Method for paving traffic routes in two superimposed layers

Info

Publication number
DE320698C
DE320698C DE1917320698D DE320698DD DE320698C DE 320698 C DE320698 C DE 320698C DE 1917320698 D DE1917320698 D DE 1917320698D DE 320698D D DE320698D D DE 320698DD DE 320698 C DE320698 C DE 320698C
Authority
DE
Germany
Prior art keywords
paving
stones
stone
superimposed layers
traffic routes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE1917320698D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ERICH HUNDRIESER
Original Assignee
ERICH HUNDRIESER
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ERICH HUNDRIESER filed Critical ERICH HUNDRIESER
Application granted granted Critical
Publication of DE320698C publication Critical patent/DE320698C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Description

Verfahren zum Pflastern von Verkehrswegen in zwei übereinandergelegten Schichten. Die Erfindung betrifft ein Verfahren zum Pflastern von Verkehrswegen in zwei übereinandergelegten Schichten. Das Neue besteht darin, daß die Ecken eines Pflastersteines der oberen Schicht unmittelbar in die Mitte der Grundfläche eines Pflastersteines der unteren Schicht aufgelegt werden. Hierdurch wird erreicht, daß der auf den oberen Stein ausgeübte Druck sich auf eine Anzahl darunter befindlicher Steine verteilt.Method for paving traffic routes in two superimposed Layers. The invention relates to a method for paving traffic routes in two superimposed layers. The new thing is that the corners of a Paving stone of the top layer immediately in the center of the base of a Paving stone of the lower layer are placed. This achieves that the pressure exerted on the upper stone is applied to a number of those below Stones distributed.

Die Erfindung ist in der Zeichnung in mehreren Ausführungen veranschaulicht, und zwar zeigt Fig. i die neue Pflasterung in Aufsicht, und Fig. 2 einen Stein der oberen Schicht mit den Eckstollen an seiner Unterseite schaubildlich.The invention is illustrated in the drawing in several embodiments, namely Fig. 1 shows the new paving in plan, and Fig. 2 shows a stone of the upper layer with the corner studs on its underside graphically.

Fig.3 zeigt eine zweite Ausführung der neuen Pflasterung in Aufsicht, und Fig.4 zeigt eine Ausführung der neuen Pflasterung als Unterlage für eine Eisenbahnschiene.Fig. 3 shows a second embodiment of the new paving in plan, and FIG. 4 shows an embodiment of the new paving as a base for a railroad track.

Bei der Ausführung nach der Fig. i sind die oberen und unteren Pflastersteine von gleichem dreieckigen Grundriß.In the embodiment according to FIG. I, the upper and lower paving stones are of the same triangular plan.

Die oberen Steine a, b, c; a, c, d; d, c, e; b, m, c; c, n, e sind auf die Steine a', b', c'; a', c', d'; d', c', e'; b', m', c'; c', m', n' der unteren Schicht derart verlegt, daß der Fußpunkt jeder senkrechten Eckkante eines oberen Steines auf dem Dreiecksmittelpunkt eines Steines der unteren Schicht liegt; z. B. liegt der Eckpunkt a des oberen Steines a, b, c in der Mitte des unteren Steines a', c', d'. Die Übertragung der Last von dem oberen Stein auf die untere Steinschicht erfolgt durch die unteren Eckpunkte der oberen Steine. Zu diesem Zwecke sind die Steine gemäß- der Fig. 2 mit Eckstollen A an ihren Unterseiten versehen. Jeder dieser Stollen steht auf der Mitte des darunter befindlichen Steines auf, der eine entsprechende Aussparung erhält, so daß auch die Stollen der benachbarten Steine in sachgemäßer Weise eingesetzt werden können. Dadurch, daß die Last bei dieser Anordnung mit Sicherheit in der Mitte der unteren Platte wirkt, erfolgt ihre gleichmäßige Verteilung auf die darunter befindliche Bodenschicht.The top stones a, b, c; a, c, d; d, c, e; b, m, c; c, n, e are on the stones a ', b', c '; a ', c', d '; d ', c', e '; b ', m', c '; c ', m', n 'of the lower layer laid in such a way that the base point of each vertical corner edge of an upper stone lies on the triangular center of a stone of the lower layer; z. B. is the corner point a of the upper stone a, b, c in the middle of the lower stone a ', c', d '. The transfer of the load from the upper stone to the lower stone layer takes place through the lower corner points of the upper stones. For this purpose, the stones according to FIG. 2 are provided with corner studs A on their undersides. Each of these studs stands on the middle of the stone below, which is given a corresponding recess so that the studs of the neighboring stones can also be used properly. Because the load acts with certainty in the center of the lower plate in this arrangement, it is evenly distributed over the layer of soil below.

Bei der Anordnung nach der Fig. 3 sind die Steine der oberen und unteren Schicht nicht von gleicher Gestalt. Für die obere Schicht sind beispielweiseSteine von dreieckigem Grundriß (a, b, c) gewählt, während die Steine der unteren Schicht im Grundriß sechseckig sind (a1, a2, a3, a¢, ab, ah. Es können die Steine der unteren Schicht zur Erzielung von Stoffersparnis im wesentlichen auch dreieckigen Grundriß erhalten, wobei jedoch die Spitzen der Dreiecke winklig abgestumpft sind. In der Fig. 3 sind diese dreieckigen Steine der unteren Schicht mit abgestumpften Ecken schraffiert dargestellt.In the arrangement according to FIG. 3, the stones of the upper and lower layers are not of the same shape. For the upper layer, for example , stones with a triangular plan (a, b, c) are chosen, while the stones of the lower layer are hexagonal in plan (a1, a2, a3, a ¢, ab, ah. The stones of the lower layer can be used for In order to save material, a triangular plan is essentially obtained, but the points of the triangles are truncated at an angle, these triangular stones of the lower layer with truncated corners are shown hatched in FIG.

