DE3539324A1 - Method of constructing a tunnel - Google Patents

Method of constructing a tunnel

Info

Publication number
DE3539324A1
DE3539324A1 DE19853539324 DE3539324A DE3539324A1 DE 3539324 A1 DE3539324 A1 DE 3539324A1 DE 19853539324 DE19853539324 DE 19853539324 DE 3539324 A DE3539324 A DE 3539324A DE 3539324 A1 DE3539324 A1 DE 3539324A1
Authority
DE
Germany
Prior art keywords
tunnel
planned
frost body
diameter
thawed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
DE19853539324
Other languages
German (de)
Inventor
Dieter Ing Grad Rebhan
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linde GmbH
Original Assignee
Linde GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linde GmbH filed Critical Linde GmbH
Priority to DE19853539324 priority Critical patent/DE3539324A1/en
Publication of DE3539324A1 publication Critical patent/DE3539324A1/en
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections

Abstract

The invention relates to a method of constructing a tunnel by means of soil freezing. In this method, a freezing pipe is placed in or near the planned axis of the subsequent tunnel and is cooled until an ice mass of greater diameter than the planned tunnel diameter has been formed around the freezing pipe. In order to permit the construction of a smaller tunnel or the laying of a sag pipe or a conduit in a simple and reliable manner, it is proposed, after the forming of the ice mass, to thaw that part of the ice mass which lies within the outside diameter of the planned tunnel and to excavate the thawed earth.

Description

Die Erfindung betrifft ein Verfahren zur Erstellung eines Tunnels mittels Bodenvereisung, wobei in oder in der Nähe der geplanten Achse des späteren Tunnels ein Gefrierrohr eingebracht und das Gefrierrohr gekühlt wird, bis um das Gefrierrohr ein Frostkörper mit größerem Durchmesser als dem geplanten Tunneldurchmesser gebildet worden ist.The invention relates to a method for creating a Soil freezing tunnels, being in or near a freeze pipe on the planned axis of the future tunnel inserted and the freezer tube is cooled until around the Freezer tube a frost body with a larger diameter than the planned tunnel diameter.

Für den Transport verschiedener Medien müssen Rohrlei­ tungen oder Düker unterirdisch verlegt werden. Problema­ tisch können diese Verlegearbeiten im Bereich von Flüssen, Kanälen, Gebäuden, Straßen, Schienenwegen usw. werden, vor allem dann, wenn schwieriger Baugrund wie z.B. Fließ­ sand, schluffige Böden mit niedriger Konsistenz, Findlinge, hoher Grundwasserspiegel usw. anstehen. In derartigen Bereichen werden Versorgungsleitungen oftmals mittels Rohrdurchpressung verlegt. Man praktiziert auch Grund­ wasserabsenkungen, Abdichtinjektionen oder Schildvor­ triebe. Alle diese Verfahren sind aufwendig und führen manchmal - vor allem bei ungünstiger Konstellation ver­ schiedener Baugrundgegebenheiten - nicht zum Erfolg. Rohrlei are required for the transport of various media pipes or culverts are laid underground. Problema this laying work in the area of rivers, Canals, buildings, roads, railways, etc. especially when difficult ground such as Flow sand, silty soils with low consistency, boulders, high water table etc. In such Areas are often made using supply lines Pipe penetration laid. You also practice reason water subsidence, sealing injections or shield drives. All of these procedures are complex and lead sometimes - especially with an unfavorable constellation ver different ground conditions - not to success.  

Zudem stellen eine Reihe der bei diesen Verfahren erfor­ derlichen Bauhilfsmaßnahmen eine Belastung der Umwelt dar. Es dürfte daher in Zukunft zunehmend schwieriger werden, behördliche Genehmigungen für Bauhilfsmaßnahmen wie Grund­ wasserabsenkungen, Injektionen oder für einen bleibenden, d.h. einen Stau des Grundwasser verursachenden oder das Grundwasser ablenkenden Verbau zu erhalten. Außerdem ver­ ursacht eine Grundwasserabsenkung normalerweise Setzungs­ schäden. Eine Injektion kann zu bleibenden Hebungen führen. Dies ist z.B. bei der Verlegung von Rohrleitungen unter­ halb des Gleiskörpers von Eisenbahnen unbedingt zu ver­ meiden.In addition, a number of those required for these processes building aid measures are a burden on the environment. It will therefore become increasingly difficult in the future official permits for construction aid measures like Grund water sinks, injections or for a permanent, i.e. a congestion of the groundwater or that Obtain groundwater-deflecting shoring. In addition ver A lowering of the groundwater usually causes subsidence damage. An injection can lead to permanent uplifts. This is e.g. when laying pipelines under half of the track body of railways avoid.

