtungen bekannt, bei denen ein Füllrohr an einer Säule geführt ist, die neben einem Standplatz für ein Gebinde angeordnet ist. Das Füllrohr wird mit einer Kolbenzylindereinheit in das zu füllende Gebinde abgesenkt und dann in dem Maß angehoben, in dem das Niveau des Füllguts im Gebinde steigt. Bei solchen Vorrichtungen hat man sich zwar stets bemüht, das Füllrohr mit einer möglichst kurzen Schlauchleitung, die gut zu reinigen ist, an einen Vorratsbehälter oder eine Pumpe anzuschließen. Die Biegebewegungen, die von der Schlauch­ leitung jeweils beim Absenken und Anheben des Füllrohrs ausgeführt werden müssen, erfordern jedoch eine vom Durch­ messer der Schlauchleitung abhängige reichliche Bemessung ihrer Länge, damit die Schlauchleitung nicht schon nach kurzer Zeit infolge Biegebeanspruchungen unbrauchbar wird.Container filling devices are also known in which a filling pipe is guided on a column that is next to one Stand for a container is arranged. The fill pipe is filled with a piston-cylinder unit in the Container lowered and then raised to the extent that the level of the contents in the container increases. In such Devices have always tried to fill the tube with a hose line as short as possible, which is good too to a storage container or a pump to connect. The bending movements made by the hose line each time the filling pipe is lowered and raised must be performed, however, require one of the through ample dimensioning depending on the diameter of the hose line their length so that the hose line is not already becomes unusable for a short time due to bending stresses.

Der Erfindung liegt die Aufgabe zugrunde, eine Vorrichtung der eingangs beschriebenen Gattung derart weiterzubilden, daß die Mündungshöhe des Füllrohrs dem Niveau des Füllguts im sich füllenden Gebinde auf einfache Weise angepaßt und dennoch die Anschlußleitung zwischen Kessel und Füllrohr kurz bemessen werden kann. The invention has for its object a device to further develop the genus described at the beginning, that the mouth height of the filling pipe corresponds to the level of the filling material in the filling container easily adapted and nevertheless, the connection line between the boiler and the filling pipe can be measured briefly.  

Die Aufgabe ist erfindungsgemäß bei einer Kesselauspreß­ und Gebindefüllvorrichtung der genannten Gattung dadurch gelöst, daß das Füllrohr mit dem Kessel zu gemeinsamer Hubbewegung verbindbar und durch Absenken und Anheben der Hebebühne in das Gebinde absenkbar bzw. in diesem anhebbar ist.The object of the invention is in a boiler extrusion and container filling device of the type mentioned solved that the filling pipe with the boiler to common Lifting movement connectable and by lowering and raising the Lift can be lowered into the container or raised in it is.

Bei einer bevorzugten Ausführungsform der Erfindung ist das Füllrohr unabhängig von der Hebebühne auf einer Strecke, die dem maximalen Hub der Hebebühne mindestens annähernd entspricht, höhenverschiebbar am Gestell ge­ führt, durch eine Vorrichtung zum Gewichtsausgleich zumindest annähernd im Gleichgewicht gehalten und durch eine an den Auslaß des Kessels anschließbare Leitungskupp­ lung zugleich mechanisch mit der Hebebühne kuppelbar.In a preferred embodiment of the invention the filling pipe on one, independent of the lift Distance that the maximum lift of the lift at least approximately corresponds to ge adjustable in height on the frame leads through a device for weight compensation at least approximately in balance and through a pipe connector that can be connected to the outlet of the boiler can also be mechanically coupled to the lift.

