DE2821561C2 - Device for pre-stressing closed pit support frames to be embedded in shotcrete - Google Patents

Device for pre-stressing closed pit support frames to be embedded in shotcrete

Info

Publication number
DE2821561C2
DE2821561C2 DE2821561A DE2821561A DE2821561C2 DE 2821561 C2 DE2821561 C2 DE 2821561C2 DE 2821561 A DE2821561 A DE 2821561A DE 2821561 A DE2821561 A DE 2821561A DE 2821561 C2 DE2821561 C2 DE 2821561C2
Authority
DE
Germany
Prior art keywords
frame
segments
clamping
segment
extension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE2821561A
Other languages
German (de)
Other versions
DE2821561A1 (en
Inventor
Csaba Dr. Budapest Asszonyi
Istvan Sarisap Klausz
Istvan Dorog Kmety
Nandor Dr. Meitzen
Rezsö Budapest Pasztor
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MAGYAR SZENBANYASZATI TROESZT TATABANYA HU
Magyar Szenbanyaszati Troszt
Original Assignee
MAGYAR SZENBANYASZATI TROESZT TATABANYA HU
Magyar Szenbanyaszati Troszt
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MAGYAR SZENBANYASZATI TROESZT TATABANYA HU, Magyar Szenbanyaszati Troszt filed Critical MAGYAR SZENBANYASZATI TROESZT TATABANYA HU
Publication of DE2821561A1 publication Critical patent/DE2821561A1/en
Application granted granted Critical
Publication of DE2821561C2 publication Critical patent/DE2821561C2/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/0636Three-dimensional reinforcing mats composed of reinforcing elements laying in two or more parallel planes and connected by separate reinforcing parts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F27/00Making wire network, i.e. wire nets
    • B21F27/12Making special types or portions of network by methods or means specially adapted therefor
    • B21F27/128Making special types or portions of network by methods or means specially adapted therefor of three-dimensional form by connecting wire networks, e.g. by projecting wires through an insulating layer
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F27/00Making wire network, i.e. wire nets
    • B21F27/12Making special types or portions of network by methods or means specially adapted therefor
    • B21F27/20Making special types or portions of network by methods or means specially adapted therefor of plaster-carrying network
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Sewage (AREA)
  • Piles And Underground Anchors (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Description

Die Erfindung betrifft eine Einrichtung zum Vorspannen von geschlossenen, in Spritzbeton einzubetonierenden Grubenausbaurahmen, mit einem auf die Bogensegmente des Ausbaurahmens zu dessen allseitig radialen Vorspannung über Spannelemente einwirkenden Hydraulikmechanismus. The invention relates to a device for prestressing closed, to be embedded in shotcrete Pit support frame, with one on the arc segments of the support frame to its radial on all sides Pre-tensioning by hydraulic mechanism acting on tensioning elements.

Es ist bekannt (DE-AS 11 43 468), das Aufblättern der einen Streckenhohlraum umgebenden Gesteinsschichten von vorneherein dadurch zu vermeiden, daß die Segmente der Ausbaurahmen gegeneinander und gegen das Gebirge mit einem Druck von derartige Höhe vorgespannt werden, daß das abgestützte Gestein im wesentlichen in seinem selbsttragenden Verband verbleibt. Diese Vorspannung wird anschließend durch Verspannen oder Abstützen der Bogensegmente des Ausbaurahmen fixiert.It is known (DE-AS 11 43 468), the scrolling of the to avoid rock strata surrounding a route cavity from the outset by the fact that the Segments of the expansion frame against each other and against the mountains with a pressure of such a height be that the supported rock remains essentially in its self-supporting association. This preload is then achieved by bracing or supporting the arch segments of the extension frame fixed.