Zur Erstellung von Tunneln mit großer Querschnittsfläche ist es bereits bekannt, über ein in der Achse des geplan­ ten Tunnels verlegtes Gefrierrohr einen Frostkörper zu bilden, dessen Durchmesser größer als der geplante Tunnel­ durchmesser ist. Im Schutz eines im Querschnitt kreis­ ringförmigen Frostkörpers wird anschließend gefrorenes Erdreich abgebaut. Für das Verlegen von Rohrleitungen oder die Herstellung kleiner Tunnel, beispielsweise von Tunneln mit einem Durchmesser bis zu ca. 2 m, ist dieses Verfahren wegen des aufwendigen Abbaus des Erdreiches wenig geeignet.For creating tunnels with a large cross-sectional area it is already known about one in the axis of the plan Freezer pipe installed in the tunnels to freeze a frost form whose diameter is larger than the planned tunnel diameter is. In the protection of a circle in cross section annular frost body is then frozen Soil mined. For laying pipes or the production of small tunnels, for example from This is tunnels with a diameter of up to approx. 2 m Procedure due to the complex mining of the soil not very suitable.

Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren der eingangs genannten Art anzugeben, das auf sichere und einfache Weise die Erstellung eines kleineren Tunnels bzw. das Verlegen eines Dükerrohres oder einer Leitung ermöglicht.The invention has for its object a method of the type mentioned at the outset, in a safe manner and easy way to create a smaller tunnel or the laying of a culvert pipe or a pipe enables.

Diese Aufgabe wird erfindungsgemäß dadurch gelöst, daß nach der Ausbildung des Frostkörpers jener Teil des Frostkörpers aufgetaut wird, der innerhalb des Außen­ durchmessers des geplanten Tunnels liegt, und das auf­ getaute Erdreich abgebaut wird.This object is achieved in that after the formation of the frost body that part of the Frost body is thawed inside the outside diameter of the planned tunnel, and that on  thawed soil is mined.

Erfindungsgemäß werden zunächst ein Start- und ein Ziel­ schacht (Pressgruben) errichtet und zwischen den beiden Schächten sowie in der Achse des geplanten Tunnels bzw. der geplanten Rohrleitung ein einziges Gefrierrohr einge­ bracht. Durch Einleiten eines Kühlfluids in das Gefrier­ rohr wird um das Gefrierrohr ein Frostkörper gebildet. Der Durchmesser dieses Frostkörpers ist größer als die zu verlegende Leitung bzw. das zu setzende Dükerrohr oder der zu erstellende Tunnel. Erfindungsgemäß wird nun nicht gefrorenes Erdreich abgebaut, sondern ein Teil des Frostkörpers wird vor dem Abbau aufgetaut. Dabei wird nur der Teil des Frostkörpers aufgetaut, der sich inner­ halb des Außendurchmessers des geplanten Tunnels bzw. der geplanten Rohrleitung befindet. Auf diese Weise bleibt ein im Querschnitt kreisringförmiger, gefrorener Mantel bestehen. Im Schutz dieses Mantels kann das aufgetaute Erdreich auf einfache Weise abgebaut werden. Sobald das Erdreich abgebaut ist, kann ein Zusetzen des Dükerrohr bzw. eine zu verlegende Versorgungsleitung leicht in den vom gefrorenen, mantelförmigen Frostkörper begrenzten Tunnel eingeführt werden. Nach Verlegen der Leitung wird der Frostmantel durch natürliche Einflüsse wieder aufge­ taut.According to the invention, a start and a destination are first shaft (press pits) erected and between the two Shafts and in the axis of the planned tunnel or a single freeze pipe in the planned pipeline brings. By introducing a cooling fluid into the freezer a frost body is formed around the freezer tube. The diameter of this frost body is larger than that the pipe to be laid or the culvert pipe to be set or the tunnel to be created. According to the invention not mine frozen ground, but part of the Frost body is thawed before dismantling. Doing so only thawed the part of the frost body that is inside half of the outside diameter of the planned tunnel or the planned pipeline. That way stays a frozen jacket with a circular cross-section consist. In the protection of this coat, the thawed can Soil can be mined easily. As soon as that Soil is mined, clogging the culvert pipe or a supply line to be laid easily in the bounded by the frozen, jacket-shaped frost body Tunnels will be introduced. After laying the line the frost coat re-opened due to natural influences thaws.