Dabei ist es vorteilhaft, wennIt is advantageous if

  • - die Hebebühne in einem Rahmen angeordnet ist, der den Kessel umschließt,- The lift is arranged in a frame that the Encloses boiler
  • - der Rahmen an den Innenseiten eines Paars senkrechter Säulen des Gestells geführt ist und- The frame on the inside of a pair of vertical Pillars of the frame is guided and
  • - an der Außenseite einer dieser Säulen eine senkrechte Führung für einen Ausleger angeordnet ist, an dem das Füllrohr aufgehängt ist.- A vertical one on the outside of one of these columns Guide is arranged for a boom on which the Filling tube is suspended.

Bei dieser erfindungsgemäßen Vorrichtung kann der Ge­ wichtsausgleich dadurch hergestellt sein, daß der Ausleger mit einem Gegengewicht verbunden ist. Ein weitgehender Ge­ wichtsausgleich ist aber auch durch eine Feder od. dgl. möglich.In this device according to the invention, the Ge be made up in that the boom is connected to a counterweight. An extensive ge weight compensation is also by a spring or the like. possible.

Nahe dem unteren Ende des Füllrohrs ist zweckmäßigerweise mindestens ein Sensor angeordnet, der zum Feststellen des Niveaus des Füllguts im Gebinde ausgebildet und an einen Regler angeschlossen ist, der die Bewegungen der Hebebühne steuert. Near the lower end of the fill tube is convenient at least one sensor arranged to detect the Levels of the filling material in the container and to one Controller is connected to the movements of the lift controls.  

Das bevorzugte Verfahren zum Betreiben der erfindungsge­ mäßen Vorrichtung besteht darin, daßThe preferred method of operating the fiction measured device is that

  • - die Hebebühne aus einer unteren Stellung, in der ein Kessel auf ihr abgesetzt wird, in eine Stellung angehoben wird, in welcher der Auslauf des Kessels etwa in Höhe Oberkante des Gebindes steht und das Füllrohr an den Aus­ laß angeschlossen wird,- The lift from a lower position, in the Boiler is placed on it, raised to a position in which the outlet of the boiler is approximately at height The top edge of the container stands and the filling pipe at the end let be connected,
  • - die Hebebühne samt Kessel und Füllrohr abgesenkt wird, bis das untere Ende des Füllrohrs in geringem Abstand über dem Boden des Gebindes steht,- the lift including the boiler and filling pipe is lowered, until the lower end of the filling tube is a short distance above the bottom of the container,
  • - der Auspreßkolben in dem Kessel abgesenkt und dadurch ein Teil des in diesem enthaltenen Füllguts in das Gebinde verdrängt wird, und- The ejector piston is lowered in the boiler and thereby part of the contents contained in this into the container is ousted, and
  • - der Anstieg des Füllguts im Gebinde beobachtet und die Hebebühne samt Kessel und Füllrohr derart angehoben wird, daß ein vorbestimmter Abstand zwischen dem Niveau des Füllguts und dem unteren Ende des Füllrohrs aufrechterhal­ ten wird.- The increase in the contents in the container is observed and the The lift including the boiler and filling tube is raised in such a way that a predetermined distance between the level of Filling material and the lower end of the filling tube will.

Ein Ausführungsbeispiel der Erfindung wird im folgenden anhand schematischer Zeichnungen mit weiteren Einzelheiten erläutert. Es zeigen:An embodiment of the invention is as follows based on schematic drawings with further details explained. Show it:

Fig. 1 eine erfindungsgemäße Vorrichtung in Vorderan­ sicht, Fig. 1 shows a device according to the invention in Vorderan view,

Fig. 2 die Seitenansicht in Richtung des Pfeils II in Fig. 1 und Fig. 2 is a side view in the direction of arrow II in Fig. 1 and

Fig. 3 die zugehörige Draufsicht. Fig. 3 shows the associated top view.