Bei einer bekannten Vorspannrichtung für das Vorspannen von Ausbaurahmen beim Auffahren eines Tunnels im Schildvortriebsverfahren (US-PS 40 10 616) ist ein an der Innenseite des Ausbaurahmens angreifender Spannrahmen äüs gelenkig miteinander verbundenen Segmenten vorgesehen, die mittels im wesentlichen tangential zum Ausbaurahmen ausgerichteten Hydraulikdruckzylindern auseinanderdrückbar sind, so daß dadurch das Firstbogensegment des Ausbaurahmens von dessen an den Seitenwänden und der Sohle des Tunnel· hohlraums anliegenden Bogensegment abgerückt und in dieser Lage gegen das Bogensegment verkeilt werden kann. Nach einem anderen bekannten Verschlag (DE-AS 12 83 778) werden die Enden der Segmente des Ausbaurahmens mittels das Gelenk zwischen einander benachbarten Segmenten überbrückenden Hydraulikdruckzylindern tangential auseinandergerückt und in dieser Lage gegeneinander verriegelt Mit diesen bekannten Vorspannvorrichtungen lassen sich die Ausbaurahmen zwar gegen das Gebirge verspannen, jedoch können mittels der im wesentlichen tangenthJ zum Ausbaurahmen wirkenden Druckzylinder keine so starken Kräfte in das Gebirge eingeleitet werden, daß dadurch den nach dem Ausbruch auftretenden Gebirgsverformungen ein wesentlicher elastischer Widerstand entgegengesetzt werden kann.With a known pretensioning direction for pretensioning of expansion frames when driving a tunnel using the shield driving method (US-PS 40 10 616) is a tensioning frame that acts on the inside of the extension frame and is articulated to one another Segments provided by means of hydraulic pressure cylinders aligned essentially tangentially to the extension frame can be pushed apart, so that thereby the ridge segment of the extension frame of its arched segment resting against the side walls and the sole of the tunnel cavity is withdrawn and can be wedged against the arch segment in this position. According to another well-known shack (DE-AS 12 83 778) the ends of the segments of the extension frame by means of the joint between each other hydraulic pressure cylinders bridging adjacent segments moved apart tangentially and locked against each other in this position With these known Pretensioning devices can be used to brace the support frames against the rock, but can by means of the essentially tangenthJ to the extension frame acting pressure cylinder no such strong forces are introduced into the mountains that thereby the rock deformation occurring after the eruption is opposed by a substantial elastic resistance can be.

Den Gebirgsverformungen nach dem Ausbruch kann nämlich durch einen Betonausbau mit einer Bewehrung aus einbetonierten Grubenausbaurahmen und zwischen diesen verlaufenden Gittermatten ein elastischer Widerstand entgegengesetzt werden, so daß dadurch auf den sich nach dem Ausbruch einstellenden neuen Spannungszustand im Gebirge eingewirkt werden kann, wenn dieser elastische Widerstand in vom Gebirgsdruck und den Gesteinseigenschaften abhängiger Größe durch entsprechend starkes Vorspannen der einzubetonierenden Ausbaurahmen von Anfang an unmittelbar nach dem Ausbruch und bereits während des Ausbauens erzeugt wird.The rock deformation after the eruption can namely by a concrete lining with reinforcement made of cast-in pit support frames and an elastic mesh mat running between these Resistance to be opposed, so that thereby adjusting itself after the outbreak new State of tension in the rock can be acted upon if this elastic resistance is in the rock pressure and the rock properties depending on the size by correspondingly strong prestressing of the concrete to be embedded Extension frame from the beginning immediately after the excavation and already during the extension is produced.

Mit anderen bekannten Vorspannvorrichtungen mit den eingangs erwähnten Merkmalen hingegen werden die Vorspannkräfte im wesentlichen radial zum Ausbaurahmen an mehreren Stellen in diesen eingeleitet, so daß größere Vorspannungen der Ausbaurahmen erzielt werden können. Bei der einen Vorspannvorrichtung dieser Art (DE-AS ! 1 93 457) werden mehrere polygonartig aneinandergesetzte Hydraulikdruckzyiinder verwendet, die zur Erzielung der radialen Vorspannungskräfte zusammenwirken, die über Längsträger, welche sich über mehrere Ausbaurahmen hin erstrecken, in die Ausbaurahmen eingeleitet werden. Bef der anderen Vorrichtung dieser Art (HU-PS 1 62 676) sind mehrere Druckrahmensegmente vorgesehen, die jeweils mittels mehreren an ihnen angelenkten Druckzylindern gegeneinander verspannt werden. Diese bekannten Vorspannvorrichtungen sind jedoch nicht ohne weiteres geeignet für das Vorspannen einzubetonierender Ausbaurahmen, wenn die radialen Vorspannkräfte auf den Ausbaurahmen bis nach dessen Einbetonieren und dem Festwerden des Betons eingeleitet bleiben sollen, so daß dieser bei dem Lösen dieser radialen Vorspannkräfte bereits tragfähig ist und seinerseits zur Erzeugung des den Gebirgsverformungen entgegenwirkenden elastischen Widerstandes beitragen kann.With other known pretensioning devices with the features mentioned at the beginning, however, the pretensioning forces are introduced into the extension frame at several points essentially radially to the extension frame, so that greater pretensioning of the extension frame can be achieved. In the one pretensioning device of this type (DE-AS! 1 93 457), several hydraulic pressure cylinders are used, which are placed next to one another in a polygonal manner and which work together to achieve the radial pretensioning forces which are introduced into the extension frames via longitudinal members which extend over several extension frames. Be f the other device of this type (HU-PS 1 62 676) several printing frame segments are provided, which are each braced against each other by means of several printing cylinders hinged to them. However, these known prestressing devices are not readily suitable for prestressing construction frames to be embedded in concrete if the radial prestressing forces are to remain applied to the construction frame until after it has been concreted in and the concrete has solidified, so that it is already stable when these radial prestressing forces are released and, in turn, for Generation of the rock deformation counteracting elastic resistance can contribute.

