DE3322298C1 - Device for moving a climbing protection device from a first climbing path to a second climbing path - Google Patents

Device for moving a climbing protection device from a first climbing path to a second climbing path

Info

Publication number
DE3322298C1
DE3322298C1 DE3322298A DE3322298A DE3322298C1 DE 3322298 C1 DE3322298 C1 DE 3322298C1 DE 3322298 A DE3322298 A DE 3322298A DE 3322298 A DE3322298 A DE 3322298A DE 3322298 C1 DE3322298 C1 DE 3322298C1
Authority
DE
Germany
Prior art keywords
climbing
path
slide
climbing path
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE3322298A
Other languages
German (de)
Inventor
Manfred 8670 Hof Fränkel
Ernst Söll
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Soell Industrieschmiede GmbH
Soell KG Industrieschmiede
Original Assignee
Soell Industrieschmiede GmbH
Soell KG Industrieschmiede
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Soell Industrieschmiede GmbH, Soell KG Industrieschmiede filed Critical Soell Industrieschmiede GmbH
Priority to DE3322298A priority Critical patent/DE3322298C1/en
Priority to ES1984288746U priority patent/ES288746Y/en
Priority to NO842452A priority patent/NO842452L/en
Priority to DK298484A priority patent/DK298484A/en
Priority to DE8484106987T priority patent/DE3467790D1/en
Priority to AT84106987T priority patent/ATE31101T1/en
Priority to EP84106987A priority patent/EP0129241B1/en
Priority to ZA844670A priority patent/ZA844670B/en
Application granted granted Critical
Publication of DE3322298C1 publication Critical patent/DE3322298C1/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06CLADDERS
    • E06C7/00Component parts, supporting parts, or accessories
    • E06C7/18Devices for preventing persons from falling
    • E06C7/186Rail or rope for guiding a safety attachment, e.g. a fall arrest system
    • E06C7/187Guiding rail
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06CLADDERS
    • E06C1/00Ladders in general
    • E06C1/02Ladders in general with rigid longitudinal member or members
    • E06C1/38Special constructions of ladders, e.g. ladders with more or less than two longitudinal members, ladders with movable rungs or other treads, longitudinally-foldable ladders
    • E06C1/381Ladders with rungs or treads attached only to one rigid longitudinal member

Abstract

1. A device for shifting a safety means for climbers from a first climbing path (4) to a second climbing path (5), said safety means comprising a slide (8) moving along a longitudinal guide path (2) and having a releasable lock against downward movement, characterized in that a short portion (1) of the longitudinal guide path (2) is slidable in parallel along a transverse guide path (3) between the first climbing path (4) and the second climbing path (5).

Description

Die Erfindung betrifft eine Vorrichtung zum Verschieben einer Steigschutzeinrichtung von einem ersten Steigweg zu einem zweiten Steigweg, wobei die Steigschutzeinrichtung einen Schieber aufweist, der entlang einer Längsführung gleitet und eine lösbare Arretierung gegen eine Abwärtsbewegung aufweistThe invention relates to a device for moving a climbing protection device from a first Climb path to a second climbing path, the climbing protection device has a slide that slides along a longitudinal guide and a releasable lock has against a downward movement

An Leitern zum Besteigen hoher Bauwerke, z. B. Sendemasten oder Schornsteine, sind Steigschutzeinrichtungen vorgesehen, die die das Bauwerk besteigende Person gegen Absturz sichert (DE-PS 19 61 757). Insbesondere bei Sendemasten ist es häufig notwendig, den Steigweg zu versetzen, um zwischen den vorhandenen Richtstrahlern hindurch nach oben steigen zu können. Um auch während des Umsteigens von dem ersten Steigweg auf den zweiten Steigweg eine lückenlose Absturzsicherung zu haben, wurde der Schieber bisher mittels einer drehteller-ähnlichen Einrichtung von dem Ende des ersten Steigwegs in eine waagrechte Führung übergeleitet und an deren Ende wieder mittels einer drehteller-ähnlichen Einrichtung in die Längsführung des zweiten Steigweges eingeführt. Nachteilig ist hierbei, daß die drehteller-ähnlichen Einrichtungen im Aufbau kompliziert sind. Diese Art der Versetzung ist außerdem nur bei Sendemasten mit relativ großem Durchmesser möglich, da der Schieber nicht auf Querführungen mit starker Krümmung gleiten kann.On ladders for climbing tall structures, e.g. B. transmission masts or chimneys are climbing protection devices provided that secures the person climbing the structure against falling (DE-PS 19 61 757). In particular In the case of transmission masts, it is often necessary to relocate the climbing path in order to move between the existing ones Directional spotlights to be able to rise through it. To even during the changeover from the first one Steigweg to have a complete fall protection on the second Steigweg, the slide was previously by means of a turntable-like device from the end of the first climbing path into a horizontal guide transferred and at the end again by means of a turntable-like device in the longitudinal guide of the second climbing path introduced. The disadvantage here is that the turntable-like devices in structure are complicated. This type of offset is also only available for transmission masts with a relatively large diameter possible because the slide cannot slide on transverse guides with a strong curvature.