Zu der dargestellten Vorrichtung gehört ein portalartiges Gestell 10 mit zwei senkrechten Säulen, die oben durch ein waagerechtes Joch 14 miteinander verbunden sind. An den Innenseiten der Säulen 12 ist ein senkrechter Rahmen 16 derart geführt, daß er mittels zweier am Joch 14 abge­ stützter hydraulischen Kolbenzylindereinheiten 18 heb- und senkbar ist. Im Rahmen 16 ist eine Hebebühne 20 angeord­ net, die mehrere Doppel-T-Träger 22 aufweist, zwischen die ein Fahrwerk 24 eines Kessels 26 einfahrbar ist. Hebebühne 20 und Kessel 26 sind in Fig. 1 in einer unteren Endstel­ lung und in Fig. 2 in einer angehobenen Stellung abgebil­ det.The device shown includes a portal-like frame 10 with two vertical columns which are connected to one another at the top by a horizontal yoke 14 . On the inside of the columns 12 , a vertical frame 16 is guided such that it can be raised and lowered by means of two hydraulic piston-cylinder units 18 supported on the yoke 14 . In the frame 16 is a lifting platform 20 angeord net, which has a plurality of double-T beams 22 , between which a chassis 24 of a boiler 26 can be retracted. Lift 20 and boiler 26 are shown in Fig. 1 in a lower end position and in Fig. 2 in a raised position.

Der Kessel 26 ist in Fig. 1 zur Hälfte aufgeschnitten dar­ gestellt; er enthält ein nicht abgebildetes hochviskoses Füllgut wie z.B. Druckfarbe, Silikon, Kleber, Dichtmasse od. dgl.. In Bodennähe ist am Kessel 26 ein seitlicher Auslaß 28 angeordnet, durch den das Füllgut mittels eines Auspreßkolbens 30 auspreßbar ist. Der Auspreßkolben 30 ist über eine hydraulische Kolbenzylindereinheit 32 am Joch 14 des Gestells 10 abgestützt.The boiler 26 is shown cut in half in FIG. 1; it contains a highly viscous filling material (not shown) such as printing ink, silicone, adhesive, sealing compound or the like. A side outlet 28 is arranged near the bottom of the boiler 26 , through which the filling material can be pressed out by means of a pressing piston 30 . The ejection piston 30 is supported on the yoke 14 of the frame 10 by a hydraulic piston-cylinder unit 32 .

An der Außenseite einer der beiden Säulen 12 ist eine senkrechte Führung 34 befestigt, und oberhalb davon sind Umlenkrollen 36 gelagert, über die ein Seil 38 läuft. An einem Ende des Seils 38 hängt ein waagerechter Ausleger 40, der an der Führung 34 derart geführt ist, daß er um mindestens eine ebenso große Strecke heb- und senkbar ist wie die Hebebühne 20. Am anderen Ende des Seils 38 hängt ein Gegengewicht 42, das mit dem Ausleger 40, einem an diesem befestigten senkrechten Füllrohr 44 und einer Lei­ tung 46 im Gleichgewicht steht. Die Leitung 46 verbindet das Füllrohr 44 mit einer Leitungskupplung 48, die schnell lösbar mit dem Auslaß 28 des Kessels 26 verbunden ist. Im dargestellten Beispiel besteht die Leitung 46 aus mehreren Abschnitten, die durch ebenfalls schnell lösbare Leitungs­ kupplungen miteinander verbunden und deshalb leicht zu reinigen sind.A vertical guide 34 is fastened to the outside of one of the two columns 12 , and deflection rollers 36 over which a rope 38 runs are mounted above it. At one end of the cable 38 hangs a horizontal boom 40 which is guided on the guide 34 in such a way that it can be raised and lowered by at least as great a distance as the lifting platform 20 . At the other end of the rope 38 hangs a counterweight 42 , the device with the boom 40 , a vertical fill pipe 44 attached to this and a line 46 is in equilibrium. The line 46 connects the filling pipe 44 to a line coupling 48 which is quickly detachably connected to the outlet 28 of the boiler 26 . In the example shown, the line 46 consists of several sections which are also connected to one another by line couplings which can also be released quickly and are therefore easy to clean.