Durch die Erfindung wird die Aufgabe gelöst, eine Einrichtung zum Vorspannen von geschlossenen, in Spritzbeton einzubetonierenden Grubenausbaurahmen derart zu gestalten, daß den Gebirgsverformungen von Anfang an, d. i. unmittelbar nach dem Ausbruch, ein elastischer Widerstand entgegengesetzt werden kann und dieser elastische Vorspannungszustand des Ausbaurahmens bis nach seinem Einbetonieren und dem Festwerden des Spriczbetons beibehalten wird, obwohl der Hydraulikmechanismus nach dem Vorspannen des Ausbaurahmens für das Aufbringen des Spritzbetons abgebaut wird.The invention solves the problem of providing a device for prestressing closed, in To design shotcrete to be concreted pit support frame in such a way that the rock deformations of Start at, d. i. Immediately after the outbreak, an elastic resistance can be opposed and this elastic pre-tensioning state of the support frame until after it has been set in concrete and solidified of the spray concrete is retained, although the hydraulic mechanism after prestressing the support frame for the application of the shotcrete is dismantled.

Dies wird gemäß der Erfindung bei einer Einrichtung der eingangs erwähnten Art dadurch erreicht, daß sie einen inneren, aus gelenkig miteinander verbundenen Segmenten bestehenden Spannrahmen aufweist, derThis is achieved according to the invention in a device of the type mentioned in that it an inner tensioning frame consisting of articulated segments which

zum Angriff an dem Ausbaurahmen mit radial zum Umfang des Ausbaurahmens verlaufenden Druckstreben ausgerüstet ist, daß die Spannelemente aus mit dem Hydraulikmechanismus verbundenen, lösbar an dem Spannrahmen angreifenden Halterungen bestehen und daß der Spannrahmen Mittel aufweist, mit denen seine Segmente im vorgespannten Zustand des Rahmens gegeneinander mechanisch verriegelbar sind.to attack the extension frame with struts extending radially to the circumference of the extension frame is equipped that the clamping elements connected to the hydraulic mechanism, releasable on the There are brackets attacking the clamping frame and that the clamping frame has means with which its Segments can be mechanically locked against one another in the prestressed state of the frame.

Aufgrund der Erfindung kann daher durch die radial an mehreren Stellen über die Druckstreben in den Grubenausbaurahmen eingeleiteten Vorspannungskräfte auch bei einzubetonierenden Grubenausbaurahmen bereits während des Ausbauens auf den sich nach dem Ausbruch einstellenden neuen Spannungszustand im Gebirge aktiv eingewirkt werden. Gleichwohl kann der Hydraulikmechanismus nach der gegenseitigen Verriegelung der vorgespannten Segmente des Spannrahmens bereits vor dem Aufbringen des Spritzbetons von dem Spannrahmen abgebaut werden, so daß das Betonieren nicht behindert wird und während dessen der Hydraulikmechanismus bereits beim nächstfolgenden Ausbaurahmen eingesetzt werden kann, wodurch der gesamte Ausbau dem Ausbruch zügig folgen kann.Due to the invention, therefore, by the radial at several points over the struts in the pit support frame introduced prestressing forces even with pit support frames to be set in concrete during expansion to the new state of tension in the after the eruption Mountains are actively influenced. Nevertheless, the hydraulic mechanism can after the mutual locking of the pre-stressed segments of the tenter frame before the shotcrete is applied the clamping frame are dismantled so that the concreting is not hindered and during which the hydraulic mechanism can already be used in the next expansion frame, whereby the entire Expansion can quickly follow the outbreak.