Der Erfindung liegt die Aufgabe zugrunde, eine Vorrichtung zum seitlichen Verschieben einer Steigschutzeinrichtung von einem ersten Steigweg zu einem zweiten Steigweg zu schaffen, die im Aufbau einfach ist und z. B. bei Sendemasten von geringem Durchmesser anwendbar ist.The invention is based on the object of a device for the lateral displacement of a climbing protection device to create from a first climbing path to a second climbing path that is simple in structure and z. B. is applicable to transmission masts of small diameter.

Diese Aufgabe wird dadurch gelöst, daß ein kurzes Teilstück der Längsführung auf einer Querführung zwischen dem ersten Steigweg und dem zweiten Steigweg parallel verschiebbar ist.This object is achieved in that a short section of the longitudinal guide on a transverse guide between the first climbing path and the second climbing path is displaceable in parallel.

Die Querführung weist vorzugsweise zwei im Abstand angeordnete Schienen auf, auf denen das Teilstück der Längsführung mit Rollen geführt ist.The transverse guide preferably has two spaced apart rails on which the section the longitudinal guide is guided with rollers.

Eine einfachere Ausführungsform der Querführung besteht in einer profilierten Schiene, die vom ersten Steigweg um den Masten bzw. den Schornstein herum zum zweiten Steigweg führt und auf dem der Schlitten mittels eines Gleitlagers gleitet.A simpler embodiment of the transverse guide consists of a profiled rail, which from the first Climbing path around the mast or chimney leads to the second climbing path and on which the sledge slides by means of a plain bearing.

Die Steigwege können eine Mittelholmleiter gemäß der DE-PS 19 61 757 oder durch eine normale Doppelholmleiter mit einer zusätzlichen Führungsschiene für den Schieber gebildet werden.The climbing paths can be a central stile ladder according to DE-PS 19 61 757 or a normal double stile ladder be formed with an additional guide rail for the slide.

Um ein Herausfallen des Schiebers aus dem Teilstück der Längsführung zu verhindern, ist dieses verzugsweise am oberen und unteren Ende mit einer Sicherung versehen.In order to prevent the slide from falling out of the section of the longitudinal guide, this is preferred fitted with a fuse at the top and bottom.

Die Querführung kann an einer ebenen Wand gerade oder um einen Sendemasten, einen Schornstein oder ein ähnliches Bauwerk auf einem gekrümmten Weg herum führen. Der Krümmungsradius kann dabei praktisch beliebig klein sein und z. B. nur 20 cm betragen. Die Vorrichtung kann dabei den Schieber um einen beliebigen Winkel um den Sendemast, Schornstein oder dergleichen herum führen, z. B. um 90°, 180° oder 360°.The lateral guide can be straight on a flat wall or around a transmitter mast, a chimney or a Lead a similar structure around on a curved path. The radius of curvature can be practically arbitrary be small and z. B. be only 20 cm. The device can move the slide around any desired Lead angles around the transmission mast, chimney or the like, z. B. by 90 °, 180 ° or 360 °.

Ein Ausführungsbeispiel der Erfindung wird nachfolgend anhand der Zeichnung näher erläutert. Es zeigtAn exemplary embodiment of the invention is explained in more detail below with reference to the drawing. It shows

F i g. 1 in einer perspektivischen Darstellung die Vorrichtung zum Verschieben einer Steigschutzeinrichtung in ihrer Position als Teil eines Steigweges;F i g. 1 shows the device for moving a climbing protection device in a perspective view in their position as part of a climbing path;

F i g. 2 die Vorrichtung zum Verschieben einer Steigschutzeinrichtung in einer Stellung außerhalb eines Steigweges undF i g. 2 the device for moving a climbing protection device in a position outside of a climbing path and

F i g. 3 die Vorrichtung zum Verschieben einer Steigschutzeinrichtung im Vertikalschnitt und um Horizontalschnitt. F i g. 3 the device for moving a climbing protection device in vertical section and around horizontal section.