Das senkrechte Füllrohr 44 ist über einem Standplatz 50 angeordnet, der im dargestellten Beispiel vom Ende einer Rollenbahn gebildet ist und ein im dargestellten Beispiel tonnenförmiges Gebinde 52 trägt. Nahe dem unteren Ende des Füllrohrs 44 ist eine kolbenartige Platte 54 befestigt, die zusammen mit dem Füllrohr in das Gebinde 52 absenkbar ist.The vertical filling tube 44 is arranged above a stand 50 , which in the example shown is formed by the end of a roller conveyor and carries a barrel-shaped container 52 in the example shown. A piston-like plate 54 is fastened near the lower end of the filling tube 44 and can be lowered into the container 52 together with the filling tube.

An der Platte 54 ist mindestens ein Sensor 56 angeordnet, mit dem sich das Niveau des in das Gebinde 52 strömenden Füllguts beobachten läßt. Der Sensor 56 ist durch eine Steuerleitung 58 mit einem Regler 60 verbunden. Von diesem geht eine Steuerleitung 62 für ein Mehrwegeventil 64 aus, das die beiden doppeltwirkenden Kolbenzylindereinheiten 18 zum Heben und Senken der Hebebühne 20 steuert. Eine wei­ tere vom Regler 60 ausgehende Steuerleitung 66 führt zu einem Mehrwegeventil 68, das die ebenfalls doppeltwirkende Kolbenzylindereinheit 32 zum Heben und Senken des Auspreß­ kolbens 30 steuert. Die beiden Mehrwegeventile 64 und 68 sind an eine Pumpe 70 sowie einen Behälter 72 für Hydrau­ likflüssigkeit angeschlossen.At least one sensor 56 is arranged on the plate 54 , with which the level of the filling material flowing into the container 52 can be observed. The sensor 56 is connected to a controller 60 by a control line 58 . From this a control line 62 for a multi-way valve 64 starts, which controls the two double-acting piston-cylinder units 18 for lifting and lowering the lifting platform 20 . A white direct from the controller 60 control line 66 leads to a multi-way valve 68 , which also controls the double-acting piston-cylinder unit 32 for lifting and lowering the squeeze piston 30 . The two multi-way valves 64 and 68 are connected to a pump 70 and a container 72 for hydraulic fluid.

Fig. 2 zeigt die Vorrichtung in einem Zustand, bei dem ein gefüllter Kessel 26 auf der Hebebühne 20 abgesetzt und mit dieser in eine obere Stellung angehoben worden ist, in der die Leitungskupplung 48 an den Auslaß 28 des Kessels 26 angeschlossen worden ist. Auf dem Standplatz 50 ist ein leeres Gebinde 52 abgestellt worden. Wenn nun die Hebebüh­ ne 20 samt dem Kessel 26 abgesenkt wird, sorgt die Lei­ tungskupplung 48 dafür, daß die Leitung 46 und das Füll­ rohr 44 samt kolbenartiger Platte 54 sowie der Ausleger 40 an der Abwärtsbewegung teilnehmen. Infolgedessen dringt das Füllrohr 44 samt der kolbenartigen Platte 54 in das Gebinde 52 ein. Die Abwärtsbewegung endet in einem vorbe­ stimmten Abstand des unteren Endes des Füllrohrs 44 über dem Boden des Gebindes 52. FIG. 2 shows the device in a state in which a filled boiler 26 has been placed on the lifting platform 20 and has been raised with it to an upper position in which the line coupling 48 has been connected to the outlet 28 of the boiler 26 . An empty container 52 has been placed on stand 50 . If the Hebebüh ne 20 together with the boiler 26 is lowered, the Lei line coupling 48 ensures that the line 46 and the filling tube 44 together with the piston-like plate 54 and the boom 40 participate in the downward movement. As a result, the filling tube 44, together with the piston-like plate 54 , penetrates into the container 52 . The downward movement ends at a predetermined distance from the lower end of the filling tube 44 above the bottom of the container 52 .

