DE3003685A1 - Mine coal seam hydromechanical extraction - involves jet nozzles following up point of attack as extraction progresses - Google Patents

Mine coal seam hydromechanical extraction - involves jet nozzles following up point of attack as extraction progresses

Info

Publication number
DE3003685A1
DE3003685A1 DE19803003685 DE3003685A DE3003685A1 DE 3003685 A1 DE3003685 A1 DE 3003685A1 DE 19803003685 DE19803003685 DE 19803003685 DE 3003685 A DE3003685 A DE 3003685A DE 3003685 A1 DE3003685 A1 DE 3003685A1
Authority
DE
Germany
Prior art keywords
extraction
hydromechanical
attack
jet
nozzles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19803003685
Other languages
German (de)
Inventor
Karl-Hans 4670 Lünen Marx
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RAG AG
Original Assignee
Ruhrkohle AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ruhrkohle AG filed Critical Ruhrkohle AG
Priority to DE19803003685 priority Critical patent/DE3003685A1/en
Publication of DE3003685A1 publication Critical patent/DE3003685A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C25/00Cutting machines, i.e. for making slits approximately parallel or perpendicular to the seam
    • E21C25/60Slitting by jets of water or other liquid
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal

Abstract

A seam of coal between two extraction sites is extracted disc-wise in a reverse process, with a high-pressure water jet from one or more nozzles undercutting the disc, which is then recovered hydromechanically, in a mine. In the course of hydromechanical engagement, the nozzles (44) are guided along behind the point of attack, in accordance with the progress of extraction. The break-in may be driven forward so that the face of the disc is inclined steeply backwards towards another extraction site. A main jet may be swivelled in one or more planes. Hydromechanical attack is made independent of the weakening and widening jet, as distance increases.

Description

Die Erfindung betrifft ein Verfahren zur hydromechan-ischenThe invention relates to a method for hydromechanical

Gewinnung im Untertagebetrieb, insbesondere von Steinkohle im Tei1sohlenpfeilerbruchbau, bei dem von einem vorzugsweise unteren bis zur ,Baugrenze vorgetriebenen Gewinnungsort der zwischen zwei Gewinnungsörtern anstehende Kohlenpfeiler im Rückbau scheibenweise hereingewonnen wird, wobei mit Hilfe enes aus einer oder mehreren Düsen austretenden Hochdruckwasserstrahles ein die Scheibe hinterschneidender Einbruch ausgespritzt und die Scheibe nachfolgend wenigstens teilweise ebenfalls hydromechanisch hereingewonnen wird'.Extraction in underground operations, in particular of hard coal in the partial bottom pile construction, at the extraction site driven from a preferably lower to the building limit the coal piers between two mining sites are being dismantled in slices is recovered, with the aid of a nozzle emerging from one or more nozzles High-pressure water jet sprayed an undercut break in the window and the disk subsequently also recovered at least partially hydromechanically will'.

Die Erfindung ist insbesondere auf die mäßig bis stark geneigte Lagerung von Steinkohlenflözen anwendbar, deren hydromechanischer Abbau in der Regel mit einer hydraulischen Abf örderung z.B. in offenen Rinnen durch die zu diesem Zweck mit entsprechendem Ansteigen bis zur Baugrenze aufgefahrenen Gewinnungsörter verbunden ist. Bei einem solchen Abbauverfahren hängt der Abstand der Gewinnungsörter von der hereingewinnbaren Mächtigkeit der Kohlenpfeiler ab. Benutzt man die üblichen Wasserwerfer, welche mit einem Betriebsdruck in der Größenordnung von ca. 100 bar arbeiten, so ergeben sich Abstände der Gewinnungsörter im -Steinkohlenbergbau der Ruhr von ca. 15 - 18 m. Das bedingt einen relativ hohen spezifischen Bedarf an Gewinnungsörtern, d.h. an-Abbaustrecken.The invention is particularly applicable to the moderately to severely inclined storage of hard coal seams can be used, their hydromechanical degradation usually with a hydraulic discharge e.g. in open channels through the for this purpose associated with a corresponding increase up to the construction limit excavated sites is. In such a mining method, the distance between the extraction sites depends on the recoverable thickness of the charcoal pillars. If you use the usual Water cannons with an operating pressure of around 100 bar work, there are distances between the extraction sites in the hard coal mining of Ruhr of approx. 15 - 18 m. This requires a relatively high specific need for quarries, i.e. on-mining routes.

Es ist bekannt, in derartigen Abbaubetrieben Wasserwerfer ein zu-' setzen, welche eine in einem Gewinnungsort abstempelbare Konsole aufweisen, auf der ein oder mehrere Strahlrohre mit entsprechenden Düsen schwenkbar gelagert und mit einem Schwenkgetriebe meistens hydraulisch angetrieben sind; die meistens als -Schubkolbengetriebe ausgebildeten Mbboren des Getriebes sind fernbedienbar, weil der Aufenthalt in unmittelbarer Nähe des Strahlrohres gefährlich ist.It is known to use water cannons in such mining operations. set, which have a console that can be stamped in a mining site the one or more jet pipes with corresponding nozzles pivotably mounted and are mostly hydraulically driven with a swivel gear; mostly as -Push piston gear trained Mbboren of the gear are remotely controllable because staying in the immediate vicinity of the nozzle is dangerous.

