DE3006662C2 - Process for the dumping of bulk material from the extraction of hard coal, preferably from mountains - Google Patents

Process for the dumping of bulk material from the extraction of hard coal, preferably from mountains

Info

Publication number
DE3006662C2
DE3006662C2 DE19803006662 DE3006662A DE3006662C2 DE 3006662 C2 DE3006662 C2 DE 3006662C2 DE 19803006662 DE19803006662 DE 19803006662 DE 3006662 A DE3006662 A DE 3006662A DE 3006662 C2 DE3006662 C2 DE 3006662C2
Authority
DE
Germany
Prior art keywords
beds
area
sub
leveled
vehicles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19803006662
Other languages
German (de)
Other versions
DE3006662A1 (en
Inventor
Joachim 4352 Herten Bachmann
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE19803006662 priority Critical patent/DE3006662C2/en
Publication of DE3006662A1 publication Critical patent/DE3006662A1/en
Application granted granted Critical
Publication of DE3006662C2 publication Critical patent/DE3006662C2/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • B65G65/28Piling or unpiling loose materials in bulk, e.g. coal, manure, timber, not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G3/00Storing bulk material or loose, i.e. disorderly, articles
    • B65G3/02Storing bulk material or loose, i.e. disorderly, articles in the open air

Description

Die Erfindung betrifft ein Verfahren zur Deponie von Schüttgut aus der Förderung von Steinkohle, vorzugsweise von Bergen mit Hilfe von gleislosen Transportfahrzeugen, z. B. Lkw. mit denen das Schüttgut aufgehaldet und die Halde vorzugsweise mit Hilfe von mit einem Planierschild versehenen Hilfsfahrzeugen planiert und durch Befahren mit den Transportfahrz.eugenThe invention relates to a method for dumping bulk material from the extraction of hard coal, preferably of mountains with the help of trackless transport vehicles, e.g. B. trucks with which the bulk material is piled up and the dump is leveled preferably with the aid of a dozer blade and by driving on with the transport vehicles

verdichtet wird.is compressed.

Die Erfindung ist anwendbar auf die Deponie von sogenannter Ballastkohle, von Feinkohle und von Koks unterschiedlicher Körnung. Ihr vorzugsweises Anwendungsgebiet ist jedoch die Deponie von Bergen, die aus der Förderung von Steinkohle stammen, weshalb die Erfindung im folgenden anhand dieser Anwendungsfälle näher erläutert wird.The invention is applicable to the landfill of so-called ballast coal, fine coal and coke different grain size. Their preferred field of application, however, is the landfill of mountains, which from originate from the promotion of hard coal, which is why the invention is based on these applications below is explained in more detail.

Die bei der Gewinnung von Steinkohle im Um ;rtagebetrieb anfallenden Mengen von Nebengestein werden bei der Aufbereitung der verkaufsfähigen Kohle getrennt und bilden ein mit Waschberge bezeichnetes Produkt Wegen der fortschreitenden Mechanisierung unter Tage verändert sich das Verhältnis von Kohle zu is Sergen ständig zu Gunsten der Berge, deren Anteil in der Rohförderung im Ruhrbergbau im Jahre 1973 ca. 403% betrug. Neben den Waschbergen fallen sogenannte Grubenberge an; hierbei handelt es sich um Gestein aus Streckenvortrieben unter Tage. Außerdem ireten gelegentlich Flotationsberge auf. die aus der Aufbereitung von Schlämmen oder Stäuben stammen, aber mengenmäßig nicht bedeutend sind und daher in der Regel den Waschbergen zugesetzt werden. Die nach dem erfindungsgemäßen Verfahren hergestellten Deponien nehmen entweder die bezeichneten Arien von Bergen in der Zusammensetzung auf. wie sie von der Grube abgegeben werden.^Oder die Berge werden vorher grubenseitig in einer Absiebung und Brechanlage so weit aufbereitet, daß die den Transportfahrzeugen aufgegebenen Berge eine bestimmte obere Korngrenze nicht überschreiten.Those involved in the extraction of hard coal in the surrounding field Accumulating amounts of secondary rock are separated during the processing of the salable coal and form a product called wash mountains due to advancing mechanization Days, the ratio of coal to is Sergen changes constantly in favor of the mountains, whose share in the raw production in the Ruhr mining in 1973 was approx. 403%. In addition to the wash mountains there are so-called Mine mountains on; this is rock from underground drifting. In addition, irets occasionally flotation mountains. that come from the processing of sludge or dust, but are not significant in terms of quantity and are therefore usually added to the wash mountains. The after Landfills produced using the method according to the invention either take the designated Arias from Bergen in the composition. how they are released from the pit. ^ Or the mountains will be on the side of the pit beforehand so far processed in a screening and crushing plant that the abandoned the transport vehicles Mountains do not exceed a certain upper grain limit.

Die Wasch- und die Grubenberge gelangen auf diese Weise mit einem Wassergehalt zwischen z. B. 8 und 18% in die Transportfahrzeuge. Sie bestehen im allgemeinen zur Hälfte aus Grobbergen, die z. B. eine ursprüngliche Korngröße von 150 — 10 mm haben. Die Grubenberge sind in der Regel Ausrichtungs- und Leseberge mit einem Gesamtanteil von ca. 21% und einer Korngröße zwischen 1000 und 150 mm. die aber zum größten Teil durch die beschriebene Brechanlage zerkleinert sind. Der restliche Anteil wird von feinen und/oder FIoM-tionsbergen gebildet. Auf dieser Zusammensetzung beruht u.a. die an sich gute Verdichibarkeit der im Rahmen der crfindungsgemäßcn Deponien abgelagerten Berge aus der Förderung von Steinkohle.The wash and pit mountains get in this way with a water content between z. B. 8 and 18% in the transport vehicles. They generally consist of half of coarse mountains z. B. an original Have a grain size of 150 - 10 mm. The mine mountains are usually alignment and reading mountains with a total share of approx. 21% and a grain size between 1000 and 150 mm. but most of them are crushed by the crushing plant described. The remainder is made up of fine and / or FIoM-tion mountains. Based on this composition i.a. the good compressibility of the in the frame the mountains deposited according to the invention from the extraction of hard coal.