Nun wird der obere Teil der Kolbenzylindereinheit 32 unter Druck gesetzt, so daß der Auspreßkolben 30 in den Kessel 26 eindringt und beginnt, das Füllgut in das Gebinde 52 zu verdrängen. Das dort ansteigende Niveau des Füllguts wird vom Sensor 56 festgestellt, der daraufhin über den Regler 60 und das Mehrwegeventil 64 die unteren Teile der beiden Kolbenzylindereinheiten 18 unter Druck setzt, so daß der Rahmen 16 mit dem Kessel 26 sich wieder aufwärts bewegt. Die Leitungskupplung 48 sorgt dafür, daß die Leitung 46, das Füllrohr 44 samt kolbenartiger Platte 54 und der Aus­ leger 40 an der Aufwärtsbewegung teilnehmen; wegen des Gegengewichts 42 werden dabei die Leitung 46 und Leitungs­ kupplung 48 nur so geringfügig belastet, daß ihre Lebens­ dauer nicht unter ihrer Funktion als mechanische Mitnehmer leidet.Now the upper part of the piston-cylinder unit 32 is pressurized, so that the extrusion piston 30 penetrates into the boiler 26 and begins to displace the filling material into the container 52 . The level of the filling material rising there is determined by the sensor 56 , which then presses the lower parts of the two piston-cylinder units 18 via the controller 60 and the multi-way valve 64 , so that the frame 16 with the boiler 26 moves up again. The line coupling 48 ensures that the line 46 , the fill tube 44 together with the piston-like plate 54 and the casual 40 participate in the upward movement; because of the counterweight 42 , the line 46 and line coupling 48 are only so slightly loaded that their life does not suffer from their function as a mechanical driver.

Der Sensor 56 sorgt in Verbindung mit dem Regler 60 dafür, daß der Auspreßkolben 30 in Bezug auf den Rahmen 16 und somit auch in Bezug auf den Kessel 26 weiterhin mit einer Geschwindigkeit abgesenkt wird, die auf die Hubgeschwin­ digkeit des Kessels 26 und somit auch des Füllrohrs 44 derart abgestimmt ist, daß zwischen dem Niveau des in das Gebinde 52 geströmten Füllguts und dem unteren Ende des Füllrohrs 44 ein vorbestimmter Abstand aufrechterhalten wird. Beim Abfüllen pastösen Füllguts wird dieser Abstand zweckmäßigerweise so gewählt, daß das untere Ende des Füllrohrs 44 und die kolbenartige Platte 54 niemals vom Füllgut berührt wird.The sensor 56 in conjunction with the controller 60 ensures that the squeezing piston 30 with respect to the frame 16 and thus also in relation to the boiler 26 is further lowered at a speed which is based on the Hubgeschwin speed of the boiler 26 and thus also Filling tube 44 is adjusted such that a predetermined distance is maintained between the level of the filling material flowing into the container 52 and the lower end of the filling tube 44 . When filling pasty filling material, this distance is expediently chosen such that the lower end of the filling tube 44 and the piston-like plate 54 are never touched by the filling material.

Der Zwischenraum zwischen dem Niveau des Füllguts und der Platte 54 läßt sich in bekannter Weise evakuieren oder mit einem inerten Gas füllen, damit das Füllgut nicht mit Luftsauerstoff in Berührung kommt. The space between the level of the filling material and the plate 54 can be evacuated in a known manner or filled with an inert gas so that the filling material does not come into contact with atmospheric oxygen.