Wie die F i g. 1 und 2 zeigen, sind an einem Betonmast 10 ein erster Steigweg 4 und ein zweiter Steigweg 5 in Form von Leitern mit einem Mittelholm 11 und Leitersprossen 12 befestigt, wie sie aus der DE-PS 19 61 757 bekannt sind. Der erste Steigweg 4 führt vom Erdboden bis zu der in den F ig. 1 und 2 gezeigten Stelle, während der zweite Steigweg 5 von der in den F i g. 1 und 2 gezeigten Stelle nach oben weiterführt. Beide Steigwege überlappen dabei etwa um 2 m. Die Vorrichtung zum Verschieben der Steigschutzeinrichtung weist zwei gekrümmte, vertikal übereinander angeordnete und mit Stegen verbundene Rundeisen 6 auf, die als Schienen zur Führung eines Schlittens 13 dienen. Die Rundeisen 6 sind konzentrisch um den Betonmast 10 angeordnet und sind durch Rohrschellen 14 an diesem befestigt. Die Rundeisen 6 sind durch verstellbare AbstandschraubenAs the F i g. 1 and 2 show, a first climbing path 4 and a second climbing path 5 in FIG Form of ladders with a central spar 11 and ladder rungs 12 attached, as described in DE-PS 19 61 757 are known. The first climbing path 4 leads from the ground to the in the F ig. 1 and 2, while the second climbing path 5 from the one shown in FIGS. 1 and 2 continues upwards. Both climbs overlap by about 2 m. The device for moving the climbing protection device has two curved, Round iron 6 arranged vertically one above the other and connected with webs, which act as rails serve to guide a slide 13. The round iron 6 are arranged concentrically around the concrete pole 10 and are attached to this by pipe clamps 14. The round iron 6 are adjustable by means of spacer screws

15 in ihrem Abstand von dem Betonmast einjustierbar.
Die beiden Rundeisen 6 führen einen Schlitten 13 vom
15 adjustable in their distance from the concrete mast.
The two round iron 6 lead a slide 13 from

Ende des ersten Steigweges 4 zu einer Lücke des zweiten Steigwegs 5, der in dem vorliegenden Ausführungsbeispiel um 180° versetzt an dem Betonmast angeordnet ist. Der Schlitten 13 wird durch insgesamt 8 RollenThe end of the first climbing path 4 leads to a gap in the second climbing path 5, which in the present exemplary embodiment is arranged offset by 180 ° on the concrete pole is. The carriage 13 is made by a total of 8 rollers

16 auf den beiden Rundeisen ß geführt. Der Schlitten 13 ist ein U-Profileisen ausreichender Länge, so daß von den beiden Schenkeln des U-Profileisens insgesamt acht Rollen 16 nach innen abstehend angeordnet werden können, wobei jeweils zwei Rollen 16 zusammen die Rundeisen 6 umklammern. Zur sicheren Führung wird jedes Rundeisen 6 von zwei Rollenpaaren umklammert, die in einem Abstand von etwa 20 cm angeordnet sind. Der Schlitten 13 trägt ein kleines Teilstück 1 des Mittelholms der Leiter, und der Abstand der Rundeisen 6 vom Betonmast 10 ist so eingestellt, daß das Teilstück 1 mittels des Schlittens 13 in exakte Fluchtung mit den Mittelholmen 11 des ersten bzw. zweiten Steigweges 4S 5 gebracht werden kann.16 out on the two round iron ß. The carriage 13 is a U-profile iron of sufficient length so that a total of eight rollers 16 can be arranged inwardly protruding from the two legs of the U-profile iron, with two rollers 16 each clasping the round iron 6. For safe guidance, each round iron 6 is clasped by two pairs of rollers, which are arranged at a distance of about 20 cm. The carriage 13 carries a small section 1 of the central spar of the ladder, and the distance of the round iron 6 from the concrete mast 10 is set so that the section 1 by means of the carriage 13 is in exact alignment with the central struts 11 of the first and second climbing path 4 S 5 can be brought.