Die Druckstreben, über welche der Spannrahmen an dem Ausbaurahmen radial angreift, sind etwas länger als die Dicke der Betonschicht, in die der Ausbaurahmen einbetoniert wird, so daß der Spannrahmen außerhalb der Betonschicht verbleibt und nach dem Festwerden des Betons zur Wiederverwendung abgebaut werden kann.The struts, via which the tensioning frame engages the extension frame radially, are somewhat longer than the thickness of the concrete layer into which the support frame is concreted, so that the tenter frame outside remains of the concrete layer and can be dismantled for reuse after the concrete has set can.

Vorzugsweise besteht der Spannrahmen ads einem Firstsegment, zwei Seitensegmenten und einem Sohlensegment, wobei die an den Seitensegmenten und dem Sohlensegment angreifenden Halterungen über ein Hebelgetriebe mit einem Spannbalken gekuppelt sind, an welchem ein Hydraulikdruckzylinder mit seinem einen Ende angelenkt ist, der mit seinem anderen Ende an der am Firstsegment angreifenden Halterung angelenkt ist und diese über den Spannbalken gemeinsam mit den an den Seitensegmenten und dem Sohlensegment angreifenden Halterungen antreibtThe clamping frame is preferably made up of a Ridge segment, two side segments and a sole segment, with those on the side segments and the Brackets engaging the sole segment are coupled to a clamping beam via a lever mechanism, to which a hydraulic pressure cylinder is articulated with one end and that with its other end is hinged to the bracket acting on the ridge segment and this joint via the clamping beam drives with the brackets engaging the side segments and the sole segment

Im folgenden wird die Erfindung anhand des in der Zeichnung dargestellten Ausführungsbeispiels näher erläutert. In der Zeichnung zeigtIn the following, the invention will be described in greater detail using the exemplary embodiment shown in the drawing explained. In the drawing shows

Fig. 1 Eine Ansicht einer erfindungsgemäßen Einrichtung zum Vorspannen einzubetonierender Grubenausbaurahmen undFig. 1 is a view of a device according to the invention Pit support frames to be embedded in concrete for prestressing and

F i g. 2 Teile der Vorspanneinrichtung aus F i g. 1 nach dem Betonieren.F i g. 2 parts of the pretensioning device from FIG. 1 after concreting.

F i g. 1 zeigt eine Vorspanneinrichtung für einen einzubetonierenden geschlossenen Grubenausbaurahmen 1, der kreisbogenförmig ist und über radiale Druckstreben 2 an einem inneren Spannrahmen aus gelenkig miteinander verbundenen Segmenten 3, 4, 5 abgestützt ist, der zum allseitig radialen Vorspannen des Ausbaurahmens 1 mittels eines Hydraulikmechanismus 6 gespannt wird.F i g. 1 shows a prestressing device for one to be set in concrete closed pit support frame 1, which is circular and has radial struts 2 is supported on an inner clamping frame made of articulated segments 3, 4, 5, which is tensioned by means of a hydraulic mechanism 6 in order to pretension the expansion frame 1 radially on all sides will.