Sobald das Füllgut im Gebinde 52 ein vorbestimmtes Niveau erreicht hat, wird die Kolbenzylindereinheit 32 stillge­ setzt oder nötigenfalls für einen kurzen Augenblick umge­ steuert, um weiteres Ausfließen von Füllgut aus dem Füll­ rohr 44 in das Gebinde 52 zu verhindern. Währenddessen wird der Rahmen 16 mit der Hebebühne 20 und dem darauf stehenden Kessel 26 noch ein Stück weiter nach oben gefah­ ren und erst dann stillgesetzt, wenn das untere Ende des Füllrohrs 44 eine Stellung oberhalb der Oberkante des Ge­ bindes 52 erreicht hat. Sobald das Gebinde 52 durch ein leeres ersetzt worden ist, beginnt der beschriebene Ar­ beitszyklus von neuem; er wird so oft wiederholt, bis der Kessel 26 leer ist.As soon as the filling material in the container 52 has reached a predetermined level, the piston-cylinder unit 32 is stopped or, if necessary, reversed for a brief moment in order to prevent further outflow of filling material from the filling tube 44 into the container 52 . In the meantime, the frame 16 with the lifting platform 20 and the boiler 26 standing thereon is moved a little further upwards and is only stopped when the lower end of the filling tube 44 has reached a position above the upper edge of the binding 52 Ge. As soon as the container 52 has been replaced by an empty one, the described working cycle begins again; it is repeated until the boiler 26 is empty.

Claims (6)