Das erfindungsgemäße Verfahren ermöglicht ein sicheres Arbeiten auch bei schwierigsten Baugrundverhältnissen. Da nur ein Gefrierrohr benötigt wird, ist das erfindungs­ gemäße Verfahren in hohem Maße wirtschaftlich. Das erfin­ dungsgemäße Verfahren ermöglicht zudem einen Erdaushub im Ungefrorenen. Ebenso ist Vorpressung möglich. Durch den Frostkörper besteht (bezogen auf die Tunnelachse) eine Sicherung sowohl in radialer als auch in axialer Richtung, so daß der mantelförmige Frostkörper sowohl gegen Wasser abdichtet als auch den Tunnelhohlraum sichert. Der Frostkörper liegt konzentrisch zum Gefrierrohr, so daß durch die Position des Gefrierrohres die Lage des Tunnels bzw. die Lage der zu verlegenden Leitung festgelegt wird. Mit dem erfindungsgemäßen Verfahren kann ohne andere Bau­ hilfsmaßnahme umweltfreundlich auch im Grundwasser gearbei­ tet werden.The method according to the invention enables a safe one Work even in the most difficult ground conditions. Since only one freezer tube is required, this is inventive procedures to a high degree are economical. That invented The method according to the invention also enables excavation in the frozen. Prepressing is also possible. Due to the frost body (in relation to the tunnel axis) a backup in both radial and axial Direction so that the jacket-shaped frost body both  seals against water and also secures the tunnel cavity. The frost body is concentric with the freezer tube, so that by the position of the freezer tube the location of the tunnel or the position of the line to be laid is determined. With the method according to the invention can be built without other environmental friendly measure also in groundwater be tested.

Mit dem erfindungsgemäßen Verfahren können beispielsweise Rohre mit einem Durchmesser von ca. 2 m verlegt werden. Dabei hat der Frostkörper einen maximalen Durchmesser von ca. 4 m.With the method according to the invention, for example Pipes with a diameter of approx. 2 m are laid. The frost body has a maximum diameter of approx. 4 m.

In einer besonders wirtschaftlichen Variante des erfindungs­ gemäßen Verfahrens wird der Frostkörper abschnittsweise erstellt - beispielsweise durch Abschottungen im Gefrier­ rohr -. In dieser Ausgestaltung wird ein Frostkörper stets nur in einem Teil des Bodenbereiches zwischen Start- und Zielschacht gebildet. Dabei werden die Energiekosten er­ heblich gesenkt im Vergleich zu einem Verfahren, bei dem der Frostkörper entlang der gesamten Strecke zwischen Start- und Zielschacht gebildet wird. Dem Vortriebsverlauf entsprechend wird der Frostkörper zuerst im Bereich des Startschachtes erstellt, in dem der Vortrieb beginnt. Je nach Fortschritt der dem Bodengefrieren folgenden Arbeiten wird ein Frostkörper in weiteren Teilstrecken erstellt.In a particularly economical variant of the invention According to the procedure, the frost body is made in sections created - for example by foreclosures in the freezer pipe -. In this configuration, a frost body is always only in a part of the floor area between start and Target shaft formed. Thereby, the energy costs significantly reduced compared to a method in which the frost body along the entire route between Start and finish shaft is formed. The progress of the tunneling accordingly, the frost body is first in the area of Starting shaft created in which the tunneling begins. Each after the progress of the work following the freezing of the ground a frost body is created in further sections.