Der Spannrahmen besteht aus einem Firstsegment 5, zwei Seitensegmenten 4 und einem Sohlensegment 3. Der Hydraulikmechanismus 6 weist eine an dem Firstsegment 5 angreifende obere Halterung 7 auf, weiche auf einer Vorpfändeinrichtung 17 aufliegt und an welcher ein Hydraulikdruckzylinder 10 mit seinem oberen Ende angelenkt ist Das untere Ende des Druckzylinders 10 ist über ein Gelenk an einem quer verlaufenden Spannbalken 11 abgestützt, der seinerseits über Gelenke 12 an Winkelhebel 13 angeschlossen ist An den Winkelhebeln 13 ist ein weiteres Gelenk angeordnet, über welches von dem zugeordneten Winkelhebel 13 horizontal wirkende Kräfte auf den Seitensegmenten 4 des Spannrahmens zugeordnete seitliche Halterungen 18, und von diesen auf die Seitensegmente 4 übertragen werden. Der Hydraulikmechanimus 6 wird von einem Gestell 14 zusammengehalten, an dem an dem Sohlensegment 3 angreifende untere Halterungen 9 abgestützt sind. Die Halterungen 8 und 9 sind an dem Hydraulikmechanismus lösbar befestigt, so daß sie zur Anpassung an die jeweilige Form des Spannrahmens auswechselbar sind.The clamping frame consists of a ridge segment 5, two side segments 4 and a sole segment 3. The hydraulic mechanism 6 has an upper holder 7 which engages on the ridge segment 5 and is soft rests on a pre-pledging device 17 and on which a hydraulic pressure cylinder 10 with its upper The lower end of the printing cylinder 10 is hinged to a transverse end Clamping beam 11 supported, which in turn is connected to angle lever 13 via joints 12 on the angle levers 13 a further joint is arranged, via which of the associated angle lever 13 horizontally forces acting on the side segments 4 of the clamping frame associated side brackets 18, and are transferred from these to the side segments 4. The hydraulic mechanism 6 is of a Frame 14 held together, on which lower brackets 9 engaging the sole segment 3 are supported are. The brackets 8 and 9 are releasably attached to the hydraulic mechanism so that they can be used for adjustment are interchangeable with the respective shape of the clamping frame.

Die Bogensegmente des Ausbacshmens 1 sind über Laschen 18 und Spannglieder 19 miteinjjider verbunden, die zur Verriegelung des Vorspannungszustandes des Ausbaurahmens 1 in der tangentialen Richtung wirksam sind. Die Segmente 3 bis 5 des Spannrahmens werden im vorgespannten Zustand desselben mittels eines Keiles 15 gegeneinander verriegelt Der Keil 15 wird in eine Führung aus an den Spannrahmensegmenten 3 bis 5 fest angeordneten Führungsteilen bzw. an einem Bügel 16 einstellbar ausgebildeten Führungsteilen eingespannt Die Fixierung des Vorspannungszustandes kann auch durch geeignete andere Bauelemente vorgenommen werden. Wesentlich ist, daß der eingespannte Zustand auch nach dem Abbauen des Hydraulikmechanismus 6 aufrechterhalten bleibtThe arc segments of the prop 1 are over Lugs 18 and tendons 19 connected to each other, effective for locking the pretensioned state of the support frame 1 in the tangential direction are. The segments 3 to 5 of the clamping frame are in the prestressed state of the same by means of a wedge 15 locked against each other. The wedge 15 is fixed in a guide on the clamping frame segments 3 to 5 arranged guide parts or clamped on a bracket 16 adjustable guide parts The pre-tensioning state can also be fixed by means of other suitable components will. It is essential that the clamped condition also after the hydraulic mechanism 6 has been dismantled is maintained

Für die Firstverankerung durch Gesteinsschrauben ist aus F i g. 1 außerdem eine Bohrlafette 20 zur Ausbildung der Bohrungen für die Gesteinsschrauben ersichtlich, die an eine Bohrstütze 23 montiert ist, die auf eine beliebige Lage eingestellt werden kann und durch eine Gelenkverbindung 21 an das Gestellt 14 des Hydraulikmechanismus 6 angeschlossen istFor ridge anchoring using rock screws, FIG. 1 also a drill carriage 20 for training of the holes for the rock screws can be seen, which is mounted on a drill support 23, which is on any Position can be adjusted and through an articulated connection 21 to the frame 14 of the hydraulic mechanism 6 is connected

In der linken Hälfte der F i g. 2 ist der Zustand dargestellt, bei welchem der innere Spannrahmen <nis F i g. 1 noch eingespannt ist, während der Hydraulikmechanismus abmontiert ist, wonach die Spritzbeton-Ausbauwand 22 hergestellt wird, in welche der vorgespannte Ausbaurahmen 1 und die Druckstreben 2 einbetoniert werden. Die Länge der Druckstreben 2 muß derart gewählt werden, daß sie etwas größer ist die Dicke der Ausbauwand 22 ist In der rechten Hälfte der F i g. 2 ist der fertige Streckenausbauabschnitt dargestellt Hier :st auch der Spannrahmen abmontiert und die aus der Ausbnuw ii:d 22 ragenden Enden der Druckstreben 2 sind abgeschnitten. Es ist jedoch auch möglich, die herausragenden Druckstreoenenden z. B. für Aüfhängungszwecke zu verwenden.In the left half of FIG. 2 shows the state in which the inner clamping frame <nis F i g. 1 is still clamped, while the hydraulic mechanism is dismantled, after which the shotcrete lining wall 22 is produced, in which the prestressed supporting frame 1 and the struts 2 are concreted. The length of the struts 2 must be chosen so that it is slightly larger, the thickness of the extension wall 22 is in the right half of the F i g. 2 shows the finished route extension section. Here : the tensioning frame is also removed and the ends of the struts 2 protruding from the extension 22 are cut off. However, it is also possible to use the outstanding Druckstreoenenden z. B. to use for suspension purposes.