1. Kesselauspreß- und Gebindefüllvorrichtung mit
  • - einer Hebebühne (20) für einen Kessel (26), die heb- und senkbar an einem Gestell (10) angeordnet ist,
  • - einem Auspreßkolben (30), der über der Hebebühne (20) senkrecht angeordnet und in den Kessel (26) zum Auspressen von in ihm enthaltenem Füllgut absenkbar ist,
  • - einem Standplatz (50) für ein Gebinde (52) und
  • - einem senkrechten Füllrohr (44), das über dem Standplatz (50) angeordnet, am Gestell (10) höheneinstellbar abge­ stützt und an einen bodennahen Auslaß (28) des Kessels (26) anschließbar ist, dadurch gekennzeichnet, daß das Füllrohr (44) mit dem Kessel (26) zu gemeinsamer Hubbewegung ver­ bindbar und durch Absenken und Anheben der Hebebühne (20) in das Gebinde (52) absenkbar bzw. in diesem anhebbar ist.
1. Boiler squeezing and container filling device with
  • - a lifting platform ( 20 ) for a boiler ( 26 ) which can be raised and lowered on a frame ( 10 ),
  • a squeezing piston ( 30 ) which is arranged vertically above the lifting platform ( 20 ) and can be lowered into the boiler ( 26 ) for squeezing out the contents contained therein,
  • - A stand ( 50 ) for a container ( 52 ) and
  • - A vertical filler tube ( 44 ), which is arranged above the stand ( 50 ), supports abge adjustable in height on the frame ( 10 ) and can be connected to an outlet ( 28 ) of the boiler ( 26 ) near the bottom, characterized in that the filler tube ( 44 ) with the boiler ( 26 ) for common lifting movement ver bindable and by lowering and lifting the lifting platform ( 20 ) in the container ( 52 ) can be lowered or raised in this.
2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß das Füllrohr (44) unabhängig von der Hebebühne (20) auf einer Strecke, die dem maximalen Hub der Hebebühne (20) mindestens annä­ hernd entspricht, höhenverschiebbar am Gestell (10) ge­ führt, durch eine Vorrichtung zum Gewichtsausgleich zumindest annähernd im Gleichgewicht gehalten und durch eine an den Auslaß (28) des Kessels (26) anschließbare Leitungskupplung (48) zugleich mechanisch mit der Hebebüh­ ne (20) kuppelbar ist.2. Apparatus according to claim 1, characterized in that the filling tube ( 44 ) independently of the lifting platform ( 20 ) on a distance which corresponds at least approximately to the maximum lifting height of the lifting platform ( 20 ) leads vertically on the frame ( 10 ), kept at least approximately in equilibrium by a weight-balancing device and at the same time mechanically coupled to the lifting platform ( 20 ) by a line coupling ( 48 ) which can be connected to the outlet ( 28 ) of the boiler ( 26 ). 3. Vorrichtung nach Anspruch 2, dadurch gekennzeichnet, daß
  • - die Hebebühne (20) in einem Rahmen (16) angeordnet ist, der den Kessel (26) umschließt,
  • - der Rahmen (16) an den Innenseiten eines Paars senkrech­ ter Säulen (12) des Gestells (10) geführt ist und
  • - an der Außenseite einer dieser Säulen (12) eine senk­ rechte Führung (34) für einen Ausleger (40) angeordnet ist, an dem das Füllrohr (44) aufgehängt ist.
3. Device according to claim 2, characterized in that
  • - The lifting platform ( 20 ) is arranged in a frame ( 16 ) which surrounds the boiler ( 26 ),
  • - The frame ( 16 ) on the inside of a pair of vertical ter columns ( 12 ) of the frame ( 10 ) is guided and
  • - On the outside of one of these columns ( 12 ) a vertical right guide ( 34 ) for a boom ( 40 ) is arranged on which the filling tube ( 44 ) is suspended.
4. Vorrichtung nach Anspruch 3, dadurch gekennzeichnet, daß der Ausleger (40) mit einem Gegengewicht (42) verbunden ist.4. The device according to claim 3, characterized in that the boom ( 40 ) is connected to a counterweight ( 42 ). 5. Vorrichtung nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß nahe dem un­ teren Ende des Füllrohrs (44) mindestens ein Sensor (56) angeordnet ist, der zum Feststellen des Niveaus des Füll­ guts im Gebinde (52) ausgebildet und an einen Regler (60) angeschlossen ist, der die Bewegungen der Hebebühne (20) steuert.5. Device according to one of claims 1 to 4, characterized in that near the un lower end of the filling tube ( 44 ) at least one sensor ( 56 ) is arranged, which is designed to determine the level of the filling material in the container ( 52 ) and on a controller ( 60 ) is connected, which controls the movements of the lifting platform ( 20 ). 6. Verfahren zum Betreiben einer Vorrichtung nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß
  • - die Hebebühne (20) aus einer unteren Stellung, in der ein Kessel (26) auf ihr abgesetzt wird, in eine Stellung angehoben wird, in welcher der Auslaß (28) des Kessels (26) etwa in Höhe Oberkante des Gebindes (52) steht und das Füllrohr (44) an den Auslaß (28) angeschlossen wird,
  • - die Hebebühne (20) samt Kessel (26) und Füllrohr (44) abgesenkt wird, bis das untere Ende des Füllrohrs (44) in geringem Abstand über dem Boden des Gebindes (52) steht,
  • - der Auspreßkolben (30) in dem Kessel (26) abgesenkt und dadurch ein Teil des in diesem enthaltenen Füllguts in das Gebinde (52) verdrängt wird, und
  • - der Anstieg des Füllguts im Gebinde (52) beobachtet und die Hebebühne (20) samt Kessel (26) und Füllrohr (44) derart angehoben wird, daß ein vorbestimmter Abstand zwischen dem Niveau des Füllguts und dem unteren Ende des Füllrohrs (44) aufrechterhalten wird.
6. A method of operating a device according to one of claims 1 to 5, characterized in that
  • - The lifting platform ( 20 ) from a lower position, in which a boiler ( 26 ) is placed on it, is raised to a position in which the outlet ( 28 ) of the boiler ( 26 ) is approximately at the level of the upper edge of the container ( 52 ) stands and the filling pipe ( 44 ) is connected to the outlet ( 28 ),
  • - The lifting platform ( 20 ) including the boiler ( 26 ) and filling tube ( 44 ) is lowered until the lower end of the filling tube ( 44 ) is a short distance above the bottom of the container ( 52 ),
  • - The Auspreßkolben ( 30 ) in the boiler ( 26 ) is lowered and thereby a part of the contents contained therein is displaced into the container ( 52 ), and
  • - The increase in the contents in the container ( 52 ) is observed and the lifting platform ( 20 ) together with the boiler ( 26 ) and filling tube ( 44 ) is raised in such a way that a predetermined distance between the level of the filling material and the lower end of the filling tube ( 44 ) is maintained becomes.
DE19893925463 1989-08-01 1989-08-01 Automatic barrier filling appts. - incorporates piston squeezing out contents of boiler Expired - Fee Related DE3925463C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19893925463 DE3925463C1 (en) 1989-08-01 1989-08-01 Automatic barrier filling appts. - incorporates piston squeezing out contents of boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19893925463 DE3925463C1 (en) 1989-08-01 1989-08-01 Automatic barrier filling appts. - incorporates piston squeezing out contents of boiler