Nach einer weiteren vorteilhaften Ausgestaltung des Er­ findungsgedankens wird als Kühlfluid ein tiefsiedendes, verflüssigtes Gas, insbesondere flüssiger Stickstoff, verwendet. Wegen ihrer niedrigen Siedetemperaturen können durch diese Gase dem Erdreich erhebliche Wärmemengen entzogen werden. Ein besonders geeignetes tiefsiedendes Gas ist flüssiger Stickstoff, da er billig ist, wegen seines tiefen Siedepunktes für eine rasche Abkühlung sorgt und darüber hinaus einfach zu handhaben ist. Es kann auch Sole als Kälteträger eingesetzt werden. Gemäß einer wei­ teren vorteilhaften Ausgestaltung der Erfindung wird das Gefrierrohr mit Hilfe von Preß- oder Bohrgeräten oder eines Bodenverdrängungshammers eingebracht.According to a further advantageous embodiment of the Er the cooling fluid is a low-boiling, liquefied gas, especially liquid nitrogen, used. Because of their low boiling temperatures significant amounts of heat to the soil through these gases be withdrawn. A particularly suitable low-boiling Gas is liquid nitrogen because it is cheap because of its low boiling point ensures rapid cooling  and is also easy to use. It can also Brine can be used as a coolant. According to a white teren advantageous embodiment of the invention Freezer tube with the help of pressing or drilling equipment or a ground displacement hammer.

Claims (5)

1. Verfahren zur Erstellung eines Tunnels mittels Boden­ vereisung, wobei in oder in der Nähe der geplanten Achse des späteren Tunnels ein Gefrierrohr eingebracht und das Gefrierrohr gekühlt wird, bis um das Gefrier­ rohr ein Frostkörper mit größerem Durchmesser, als dem geplanten Tunneldurchmesser gebildet worden ist, dadurch gekennzeichnet, daß nach der Ausbildung des Frostkörpers jener Teil des Frostkörpers aufgetaut wird, der innerhalb des Außendurchmessers des geplan­ ten Tunnels liegt, und das aufgetaute Erdreich ab­ gebaut wird.1. Method for creating a tunnel by means of ground icing, whereby a freezing tube is inserted in or near the planned axis of the future tunnel and the freezing tube is cooled until a frost body with a larger diameter than the planned tunnel diameter has been formed around the freezing tube , characterized in that after the formation of the frost body that part of the frost body is thawed, which lies within the outer diameter of the planned tunnel, and the thawed soil is removed. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß der Frostkörper durch Erwärmen des Gefrierrohres aufgetaut wird.2. The method according to claim 1, characterized in that that the frost body by heating the freezer tube is thawed. 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeich­ net, daß der Frostkörper abschnittsweise erstellt wird. 3. The method according to claim 1 or 2, characterized net that the frost body is created in sections.   4. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß als Kälteträger eine Sole oder ein Kühlfluid, z.B. ein tiefsiedendes, verflüssigtes Gas, insbesondere flüssiger Stickstoff, verwendet wird.4. The method according to any one of claims 1 to 3, characterized characterized in that a brine or a cooling fluid, e.g. a low-boiling, liquefied Gas, especially liquid nitrogen, used becomes. 5. Verfahren nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß das Gefrierrohr mit Hilfe von Preß- oder Bohrgeräten oder eines Bodenverdrängungs­ hammers eingebracht wird.5. The method according to any one of claims 1 to 4, characterized characterized in that the freezer tube using Press or drilling equipment or a displacement is brought in.
DE19853539324 1985-11-06 1985-11-06 Method of constructing a tunnel Ceased DE3539324A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19853539324 DE3539324A1 (en) 1985-11-06 1985-11-06 Method of constructing a tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19853539324 DE3539324A1 (en) 1985-11-06 1985-11-06 Method of constructing a tunnel

Publications (1)