Wie in der DE-PS 19 61 757 näher beschrieben ist,As described in more detail in DE-PS 19 61 757,

dient der Mittelholm 11 zugleich als Längsführung für einen Schieber 8 einer Steigschutzeinrichtung. Die die Leiter hochsteigende Person ist mittels eines Sicherheitsgürtels an diesem Schieber 8 gesichert. Der Schieber 8 weist als Arretierung eine Sperrklinke auf, die durch Federwirkung in ihrer Sperrstellung gehalten wird, in der die Klinkennase in das Innere des U-Profils der Längsführung ragt und gegen dort befindliche Anschlagflächen anliegt. Als Anschlagflächen dienen dabei die Oberseiten der Leitersprossen 12, die durch paarweise fluchtende Öffnungen verlaufen, die durch die parallelen Seitenwände des U-Profils des Mittelholms 11 angeordnet sind. Zusätzlich zu den Leitersprossen 12 können weitere Anschlagflächen vorgesehen werden, indem rechteckige Hohlprofilstücke 17 durch weitere Öffnungen in den Seitenwänden des U-Profils des Mittelholms 11 eingesetzt sind. Das Teilstück 1 ist fest an dem Schlitten 13 angeschraubt und enthält in seinem Inneren eine Anschlagfläche, die durch ein solches zusätzliches Hohlprofilstüclc 17 gebildet wird, so daß der Schieber 8 in dem Teilstück 1 arretiert ist. Um ein unbeabsichtigtes Herausfallen des Schiebers 8 aus dem Teilstück 1 zusätzlich zu verhindern, sind am oberen und unteren Ende des Teilstücks 1 Arretierungsbolzen 18 vorgesehen, die durch eine Feder radial nach außen, d. h. zu der den Steigweg erklimmenden Person gedrückt werden und von Hand zurückgedrückt werden, wenn der Schlitten über das untere oder obere Ende des Teilstückes 1 verschoben werden soll.the central spar 11 also serves as a longitudinal guide for a slide 8 of a climbing protection device. The those A person climbing up a ladder is secured to this slide 8 by means of a safety belt. The slider 8 has a locking pawl which is held in its locking position by spring action in which the latch nose protrudes into the interior of the U-profile of the longitudinal guide and against the stop surfaces located there is applied. The upper sides of the ladder rungs 12, which are paired by aligned openings run through the parallel side walls of the U-profile of the central spar 11 are arranged. In addition to the ladder rungs 12 Further stop surfaces can be provided by rectangular hollow profile pieces 17 by further Openings in the side walls of the U-profile of the central spar 11 are used. Part 1 is firmly on screwed to the carriage 13 and contains a stop surface in its interior, which by such an additional Hohlprofilstüclc 17 is formed so that the slide 8 is locked in the section 1. To an accidental To prevent the slide 8 from falling out of the section 1 in addition, are at the top and lower end of the section 1 locking bolt 18 provided which by a spring radially outward, d. H. be pressed towards the person climbing the climbing path and pushed back by hand when the slide is to be moved over the lower or upper end of section 1.

In einem Abstand von etwa 1,5 m unterhalb der Rundeisen 6 und in einem Abstand von etwa 30 cm darüber sind noch ein unterer Steigring 19 und ein oberer Steigring 20 durch Rohrschellen an dem Betonmast 10 befestigt. Der untere Steigring 19 wird beim Umsteigen betreten und der obere Steigring 20 dient dabei zum Festhalten.At a distance of about 1.5 m below the round iron 6 and at a distance of about 30 cm above it are still a lower riser ring 19 and an upper riser ring 20 by pipe clamps on the concrete mast 10 attached. The lower riser ring 19 is entered when changing and the upper riser ring 20 is used for Hold tight.