Man führt das bekannte Verfahren so, daß man mit dem Strahlrohr zunächst den eingangs erwähnten Einbruch über eine bestimmte Hilfsstrecke herstellt und dann durch Schwenken des Strahlrohres den hinterschnittenen Teil der Scheibe hereingewinnt. Da ein Sichtkontakt mit dem Gewinnungsstoß fehlt, wird das Strahlrohr im allgemeinen nach dem Geräusch des hereinbrechenden Haufwerkes gesteuert.The known method is carried out in such a way that one uses the jet pipe first establishes the break-in mentioned above via a certain auxiliary route and then by swiveling the jet pipe, the undercut part of the disc is won. Since there is no visual contact with the extraction joint, the jet pipe is generally used controlled by the sound of the falling pile.

Da der Energieninhait des Wasserstrahles mit zunehmender Entfernung stark abnimmt, sinkt die Löseleistung mit zunehmender Entfernung des Punktes, an dem der hydromechanische Angriff erfolgt, von dem Wasserwerfer entsprechend ab. Außerdem verbreitert sich der Strahl, so daß sich die Angriffsfläche mit zunehmender Entfernung ebenfalls vergrößert. Daraus ergeben sich verhältnismäßig unregelmäßige Profile des Einbruches. Das führt u.a. dazu, daß bei zunehmender Festigkeit der Kohle der Hochdruckwasserbedarf auf das Mehrfache ansteigt und daß Abbauverluste auftreten, wenn der Energieinhalt des Strahles nicht mehr ausreicht, um die Kohle aus ihrem Verband zu lösen. Außerdem führt die an sich mangelhafte Steuerung des Strahlrohres häufig dazu, daß unbeabsichtigte Schichten des Nebengesteins zusammen mit der Kohle hereinbrechen.Because the energy content of the water jet increases with distance decreases sharply, the dissolving power decreases with increasing distance from the point that the hydromechanical attack takes place, from the water cannon accordingly. In addition, the beam widens, so that the attack surface increases with increasing Distance also increased. This results in relatively irregular Profiles of the burglary. This leads, among other things, to the fact that with increasing strength the Coal the high pressure water demand increases several times and that mining losses occur when the energy content of the beam is no longer sufficient to remove the coal to loosen from their association. In addition, the poor control of the Jet pipe often causes unintended layers of the adjacent rock together break in with the coal.

Geschieht das, bevor die Scheibe hereingewonnen ist, muß die restliche Scheibe, g.elegentlich sogar der restliche Pfeiler unter Inkaufnahme entsprechender Kohlenverluste aufgegeben werden.If this happens before the disc is won, the remaining one must Disc, sometimes even the rest of the pillar at the expense of corresponding ones Coal losses are abandoned.

Der streichende Abbau führt außerdem zu der Notwendigkeit, den versatzseitigen Stoß des Pfeilers bzw. der Scheibe so auszurichten, daß er im spitzen Winkel zum Gewinnungsort steht. Die überhängende Kohle fällt bei der hydromechanischen Gewinnung in den Alten Mann und kann, insbesondere bei gebrächem Hangenden, nicht mehr herausgespült, d.h. hydraulisch abgefördert werden, weil in dem betreffenden Raum liegende Bergebrocken die Abförderung verhindern. Das führt regelmäßig zu erheblichen Abbauverlusten.The strike mining also leads to the need for the offset side Align the joint of the pillar or the disc so that it is at an acute angle to the Extraction site stands. The overhanging coal falls during hydromechanical extraction into the old man and can no longer be flushed out, especially if the hanging wall is used, i.e. be hydraulically conveyed away because there are rocks in the area in question prevent removal. This regularly leads to considerable degradation losses.

Beim fallend geführten TeiFohlenpfeilerbruchbau, bei dem von einer Strecke aus nach beiden Seiten Scheiben hereingewonnen werden, ist die Reichweite der Wasserstrahlen von stationären Wasserwerfern weder einstell- noch kontrollierbar. Nimmt die Kohlenfestgkeit zwischen zwei in einem vorgegebenen Abstand aufgefahrenen Gewinnungsörtern zu, so müssen ebenfalls Kohlenverluste in Kauf genommen werden. Kann ein Durchschlag mit dem oberen Gewinnungsort nicht erzielt werden, so verschlechtern sich Wetterführung und Klima entsprechend.In the case of the sloping part of the foal pillar break, in the case of one Distance from both sides of the discs is the range the water jets from stationary water cannons can neither be adjusted nor controlled. Takes the carbon strength between two driven at a given distance Mining areas, coal losses must also be accepted. If a breakthrough cannot be achieved with the upper extraction point, it will deteriorate weather conditions and climate accordingly.

Der Erfindung liegt die Aufgabe zugrunde, den hydromechanischen Angriff von dem mit zunehmender Entfernung vom Düsenaustritt abnehmenden Energien inhalt des Wasserstrahles und der damit verbundenen Verbreiterung des Strahles unabhängig zu machen.The invention is based on the object of the hydromechanical attack of the energy content, which decreases with increasing distance from the nozzle outlet of the water jet and the associated broadening of the jet independently close.

Gemäß der Erfindung wird das vorbekannte Verfahren daher so geführt, daß beim hydromechanischen Angriff die Düsen entsprechend dem Fortschritt der Hereingewinnung dem Angriffspunkt nachgeführt werden.According to the invention, the previously known method is therefore carried out so that with the hydromechanical attack the nozzles according to the progress of the winning be tracked to the point of attack.

Dadurch ist es möglich, die im Wasserstrahl enthaltene Energie optimal zu nutzen. Das führt dazu, daß die Angriffsfläche des Wasserstrahls beim Auffahren des Einbruches im wesentlichen nicht verändert wird, so daß die Einbruchslänge praktisch nur noch von der Entfernung abhängt, über die die DUse nachgeführt werden kann. Im Ergebnis werden dadurch gröire Abstände der Gewinnungsörter möglich, die daher auch nicht mehr von der Reichweite des Wasserwerfers abhängig festgelegt zu werden brauchen. Das ergibt eine Verminderung des spezifischen Bedarfes an Abbaustrecken.This makes it possible to optimize the energy contained in the water jet to use. This leads to the fact that the attack surface of the water jet when driving up of the break-in is essentially not changed, so that the break-in length is practical only depends on the distance over which the DUse can be tracked. As a result, larger distances between the extraction sites are possible, which is why also no longer to be determined depending on the range of the water cannon to need. This results in a reduction in the specific need for mining routes.

Man kann andererseits die Strahllängen erheblich verkürzen, so daß die spezifische Löseleistung bei gleichzeitiger Abnahme des spezifischen Wasserverbrauches ansteigt.On the other hand, the beam lengths can be shortened considerably, see above that the specific dissolving capacity with a simultaneous decrease in the specific water consumption increases.

Gemäß einer bevorzugten Ausführungsform der Erfindung wird das Verfahren so geführt, daß der Einbruch bis zum Durchschlag mit einem anderen Gewinnungsort vorgetrieben und danach der noch stehende Teil der Scheibe abgebaut wird. Das hat den Vorteil, daß bei der Herstellung des Einbruches verhältnismäßig wenig Hangendfläche freigelegt zu werden braucht, wodurch die Standfestigkeit des Nebengesteins erhöht wird; erst bei der Hereingewinnung der Scheibe wird das Hangende freigemacht.According to a preferred embodiment of the invention, the method so managed that the break-in to the breakthrough with another extraction location driven forward and then the still standing part of the disc is dismantled. That has the advantage that there is relatively little hanging area when making the break-in needs to be exposed, which increases the stability of the adjacent rock will; the hanging wall is only cleared when the pane is brought in.

Da man erfindungsgemäß den Einbruch mit einem verhältnismäßig regelmäßigen Querschnitt herstellen kann, erübrigt es sich auch, den Kohlenstoß wie bekannt in den Alten Mann überhängen zu lassen.Since you according to the invention the break-in with a relatively regular Cross-section, there is also no need to cut the coal face, as is known in to let the old man hang over.

Deswegen besteht eine vorzugsweise Ausführungsform der erfindungsgemäßen Verfahrens darin, den Einbruch so vorzutreiben, daß der Stoß der Scheibe steil bis schräg in Richtung auf das andere Gewinnungsort zurückgeneigt ist. Dadurch können Abbauverluste vermieden werden, die bislang durch die mit Bergebrocken blockierten Kohleanteile entstehen.Therefore, there is a preferred embodiment of the invention Method is to advance the break in so that the impact of the disc is steep is inclined backwards in the direction of the other extraction site. This allows Mining losses can be avoided, which were previously blocked by the rocks Coal shares arise.

Besondere Vorteile ergeben sich durch das erfindungsgemäße Verfahren auch bei diagonal verlaufenden Störungen. Man kann nämlich bei einer bevorzugten Ausführungsform des erfindungsgemäßen Verfahrens den Einbruch längs der Störung bzw. parallel zur Störungsrichtung vortreiben. Dadurch-verhindert man ebenfalls ein zu schnelles Hereinbrechen des Hangenden.The method according to the invention results in particular advantages even with diagonal faults. You can namely with a preferred Embodiment of the method according to the invention the break-in along the disturbance or advance parallel to the direction of the fault. This also prevents it the hanging wall collapsing too quickly.

Im allgemeinen werden Kohlenverluste mit dem erfindungsgemäßen Verfahren auch dadurch vermieden, daß Kohleninseln mit schwer gewinnbarer Kohle nunmehr hereingewonnen werden können, die bislang wegen nicht ausreichender wirksamer Reichweite des Wasserstrahles stehenbleiben mußten.In general, coal losses with the method according to the invention also avoided by the fact that coal islands were now won in with coal that was difficult to extract can be that so far because of insufficient effective Range of the water jet had to stop.

Mit dem erfindungsgemäßen Verfahren läßt sich ferner die Vortriebsleistung insbesondere bei der Herstellung des Einbruches wesentlich steigern, indem bei der Herstellung des Einbruches der Wasserstrahl in einer oder mehreren Ebenen geschwenkt' wird.With the method according to the invention, the propulsive power can also be determined in particular increase significantly in the production of the break-in by in the Making the ingress of the water jet swiveled in one or more planes' will.

Auf diese Weise erzeugt man Schramschlitze, welche die Gewinnungsleistung erheblich erhöhen können.In this way one creates Schramschlitze, which the extraction capacity can increase significantly.

Das erfindungsgemäße Verfahren läßt es ferner zu, den hydromechanischen Angriff mit mehreren Wasserstrahlen gleichzeitig vorzunehmen, die unabhängig voneinander schwenkbar sind. Auf diese Weise kann die Schrämtechnik noch weitergehender zur Wirkung gebracht werden.The inventive method also allows the hydromechanical Attack with multiple jets of water at the same time, independently of each other are pivotable. In this way, the cutting technique can go even further Effect.

Die Erfindung wird im folgenden anhand eines Ausführungsbeispieles einer Vorrichtung zur Durchführung des neuen Verfahrens beschrieben,- die in den Figuren der Zeichnungen dargestellt ist; es zeigen Fig. 1 im Querschnitt ein Gewinnungsort der eingangs beschriebenen Art mit einer Ansicht der erfindunqsgemäßen Vorrichtung bei der Herstellung eines Einbruches, Fig. 2 den Gegenstand der Fig. 1 in Draufsicht, Fig. 3 eine Stirnansicht des Gegenstandes nach den Fig. 1 und 2, Fig. 4 in vergrößerter Darstellung die Ausführung eines Düsen kopfes gemäß der Erfindung und Fig. 5 den um 900 gedrehten Düsenkopf nach Fig. 4.The invention is illustrated below using an exemplary embodiment a device for carrying out the new method described, - in the Figures of the drawings is shown; 1 shows a site of extraction in cross section of the type described above with a view of the device according to the invention during the production of a burglary, FIG. 2 shows the object of FIG. 1 in plan view, 3 shows an end view of the object according to FIGS. 1 and 2, FIG. 4 in an enlarged manner Representation of the execution of a nozzle head according to the invention and Fig. 5 the nozzle head rotated by 900 according to FIG. 4.

Gemäß'Fig. 1 ist ein einfallendes Steinkohlenflöz 4 zwischen zwei nicht dargestelltenTeiEsohle mit Hilfe eines ebenfalls nicht gezeigten Basisberges aufgeschlossen. Von dem Basisberg aus sind mehrere Gewinnungsörter bis zur Baugrenze vorgetrieben; gezeigt ist eines der Gewinnungsörter 1. Nicht dargestellt ist, daß die Gewinnungsörter ansteigend aufgefahren sind, so daß die hereingewonnene Kohle mit einer offenen Rinne hydraulisch abgefördert werden kann. Gemäß dem dargestellten Ausführungsbeispiel ist das Ort ausschließlich in der Kohle aufgefahren. Ferner wird gemäß dem dargestellten Ausführungsbeispiel der oberhalb des Ortes anstehende Kohlenpfeiler 5 hydromechanisch hereingewonnen. Es ist aber auch möglich, von dem Ort l aus auch den unteren Kohlenpfeiler 6 zu gewinnen. Der Abbau erfolgt jeweils im Rückbau scheibenweise.According to 'Fig. 1 is a collapsing coal seam 4 between two Partial sole, not shown, with the help of a base mountain, also not shown open minded. From the base mountain there are several extraction sites up to the building limit driven forward; shown is one of the mining locations 1. It is not shown that the mining areas are ascending, so that the coal won can be conveyed away hydraulically with an open channel. According to the one shown Embodiment, the place is driven exclusively in the coal. Further becomes, according to the illustrated embodiment, the pending above the place Coal pillar 5 gained hydromechanically. But it is also possible from the Place 1 from also the lower charcoal pillar 6 to be won. The dismantling takes place in each case in dismantling, slice by slice.

Gemäß dem dargestellten Ausführungsbeispiel wird zunächst von dem Ort 1 aus ein Einbruch gegen den anstehenden Kohlenstoß eingebracht und zum Durchschlag mit dem oberen Ort vorgetrieben.According to the illustrated embodiment is first of the Place 1 from a break in against the pending coal face and brought about the breakthrough advanced with the upper place.

Dazu dient ein allgemein mit 9 bezeichneter Wasserwerfer, dessen als Grundrahmen ausgebildete Konsole 10 mit einer aus Stempeln 11, 12 bestehenden Einspannung zwischen dem Liegenden des Flözes 4 und dem Hangenden 3 festgelegt ist. Wie dargestellt, stützt sich die Abstempelung auf einer der Ausbaukappen 13 ab.A water cannon, generally designated 9, is used for this purpose Base frame formed console 10 with a clamping consisting of punches 11, 12 is set between the lying of the seam 4 and the hanging wall 3. As shown, the stamp is supported on one of the expansion caps 13.

Auf der Konsole werden die Reaktionskräfte einer Vorschubeinrichtung 15 abgestützt, die über ein Führungsrohr 16 ein aus einzelnen Hochdruckwasserrohren bestehendes Rohrgestänge 18 in dessen Achsrichtung entsprechendem Fortschritt der Hereingewinnung vorschiebt. Das Rohrgestänge hat ein vorderes Rohr 21. Das freie Ende dieses Rohres trägt einen Düsenkopf 22, der eine abgerundete Kappe 52 und einen Konus (68) nach der Fig. 2 aufweist und werden weiter unten erläutert. Der Düsenkopf 22 liefert einen mit Hochdruckwasser erzeugten Hauptstrahl, welcher die Sohle des Einbruches hydromechanisch angreift und unter fortschreitender Vertiefung des Einbruches Kohle löst, die mit dem entspannten'Hochdruckwasser aus dem-Einbruch ausgetragen wird.The reaction forces of a feed device are on the console 15 supported by a guide tube 16 made of individual high-pressure water pipes existing pipe rod 18 in the axial direction corresponding progress of the Gaining in advances. The pipe rod has a front pipe 21. The free one The end of this tube carries a nozzle head 22 which is rounded cap 52 and a cone (68) according to FIG. 2 and are explained further below. The nozzle head 22 delivers a main jet generated with high pressure water, which the bottom of the break-in attacks hydromechanically and with progressive deepening The burglary dissolves coal, which with the relaxed'high-pressure water from the burglary is carried out.

Die ZufGhrun +es Hochdruckwassers erfolgt über eine Leitung 25 und einen Anschlußkopf 24, auf den die Kolbenstanqe 30 eines hydraulischen Zylinders 31 wirkt, der als Motor in der Vorschubeinrichtung 15 dient. Die ausgezogene Länge der Kolbenstange 30 ist so gewählt, daß sich jeweils ein Rohr in das aus den Rohren 19, 20, 23 bestehende Rohrgestänge einwechseln bzw. aus dem Gestänge auswechseln läßt, wenn der Düsenkopf zurückgezogen werden soll. Eine Abfangvorrichtung für das Rohrgestänge ist vorgesehen, jedoch in der Zeichnung nicht wiedergegeben.The supply of high-pressure water takes place via a line 25 and a connection head 24 on which the piston rod 30 of a hydraulic cylinder 31 acts, which serves as a motor in the feed device 15. The extended length the piston rod 30 is chosen so that there is one tube in each of the tubes 19, 20, 23 replace existing pipe rods or replace them from the rods leaves when the nozzle head is to be withdrawn. An interception device for the Pipe linkage is provided, but not shown in the drawing.

Eines der unter sich gleichen Rohre 32 des Rohrgestänges ist in Fig.2 dargestellt. Das Rohr hat einen von der Außenwand umschlossenen Hohlraum 33, durch den das mit der Leitunq 25 angelieferte Hochdruckwasser strömt. Ferner -hat das Rohr hiervon abgeschlossene Kanäle, denen der Schnellverbinder 34-37 an den Rohrenden zugeordnet sind. Diese Kanäle ermöglichen die Zuführung von hydraulischem Medium zu noch zu beschreibenden Einrichtungen für die Steuerung des Düsenkopfes. Diese Steuerleitungen sind bei 38-41 dargestellt und führen zu einem nicht dargestellten Steuerstand in der Strecke 1, von dem aus eine Fernsteuerung aller Einrichtungen des Wasserwerfers möglich ist.One of the mutually identical tubes 32 of the tubular rod is shown in FIG shown. The tube has a cavity 33 enclosed by the outer wall which the high pressure water delivered with the line 25 flows. Furthermore, that has Pipe closed channels, which the quick connector 34-37 on the pipe ends assigned. These channels enable the supply of hydraulic medium to devices still to be described for controlling the nozzle head. These Control lines are shown at 38-41 and lead to one not shown Control station in route 1, from which a remote control of all facilities of the water cannon is possible.

Zu den steuerbaren Antrieben gehört auch eine Schwenkeinrichtung 42, deren Reaktionskräfte ebenfalls auf der Konsole 15, wie aus Fig.3 in gestrichelter Linienführung ersichtlich ist, abgestützt werden. Der Motor der Schwenkeinrichtung wirkt über eine Kurbel 43 auf die Gestängeführung 16 und besteht aus einem hydraulischen Schubkolbengetriebe.The controllable drives also include a swivel device 42, their reaction forces also on the console 15, as shown in Figure 3 in dashed lines Line is visible, be supported. The engine of the The pivoting device acts on the rod guide 16 via a crank 43 and consists from a hydraulic thrust piston gear.

GemäS der Darstellung des Düsenkopfes nach den-Fig. 4 und 5 wird der Hauptwasserstrahl von einer Hauptwasserdüse 44 erzeugt, die um eine das Gestänge quer durchsetzende geometrische Achse in einem-Rohrgelenk 45 um einen Bogenwinkel schwenkbar ist. Der die dafür erforderlichen Bewegungsenergie liefernde Antrieb besteht aus einer Schwenkplatte 46, die ein Anschlußgelenk 47 für die Kolbenstange 48 eines hydraulischen Zylinders 49 aufweist, der mit seinem Ende über ein Anschlußgelenk 50 an eine Konsole 51 angelenkt ist, die ihrerseits-an dem Düsenkopf befestigt ist. According to the representation of the nozzle head according to the-Fig. 4 and 5 will the main water jet generated by a main water nozzle 44, which around a the linkage transversely penetrating geometric axis in a pipe joint 45 by an arc angle is pivotable. The drive that supplies the kinetic energy required for this consists of a pivot plate 46 which has a connection joint 47 for the piston rod 48 has a hydraulic cylinder 49, the end of which has a connection joint 50 is articulated to a bracket 51, which in turn is attached to the nozzle head.

Die Schwenkplatte 46 ist über einen Bogenwinkel von ca. 2700 kreisförmig ausgebildet und sitzt in der Mitte der Kappe 52, nämlich in einer in dieser angebrachten Ausnehmung 53, welche die Schwenkplatte 46 führt. Ebenso wie die kreisförmige Krümmung 54 der Schwenkplatte ist die Außenseite der Kappe bei 56 abgerundet. Durch die Platte und die Kanne entsteht eine Dichtung, welche den Düsenkopf vor Verschmutzunaen schützt. The pivot plate 46 is circular over an arc angle of approximately 2700 formed and sits in the middle of the cap 52, namely in one attached in this Recess 53 which guides the swivel plate 46. Just like the circular curvature 54 of the pivot plate, the outside of the cap is rounded at 56. Through the plate and the jug creates a seal that protects the nozzle head from dirt.

Unterhalb der Kopfplatte 52 sind weitere Düsen 57, 58 anqeordnet, deren Düsen strahlen 59, 60, wie aus der Darstellung der Fig. 2 ersichtlich ist, derart nach hinten qeneiqt sind, daß sie mit dem Rclhrqestänse einen spitzen Winkel einschließen. Die Düsen 57, 58 liegen in der gleichen Ebene wie die Düse 44; weitere Düsen 62, 63 sind auf dem Umfang des durch die Kappe abgerundeten Kopfes angebracht Die aus den HilfsdUsen 57,58 sowie 62,63 austreten-den Strahlen dienen dazu, /die in dem Einbruch angesammelten Feststoffe freizuspritzen, um eine einwandfreie hydraulische Abförderung zu gewährleisten. Further nozzles 57, 58 are arranged below the head plate 52, whose nozzles radiate 59, 60, as can be seen from the illustration in FIG. 2, are in such a way qeneiqt backwards that they form an acute angle with the spine lock in. The nozzles 57, 58 lie in the same plane as the nozzle 44; Further Nozzles 62, 63 are mounted on the circumference of the head rounded by the cap The jets emerging from the auxiliary nozzles 57, 58 and 62, 63 serve to / the in the slump accumulated solids spray free to a proper hydraulic Ensure removal.

Außerdem können diese Düsen mit Hilfe eines Absperrorgans 64 ferngesteuert zu- und abgeschaltet werden. Dazu dient ein Antrieb 65, der aus einem hydraulisch beaufschlagbaren Zylinder 66 besteht, dessen Kolbenstange 67, wie schematisch in Fig. 5 dargestellt ist, auf die Spindel des Absperrorqans 64 wirkt. Der Hauptdüse ist ein von den Hilfsdüsen getrennter Druckwasserkanal zugeordnet und die Ylilfsdüsen werden aus einem qemeinsamen Druckwasserkanal beaufschlagt, in dem das Absperrorgan sitzt, Die Steuerunq der beiden Antriebe des Düsenkopfes erfolgt über di beschriebenen Steuerleitungen, die paarweise den doppelt wirkenden Zylindern zugeordnet sind. In addition, these nozzles can be controlled remotely with the aid of a shut-off device 64 can be switched on and off. A drive 65, which consists of a hydraulic cylinder 66 can be acted upon, the piston rod 67 of which, as shown schematically in FIG Fig. 5 is shown, acts on the spindle of the shut-off valve 64. The main nozzle is assigned a pressurized water channel that is separate from the auxiliary nozzles and the auxiliary nozzles are pressurized from a common pressurized water channel, in which the shut-off element sits, the control of the two drives of the nozzle head takes place via the control lines described, the double-acting in pairs Are assigned to cylinders.

Gemäß der Erfindung wird der Ein-bruch kaminartig ausgebildet.According to the invention, the break-in is designed like a chimney.

Die Größe seines Querschnittes und die Form der Querschnittsbegrenzung richtet sich nach den örtlichen Verhältnissen. Sie kann relativ genau wegen der Steuerbarkeit der Düsen einqehalten werden.The size of its cross-section and the shape of the cross-section boundary depends on the local conditions. You can be relatively accurate because of the Controllability of the nozzles are complied with.

Nach Herstellung des Kamins wird die zum Alten Mann hin gelegene Scheibe mit dem gleichen Düsenkopf hydromechanisch hereingewonnen. Man kann selbstverständlich einen der Pfeiler -auch an mehreren Stellen gleichzeitig bearbeiten, wenn man mehrere Wasserwerfer einsetzt.After the chimney is made, the pane facing the old man becomes gained hydromechanically with the same nozzle head. Of course you can edit one of the pillars - also in several places at the same time, if you have several Uses water cannons.

Claims (12)

"Verfahren und Vorrichtung zur hydromechanischen Gewinnung im Untertagebetrieb, insbesondere von Steinkohle im leilsohlenpfeilerbruchbau" Patentansprüche 1. Verfahren zur hydromechanischen Gewinnung im Untertagebetrieb, insbesondere von Steinkohle im Teilsohlenpfeilerbruchbau, bei dem von einem vorzugsweise unteren bis zur -Baugrenze vorgetriebenen Gewinnungsort der zwischen zwei Gewinnungsörter anstehende Kohlenpfeiler im Rückbau sche.ibenweise hereingewonnen wird, wobei mit Hilfe eines aus einer oder mehreren Düsen austretenden Hochdruckwasserstrahles ein-die Scheibe hinterschneidender Anbruch ausgespritzt und die-Scheibe nachfolgend wenigstens teilweise ebenfalls hydromechanisch hereingewonnen wird , d a d u r c h g e k e n n -z e i c h n e t , daß beim hydromechanischen Angriff die Düsen (44; 57, 58; 62, 63) entsprechend dem Fortschritt der Hereingewinnung dem Angriffspunkt nachgeführt werden."Process and device for hydromechanical extraction in underground operations, in particular of hard coal in broken soles piers "claims 1. Method for hydromechanical extraction in underground operations, especially of hard coal in partial base pier fracture construction, in which from a preferably lower to the building limit driven extraction site the coal piers between two extraction sites in dismantling is gained in slices, with the help of one from one or several nozzles exiting high-pressure water jet undercutting the window Partially injected and the disk subsequently at least partially as well is gained hydromechanically, which is not shown that during the hydromechanical attack the nozzles (44; 57, 58; 62, 63) accordingly the progress of winning the point of attack can be tracked. 2. Verfahren nach Anspruch 1 , d a d u r c h g e k e n nz e i c h n e t , daß der Einbruch bis zum Durchschlag mit einer anderen Gewinnungsort vorgetrieben und danach der noch stehende Teil der Scheibe abgebaut wird. 2. The method according to claim 1, d a d u r c h g e k e n nz e i c h n e t that the burglary advanced to the point of breakthrough with another extraction site and then the part of the pane that is still standing is dismantled. 3. Verfahren nach einem der Ansprüche 1 oder 2 , d a d u r c h g e k e n n z e i c h n e t , daß der Einbruch so vorgetrieben wird, daß der Stoß der Scheibe steil bis schräg in Richtung auf das andere Gewinnungsort zurückgeneigt ist. 3. The method according to any one of claims 1 or 2, d a d u r c h g It is not shown that the break-in is driven forward in such a way that the shock the disc tilted back steeply to obliquely in the direction of the other extraction site is. 4. Verfahren nach einem der Ansprüche 1 bis 3 , d a d u r c h g e k e n n z e i c h n e t , daß bei diagonal verlaufenden Störungen der Einbruch längs der Störung bzw. parallel zur Störungsrichtung vorgetrieben wird.4. The method according to any one of claims 1 to 3, d a d u r c h g e it is not indicated that the break-in lengthways in the case of diagonal disturbances the disturbance or is driven in parallel to the direction of the disturbance. 5. Verfahren nach einem der Ansprüche 1 bis 4 , d a d u r c h g e k e n n z e i c h n e t , daß bei der Herstellung des Einbruches ein Hauptwasserstrahl in einer oder mehreren Ebenen geschwenkt wird. 5. The method according to any one of claims 1 to 4, d a d u r c h g e It is not stated that a main jet of water was used in the creation of the break-in is swiveled in one or more planes. 6. Verfahren nach einem der Ansprüche 1 bis 5 , d a d u r c h g e ke n n z e i c h n e t , daß der hydromechanische Angriff mit mehreren Wasserstrahlen gleichzeitig erfolgt, die unabhängig voneinander schwenkbar sind.6. The method according to any one of claims 1 to 5, d a d u r c h g e do not indicate that the hydromechanical attack with multiple water jets takes place simultaneously, which can be pivoted independently of each other. 7. Vorrichtung zur Durchführung des Verfahrens nach einem der Ansprüche 1 bis 6 mit wenigstens einem Wasserwerfer, der eine vorzugsweise abstempelbare Konsole und ein Strahlrohr aufweist, das einen Anschluß an eine Hochdruckwasserleitung, einen vorzugsweise hydraulisch beaufschlagte Zylinder aufweisenden Antrieb und einen Düsenkopf zur Strahlerzeugung aufweist , d a d u r c h g e k e n n z e i c h n e t daß das Strahlrohr aus einem Rdirgestänqe (18, 21) und ein Teil seines Antriebes aus einer Vorschubeinrichtung (15) und jeweils bezogen auf die Achse des RohrgestSnges (18, 21) da: andere Teil aus einer Drehvorrichtung (42, 43) besteht 7. Device for performing the method according to one of the claims 1 to 6 with at least one water cannon, which is a preferably stampable console and has a jet pipe which is connected to a high pressure water line, a preferably hydraulically acted upon cylinder having a drive and a Has nozzle head for jet generation, d u r c h e k e n n n z e i c h n e t that the jet pipe from a Rdirgestänqe (18, 21) and a part its drive from a feed device (15) and each based on the Axis of the tubular string (18, 21) there: other part from a rotating device (42, 43) exists 8. Vorrichtung nach Anspruch 7 , d ad u r c h g e -k e n n z e i c h n e t , daß der Düsenkopf eine Hauptdüse (44) mit einer mit der Achse des Rohrgestänges ausfluchtbaren Längsachse und Hilfsdüsen (57, 58; 62 62, aufweist, deren Achsen entgegen der Vorschubrichtung des Gestänges nach rückwärts gerichtet sind und mit der Gestängeachse einen spitzen Winkel einschließen.8. Apparatus according to claim 7, d ad u r c h g e -k e n n z e i c h n e t that the nozzle head has a main nozzle (44) with one with the axis of the pipe rod alignable longitudinal axis and auxiliary nozzles (57, 58; 62 62, whose axes are directed backwards against the direction of advance of the rod and with Include an acute angle with the rod axis. 9. Vorrichtung nach einem der Ansprüche 7 oder 8 , d a d u r ch g e k e n n z e i c h n e t, daß die Hauptdüse (44) einen Schwenkantrieb (47-50) mit einem als Schubkolbengetriebe (48, 49) ausgebildeten Motor, dem ein Steuerleitüngspaar (38, 39)'im Rohrgestänge (18, 20, 23) zugeordnet ist, aufweist, und daß die Hilfsdüsen (57, 58; 62, 63) um den Umfang des Düsenkopfes angeordnet und mit einem gemeinsamen Absperrorgan (64) über einen als Schubkolbengetriebe ausgebildeten Stellmotor (66, 67) zu- und abschaltbar sind. 9. Device according to one of claims 7 or 8, d a d u r ch g It is not noted that the main nozzle (44) has a rotary actuator (47-50) a motor designed as a thrust piston gear (48, 49) to which a pair of control lines (38, 39) 'in the pipe rod (18, 20, 23) is assigned, and that the auxiliary nozzles (57, 58; 62, 63) arranged around the circumference of the nozzle head and with a common Shut-off device (64) via a servomotor (66, 67) can be switched on and off. 10. Vorrichtung nach einem der Ansprüche 7 bis 9 , d a d u r c h g e k e n n z e i c hn e t , daß die Hauptdüse (44) in einer Schwenkplatte (46) ausgebildet und über ein Rohrgelenk (45) an die Druckwasserleitung angeschlossen ist, und daß die Schwenkplatte (46) in einer Führung (53) des abgerundeten Düsenkopfes geführt st.10. Device according to one of claims 7 to 9, d a d u r c h g It is evident that the main nozzle (44) is formed in a swivel plate (46) and is connected to the pressure water line via a pipe joint (45), and that the swivel plate (46) is guided in a guide (53) of the rounded nozzle head st. 11. Vorrichtung nach einem der Ansprüche 7 bis 10 , d a -d u r c- h g e k e n n z e i c h n e t , daß die Hilfsdüsen (57, 58; 62, 63) fest eingestellt sind.11. Device according to one of claims 7 to 10, d a -d u r c- it is noted that the auxiliary nozzles (57, 58; 62, 63) are permanently set are. 12. Vorrichtung nach einem der Ansprüche 7 bis 11 , d a -d u r c h g e k e n n z e i c h n e t , dauer Düsen kopf ein konisches Unterteil (68) und eine abgerundete Kappe (52) aufweist, in dem die Schwenkplatte (46) geführt ist, während der konische Teil (68) Druckleitungen (69, 70) für die Hochdruckwasserversorgung der Hauptdüse (44) und der Hilfsdüsen (57, 58; 62, 63)aufweist.12. Device according to one of claims 7 to 11, d a -d u r c h not shown, permanent nozzle head a conical lower part (68) and has a rounded cap (52) in which the pivot plate (46) is guided, while the conical part (68) pressure lines (69, 70) for the high pressure water supply the main nozzle (44) and the auxiliary nozzles (57, 58; 62, 63).
DE19803003685 1980-02-01 1980-02-01 Mine coal seam hydromechanical extraction - involves jet nozzles following up point of attack as extraction progresses Withdrawn DE3003685A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19803003685 DE3003685A1 (en) 1980-02-01 1980-02-01 Mine coal seam hydromechanical extraction - involves jet nozzles following up point of attack as extraction progresses

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19803003685 DE3003685A1 (en) 1980-02-01 1980-02-01 Mine coal seam hydromechanical extraction - involves jet nozzles following up point of attack as extraction progresses

Publications (1)

Publication Number Publication Date
DE3003685A1 true DE3003685A1 (en) 1981-08-06

Family

ID=6093507

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19803003685 Withdrawn DE3003685A1 (en) 1980-02-01 1980-02-01 Mine coal seam hydromechanical extraction - involves jet nozzles following up point of attack as extraction progresses

Country Status (1)

Country Link
DE (1) DE3003685A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111550245A (en) * 2020-04-30 2020-08-18 中煤科工集团唐山研究院有限公司 Hydraulic mechanical coal mining method for steep coal seam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111550245A (en) * 2020-04-30 2020-08-18 中煤科工集团唐山研究院有限公司 Hydraulic mechanical coal mining method for steep coal seam

Similar Documents

Publication Publication Date Title
DE2930136A1 (en) ROAD DRIVING MACHINE FOR UNDERGROUND CONSTRUCTION
DE3419517C2 (en) Process for underground installation of pipelines and device for carrying out the process
DE3529643A1 (en) TRACK DRIVE OR EXTRACTION MACHINE
EP0548588B1 (en) Device for making boreholes in the ground
DE4328863C2 (en) Mining facility for underground mining
DE2737330C2 (en) Process for driving and expanding a tunnel and drilling equipment for carrying out the process
DE2621674B2 (en) Process and device for driving and upgrading an underground route as well as upgrading the route to carry out the process
DE3529644A1 (en) DEVICE FOR SEALING A SECTION OF A SECTION OPEN FROM A BREWING MACHINE
DE3620026C2 (en)
DE3108877A1 (en) Method of producing bolted supports as well as apparatus for carrying out this method
DE2307413B1 (en) .Device for the hydromechanical extraction of a floe-like storage facility divided into pillars by a system of lines
DE4109871A1 (en) PIPE PRESSING DEVICE AND PIPE PRESSING METHOD FOR LAYING PIPELINES WITH A NON-ACCESSIBLE INTERNAL DIAMETER IN THE GROUND FLOOR
DE2909918C3 (en) Device for driving and expanding an underground route
EP0189158B1 (en) Process and apparatus for sealing off refuse tips and contaminated areas
DE3003685A1 (en) Mine coal seam hydromechanical extraction - involves jet nozzles following up point of attack as extraction progresses
EP2500514A2 (en) Method and device for expansion work during tunnel construction
DE4006320C1 (en) Straight line tunnel borer - has guide tube to which casing is connected with load-out conveyor
DE3410121A1 (en) Selective-cut heading machine with central and outer drum
EP0542942B1 (en) Driving shield with hydraulically supported facing, and a device for providing temporary mechanical support
DE3009923A1 (en) METHOD AND DEVICE FOR DISASSEMBLING THE PILLARS IN CHAMBER PILLAR CONSTRUCTION
DE2805362A1 (en) Advancing shield tunnelling machine - has frame inside shield supporting cutting tools at front and cladding material erector at rear
DE3232906C2 (en)
DE3003686A1 (en) Coal mine hydromechanical cavity excavation - involves forwarding nozzles for transverse water jets, and widening from inside
AT502468B1 (en) METHOD AND DEVICE FOR DISMANTLING UNDERLYING STORAGE SITES
DE3128278A1 (en) Excavating apparatus, in particular for driving tunnels with large, non-circular cross-sections

Legal Events

Date Code Title Description
8140 Disposal/non-payment of the annual fee for main application