Publication Number Publication Date
DE3539324A1 true DE3539324A1 (en) 1987-05-14

Family

ID=6285285

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19853539324 Ceased DE3539324A1 (en) 1985-11-06 1985-11-06 Method of constructing a tunnel

Country Status (1)

Country Link
DE (1) DE3539324A1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1156732B (en) * 1958-06-11 1963-11-07 Wolfgang Staender Dipl Ing Procedure for regulating the level of the internal frost line in freezing pits
DE3140672A1 (en) * 1981-10-13 1983-04-28 Linde Ag, 6200 Wiesbaden METHOD FOR CREATING A TUNNEL
DE8509601U1 (en) * 1985-03-30 1985-08-22 Jeschke, Immanuel, 3203 Sarstedt Device for shutting off gas pipes

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1156732B (en) * 1958-06-11 1963-11-07 Wolfgang Staender Dipl Ing Procedure for regulating the level of the internal frost line in freezing pits
DE3140672A1 (en) * 1981-10-13 1983-04-28 Linde Ag, 6200 Wiesbaden METHOD FOR CREATING A TUNNEL
DE8509601U1 (en) * 1985-03-30 1985-08-22 Jeschke, Immanuel, 3203 Sarstedt Device for shutting off gas pipes

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"TIS" 6/85, S. 325 bis 327 u. 330 bis 332 *

Similar Documents

Publication Publication Date Title
EP0077943B1 (en) Method of constructing a tunnel
CN109296371A (en) MJS method and horizontal freezing joint reinforcement pressure-bearing rich water arenaceous stratum overlap the system and its construction method that section is worn under station
WO1982002935A1 (en) Underground conduits of a heat pump
DE4341858C2 (en) Underground energy store for heating or cooling energy and method for producing such an energy store
DE3539324A1 (en) Method of constructing a tunnel
DE1240789B (en) Device for driving a route or a shaft in sandy or water-containing soil
CN110512594A (en) The simple and easy method of churning driven opportunity cavity pore-forming
Klais et al. The Grautschenhof contract–Construction of an intermediate access under complex local conditions: Das Baulos Grautschenhof–Errichtung eines Zwischenangriffs unter komplexen Randbedingungen
DE3524253C1 (en) Method and apparatus for producing a shaft, in particular for mining
DE3447872A1 (en) Method of consolidating the terrain during the excavation of tunnels
DE2032101A1 (en) Method of preventing leaks in the storage of a gas or liquid in a rock chamber
Liao et al. Construction of a Piperoofed Underpass Below Groundwater Table.
EP1548228B1 (en) Method of forming an underground bore and apparatus for carrying out the same
DE2320366A1 (en) PROCESS FOR SECURING THE OUTBREAK AND LIMITING MOUNTAIN DEFORMATIONS IN THE MOUNTAIN MANNICAL PRODUCTION OF TUBE-SHAPED CAVES
Ju et al. Ground freezing for restoration of damaged tunnel
Hwang et al. Ground freezing for repairing a damaged tunnel
Lin et al. A case study of piping failure associated with shield tunnelling
EP0648298B1 (en) Process for carrying out civil engineering works
CN209959251U (en) System for reinforcing lower crossing section of pressure-bearing water-rich sandy stratum overlapped station by combining MJS method and horizontal freezing method
Klösges et al. Artificial ground freezing as a consolidation measure for tunnelling under Bern main station
Klais et al. Particular aspects of the tendering contract SBT3. 1 “Tunnel Grautschenhof”/Besondere Aspekte des Ausschreibungsprojekts SBT3. 1 Tunnel Grautschenhof
DE19901536A1 (en) Trench free parallel pipe laying method for defined horizontal or vertical spacing, involves execution of pilot hole along line and creation of two subterranean tunnels by two boring machines from exit to entry
DE3807008C1 (en) Method of constructing a shaft, in particular for mining
DE64556C (en) Process for driving tunnels, lines and the like, as well as for sinking shafts using the freezing method protected by patent no. 25015
AT382003B (en) Method and device for sealing a leaky location in an inaccessible pipeline

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
8131 Rejection