Die zwischen den schraffierten Steinen der unteren Schicht verbleibenden Räume können unausgefüllt bleiben oder mit dreieckigen Steinen ausgefüllt werden.The ones remaining between the hatched stones of the lower layer Rooms can be left empty or filled with triangular stones.

Bei der Ausführung nach der Fig. 4 wird das Lager für eine Eisenbahnschiene B dadurch gebildet, daß zwei aufeinanderfolgende Steine der oberen Schicht abwechselnd mit einer Seitenfläche b, c-b', c' und die nächsten zwei folgenden Steine mit einer Eckkante a, d- a', d' sich berühren. Dementsprechend sind die Steine der unteren Schicht gelagert.In the embodiment according to FIG. 4, the bearing for a railroad track B is formed in that two successive stones of the upper layer alternate with a side surface b, c-b ', c' and the next two subsequent stones with a corner edge a, d - a ', d' touch. The stones of the lower layer are stored accordingly.

-- Es empfiehlt sich, die Steine der oberen Schicht z. B. durch Teer zu verbinden. Im Gegensatz hierzu können die Steine der unteren Schicht lose nebeneinander gelagert werden, so daß sie besonders leicht verlegt und wieder aufgenommen werden können.- It is best to use the stones of the top layer z. B. to connect by tar. In contrast, the stones of the lower Layers can be stored loosely next to each other so that they are particularly easy to lay and can be resumed.

Claims (3)

PATENTANSPRÜCHE: i. Verfahren zum Pflastern von Verkehrswegen in zwei übereinandergelegten Schichten, dadurch gekennzeichnet, daß die Ecken eines Pflastersteines der oberen Schicht unmittelbar in die Mitte der Grundfläche eines Pflastersteines der unteren Schicht gelegt werden. PATENT CLAIMS: i. Method for paving traffic routes in two superimposed layers, characterized in that the corners of a paving stone of the upper layer are placed directly in the center of the base area of a paving stone of the lower layer. 2. Stein zur Ausführung des Verfahrens nach Anspruch i, gekennzeichnet durch Eckstollen (A) an seiner Unterseite. 2. Stone to carry out the procedure according to claim i, characterized by corner studs (A) on its underside. 3. Stein zur Ausführung des Verfahrens nach Anspruch i, gekennzeichnet durch .eine Aussparung in der Mitte seiner Oberfläche.3rd stone for carrying out the method according to claim i, characterized by .ein recess in the middle of its surface.
DE1917320698D 1917-06-22 1917-06-22 Method for paving traffic routes in two superimposed layers Expired DE320698C (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE320698T 1917-06-22

Publications (1)

Publication Number Publication Date
DE320698C true DE320698C (en) 1920-04-29

Family

ID=6156800

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1917320698D Expired DE320698C (en) 1917-06-22 1917-06-22 Method for paving traffic routes in two superimposed layers

Country Status (1)

Country Link
DE (1) DE320698C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1282047B (en) * 1964-03-04 1968-11-07 Lichtenfeld & Co Road mat made of elastic, partly overlapping and interconnected rings

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1282047B (en) * 1964-03-04 1968-11-07 Lichtenfeld & Co Road mat made of elastic, partly overlapping and interconnected rings

Similar Documents

Publication Publication Date Title
US2067356A (en) Court for games
DE320698C (en) Method for paving traffic routes in two superimposed layers
DE387810C (en) Recessed sliding platform
DE371181C (en) Concrete blower with rotatable conveyor plate in the mass container
DE102018009124A1 (en) Paving stone with offset composite sections
DE470060C (en) Heart of points and crossings made of solid rails
DE438269C (en) Device for cleaning gases through pourable filter material
DE338204C (en) Building block with several cavities lying next to one another in cross section
DE341044C (en) Floating crane with two separate floating bodies
DE2823375A1 (en) Rubber-contg. flooring compsn. for sports and playing grounds - contains quartz sand and cold bitumen-bonded chips
DE648470C (en) Rail fastening secured against loosening by unauthorized persons on base plates and wooden sleepers
AT86258B (en) Cavity wall.
DE3837681A1 (en) METHOD FOR PACKING A TRACK
DE494512C (en) Process for the production of rammed concrete floors
DE924887C (en) Fire screen made of stone layers for locomotive firing
DE526108C (en) Firebox cavity wall with inner wall divided into superimposed groups
DE406560C (en) Round building made of shaped stones with cutouts in the joint surfaces
AT228258B (en) Vibrating hand-held device for tamping under the ballast bed of railway sleepers
AT146973B (en) Race game.
DE1939673U (en) COMPOSITE STONE, IN PARTICULAR FOR ROAD PADS, PARKING SPACES, ETC.
DE1534331A1 (en) Method of laying a paving
DE1033693B (en) Crossing structure for roads
AT53081B (en) Inclined sports toboggan run with artificial cooling.
DE591554C (en) Vertically perforated binder stone
DE508638C (en) Roof tiles with triangular surfaces for building blocks