Hierzu 2 Blatt ZeichnungenFor this purpose 2 sheets of drawings

Claims (1)

Patentansprüche:Patent claims: 1. Einrichtung zum Vorspannen von geschlossenen, in Spritzbeton einzubetonierenden Grubenausbaurahmen, mit einem auf die Bogensegmente des Ausbaurahmens zu dessen allseitig radialen Vorspannung über Spannelemente einwirkenden Hydraulikmechanismus, dadurch gekennzeichnet, daß sie einen inneren, aus gelenkig miteinander verbundenen Segmenten (3—5) bestehenden Spannrahmen aufweist, der zum Angriff an dem Ausbaurahmen (1) mit radial zum Umfang des Ausbaurahmens (1) verlaufenden Druckstreben (2) ausgerüstet ist, daß die Spannelemente aus mit dem Hydraulikmechanismus (6) verbundenen, lösbar an dem Spannrahmen angreifenden Halterungen (7—9) bestehen und daß der Spannrahmen Mittel (15, 16) aufweist, mit denen seine Segmente (3—5) im vorgespannten Zustand des Rahmens gegeneinander mechanisch verriegelbar sind.1. Device for pre-tensioning closed, Pit support frame to be concreted in shotcrete, with one on the arched segments of the Extension frame to its all-round radial pretensioning via clamping elements acting hydraulic mechanism, characterized, that they have an inner one, consisting of articulated segments (3–5) Has clamping frame, which is to attack the extension frame (1) with radially to the circumference of the extension frame (1) running struts (2) is equipped that the clamping elements from with the hydraulic mechanism (6) connected, releasably engaging brackets (7-9) on the clamping frame and that the clamping frame means (15, 16), with which its segments (3-5) in the prestressed state of the frame against each other are mechanically lockable. Z Einrichtung nach Anspruch 1, dadurch gekennzeichnet, daß der Spannrahmen aus einem Firstsegment (5), zwei Seitensegmenten (4) und einem Sohlensegment (3) besteht und die an den Seitensegmenten (4) und dem Sohlensegment (3) angreifenden Halterungen (8,9) über ein Hebelgetriebe mit einem Spannbalken (11) gekuppelt sind, an welchem ein Hydraulikdruckzylinder (10) mit seinem einen Ende angelenkt ist, der mit seinem anderen Ende an der am Firstsegment (5) angreifenden Halterung (7) angelenkt ist und diese über &-,n Spannbalken (U) gemeinsam mit den an den Seitensegmenten (4) und dem Sohlensegment (3) angs fenden Halterungen (8,9) antreibt Z device according to claim 1, characterized in that the clamping frame consists of a ridge segment (5), two side segments (4) and a sole segment (3) and the brackets (8) engaging the side segments (4) and the sole segment (3) 9) are coupled via a lever mechanism to a clamping beam (11), to which a hydraulic pressure cylinder (10) is hinged at its one end, the other end of which is hinged to the bracket (7) engaging the ridge segment (5) and this over & -, n clamping beam (U) drives together with the brackets (8,9) angs on the side segments (4) and the sole segment (3)
DE2821561A 1977-05-17 1978-05-17 Device for pre-stressing closed pit support frames to be embedded in shotcrete Expired DE2821561C2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
HUMA002875 1977-05-17
GB19200/78A GB1597804A (en) 1977-05-17 1978-05-12 Process and apparatus for supporting underground cavities

Publications (2)

Publication Number Publication Date
DE2821561A1 DE2821561A1 (en) 1978-11-30
DE2821561C2 true DE2821561C2 (en) 1983-11-17

Family

ID=57485257

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2821561A Expired DE2821561C2 (en) 1977-05-17 1978-05-17 Device for pre-stressing closed pit support frames to be embedded in shotcrete

Country Status (11)

Country Link
JP (1) JPS549103A (en)
AT (1) AT374248B (en)
CA (1) CA1112884A (en)
DE (1) DE2821561C2 (en)
ES (1) ES469923A1 (en)
FR (1) FR2391353A1 (en)
GB (1) GB1597804A (en)
IT (1) IT1158716B (en)
NL (1) NL7805304A (en)
NO (1) NO781690L (en)
SE (1) SE8303498D0 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0226529Y2 (en) * 1980-11-01 1990-07-19
JPS57185385U (en) * 1981-05-20 1982-11-25
JPS5757889U (en) * 1981-08-24 1982-04-05
DE3137170C1 (en) * 1981-09-18 1983-04-07 Bilfinger + Berger Bauaktiengesellschaft, 6800 Mannheim Apparatus for applying sprayed material for securing and lining excavated areas in the construction of underground cavities
US4629362A (en) * 1984-06-07 1986-12-16 Ishikawajima-Harima Jukogyo Kabushiki Kaisha Shield tunneling machine
AT386653B (en) * 1984-11-30 1988-09-26 Sp Kt Bjuro Glavtonnelmetrostr TUNNEL CONSTRUCTION
FR2727465A1 (en) * 1994-11-24 1996-05-31 Mazurat Jean Claude PROCEDURE FOR MAKING A WALL OR A CONCRETE WALL COATING, AND APPARATUS FOR IMPLEMENTING THIS PROCESS
DE102015120562A1 (en) * 2015-11-26 2017-06-01 Bluestone Technology GmbH Apparatus and method for dispensing particles
CN109184751B (en) * 2018-11-16 2024-05-10 中铁隧道集团一处有限公司 Endoscopic type air-raid shelter monitoring device and monitoring method for tunnel lining vault
CN109709034B (en) * 2019-02-26 2024-02-09 西南交通大学 Minimum adhesion force measuring device and method for duct piece-track bed

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1080948B (en) * 1958-01-23 1960-05-05 Salzgitter Maschinen Ag Device for mechanical expansion of a route with route arches
DE1143468B (en) * 1958-07-09 1963-02-14 Bhs Bayerische Berg Method for pre-tensioning pit support frames
DE1093307B (en) * 1959-03-11 1960-11-24 Salzgitter Maschinen Ag Device for mechanical expansion of a route with route arches
DE1283778B (en) * 1959-10-09 1968-11-28 Bhs Bayerische Berg Device for pre-tensioning pit support frames
DE1176085B (en) * 1961-05-05 1964-08-20 Bwg Bergwerk Walzwerk Temporary expansion of the route
DE1193457B (en) * 1961-09-08 1965-05-26 Dipl Berging Kurt Heinz Voss Auxiliary device for tensioning newly set extension arches or rings in underground routes
DE1180704B (en) * 1962-08-22 1964-11-05 Bergbaustahl G M B H & Co Vorpfaend- and lifting device for the drifting
DE1193904B (en) * 1963-12-06 1965-06-03 Bhs Bayerische Berg Device for pre-tensioning pit support frames
GB1111715A (en) * 1964-09-18 1968-05-01 Coal Industry Patents Ltd Mine roof supports
DE2000278C3 (en) * 1970-01-05 1974-11-28 Ratzel Gerhard Dr Conveyor for concrete or the like.
DE2141727C3 (en) * 1971-08-20 1975-04-17 Bergwerksverband Gmbh, 4300 Essen System for supplying a concrete spraying machine with wet concrete
DE2166509A1 (en) * 1971-08-20 1974-07-11 Bergwerksverband Gmbh Concrete mixer dispensing plant - comprises cement screw conveyor and automatic liquid additive and water mixer-dispenser
DE2326686C2 (en) * 1973-05-25 1975-05-28 Bochumer Eisenhuette Heintzmann & Co, 4630 Bochum Setting and tensioning unit for the construction of pit sections or tunnels made of steel profile segments with an L-shaped cross-section
DE2360726C2 (en) * 1973-12-06 1975-08-14 Ruhrkohle Ag, 4300 Essen Multipurpose platform for drifting
US3978675A (en) * 1974-01-29 1976-09-07 Coal Industry (Patents) Limited Mine roof support equipment
DE2437669C3 (en) * 1974-08-05 1978-04-27 Gewerkschaft Eisenhuette Westfalia, 4670 Luenen Driving device for driving tunnels, galleries and routes
DE2514505C2 (en) * 1975-04-02 1983-12-22 Dorogi Szénbányák, Dorog Device for pre-tensioning track extension frames that can be assembled from segments
US4032905A (en) * 1975-09-18 1977-06-28 Rockwell International Corporation Bubble domain circuit organization
US4010616A (en) * 1975-09-23 1977-03-08 Richard Lovat Rib expander
AT340353B (en) 1975-10-14 1977-12-12 Voest Ag DEVICE FOR CONTINUOUS EXTENSION OF A ROUTE

Also Published As

Publication number Publication date
DE2821561A1 (en) 1978-11-30
SE8303498L (en) 1983-06-17
FR2391353B1 (en) 1983-07-08
SE8303498D0 (en) 1983-06-17
CA1112884A (en) 1981-11-24
IT7823518A0 (en) 1978-05-17
ATA353478A (en) 1983-08-15
ES469923A1 (en) 1979-09-16
NO781690L (en) 1978-11-20
IT1158716B (en) 1987-02-25
FR2391353A1 (en) 1978-12-15
GB1597804A (en) 1981-09-09
AT374248B (en) 1984-03-26
JPS549103A (en) 1979-01-23
NL7805304A (en) 1978-11-21

Similar Documents

Publication Publication Date Title
DE1255695B (en) Method and device for the construction of multi-span bridges or similar structures in sections
DE2821561C2 (en) Device for pre-stressing closed pit support frames to be embedded in shotcrete
EP0052292A1 (en) Process and device for advancing a slidable shuttering
DE2128023B2 (en) Migrating longwall construction with side-by-side support shields
DE647995C (en) Pit lining element
CH639726A5 (en) DEVICE FOR PRELOADING CLOSED PIT REMOVAL FRAMES TO BE CONCRETE IN SPRAY CONCRETE.
DE2621421C2 (en) Torque support for a propulsion shield
DE3336153C2 (en) Hollow body that can be filled with building material
DE955674C (en) Extension of the route with a chamber running through the route
DE2719376C2 (en) Additional device for the bracing device of a full-section tunneling machine driving up a circular cross-section
CH377300A (en) Auxiliary support for drifting, especially in underground mining
DE2555524C2 (en) Jacking knife for a shoring shield
DE3446679A1 (en) Method of driving and supporting a tunnel by means of a shield tunnelling machine
DE2429805C3 (en) Formwork equipment for the expansion of routes and tunnels
DE1112480B (en) Frame-like extension element for longwall construction
AT314587B (en) Device for carrying out a process for the underground production of in-situ concrete channels and tunnels of all kinds
DE340597C (en) Adjustable support of the formwork against tunnel scaffolding arches consisting of two parallel U or T irons
DE919522C (en) Ring expansion for shafts, in particular blind shafts, dies, etc. Like. And method for its preparation
DE2539149B2 (en) Shield wall for blow offset
DE1902971C (en) Formwork construction for the section have production of the lining of tunnels, tunnels, channels, shafts or the like
DE2552428C3 (en) Gradual expansion of the route with several teams arranged one behind the other
DE2209310A1 (en) DEVICE FOR COLLECTING THE TAPE OF A CONVEYOR BELT SYSTEM
DE2436807C3 (en) Preliminary route expansion
DE2240967A1 (en) METHOD AND DEVICE FOR CREATING ADAPS OR TUNNELS FROM PREFABRICATED CONCRETE PIPES
DE6445C (en) Falsework for fume hoods

Legal Events

Date Code Title Description
OD Request for examination
8125 Change of the main classification

Ipc: E21D 11/14

8126 Change of the secondary classification

Ipc: E21D 11/10

8181 Inventor (new situation)

Free format text: ASSZONYI, CSABA, DR., BUDAPEST, HU KLAUSZ, ISTVAN, SARISAP, HU KMETY, ISTVAN, DOROG, HU MEITZEN, NANDOR, DR. PASZTOR, REZSOE, BUDAPEST, HU

8172 Supplementary division/partition in:

Ref country code: DE

Ref document number: 2858131

Format of ref document f/p: P

Q171 Divided out to:

Ref country code: DE

Ref document number: 2858131

D2 Grant after examination
8364 No opposition during term of opposition
AH Division in

Ref country code: DE

Ref document number: 2858131

Format of ref document f/p: P

8339 Ceased/non-payment of the annual fee