Nach dem crfindungsgerniißcn Verführen werden die Berge ohne weitere Behandlung deponiert. In dieser Möglichkeit unterscheiden sich die nach dem erfindungsgemäßen Veifahren geführten Deponien von den so ebenfalls mit Bergen aufgeführten Ingenieurbauwerken, bei denen gelegentlich die geforderte gleichmäßige Korn- und Wasserverteilung durch eine »mäßige Aufbereitung« der Berge herbeigeführt wird, die meistens in einer zusätzlichen Zerkleinerungs- und Siebanlage erfolgt. Nach dem erfindungsgemäßen Verfahren können Kiesgruben oder Senkungsgebiete verfüllt werden, doch kommt hierfür auch die Deponie in Form von Halden in Betracht.After the pleasure of discovery, the will be seduced Mountains dumped without further treatment. In this possibility, those according to the invention differ Vaulted landfills of the engineering structures also listed with mountains, where the required even grain and water distribution is occasionally achieved through "moderate treatment" the mountains are brought about, mostly in an additional crushing and screening plant he follows. According to the method according to the invention, gravel pits or subsidence areas can be filled, however, the landfill in the form of heaps can also be considered for this.

Die Erfindung geht von einem bekannten Verfahren aus, nach dem solche Deponien im Schüttbetrieb aufgehaldet werden. Die hierbei eingesetzten Lkw kippen die Berge von oben auf eine Böschung, deren Höhe in der Regel der endgültigen Haldenhöhe entspricht. Dieses Verfahren führt zu einer allmählichen Verdichtung der b5 mit den schweren Fahrzeugen befahrenen Straßenflächen auf der Halde, die in der Regel auf den kürzesten Wegen zur Böschung entstehen. Das hat jedoch wesentliche Nachteile. Hinerscits nämlich wird mir ein Teil derThe invention is based on a known method according to which such landfills are piled up in bulk operation will. The trucks used here tip the mountains from above onto an embankment, the height of which is in the Usually corresponds to the final pile height. This process leads to a gradual compaction of the b5 road surfaces on which the heavy vehicles drive on the dump, which is usually created on the shortest routes to the embankment. However, this has essentials Disadvantage. Hinerscits will be part of the

Halde verdichtet Andererseits ergeben sich aus den großen Sturzhöhen steile Böschungen und aus dem Schüttbetrieb lockere Halden, die für den unkontrollierten Zutritt von Luft und Wasser verantwortlich sind. Die steilen Haldenböschungen sind ungünstig, wenn bei entsprechenden behördlichen Auflagen im Zuge der Rekultivierung Andeckmassen aufgetragen werden müssen, die zur Vermeidung von Böschungsrutschen eine erhebliche Abflachung der Haldenböschung notwendig machen. Der Zutrat von Wasser führt zum Auswaschen von bestimmten Substanzen aus den Bergen, die in die Vorfluter geraten, wo sie unerwünscht sind. Der Zutritt von Luft verursacht in der Regel aufgrund des verhältnismäßig hohen Anteiles an brennbaren Substanzen in den Bergen Brände in der Halde. Zwar führt das Abbrennen von Halden zu einem ausgebrannten und teilweise gesinterten Material, den sogenannten roten Bergen. Diese haben eine bessere Festigkeit und Verwitterungsbeständigkeit als die Ausgangsberge. Das unkontrollierte Abbrennen von Halden führt aber zu erheblichen Umweltschäden. Daran sind aa. Versuche gescheitert, durch planmäßiges Abbrennen von Hainen rote Berge gezielt herzustellen.Dump compacted On the other hand, steep embankments result from the great fall heights and from the Dumping operation loose heaps, which are responsible for the uncontrolled ingress of air and water. the steep slope embankments are unfavorable if there are corresponding official requirements in the course of recultivation Covering masses must be applied, which is a significant factor in avoiding slope slides Make it necessary to flatten the slope of the pile. The addition of water leads to washing out of certain substances from the mountains that get into the receiving waters where they are undesirable. The entry caused by air usually due to the relatively high proportion of flammable substances in the mountains fires in the dump. It is true that the burning down of heaps leads to a burned-out and partial sintered material, the so-called red mountains. These have better strength and weather resistance than the starting mountains. The uncontrolled burning down of heaps leads to considerable Environmental damage. There are aa. Attempts failed by systematically burning down groves to produce red mountains in a targeted manner.