Publications (1)

Publication Number Publication Date
DE3925463C1 true DE3925463C1 (en) 1990-06-07

Family

ID=6386301

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19893925463 Expired - Fee Related DE3925463C1 (en) 1989-08-01 1989-08-01 Automatic barrier filling appts. - incorporates piston squeezing out contents of boiler

Country Status (1)

Country Link
DE (1) DE3925463C1 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2028962B2 (en) * 1970-06-12 1973-03-22 Ge-Halin Chemie Weil Kg, 6201 Wicker FILLING DEVICE FOR VISCOSE PASTE

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2028962B2 (en) * 1970-06-12 1973-03-22 Ge-Halin Chemie Weil Kg, 6201 Wicker FILLING DEVICE FOR VISCOSE PASTE

Similar Documents

Publication Publication Date Title
EP3440010B1 (en) Emptying device for viscous materials, and method for same
DE2318842C2 (en) Filling device for a system equipped with a hammer to form a support column in the ground
DE2425297C3 (en) Device for the continuous filling of barrels
DE102012105461A1 (en) baler
DE2846630A1 (en) DEVICE FOR LIFTING THE BOTTOM OF CANS
DE2319835C2 (en) Lifting and loading device
DE3506250C2 (en)
DE4306680C2 (en) Method for determining the lifting height of a height-adjustable load handling device of an industrial truck
DE3023003A1 (en) DOSING DEVICE FOR HEAVY FLOWABLE MATERIALS
DE3925463C1 (en) Automatic barrier filling appts. - incorporates piston squeezing out contents of boiler
DE2240552A1 (en) DEVICE FOR HANDLING LOADS
DE1756769C3 (en) Synchronization control, especially for a tipping platform for unloading vehicles
DE29718151U1 (en) Emptying device
DE3300832C2 (en) Curve guide for a hose cart train
DE2742045B2 (en) Loading platform for trucks
DE2204124C3 (en) Guide device for a load suspended from hoisting ropes, e.g. a container
AT355747B (en) CAROUSEL DEVICE FOR CONTINUOUS CASTING PLANTS
DE862572C (en) Hydraulically driven block making machine
DE3909860C1 (en) Working frame for grouting pumps used in underground operation
DE2028962A1 (en) Filling device for viscous pastes, method for the metered dispensing of a viscous paste and metering device for carrying out this method
AT299726B (en) MOBILE LIFTING JACK FOR MAINTENANCE AND REPAIR OF MOTOR VEHICLES
DE1556200C (en) Device for moving a Con tamer
DE1906431A1 (en) Machine for filling beer kegs and similar liquid containers
DE7913758U1 (en) Device for irrigation and suction during proctoscopy and rectoscopy
DE1531769C (en) Garbage storage device on garbage trucks or trailers

Legal Events

Date Code Title Description
8100 Publication of the examined application without publication of unexamined application
D1 Grant (no unexamined application published) patent law 81
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee