DE334513C - Clock with hour and quarter hour striking - Google Patents

Clock with hour and quarter hour striking

Info

Publication number
DE334513C
DE334513C DE1920334513D DE334513DD DE334513C DE 334513 C DE334513 C DE 334513C DE 1920334513 D DE1920334513 D DE 1920334513D DE 334513D D DE334513D D DE 334513DD DE 334513 C DE334513 C DE 334513C
Authority
DE
Germany
Prior art keywords
hour
quarter
lever
disc
striking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE1920334513D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MATH SOHN
Bauerle Mathias GmbH
Original Assignee
MATH SOHN
Bauerle Mathias GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MATH SOHN, Bauerle Mathias GmbH filed Critical MATH SOHN
Application granted granted Critical
Publication of DE334513C publication Critical patent/DE334513C/en
Expired legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G04HOROLOGY
    • G04BMECHANICALLY-DRIVEN CLOCKS OR WATCHES; MECHANICAL PARTS OF CLOCKS OR WATCHES IN GENERAL; TIME PIECES USING THE POSITION OF THE SUN, MOON OR STARS
    • G04B21/00Indicating the time by acoustic means
    • G04B21/02Regular striking mechanisms giving the full hour, half hour or quarter hour
    • G04B21/022Regular striking mechanisms giving the full hour, half hour or quarter hour with saw mechanism

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Measurement Of Unknown Time Intervals (AREA)

Description

Uhr mit Stunden- und Viertelstundenschlagwerk. Die bisher bekannt gewordenen Uhren mit Stunden- und Viertelstundenschlagwerk weisen getrennte Vorrichtungen zum Auslösen bzw. Betätigen des Stunden- und Viertelschlagwerkes auf, und es besitzen diese Werke teils getrennten Antrieb, teils sind sie mit Hilfe von Wechsel-, Wende- oder Planetengetrieben mit dem Antrieb des Gehwerkes zusammengeschaltet. Dementsprechend sind diese Werke auch verhältnismäßig kompliziert, wozu noch der weitere Nachteil kommt, daß sie zu ihrem Ingangkommen eine ziemlich große Antriebskraft brauchen. Auch ist das Geräusch beim Ingangsetzen der beiden Schlagwerke ziemlich groß.Clock with hour and quarter hour striking. The previously known Now clocks with hour and quarter hour striking have separate devices to trigger or operate the hour and quarter hammer mechanism, and have it these works partly separate drive, partly they are with the help of changing, reversing or planetary gears interconnected with the drive of the walking gear. Accordingly these works are also relatively complicated, plus the further disadvantage comes that they need a rather great driving force to get going. The noise when starting the two striking mechanisms is also quite large.

Während nun die getrennten Auslösevorrichtungen für die beiden Schlagwerke dementsprechend getrennte Staffelscheiben für den Stunden- und den Viertelstundenschlag bedingten; ist es durch den Erfindungsgegenstand möglich geworden, für beide Werke den Antrieb von einer Welle aus vorzunehmen, womit ohne weiteres die Anwendung nur einer Staffelscheibe gegeben ist. Die dadurch bedingte wesentliche Vereinfachung des ganzen Werkes hat einen überaus leichten und geräuschlosen Gang- zur Folge.While now the separate release devices for the two striking mechanisms accordingly separate relay discs for the hour and quarter hour strike conditional; the subject of the invention made it possible for both works to make the drive from a shaft, with which the application only a relay disc is given. The resulting essential simplification the whole work results in an extremely easy and noiseless gait.