Die Benutzung der Vorrichtung zum Verschieben der Steigschutzeinrichtung erfolgt beim Aufwärtsklettern in der Weise, daß die Person, wenn sie am oberen Ende des ersten Steigweges 4 ankommt, den Schlitten 13 in die in F i g. 1 und 2 linke Position bringt, in der das Teilstück 1 genau an das obere Ende des Mittelholms 11 des ersten Steigweges 4 anschließt. Die Person verschiebt dann den Schieber 8 der Steigschutzvorrichtung von dem Mittelholm 11 in das Teilstück 1, wozu noch der Arretierungsbolzen 18 am unteren Ende des Teilstücks 1 zurückgedrückt wird. Die Sperrklinke des Schiebers liegt dabei gegen die durch das Hohlprofilstück 17 des Teilstücks 1 gebildete Anschlagfläche an, so daß volle Sicherheit gegeben ist. Die Person verläßt dann den ersten Steigweg 4 und tritt auf den unteren Steigring 19 und hält sich dabei gleichzeitig am oberen Steigring 20 fest und betritt von dort den zweiten Steigweg 2, der von etwas unterhalb dem unteren Steigring 19 nach oben führt Beide Steigwege 4, 5 überlappen sich etwa um 2 m. Der Schlitten 13 wird beim Umsteigen vom ersten Steigweg 4 auf den zweiten Steigweg 5 automatisch mitgezogen und rollt auf den beiden parallel gekrümmten Rundeisen 6 zu dem zweiten Steigweg hinüber, so daß die Person immer mit dem gleichen Schieber 8 gesichert vom einen Steigweg 4 zum anderen Steigweg 5 hinüberwechseln kann. Der obere Arretierungsbolzen 18 sorgt dabei dafür, daß der Schieber 8 unterwegs auch nicht nach oben aus dem Teilstück 1 herausrutschen kann.The device for moving the climbing protection device is used when climbing up in the way that the person, when they arrive at the upper end of the first climbing path 4, the carriage 13 in the in F i g. 1 and 2 brings left position in which the section 1 exactly to the upper end of the central spar 11 of the first Steigweges 4 connects. The person then moves the slide 8 of the climbing protection device from the Central spar 11 in the section 1, including the locking bolt 18 is pushed back at the lower end of the section 1. The pawl of the slide is located while against the stop surface formed by the hollow profile piece 17 of the section 1, so that full security given is. The person then leaves the first climbing path 4 and steps onto the lower climbing ring 19 and at the same time holds on to the upper climbing ring 20 and from there enters the second climbing path 2, the from a little below the lower riser ring 19 leads upwards. Both risers 4, 5 approximately overlap by 2 m. The carriage 13 is automatically switched from the first climbing path 4 to the second climbing path 5 pulled along and rolls over the two parallel curved round bars 6 to the second climbing path, so that the person is always secured with the same slide 8 from one climbing path 4 to the other Steigweg 5 can change over. The upper locking bolt 18 ensures that the slide 8 on the way cannot slip up out of section 1 either.

Auf dem zweiten, nach oben führenden Steigweg 5 angekommen, sorgt ein Anschlag 21 am oberen Ende des Teilstückes 1 dafür, daß sich das Teilstück 1 genau in die Lücke dieses Steigwegs 5 einfügt. Nach Eindrücken des oberen Arretierungsbolzens 18 kann die Person nun auf dem zweiten Steigweg 5 weiter nach oben klettern, wobei der Schieber 8 mitgezogen wird.Arrived on the second climbing path 5 leading upwards, a stop 21 provides at the upper end of the section 1 for the fact that the section 1 fits exactly into the gap of this climbing path 5. After impressions of the upper locking bolt 18, the person can now climb further up on the second climbing path 5, the slide 8 being pulled along with it.

Beim Herunterklettern erfolgen die einzelnen Maßnahmen in umgekehrter Reihenfolge, wobei nunmehr ein weiterer Anschlag 22, der am oberen Ende des Mittelholms 11 des ersten Steigweges 4 vorspringt, den Schlitten 13 anhält und justiert, so daß der Schieber 8 nach unten in den Mittelholm 11 des unteren Steigweges 4 gleiten kann.When climbing down, the individual measures are carried out in reverse order, but now another stop 22, which protrudes at the upper end of the central spar 11 of the first climbing path 4, the Carriage 13 stops and adjusts so that the slide 8 goes down into the central spar 11 of the lower climbing path 4 can slide.