Abgesehen von diesen Erschwernissen führt der Fahrbetrieb an der Haldenkante auch dazu, daß die gleiche Fahrspur immer wieder nacheinander von beladenen und unbeladenen Fahrzeugen beansprucht wird. Um den geordneten Betrieb aufrecht zu erhalten, müssen mit einem Planierschild versehene Fahrzeuge, z. B. sogenannte Planierraupen eingesetzt werden, welche die Fahrspuren wieder zuschieben. Außerdem werden diese Fahrzeuge dafür benötigt, die Böschungskante zu planieren, da die Fahrzeuge im allgemeinen nicht bis zur äußeren Kante der Böschung fahren können. Dieser Planieraufwand verteuert den Haldenbetrieb erheblich und beseitigt im Ergebnis nicht die Gefahren, die von der fehlenden Abrutschsicherheit an der Haldenkante und von der mangelhaften Verdichtung der Fahrspur an dieser Stelle der Halde ausgehen.Apart from these difficulties, driving at the edge of the dump also leads to the same The lane is repeatedly used one after the other by loaded and unloaded vehicles. Around To maintain orderly operations, vehicles equipped with a dozer blade, e.g. B. so-called Bulldozers are used, which push the lanes closed again. Also, these Vehicles needed to level the edge of the embankment, as the vehicles generally do not reach the the outer edge of the embankment. This leveling effort makes the dump operation considerably more expensive and as a result does not eliminate the dangers posed by the lack of slip protection at the edge of the pile and assume the poor compaction of the lane at this point in the heap.

Es ist auch bekannt. Lkw mit Bodenentleerung einzusetzen und dabei das Material auf die Haldenoberseite zu schütten. Bei diesem Verfahren sind zwar die Gefahren beseitigt, die von dem Kippbetrieb der meist überschweren Lkw ausgehen, weiche zum Transport der Berge dienen. Das Verfahren setzt jedoch voraus, daß die jeweüs abgekippte Lkw-Ladung planiert wird, was ebenfalls den dauernden Einsatz von Planierfahrzeugen voraussetzt. Die so planierte Haldenfläche muß mit beladcnen Fahrzeugen befanren werden, die deswegen in die noch weiche Oberfläche einsinken. Daraus entstehen weitere Schwierigkeiten, weil die Fahrzeuge stekken bleiben können und 'hre tiefen Fahrspuren durch Planieren wieder ausgefüllt werden müssen.It is also known. Use trucks with bottom emptying while pouring the material onto the top of the pile. With this procedure there are indeed the dangers eliminated, which are based on the tipping operation of the mostly heavy trucks, which are used to transport the Serve mountains. However, the procedure assumes that the respective dumped truck load is leveled, which also requires the continuous use of bulldozers. The dump area leveled in this way must also be loaded Vehicles will be fanned, which therefore sink into the still soft surface. From this arise further difficulties because the vehicles can get stuck and have deep lanes Leveling must be filled in again.

Der Erfindung liegt die Aufgabe zugrunde, bei einer im Schüttbetrieb geführten Deponie die Halde so aufzufahren, daß eine gleichmäßige Verdichtung der gesamten Haldenoberfläche mit dem Ziel der Vermeidung der Wasser- und Brandgefahren mit gleislosen Transportfahrzeugen vorgenommen werden kann und das Aufschütten ohne die Notwendigkeit der ständigen Befahrung einer Haldenkante mit einem Minimum an Planierarbeiten ermöglicht wird.The invention is based on the object of opening the dump in a landfill run in bulk operation in such a way that that a uniform compaction of the entire pile surface with the aim of avoiding the Water and fire hazards with trackless transport vehicles can be undertaken and the landfill without the need to constantly negotiate the edge of a dump with a minimum of leveling is made possible.

Gemäß der Erfindung wird diese Aufgabe dadurch gelöst, daß das Verdichten in eine durch Befahren einer vorher planierten Teilfläche der Halde mit den entleerten Transportfahr<.eugen in nebeneinanderliegenden Fahrspuren erzielte Vorverdichtung und in eine durch Befahren der vorher vorverdichteten Teilfläche mit den beladenen Transportfahrzeugen in nebencinanderliegenden Fahrspuren geschaffenen Endverdichtung unterteilt, das Aufhalden auf der jeweils endverdichteten Teilfläche durch nebeneinander angeordnete, aus jeweils einer Ladung eines Transportfahrzeuges bestehende Einzelschüttungen vorgenommen und das Planieren durch Verschieben der Oberteile der Schüttungen in die zwischen den Schüttungen befindlichen Zwickel im zyklischen Wechsel derTeilflächen durchgeführt wird.According to the invention, this object is achieved in that the compaction in a by driving on a previously leveled area of the heap with the emptied transport vehicles in adjacent Lanes achieved precompaction and in one by driving on the previously precompacted partial area with the loaded transport vehicles in side by side The final compaction created by the lanes is divided, the stockpiling on each of the final compaction Partial area through side by side, each consisting of a load of a transport vehicle Individual dumps made and leveling by moving the tops of the dumps in the gusset located between the beds is carried out in the cyclical change of the partial areas.

ίο Gemäß der Erfindung befahren die beladenen Transportfahrzeuge zunächst die vorverdichtete Teilfläche, wodurch deren Endverdichtung erzielt wird. Erst dann schütten sie ihre Ladung auf, was stets auf der endverdichteten Teilfläche erfolgt Wenn die Fahrspuren jeweils nebeneinander angeordnet sind, wird die gesamte Teilfläche der Halde und wegen des zyklischen Wechsels der Teilflächen die gesamte Haldenfläche abschnittsweise vor- und endverdichtet, wobei die jeweils zu verdichtende Schütthöhe einem Bruchteil der Schüttkegel entspricht, welche die Transportfahrzeuge bilden, die z. B. als Hinter- oder Seitenkipp- .- ausgebildet sind oder mit die Ladung nach hinten aussdärbenden Schubschilden arbeiten. Solche Schüttkegel entsprechen der geometrischen Kegelform mehr oder weniger genau.According to the invention, the loaded transport vehicles drive on first the pre-compacted partial area, whereby its final compaction is achieved. Only Pour your load up, which always takes place on the finally compacted part of the area. When the lanes each are arranged next to each other, the entire sub-area of the heap and because of the cyclical change of the partial areas, the entire dump area is pre-compacted and finally compacted in sections, the respective the dump height to be compacted corresponds to a fraction of the heap cones that form the transport vehicles, the z. B. are designed as rear or side tilt .- or with pusher shields that discolour the cargo towards the rear work. Such cones of repose correspond more or less exactly to the geometric cone shape.

Bei Hinterkippern und Schubschildentleerung sind die Grundflächen dieser Körper etwa elliptisch und die Spitzen bilden sich häufig als kurze Kämme aus. Im allgemeinen kann man die Aufschüttungen so dicht setzen, daß höchstens die Hälfte, ein Drittel oder ein noch geringerer Bruchteil der einzelnen Aufschüttungen verschoben werden muß, um die betreffenden Zwickel auszufüllen. Die dazu erforderlichen Planierarbeiten sind so gering, daß sie in mehreren, z. B. wöchentlichen Zeitabständen zu mehreren Malen oder nur einmal durchgeführt zu werden brauchen, weil die Schüttungen so hintereinandergelegt werden können, daß sie von den Transportfahrzeugen nicht befahren zu werden brauchen. Die Planierarbeit läßt sich aber auch so ausführen, daß sie der fortschreitenden Verdichtung durch Befahren mit den leeren Transportfahrzeugen, allerdings in größeren zeitlichen Abständen entspricht.In the case of rear dumpers and pusher shield emptying, the base areas of these bodies are roughly elliptical and the Tips often take the form of short ridges. In general, the embankments can be set so close that at most half, a third or an even smaller fraction of the individual embankments postponed must be to fill the gusset in question. The leveling work required for this is so low that it can be used in several, e.g. B. weekly intervals need to be carried out several times or only once, because the pourings are laid one behind the other can be that they do not need to be driven on by the transport vehicles. The leveling work can also be carried out in such a way that it can cope with the progressive compaction by driving over it with the empty transport vehicles, but at longer intervals.

Die dementsprechend bei Durchführung des erfindungsgemäßen Verfahrens gegebene Freiheit im Einsatz der mit Planierschild versehenen Fahrzeuge ermöglicht es, die Einsparung der Plariierarbeit in eine anderweitige Nutzung dieser Fahrzeuge umzusetzen.The freedom in use that is accordingly given when carrying out the method according to the invention of the vehicles provided with a dozer blade makes it possible to save the leveling work in one to implement other use of these vehicles.

Noch rationeller gestaltet sich u. U. das erfindungsgemäße Verfahren, wenn man die kürzesten Wege mit den beladenen Transportfahrzeugen für die Endverdichtung, die längeren Wege aber für die leeren Transportfahrzeuge und dahnr für die Vorverdichtung wählt. Das geschieht erfindungsgemäß dadurch, daß auf zwei nebeneinander angeordneten Teilflächen die eine Teilfläche zunächst endverdichtet und der jeweils endverdichtete Teil mit den Schüttungen besetzt wird, während die andere Teilfläche gleichzeitig mit den entladenen Fahrzeugen vorverdichtet wird.Under certain circumstances, the method according to the invention is even more efficient if one uses the shortest paths with the loaded transport vehicles for the final compaction, but the longer distances for the empty transport vehicles and chooses for the pre-compression. This is done according to the invention in that on two side by side arranged partial areas which first finally compacted a partial area and the respective finally compacted Part is occupied with the debris, while the other part of the area is simultaneously with the unloaded vehicles is pre-compressed.

Man kann die notwendige Einsatzzeit der Planierfahrzeuge auch dadurch reduzieren, daß gemäß einer Ausführungsform der Erfindung Aufschüttungen auf einer Teilfläche in zeitlichen Abstanden und in mehreren Teilvorgängen planiert werden. Auf diese Weise entstehen zeitliche Zwischenräume, in denen diese Fahrzeuge anderweitig eingesetzt we'rden können.You can reduce the necessary time of use of the bulldozers also in that according to a Embodiment of the invention Embankments on a partial area at time intervals and in several Sub-operations are leveled. This creates time gaps in which these vehicles can be used elsewhere.

Das erfindungsg°mäße Verfahren läßt sich auf die anderen Schüttgüter, z. B. Ballastkohle, Feinkohle und Koks dann anwenden, wenn das Material überhaupt verdichtbar ist. Das ist stets dann der Fall, wenn unter-The method according to the invention can be applied to the other bulk goods, e.g. B. use ballast coal, fine coal and coke, if the material at all is compressible. This is always the case when

schiedliche Körnungen vorhanden sind.different grain sizes are available.

Die Erfindung wird im folgenden anhand einer Ausführungsform und Figuren näher erläutert; es zeigtThe invention is described below on the basis of an embodiment and figures explained in more detail; it shows

Fig. I schematisch eine Draufsicht auf eine zur Deponie vorgesehene Senke,I schematically shows a plan view of a landfill intended sink,

Fig. 2 in der Fig. 1 entsprechender Darstellung die Auffüllung der Senke mit einer ersten Schicht aus Bergen zur Vorbereitung des Verfahrens.Fig. 2 in Fig. 1 corresponding representation The basin is filled with a first layer of mountains in preparation for the procedure.

Fig.3 die Aufteilung der vorbereiteten Deponiefläche in Teilflächen vor Beginn der Aufschüttung einer Halde.Fig. 3 the division of the prepared landfill area in partial areas before the beginning of the backfilling of a dump.

F i g. 4 in der F i g. 3 entsprechender Darstellung eine weitere Phase des Verfahrens, bei der sämtliche Arbeitsvorgänge auf den verschiedenen Teilflächen dargestellt sind,F i g. 4 in FIG. 3 a further phase of the procedure in which all work processes are shown on the various sub-areas,

F i g. 5 in der F i g. 4 entsprechender Darstellung die Aufhaidung nach dem Wechsel der Teilflächen.F i g. 5 in FIG. 4 shows the display after changing the partial areas.

F i g. 6 einen Schnitt längs der Linie Vl-Vl der F i g. 5 undF i g. 6 shows a section along line VI-VI in FIG. 5 and

Fig. 7 einen Schnitt längs der Linie VII-VII der F i g. 5.7 shows a section along the line VII-VII in FIG. 5.

In den F i g. 1 bis 5, die verschiedene Phasen des Aufhaldens schematisch wiedergeben, ist am oberen Bildrand schematisch die Tagesanlage einer Steinkohlenzeche wiedergegeben. Die aus dem Schacht mit Schachtgebäude I und Fördermaschine 2 kommende Förderkohle gelangt in eine Aufbereitungsanlage 3, deren Einzelheiten nicht dargestellt sind. Die Gruben- und Waschberge werden in der eingangs beschriebenen Weise auf eine bestimmte obere Korngröße heruntergebrochen und mit dem abgesiebten Unterkorn in Bunkern 4 bereit gehalten. Aus der Bunkeranlage 4 können Lkw beladen werden, die über eine Verbindungsstraße 5 auf eine Rampe 6 gelangen, von wo aus sie eine Senke 7 erreichen können. Diese Senke liegt in einem sonst flachen Gelände und ist gemäß dem dargestellten Ausführungsbeispiei von Straßen 5, Π und \2 umgeben.In the F i g. 1 to 5, which schematically show the various phases of stockpiling, the daytime installation of a coal mine is shown schematically at the top of the picture. The coal coming from the shaft with shaft building I and hoisting machine 2 reaches a processing plant 3, the details of which are not shown. The pits and washing piles are broken down to a certain upper grain size in the manner described at the outset and kept ready in bunkers 4 with the undersized grains that have been screened off. Trucks can be loaded from the bunker system 4, and they reach a ramp 6 via a connecting road 5, from where they can reach a sink 7. This depression lies in otherwise flat terrain and, according to the exemplary embodiment shown, is surrounded by roads 5, Π and \ 2 .

Gemäß der F i g. 2 wird die Senke 7 zunächst für das erfindungsgemäße Verfahren dadurch vorbereitet, daß über die Rampe 6 die als Hinterkipper ausgebildeten Lkw ihre Ladung in nebeneinander angeordneten Schüttungen 14 auf die Bodenoberfläche abgeben. F.ine solche Schüttung hat. wie insbesondere aus der Darstellung der F i g. 2 ersichtlich ist, eine etwa von einer Ellipse 15 begrenzte Grundfläche 16. auf der die Schüttung einen mehr oder weniger langgestreckten Kamm 17 ausbildet, der in Richtung der längeren Ellipsenachse verläuft. Die Schüttungen werden in Reihen 18, 19 aufgebracht, wobei gemäß dem dargestellten Ausführungsbeispiel die Schüttungen 14 in der Reihe 18 so liegen, daß die Schüttungen 20 in der Reihe 19 zwischen benachbarten Schüttungen der Reihe 18 zu liegen kommen. Auf diese Weise wird die Planierarbeit reduziert, die von einer schematisch bei 21 wiedergegebenen Raupe mit Planierschild 22 ausgeführt wird. Die so planierte Fläche ist noch relativ weich, wird jedoch durch regelmäßiges Befahren in nebeneinanderliegenden Fahrspuren mit den unbeladenen Lkw so weit verdichtet, daß der planmäßige Betrieb aufgenommen werden kann.According to FIG. 2, the sink 7 is first prepared for the method according to the invention in that Via the ramp 6, the trucks, which are designed as rear tippers, place their loads next to one another Release beds 14 on the soil surface. F. has such a bed. as in particular from the representation the F i g. 2 can be seen, a base area 16 delimited approximately by an ellipse 15 on which the bed a more or less elongated ridge 17 forms, which in the direction of the longer axis of the ellipse runs. The beds are applied in rows 18, 19, wherein according to the illustrated embodiment, the beds 14 in the row 18 are so, that the beds 20 come to lie in the row 19 between adjacent beds in the row 18. In this way the grading work is reduced, that of a caterpillar shown schematically at 21 with dozer blade 22 is carried out. The surface leveled in this way is still relatively soft, but becomes more regular Driving in adjacent lanes with the unloaded truck compacted so much that the scheduled operation can be started.

Zu diesem Zweck wird die jeweilige Haldenfläche, die in F i g. 3 durch die Begrenzungslinie bei 23 vorgegeben ist. weil die vorher vorhandene Senke ausgefüllt wurde, etwa in ihrer Mitte, wie bei 24 durch eine strichpunktierte Linie angegeben, in zwei Teilflächen 25 und 26 aufgeteilt. Auf die Teiifiäche 26 werden nun entsprechend dem Vorbild der Fig. 2 Schüttungen in Reihen 18, 19 von den Lkw aufgebracht, die zunächst gemäß der Pfeilrichtung nach links die Fläche 26 im beladenen Zustand und ncbeneinanderliegenden Fahrspuren 27, 28... und dann von den entleerten Fahrzeugen in Richtung der umgekehrten Pfeile in ebenfalls nebeneinanderliegenden Fahrspuren 27', 28' ... befahren. Am Ende dieser Phase ist die gesamte Teilfläche 26 mit Schüttungen 14 in Reihen besetzt.For this purpose, the respective dump area that in Fig. 3 is given by the boundary line at 23. because the previously existing sink was filled, approximately in their middle, as indicated at 24 by a dash-dotted line, divided into two partial areas 25 and 26. In accordance with the example in FIG. 2, beds in rows 18, 19 Applied by the truck, the first area 26 in the loaded state according to the direction of the arrow to the left and adjacent lanes 27, 28 ... and then from the emptied vehicles in the direction of the Drive on reverse arrows in lanes 27 ', 28' ... which are also adjacent to one another. At the end of this During the phase, the entire sub-area 26 is occupied by beds 14 in rows.

In der anschließenden Phase, die in F i g. 4 wiedergegeben ist, wird die Aufschüttung auf der Teilfläche 25 fortgesetzt und zwar in der gleichen Weise, wie sie vor-In the subsequent phase, which is shown in FIG. 4 is shown, the embankment on the partial area 25 continued in the same way as before

to her auf der Teilfläche 26 vorgenommen worden ist. Die Teilfläche 25 wird daher ebenso wie die Teilfläche 26 mit den beladenen Fahrzeugen längs der Fahrspuren 27, 28 ... befahren. Allerdings ist vorher auf der Teilfläche 26 ein Teil, der mit 29 bezeichnet ist, planiert worden.has been made to her on the partial area 26. The partial area 25 is therefore just like the partial area 26 drive along with the loaded vehicles along the lanes 27, 28 ... However, it is on the partial area beforehand 26 a part, which is designated by 29, has been leveled.

während der restliche Teil 30 noch die nebeneinanderliegenden Schüttungen aufweist. Auf der planierten Fläche 29 liegen die Fahrspuren 27', 28'... der leer zurückfahrenden Lkw. so daß die planierte Teilfläche 29 mit den leeren Fahrzeugen schließlich vorverdichtet isi. Am Ende dieser Phase ist somit die gesamte Teilfläche 26 planiert und vorverdichtet und die Teilfläche 25 ist ihrerseits mit Schütlungen versehen.while the remaining part 30 still has the beds lying next to one another. On the leveled surface 29 are the lanes 27 ', 28' ... of the empty trucks returning, so that the leveled sub-area 29 with the empty vehicles is finally pre-compressed. At the end of this phase, the entire partial area is 26 leveled and pre-compacted and the partial area 25 is in turn provided with shaking.

In der in F i g. 5 wiedergegebenen Phase ist wiederum der zyklische Wechsel der Teilflächen 25 und 26 vollzogen worden. Dementsprechend erfolgt das Aufbringen der Schütlungen entsprechend der in F i g. 3 wiedergegebenen Phase, so daß die Teiifiäche 26. da sie zunächst mit det-, beladenen Transportfahrzeugen in den Fahrspuren 27, 28 ... befahren wird, endverdichtet ist, bevor die Schüttungen aufgebracht werden. Die Fahrspuren der leer zurückfahrenden Transportfahrzeuge werden so gelegt, daß sie auf der vorher planierten Teilfläche 29. die nunmehr auf der Teilfläche 25 ausgebildet wird, die Vorverdichtung vornehmen können, nachdem die Pia-In the in F i g. 5 reproduced phase is again the cyclical change of the partial areas 25 and 26 has been completed. The application takes place accordingly the shaking corresponding to the in F i g. 3 reproduced phase, so that the part 26th because it is initially with det, loaded transport vehicles in the lanes 27, 28 ... is driven on, is finally compacted before the beds are applied. The lanes the empty return vehicles are placed so that they are on the previously leveled sub-area 29. which is now formed on the partial surface 25, the precompression can undertake after the Pia-

Ji nierraupe auf dieser Fläche die Schüttungen planiert hat. Auf der Teilfläche 30 sind dagegen die Schüttungen fluch vorhanden.Ji nier caterpillar leveled the debris on this area Has. On the other hand, the beds are curse on the surface part 30.

Wie die Schnittdarstellungen (F i g. 6 und 7) erkennen lassen, sind somit auf der Teilfläche 25 gemäß dem dargestellten Ausführungsbeispiel Schüttungen 14. planierte Flächen 29 und vorverdichtete Flächen 31 ausgebildet, während auf der Teilfläche 26 die vorverdichteten Teilflächen 31. die cndverdichteicn Teilflächen 32 und die Schüttungen bei 33 vorhanden sind.As can be seen from the sectional views (FIGS. 6 and 7) let, thus pourings 14 are leveled on the partial surface 25 according to the illustrated embodiment Surfaces 29 and precompacted surfaces 31 formed, while on the partial surface 26 the precompacted Sub-areas 31. The compacted sub-areas 32 and the debris is present at 33.

Wie man außerdem aus den Schnittdarstellungen entnehmen kann, sind die Spitzen 35 der beschriebenen Schüttkegel 14 jeweils in die Zwickel 36 geschoben worden, die sich zwischen benachbarten Schüttkegeln ausbilden. Der zu verschiebende Anteil ist verhältnismäßig klein, weil die Schüttkegel gemäß dem darge?*ellten Ausführungsbeispiel dicht aneinandergesetzt sind. Vom Standpunkt der Ausnutzung der für das Verschieben der Teilmengen 35 in die Zwickel 36 nötigen Fahrzeuge ist das beschriebene Verfahren daher besonders vorteilhaft. As can also be seen from the sectional views, the tips 35 are those described Pour cones 14 have each been pushed into the gussets 36, which are formed between adjacent pouring cones. The portion to be shifted is relatively small, because the cones of repose according to the depicted Embodiment are placed close together. From the standpoint of taking advantage of the move The described method is therefore particularly advantageous for the vehicles required for the subsets 35 in the gusset 36.

Entgegen der Darstellung in der F i g. 4 kann bei einer abgeänderten Ausführungsform der Erfindung die vorher mit den Schüttungen versehene Fläche 29 vollständig planiert werden. Das bietet die Möglichkeit, die Fahrspuren der entladenen Fahrzeuge jeweils über die gesamte Rcstfläche 25 zu führen und im Anschluß daran die Vorverdichtung auf der gesamten Fläche 26 auszuführen, indem man die Fahrspuren der entladenen und von der Fläche 25 kommenden Fahrzeuge über diese Fläche führt. Dementsprechend kann man im Fall der F i g. 5 bei der Vorverdichtung der Fläche 29 verfahren, wenn man vorher die gesamte Fläche 29 planiert hat. wobei man die Fahrspuren der entladenen FahrzeugeContrary to the illustration in FIG. 4, in a modified embodiment of the invention, the previously surface 29 provided with the beds is completely leveled. That offers the possibility of the To lead the lanes of the unloaded vehicles over the entire Rcstfläche 25 and then carry out the pre-compaction on the entire surface 26 by following the lanes of the unloaded and from the area 25 leads vehicles coming across this area. Accordingly, in the case of the F i g. 5 proceed with the pre-compaction of the surface 29 if the entire surface 29 has been leveled beforehand. taking the lanes of the unloaded vehicles

iiber beide leitflächen 32 und 31 der I lache 26 legt und -jlays pool 26 over both guide surfaces 32 and 31 and -j

die Fahrzeuge anschließend die !lachen 30 und 31 der
Teilfläche 25 befahren laßt. Im Fall der F i g. 4 und 5
erreicht man dadurch eine mehrfache Vorverdichtung
auf den Flachen 26 und 29, die sich günstig auf die Endverdichtung auswirkt.
the vehicles then the! laughs 30 and 31 of the
Let drive on partial area 25. In the case of FIG. 4 and 5
a multiple pre-compression is achieved in this way
on the surfaces 26 and 29, which has a favorable effect on the final compaction.

Hierzu 4 Blatt ZeichnungenFor this purpose 4 sheets of drawings

1010

1515th

3030th

4040

5050

6060

6565

Claims (6)

Patentansprüche:Patent claims: 1. Verfahren zur Deponie von Schüttgut aus der Förderung von Steinkohle, vorzugsweise von Bergen nut Hilfe von gleislosen Transportfahrzeugen, z. B. Lkw, mit denen das Schüttgut aufgehaldet und die Halde vorzugsweise mit Hilfe von mit einem Planierschild versehenen Hilfsfahrzeugen planiert und durch Befahren mit Transportfahrzeugen verdichtet wird, dadurch gekennzeichnet, daß das Verdichten in eine durch Befahren einer vorher planierten Teilfläche (29) der Halde mit den entleerten Transportfahrzeugen in nebeneinander liegenden Fahrspuren (27', 28') erzielte Vorverdichtung und in eine durch Befahren der vorher vorverdichteten Teilfläche (25, 26) mit den beladenen Transportfahrzeugen in nebeneinanderliegenden Fahrspuren (27,28) bewirkte Endverdichtung unterteilt, das Aiihalden auf der jeweils endverdichteten Teilfläche durch nebeneinander angeordnete, aus jeweils einer Ladung eines Transportfahrzeuges bestehende Einzelschüttungen (14) vorgenommen und das Planieren durch Verschieben der Oberteile (35) der Schüttungen (14) in die zwischen den Schüttungen (14) befindlichen Zwickel (36) im zyklischen Wechsel derTeilflächen (25,26) durchgeführt wird.1. Procedure for landfill of bulk material from the Extraction of hard coal, preferably from mountains, with the help of trackless transport vehicles, z. B. trucks with which the bulk material is piled up and the dump preferably with the help of with a Auxiliary vehicles equipped with a dozer blade are leveled and compacted by driving on them with transport vehicles is, characterized in that the compaction in a by driving on a previously leveled sub-area (29) of the heap with the emptied transport vehicles in side by side lying lanes (27 ', 28') achieved precompaction and in one by driving on the previously precompacted Partial area (25, 26) with the loaded transport vehicles in side by side Lanes (27,28) caused final compaction divided, the dumping on the respective finally compacted partial area by side by side, from each a load of a transport vehicle made individual dumps (14) and leveling by moving the upper parts (35) of the beds (14) in between the beds (14) located gusset (36) is carried out in the cyclical change of the partial areas (25, 26). 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Schüttungen (14) mit sich auf dem größeren Teil ihres Umfanges mit benachbarten Schüttungen berührenden Schüttkegeln aufgebracht und ca. V2 bis Vj der Schüttungen verschoben werden. 2. The method according to claim 1, characterized in that the beds (14) are applied with pouring cones touching the larger part of their circumference with adjacent beds and about V 2 to Vj of the beds are displaced. 3. Verfahren nach einem der Ansprüche 1 oder 2, dadurch gekennzeichnet, daß eh. i Teilfläche (26) zunächst endverdichtet und ihr jeweils endverdichteter Teil (32) mit den Schüttungen (14) besetzt wird, während die andere Teilfläche (25) gleichzeitig vorverdichtet und planiert wird.3. The method according to any one of claims 1 or 2, characterized in that eh. I sub-area (26) first finally compacted and their respective end-compacted part (32) is occupied with the beds (14), while the other sub-area (25) is simultaneously precompacted and is leveled. 4. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß die Schüttungen (14) auf einer Teilfläche (25, 26) in zeitlichen Abständen und mehreren Teilvorgängen planiert werden.4. The method according to any one of claims 1 to 3, characterized in that the beds (14) be leveled on a sub-area (25, 26) at time intervals and several sub-processes. 5. Verfahren nach einem der Ansprüche 1 bis 4. dadurch gekennzeichnet, daß die Schüttungen (14) in Reihen (19, 20) hintereinander und in benachbarten Reihen (19, 20) gegeneinander versetzt angeordnet werden.5. The method according to any one of claims 1 to 4. characterized in that the beds (14) in rows (19, 20) one behind the other and in adjacent Rows (19, 20) are arranged offset from one another. 6. Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß die Fahrspuren der entladenen Fahrzeuge über die gesamte noch nicht mit den Schüttungen (14) besetzte Restfläche (31) der vorverdichteten Teilfläche (25 bzw. 26) und im Anschluß daran über die gesamte vorher planierte (29) Teilfläche (26 bzw. 25) gelegt und dadurch die Vorverdichtung mehrfach vorgenommen wird, bevor die Endverdichtung erfolgt.6. The method according to any one of claims 1 to 5, characterized in that the lanes of the unloaded vehicles over the entire remaining area (31) not yet occupied by the debris (14) the pre-compacted partial area (25 or 26) and then over the entire previously leveled (29) Sub-area (26 or 25) placed and thereby the pre-compaction is carried out several times before the final compaction takes place.
DE19803006662 1980-02-22 1980-02-22 Process for the dumping of bulk material from the extraction of hard coal, preferably from mountains Expired DE3006662C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19803006662 DE3006662C2 (en) 1980-02-22 1980-02-22 Process for the dumping of bulk material from the extraction of hard coal, preferably from mountains

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19803006662 DE3006662C2 (en) 1980-02-22 1980-02-22 Process for the dumping of bulk material from the extraction of hard coal, preferably from mountains

Publications (2)

Publication Number Publication Date
DE3006662A1 DE3006662A1 (en) 1981-09-03
DE3006662C2 true DE3006662C2 (en) 1984-05-10

Family

ID=6095300

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19803006662 Expired DE3006662C2 (en) 1980-02-22 1980-02-22 Process for the dumping of bulk material from the extraction of hard coal, preferably from mountains

Country Status (1)

Country Link
DE (1) DE3006662C2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4243240A1 (en) * 1992-12-19 1994-06-23 Pwh Anlagen & Systeme Gmbh Stacking method for loose goods, e.g. coal, onto tip

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2821461C2 (en) * 1978-05-17 1986-05-07 Rothalit, Bau- Und Wegebaustoffe Gmbh, 4690 Herne Lorries or truck trailers for the transport of bulk goods

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4243240A1 (en) * 1992-12-19 1994-06-23 Pwh Anlagen & Systeme Gmbh Stacking method for loose goods, e.g. coal, onto tip

Also Published As

Publication number Publication date
DE3006662A1 (en) 1981-09-03

Similar Documents

Publication Publication Date Title
DE102005039067B3 (en) Conveyer belt assembly for copper ore stockpile in a leach production system has base section and intermediate standard extensions feeding head transfer unit
DE2823849A1 (en) STORAGE SYSTEM FOR SCHUETTGUT
DE2939051C2 (en) Method of moving excavation cavities
EP0609872B1 (en) Method and apparatus for depthwise soil consolidation
DE19600897C1 (en) Mobile preparation plant for wet classification of gravel and sand
DE2246125A1 (en) FORMWORK DEVICE FOR PACKING PIT DRAINING MATERIAL
DE3006662C2 (en) Process for the dumping of bulk material from the extraction of hard coal, preferably from mountains
DE3134642A1 (en) HEAVY DUTY EXCAVATOR
WO2014001513A1 (en) Method for operating a plant in open-cast mining, said plant comprising a mobile crusher
DE2821674C2 (en) Mobile flow rate equalizer
DE3032880C2 (en) Device for complete emptying for large bulk goods stores
DE3808731C2 (en)
EP0214359A1 (en) Posterior sealing employing mining techniques
DE2655542A1 (en) Coarse mine rubble handling system - mixes rubble with slurry containing sand, water and binder stored above ground
DE2833628A1 (en) Machine to discharge stock piled material - has bucket conveyor top run travelling over hopper and across pile at bottom
DE1231164B (en) Discharge channel for emptying a level storage area for bulk goods
DE1657115C3 (en) Large mobile crushing plant for quarries
DE19625590C2 (en) Device for filling construction pits, pipe trenches, cable trenches or the like
DD219814A1 (en) METHOD FOR THE HYDRAULIC STORAGE OF DUST-SOFT TO FINE-COATED SPOOLS
DE19621666C2 (en) Arrangement for the downward conveyance of mineral bulk goods by gravity
EP2576092A2 (en) Additive for binding the residual moisture in the residue salt of a salt heap
DE3608571A1 (en) DEVICE FOR TRANSFERRING PUMP FROM A PUMP TROLLEY TO A CONVEYOR
DE2621260A1 (en) METHOD AND DEVICE FOR BUILDING UP SOILS AND SHORES OF WATERS WITH A BUILDING MATERIAL
DE2842442A1 (en) Heap spreading process for coal waste tips - uses waste carrying goods vehicle with central funnel outlet to spread waste which is then rolled, graded and compacted
DE10008346A1 (en) Charging box plant esp. for ceramic materials with single discharge device moving across discharge openings of several boxes

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
D2 Grant after examination
8363 Opposition against the patent
8331 Complete revocation