Zur Erreichung dieses Zweckes wird gemäß der Erfindung die Stundenschlagscheibe mit der auf derselben Welle befindlichen Viertelschlagscheibe durch ein auf gleicher. Welle befindliches Differentialgetriebe derart miteinander in Verbindung gebracht, daß bei wechselweiser Hemmung der einen Schlagscheibe stets auch wechselweise die andere Schlagscheibe von der gemeinsamen Welle angetrieben wird. Die wechselweise Hemmung der Leiden Schlagscheiben erfolgt hierbei durch eine Art Winkelhebel, welcher mittels eines mit ihm auf gleicher Achse befindlichen Hebels von der unmittelbar auf der Minutenwelle sitzenden Viertelstiftscheibe gesteuert wird.To achieve this purpose, according to the invention, the hour disc with the quarter-turn washer located on the same shaft through one on the same. Differential gear located on the shaft brought into connection with one another in such a way that that with alternating inhibition of a striking disc always alternately the other impact disc is driven by the common shaft. The alternately Inhibition of the suffering blow disks takes place here by a kind of angle lever, which by means of a lever located on the same axis from the direct the quarter-pin disk on the minute shaft is controlled.

Das Einstellen und Auslösen der zu gebenden Anzahl Stunden- und Viertelstundenschläge erfolgt in bekannter Weise mittels Staffel, Rechen und Anrichtung mit den dazugehörigen Teilen von der Minuten- bzw. Stundenwelle aus.Setting and triggering the number of hourly and quarter-hour strikes to be given takes place in a known manner by means of a relay, rake and arrangement with the associated Split from the minute or hour wave.

In der Zeichnung ist der Erfindungsgegeri-.,tand als Ausführungsbeispiel in Verbindung finit einem Westminsterwerk näher erläutert. Es zeigt: rig. z die Vorderansicht, Fig. a die Oberansicht, Fig. 3 eine Ansicht bei abgenommener Vorderplatine, Fig. q. das Differentialgetriebe.In the drawing, the scope of the invention is shown as an exemplary embodiment explained in more detail in connection with a Westminster plant. It shows: rig. z the Front view, FIG. A the top view, FIG. 3 a view with the front plate removed, Fig. Q. the differential gear.

Fig. 5 die Schlag-iverkhemmung in schematischer Darstellung, y Fig.6 eine andere Ausführung des Differentialgetriebes.Fig. 5 shows the impact inhibition in a schematic representation, y Fig. 6 another version of the differential gear.

Das dargestellte Werk besitzt zwei getrennte -Antriebswellen z und z mit den Seiltrommeln 3 und q., von denen die erste für das Gehwerk und die zweite für das Schlagwerk bestimmt ist. Neben der Trommel d. läuft lose ein Zahnrad 5, das in bekannter Weise durch eine Federklinke 6 mit dem Gegensperri ad ; der Trommel q. in Verbindung steht. Das Rad 5 arbeitet durch ein Rad 8 auf die M,' eile 9, die das Differentialgetriebe trägt. Das auf der gleichen Welle 9 befindliche Rad 1o steht über Achse 1i, Rad 12, Achse 13 mit dem Stiftenrad 14 und dieses wieder mit dem Windfang 15 in Verbindung.The work shown has two separate drive shafts z and z with the cable drums 3 and q., the first of which for the walking gear and the second is intended for the striking mechanism. In addition to the drum d. a gear 5 runs loosely, in a known manner by a spring pawl 6 with the Gegenensperri ad; the drum q. communicates. The wheel 5 works through a wheel 8 on the M, 'eile 9, the the differential gear carries. The one located on the same shaft 9 Wheel 1o is above axis 1i, wheel 12, axis 13 with pin wheel 14 and this again with the vestibule 15 in connection.

Auf der Welle 9 läuft lose die mit einem Rad 16 fest verbundene Hebnägelscheibe (Stundenschlagscheibe) 17. Das Rad 16 steht mit einem Rad 18 in Eingriff, das in einem fest mit der Welle 9 verbundenen Hebel i9 gelagert ist. Ein mit dem Rad 18 auf gleicher Achse befindliches Rad 49 greift nach Art der Innenverzahnung an einem lose. auf der Welle 9 laufenden kronradartigen Rad 2o (Viertelschlagscheibe) an, das seinerseits wieder über die Räder 21, 22 mit der Spielwalze 23 in Verbindung steht, die in bekannter Weise durch ihre Stifte 24 auf die Hammerhebel 25 wirkt. Die Hebnägelscheibe 17 wirkt in bekannter Weise mittels des Hebels 26 auf den Stundenschlagarm 27, der beim Ausführungsbeispiel vier der gezeichneten Hämmer 25 zu gleichzeitigem Schlag anhebt.On the shaft 9 runs loosely connected to a wheel 16 lever nail disc (Hourly striking plate) 17. The wheel 16 is engaged with a wheel 18 which is shown in FIG a lever i9 firmly connected to the shaft 9 is mounted. One with the bike 18 Wheel 49 located on the same axis engages in the manner of internal toothing on one loose. crown wheel-like wheel 2o (quarter-turn disk) running on shaft 9, that in turn is connected to the play roller 23 via the wheels 21, 22 which acts in a known manner on the hammer lever 25 through its pins 24. The lever washer 17 acts in a known manner by means of the lever 26 on the hour strike arm 27, which in the exemplary embodiment four of the drawn hammers 25 at the same time Blow raises.

Mit der Viertelschlagscheibe 20 ist eine mit einem Randeinschnitt 28 versehene (glatte) Scheibe 29 verbunden, auf der die Nase eines Hebels 30 schleift, der zusammen mit einem Hebel 31 fest auf einer Achse 50 sitzt, wobei dieser Hebel 31 mit seinem vorderen abgestumpften Ende in die Bahn der Hebnägel 17 greift und sie hemmt, solange der Hebel 30 auf der Scheibe 29 schleift, während er sie freigibt, wenn die Nase des Hebels 30 in den Einschnitt der Scheibe 29 eingreift und damit diese gehemmt wird. Es werden also durch die starr miteinander verbundenen Hebel 30 und 31 wechselweise die Hebnägelscheibe 17 '(Stundenschlagscheibe) und die Scheibe 29 und damit auch die Viertelschlagscheibe 2o gehemmt. Die Steuerung der beiden Hebel 30 und 31 erfolgt mittels des mit ihnen starr auf gleicher Achse befindlichen Hebels 32 (Fig. i und 5) in bekannter Weise von der auf der Minutenwelle 33 befindlichen Viertelstiftscheibe 34, die mit drei kürzeren Stiften 35 und einem längeren Stift 36 versehen ist, wovon nur der längere Stift 36 den Hebel 32 anhebt und damit die Nase des Hebels 3o aus dem Einschnitt der Scheibe 29 löst, diese also freigibt und gleichzeitig durch den Hebel 31 die Hebnägelscheibe hemmt.A (smooth) disk 29 provided with an edge incision 28 is connected to the quarter hammer disk 20, on which the nose of a lever 30 grinds, which together with a lever 31 sits firmly on an axis 50 , this lever 31 with its front truncated end in the path of the lever nails 17 grips and inhibits it as long as the lever 30 grinds on the disk 29, while it releases it when the nose of the lever 30 engages in the incision of the disk 29 and thus this is inhibited. The lever 30 and 31, which are rigidly connected to one another, alternately inhibit the lever washer 17 '(hourly striking disc) and the disc 29 and thus also the quarter striking disc 2o. The control of the two levers 30 and 31 takes place by means of the lever 32 (Fig. I and 5), which is rigidly on the same axis with them, in a known manner from the quarter-pin disk 34 located on the minute shaft 33, which has three shorter pins 35 and a longer pin 36 is provided, of which only the longer pin 36 lifts the lever 32 and thus releases the nose of the lever 3o from the incision in the disc 29, thus releasing it and at the same time inhibiting the lever 31 by means of the lever 31.

Auf der hohlen Stundenwelle befindet sich die Staffelscheibe 37 mit den Stundenstaffeln und den dazwischenliegenden kleinen Staffeln für Viertel, Halb und Dreiviertel. Durch diese Staffelscheibe wird der Abfall des durch die Feder 54 beeinflußten Einfallhebels 38 und des fest damit verbundenen Rechens 39 begrenzt.The relay disk 37 is located on the hollow hour shaft the hourly scales and the small scales in between for quarter, half and three quarters. Through this relay disc, the fall of the through the spring 54 influenced drop lever 38 and the rake 39 firmly connected therewith limited.

Die Auslösung und Bewegung des Rechens erfolgt in bekannter Weise von der Welle 1t aus mittels Anrichtung 40, Schöpfer 41 und Rechensperr falle 42. Die Anrichtung 4.0 wird durch ihren Hebelarm 43 von den Stiften 35, 36 der Viertelstiftscheibe 34 angehoben.The rake is triggered and moved in a known manner from the shaft 1t by means of device 40, scoop 41 and rake lock fall 42. The arrangement 4.0 is supported by its lever arm 43 from the pins 35, 36 of the quarter pin disk 34 raised.

Die Tiefe der einzelnen Viertelstunden- und Stundenstaffeln der Staffelscheibe 37 ist so bemessen, daß beim Abfallen des Einfallhebels 38 der Rechen 39 sich um eine Anzahl seiner Zähne bewegt, welche der Zahl der zu gebenden Viertelstunden- und Stundenschläge entspricht. Zum Halbschlag wird z. B. der Rechen um zwei Zähne abfallen, beim 8-LThr-Schlag dagegen um zwölf Zähne.The depth of the individual quarter-hour and hourly scales of the relay disc 37 is dimensioned so that when the drop lever 38 falls, the rake 39 turns moves a number of its teeth, which corresponds to the number of quarter-hour and hourly chimes. For half stroke z. B. the rake by two teeth fall off, but by twelve teeth with the 8-LThr impact.

Innerhalb einer vollen Stunde hat das Werk zehn Viertelschläge zu geben, auf die dann jedesmal die Stundenschläge folgen, d. h., nach jedem zehnten Viertelschlag muß die Scheibe 25 mit der Viertelschlagscheibe 2o gehemmt werden, wodurch die Stundenschlagscheibe (Hebnägelscheibe) 17 frei wird, während vor dem ersten Viertelschlag jeder Stunde die Hemmung der Viertelschlagscheibe wieder aufgehoben und umgekehrt die Stundenschlagscheibe gehemmt werden muß.Within a full hour the work has to give ten quarter-strokes, which are then followed each time by the hour-strikes, i.e. after every tenth quarter-stroke the disc 25 must be inhibited with the quarter-stroke disc 2o, whereby the hour disc (lever-nail disc) 17 is free, while before the the first quarter strike of every hour the inhibition of the quarter striking disc is canceled and, conversely, the hour disc must be inhibited.

Dies geschieht auf folgende Weise. Nach beendetem Stundenschlag wird die Scheibe 29 noch durch die Nase des Hebels 30 gehemmt. Kurz vor dem ersten Viertel wird durch den längeren Stift 36 der Viertelstiftscheibe der Hebelarm 43 der Anrichtung 40 und durch diese die Rechensperrfalle 42 angehoben, welche den Rechen freigibt, so daß der Einfallhebel38 auf die erste Viertelstaffel fällt und der Rechen sich nun einen Zahn weiter bewegt. Gleichzeitig wird durch den längeren Stift 36 auch der Hebel 32 angehoben, -wobei durch den starr damit verbundenen Hebel 30 die Scheibe 29 freigegeben bzw. die Hebnägelscheibe durch den zweiten Hebel 31 gehemmt wird. Das Werk ist nun zum ersten Viertelschlag angerichtet. Dieser erfolgt, nachdem der Stift 36 unter dem Hebelarm 43 der Anrichtung vorbeigestreift ist, wonach dieser sich senkt und die Anrichtung durch den Anlauf 44 in bekannter Weise das Getriebe freigibt. Dabei blieb der Hebel 32 angehoben, so daß sich die Viertelschlagscheibe bewegen konnte. Bei den folgenden Halb-, Dreiviertel-und Viertelschlägen spielt sich derselbe Vorgang wie beschrieben ab, nur wird der Hebel 32 durch die drei kürzeren Stifte 35 nicht mehr angehoben, was auch nicht mehr nötig ist, da nach dem ersten Viertelschlag die Nase des Hebels 3o auf dem glatten Rand der Scheibe 29 schleifen kann. Nach vollendetem Vierviertelschlag, also nach dem zehnten Viertelschlag hat die Scheibe 29 eine volle Umdrehung gemacht, und es fällt die Nase des Hebels 30 - da der Hebel 32 ja durch den vierten Stift (einen kürzeren) nicht angehoben ist - in den Einschnitt 28 der Scheibe 29, diese hemmend und durch Hebel 31 die Hebnägel- (Stunden-) Scheibe freigebend, so daß nun die Stundenschläge erfolgen können.This is done in the following way. After the hour has ended, the disc 29 is still blocked by the nose of the lever 30 . Shortly before the first quarter, the lever arm 43 of the device 40 is raised by the longer pin 36 of the quarter pin disk and through this the rake locking latch 42, which releases the rake, so that the drop lever 38 falls on the first quarter scale and the rake now moves one tooth further . At the same time, the longer pin 36 also lifts the lever 32, the disk 29 being released by the lever 30 rigidly connected to it, or the lever-nail disk being inhibited by the second lever 31. The work is now ready for the first quarter stroke. This takes place after the pin 36 has passed under the lever arm 43 of the device, after which the latter lowers and the device releases the transmission in a known manner through the stop 44. The lever 32 remained raised so that the quarter-turn washer could move. In the following half, three-quarter and quarter strokes, the same process takes place as described, only the lever 32 is no longer raised by the three shorter pins 35, which is also no longer necessary, since the nose of the lever 3o after the first quarter stroke can grind on the smooth edge of the disc 29. After the four-quarter stroke has been completed, i.e. after the tenth quarter stroke, the disc 29 has made a full turn, and the nose of the lever 30 falls into the incision 28 of the disc - since the lever 32 is not lifted by the fourth pin (a shorter one) 29, this inhibiting and releasing the Hebnägel- (hour) disc by lever 31, so that now the hour strikes can take place.

Nach vollendetem Stundenschlag beginnt dann das ganze Spiel von neuem.When the hour is over, the whole game starts all over again.

Da das Schlagwerk eine größere Antriebskraft erfordert als das Gehwerk, so ist, um an den beiden Seiltrommeln 3, 4 gleiche Gewichte wirken lassen zu können - wobei das Schlagwerksgewicht kleiner, das Gehwerksgewicht entsprechend größer als notwendig gehalten ist -, ein lose neben der Seiltrommel 3 laufendes Rad 48, welches durch ein Differentialgetriebe 45 mit der Antriebswelle i des Gehwerkgetriebes 46 in Verbindung steht, durch ein Rad 47 mit dem losen Rad 5 des Schlagwerks in Eingriff gebracht. Dadurch wird erreicht, daß bei Ingangkommen des Schlagwerks noch ein Teil der Antriebskraft des Gehwerkes mit auf die Schlagwerkantriebswelle übertragen wird.Since the striking mechanism requires a greater driving force than the walking mechanism, so is in order to be able to have the same weights act on the two cable drums 3, 4 - the weight of the striking mechanism being smaller and the weight of the moving mechanism correspondingly larger is considered necessary -, a loosely next to the cable drum 3 running wheel 48, which by a differential gear 45 with the drive shaft i of the gear mechanism 46 is in connection, through a wheel 47 with the loose wheel 5 of the striking mechanism in Intervention brought. This ensures that when the striking mechanism is started part of the driving force of the moving mechanism is also transmitted to the hammer mechanism drive shaft will.

Der Antrieb der beiden Werke kann auf jede beliebige Weise erfolgen.The two works can be driven in any way.