Hierzu 2 Blatt ZeichnungenFor this purpose 2 sheets of drawings

- Leerseite -- blank page -

Claims (4)

Patentansprüche:Patent claims: 1. Vorrichtung zum Verschieben einer Steigschutzeinrichtung von einem ersten Steigweg zu einem zweiten Steigweg, wobei die Steigschutzeinrichtung einen Schieber aufweist, der entlang einer Längsführung gleitet und eine lösbare Arretierung gegen eine Abwärtsbewegung aufweist, dadurch gekennzeichnet, daß ein kurzes Teilstück (1) der Längsführung (2) auf einer Querführung (3) zwischen dem ersten Steigweg (4) und dem zweiten Steigweg (5) parallel verschiebbar ist.1. Device for moving a climbing protection device from a first climbing path to a second climbing path, wherein the climbing protection device has a slide which along a Longitudinal guide slides and has a releasable lock against downward movement, thereby characterized in that a short section (1) of the longitudinal guide (2) on a transverse guide (3) between the first climbing path (4) and the second climbing path (5) can be displaced in parallel. 2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die Querführung zwei im Abstand voneinander angeordnete Schienen (6) aufweist.2. Apparatus according to claim 1, characterized in that the transverse guide two spaced apart having arranged rails (6). 3. Vorrichtung nach Anspruch 2, dadurch gekennzeichnet, daß das Teilstück (1) mittels Rollen (7) auf den Schienen (6) geführt ist.3. Apparatus according to claim 2, characterized in that the section (1) by means of rollers (7) the rails (6) is guided. 4. Vorrichtung nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß das Teilstück (1) an seinem oberen und unteren Ende eine lösbare Sicherung gegen ein Herausfallen des Schiebers (8) aufweist. 4. Device according to one of claims 1 to 3, characterized in that the section (1) on its upper and lower ends have a releasable safeguard against falling out of the slide (8).
DE3322298A 1983-06-21 1983-06-21 Device for moving a climbing protection device from a first climbing path to a second climbing path Expired DE3322298C1 (en)

Priority Applications (8)

Application Number Priority Date Filing Date Title
DE3322298A DE3322298C1 (en) 1983-06-21 1983-06-21 Device for moving a climbing protection device from a first climbing path to a second climbing path
ES1984288746U ES288746Y (en) 1983-06-21 1984-06-19 MECHANISM TO MOVE A TREPADO PROTECTION DEVICE FROM A FIRST TREPADO ROAD TO A SECOND TREPADO ROAD
NO842452A NO842452L (en) 1983-06-21 1984-06-19 STIG VERNA SCHEME.
DK298484A DK298484A (en) 1983-06-21 1984-06-19 SECURITY INSTALLATION BY PERIPHERALLY PROPOSED RISES OF HIGH BUILDING CONSTRUCTIONS LIKE THE CHURCHES AND SENDMASTERS, AND WITH A DEVICE FOR PROTECTING A SECURITY ORGANIZING A SECOND STEP
DE8484106987T DE3467790D1 (en) 1983-06-21 1984-06-19 Device for moving a climbing safety arrangement from a first climbing path to a second climbing path
AT84106987T ATE31101T1 (en) 1983-06-21 1984-06-19 DEVICE FOR MOVING A CLIMBING DEVICE FROM A FIRST CLIMBING WAY TO A SECOND CLIMBING WAY.
EP84106987A EP0129241B1 (en) 1983-06-21 1984-06-19 Device for moving a climbing safety arrangement from a first climbing path to a second climbing path
ZA844670A ZA844670B (en) 1983-06-21 1984-06-20 Arrangement for shifting a climbing protection device from a first climbing path to a second climbing path

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE3322298A DE3322298C1 (en) 1983-06-21 1983-06-21 Device for moving a climbing protection device from a first climbing path to a second climbing path

Publications (1)

Publication Number Publication Date
DE3322298C1 true DE3322298C1 (en) 1984-07-19

Family

ID=6201978

Family Applications (2)

Application Number Title Priority Date Filing Date
DE3322298A Expired DE3322298C1 (en) 1983-06-21 1983-06-21 Device for moving a climbing protection device from a first climbing path to a second climbing path
DE8484106987T Expired DE3467790D1 (en) 1983-06-21 1984-06-19 Device for moving a climbing safety arrangement from a first climbing path to a second climbing path

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE8484106987T Expired DE3467790D1 (en) 1983-06-21 1984-06-19 Device for moving a climbing safety arrangement from a first climbing path to a second climbing path

Country Status (7)

Country Link
EP (1) EP0129241B1 (en)
AT (1) ATE31101T1 (en)
DE (2) DE3322298C1 (en)
DK (1) DK298484A (en)
ES (1) ES288746Y (en)
NO (1) NO842452L (en)
ZA (1) ZA844670B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999004127A1 (en) * 1997-07-18 1999-01-28 Söll Gmbh Retractable extension for the guiding rail of a climbing guard