Ebenso kann der Erfindungsgegenstand bei jedem beliebigen anderen Uhrwerk mit Stunden- und Viertelstundenschlag Verwendung finden. Die Fig.6 zeigt ein Differentialwechselgetriebe für das wechselweise Ingangsetzen des Stundenschlag- oder Viertelstundenschlagwerkes, bei dem an Stelle der Räder 16, 18, 49 und der Kronradstifte (Fig.4) die Kegelräder 54 5--, 53 angeordnet sind. Die Wirkungsweise ist genau die gleiche wie bei dem schon beschriebenen Getriebe.The subject matter of the invention can also be applied to any other Clockwork with hour and quarter hour strike can be used. The Fig.6 shows a differential change gear for the alternating starting of the hourly strike or quarter-hour strike, in which instead of the wheels 16, 18, 49 and the Crown gear pins (Fig. 4) the bevel gears 54 5--, 53 are arranged. The mode of action is exactly the same as with the gearbox already described.

Claims (1)

PATENT-AI3sPRÜcHE: i. Uhrwerk mit Stunden- und Viertelstundenschlag, dadurch gekennzeichnet. daß die auf einer Welle (9) befindliche Stunden- (17) und Viertelstunden- (2o) Schlagscheibe von einer Antriebswelle aus mittels Differentialwechselgetriebe angetrieben und wechselweise .gesperrt werden. z. Uhrwerk nach Anspruch i, dadurch gekennzeichnet, daß die wechselweise Hemmung der beiden Schlagscheiben- (17 bzw. 29) durch zwei starr mit einer Achse (50) verbundene Hebel (30, 31) erfolgt, die durch einen dritten, ebenfalls starr mit dieser Achse verbundenen Hebel (3a) gesteuert werden, der mit der auf der Minutenwelle (33) sitzenden Viertelstiftscheibe (34) in Eingriff steht.PATENT CLAIMS: i. Clockwork with hour and quarter hour strike, characterized. that the hour (17) and located on a shaft (9) Quarter-hour (2o) beater disc from a drive shaft by means of a differential gearbox driven and alternately blocked. z. Clockwork according to claim i, characterized characterized that the alternating inhibition of the two striking disc (17 or 29) is carried out by two levers (30, 31) rigidly connected to an axis (50), which controlled by a third lever (3a) also rigidly connected to this axis with the quarter pin washer (34) sitting on the minute shaft (33) is engaged.
DE1920334513D 1920-01-06 1920-01-06 Clock with hour and quarter hour striking Expired DE334513C (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE334513T 1920-01-06

Publications (1)

Publication Number Publication Date
DE334513C true DE334513C (en) 1921-03-15

Family

ID=6216859

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1920334513D Expired DE334513C (en) 1920-01-06 1920-01-06 Clock with hour and quarter hour striking

Country Status (1)

Country Link
DE (1) DE334513C (en)

Similar Documents

Publication Publication Date Title
DE334513C (en) Clock with hour and quarter hour striking
DE592986C (en) Watch with a device for winding by means of two winding forces acting simultaneously or alternately
DE531075C (en) Clock with striking mechanism with device for angel lute
DE621789C (en) Synchronous clock with beat
DE547070C (en) Self-regulation for clocks with Westminster and hour strike
DE957560C (en) Striking mechanism, especially for clocks
DE471713C (en) Striking mechanism for clocks
CH108303A (en) Beat clock with a common hour and quarter hour drive, an hour and a quarter hour scale and a common rake
AT102899B (en) Percussion.
DE264240C (en)
DE730103C (en) Striking mechanism for synchronous clocks
DE110974C (en)
DE685716C (en) Installation on striking mechanisms of clocks
DE177600C (en)
DE474118C (en) Rake hammer mechanism in which the rake is lifted up by the fall of the hammer
AT165273B (en) Adjustment device for the type lever on calculating machines
DE492916C (en) Time control device for the duration of work
DE578458C (en) Clock with a common electric motor drive for walking and striking mechanism
DE501285C (en) Switching mechanism for cash registers and calculating machines
DE410854C (en) Hour and quarter hour striking
DE576311C (en) Clock mechanism with self-regulation
DE385459C (en) Movement with a common drive for two movements
DE546203C (en) Electric strike clock
AT122832B (en) Clock with lighter.
DE221418C (en)