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE8809386U1 (en) * 1988-07-22 1988-12-15 Soell Industrieschmiede Gmbh, 8670 Hof, De
DE29719485U1 (en) 1997-11-03 1999-03-18 Soell Gmbh Fall protection
DE29815485U1 (en) 1998-08-28 1998-12-10 Soell Gmbh Device for changing the guide level of a runner who is guided on the guide rail of a fall protection device
US6604605B2 (en) * 2001-01-11 2003-08-12 Sala Group Pty Limited Safety line anchorage methods and apparatus

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1961757A1 (en) * 1969-12-09 1971-06-24 Karl Soell Fa Fall protection device for ladders

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3348632A (en) * 1965-02-16 1967-10-24 William E Swager Climbing device
DE2060718B2 (en) * 1970-12-10 1973-08-02 Fahrleitungsbau Gmbh, 4300 Essen FALL PROTECTION ON LADDERS OR SIMILAR DEVICES
FR2495684A1 (en) * 1980-12-09 1982-06-11 Risacher Marcel Charles Safety cage for ladders - includes frame having rollers guided by uprights of ladder

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1961757A1 (en) * 1969-12-09 1971-06-24 Karl Soell Fa Fall protection device for ladders

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999004127A1 (en) * 1997-07-18 1999-01-28 Söll Gmbh Retractable extension for the guiding rail of a climbing guard

Also Published As

Publication number Publication date
EP0129241B1 (en) 1987-11-25
ATE31101T1 (en) 1987-12-15
DK298484A (en) 1984-12-22
NO842452L (en) 1984-12-27
EP0129241A3 (en) 1986-01-22
ES288746U (en) 1986-01-16
DK298484D0 (en) 1984-06-19
DE3467790D1 (en) 1988-01-07
ZA844670B (en) 1985-08-28
EP0129241A2 (en) 1984-12-27
ES288746Y (en) 1986-10-01

Similar Documents

Publication Publication Date Title
EP0076974B1 (en) Lifting platform for persons
DE19723000C2 (en) Support for leaning ladders
DE102008006611B3 (en) Continuous security system for use at e.g. building, has fixed component, frame, plate or supporting point carrying starting point or starting points of one set of securing units or end point or end points of another set of securing units
DE3322298C1 (en) Device for moving a climbing protection device from a first climbing path to a second climbing path
DE10110405C2 (en) Device for securing ladders and scaffolding stands on uneven terrain
CH631943A5 (en) Apparatus for travelling on a perpendicular or virtually perpendicular wall
EP0341563A2 (en) Inclined lift comprising several telescopic elements
DE2736037A1 (en) Ladder safety belt slide fitting - has base piece protrusion movable for width reduction
DE102008050178A1 (en) Working scaffold has multiple scaffold leaders facing to each other, where multiple scaffold leaders are bridged by platform arranged in area of upper end
EP0996805B1 (en) Retractably extendable guide rail for supporting a safety harness
DE2932707A1 (en) Demountable mast climbing aid - has lockable sliding scaling loop shackles on railed shaped climbing element
DE3433281A1 (en) Ladder for entrance into a supply shaft
DE3505918A1 (en) Ladder system
DE3026443C2 (en) Ladder substructure that can be connected to a stile of a scaffolding ladder
DE2643982B2 (en) Access device to a working platform of a scaffolding
DE2915607A1 (en) SECURITY AND RESCUE RACK
DE3403959A1 (en) Weir with stop-log guides and lifting and lowering device
DE2337892C2 (en) Working scaffold with a lifting and lowering platform
DE202022102665U1 (en) director
DE902184C (en) Equipment for the assembly of lattice masts or towers
DE1963344C (en) Device for marking steps in buildings
EP0428090B1 (en) Safety device
DE202022102664U1 (en) director
DE102008016601B3 (en) Safety barrier for projection beam of solid bridge system for person, has rollers with tilting moment supports, which are arranged parallel to bearing surface and are guided to right and left of beam below surface
DD289747A5 (en) ROLLER ROLL BREAKER FOR CONSTRUCTION LIFE

Legal Events

Date Code Title Description
8100 Publication of patent without earlier publication of application
D1 Grant (no unexamined application published) patent law 81
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee