DE2609930A1 - Coal plough haulage chain guide - has high elastic nonabrading rubbers on strips forming chain tracks and chain channel partition - Google Patents

Coal plough haulage chain guide - has high elastic nonabrading rubbers on strips forming chain tracks and chain channel partition

Info

Publication number
DE2609930A1
DE2609930A1 DE19762609930 DE2609930A DE2609930A1 DE 2609930 A1 DE2609930 A1 DE 2609930A1 DE 19762609930 DE19762609930 DE 19762609930 DE 2609930 A DE2609930 A DE 2609930A DE 2609930 A1 DE2609930 A1 DE 2609930A1
Authority
DE
Germany
Prior art keywords
chain
plow
bar
chain guide
channels
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19762609930
Other languages
German (de)
Other versions
DE2609930C2 (en
Inventor
Horst Ing Grad Eckey
Guenther Dipl Ing Dr Kluge
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RAG AG
Original Assignee
Ruhrkohle AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ruhrkohle AG filed Critical Ruhrkohle AG
Priority to DE19762609930 priority Critical patent/DE2609930C2/en
Publication of DE2609930A1 publication Critical patent/DE2609930A1/en
Application granted granted Critical
Publication of DE2609930C2 publication Critical patent/DE2609930C2/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C27/00Machines which completely free the mineral from the seam
    • E21C27/20Mineral freed by means not involving slitting
    • E21C27/32Mineral freed by means not involving slitting by adjustable or non-adjustable planing means with or without loading arrangements
    • E21C27/34Machine propelled along the working face by cable or chain
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C35/00Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/00 - E21C33/00, E21C37/00 or E21C39/00
    • E21C35/08Guiding the machine
    • E21C35/12Guiding the machine along a conveyor for the cut material

Abstract

Coal plough haulage chain guide screwed to the rear of the pans forming the conveyor line has two superimposed channels for the chain strands which have chain tracks, made or faced with sound damping material in the case of the upper strand track. The sound-damping track (20, 21) is equipped with non-abrading high elasticity and self-extinguishing rubber (27, 28) and supports the chain strand right along each of the several conveyor pans. The rubber parts extend between pans to gaps which interrupt the chain tracks. The tracks are mounted on strips (12) which limit the chain channels forming the guide arrangement. Pref. the strip (12) should form the partition between the chain channels, be rectangular in section and have a steel section inlay to carry the rubber clads (27, 28) on opposite sides and an extension along one rim for parts (13) of the chain guide system.

Description

"Hobelkettenführung für Gewinnungaanlagen des"Plow chain guide for extraction plants of the

Untertagebergbaus" Die Erfindung betrifft eine Hobelkettenführung für Gewinnungsanlagen des Untertagebetriebes, die an der Rückseite von Rinnen eines Fördermittels befestigt, beispielsweise angeschraubt ist und für die umlaufende Hobelkette zwei übereinander angeordnete KettelltanEle aufweist, in denen zur Unterstützirng der Ober- und der Unterkette Kettenlaufbahnen ausgebildet sind, von denen wenigstens die der Oberkette zugeordneten Kettenlaufbahnen aus schalldämmendem Werkstoff beetehen oder auf denen schalldämmender Werkstoff betestigt ist Während bei einigen Kohlenhobelanlagen des Steinkohlenbergbaus unter lage die Hobelkette an der Stirnseite des Strebfördermittels angeordnet ist und freiliegt, wird durch eine Hobelkettenführung die Kette an die flergeeite des Förderers verlegt und nach außen abgedeckt. An die umlaufende Hobelkette ist der Kohlenhobel über einen sogenannten Kettenkloben angeschlagen.Underground mining "The invention relates to a plow chain guide for extraction systems of the underground operation, which at the rear of channels one Conveyor attached, for example, is screwed and for the circumferential Plow chain has two KettelltanEle arranged one above the other, in which for support the upper and lower chain chain tracks are formed, of which at least the chain tracks assigned to the upper chain are made of sound-absorbing material or on which sound-absorbing material is attached While at Some coal plowing systems in the hard coal mining industry were subject to the plow chain the face of the face conveyor is arranged and exposed, is by a Plow chain guide moves the chain to the side of the conveyor and to the outside covered. The coal plow is attached to the revolving plow chain via a so-called Chain block struck.

In der Regel bildet die Unterkette das Lastrum, und die Oberkette läuft zurück.As a rule, the lower chain forms the load drum and the upper chain runs back.

Derartige Hobelkettenführungen sind an sich in zahlreichen Ausführungsformen bekannt. Besonders zweckmäßig ist eine bekannte Hobelkettenführung, welche aus zwei Leisten besteht, welche koaxial an der Rückseite jeder Förderrinne befestigt sind und Jeweils eine Hälfte Jedes Kettenkanales bilden, weil hierdurch eine symmetrische Anordnung entsteht, die nach eingetretenem Verschleiß gedreht und noch einmal benutzt werden kann. Bei dieser Hobelkettenführung ist die Kettenlaufbahn auf einer Fläche ausgebildet, welche die ihr zugeordnete Kette längs jeder Förderrinne durchgehend unterstützt und zwischen den Förderriunen durch Spalte unterbrochen ist. Die Spalte hat die Aufgabe, Kohlenklein und andere Verunreinigungen abfließen zu lassen, welche von der Hobelkette in die Führung eingezogen werden oder dorthin auf andere Weise gelangt sind.Such plow chain guides are in themselves in numerous embodiments known. A known plow chain guide, which consists of two There are strips which are attached coaxially to the rear of each conveyor trough and each form one half of each chain channel, because this makes it a symmetrical one Arrangement arises, which rotated after occurring wear and tear and used again can be. With this plow chain guide, the chain track is on a surface formed which the chain assigned to it continuously along each conveyor trough and is interrupted by gaps between the conveyor belts. The gap has the task of draining coal and other impurities, which be pulled into the guide by the plow chain or in some other way have arrived.

Aufgrund der Kraftverteilung in einer in sich t%2sahlossenen Hobelkette, bei der der Kohlenhobel an die Unterkette angeschlagen ist, wird die Unterkette mehr oder weniger straff gespannt und führt bei normalem Betrieb nur geringe Eigenbewegungen aus. Die Oberkette hat dagegen eine geringere Spannung und kann deswegen leichter in Schwingungen geraten. Von der Oberkette geht daher in der Regel eine größere Körperschallenergie aus.Due to the force distribution in a self-contained plow chain, at which the coal plane is attached to the lower chain, the lower chain becomes more or less taut and leads during normal operation only minor movements. The upper chain, on the other hand, has a lower tension and can therefore start to vibrate more easily. So goes from the upper chain usually emit greater structure-borne sound energy.

Bekanntlich bezeichnet man als Körperschall mechanische Schwingungen im hörbaren Frequenzbereich. Die Energie des Körperschalles ist in den Teilen eines schwingenden Körpers enthalten. Diese Schwingungen können Luftschall erzeugen. Die Schallabstrahlung muß vermindert werden, wenn der hierdurch bedingte Lärm herabgesetzt werden soll. In einer Hobelanlage verursacht der normale Betrieb einen Lärm, der bei den in der Nähe einer solchen Anlage Beschäftigten zu Gehörschäden führen kann. In der Hobelkettenführung entsteht der für den Lärm verantwortliche Körperschall einerseits durch den Einfluß der Diskontinuitätsstelle des Kettenlaufes, also z.B. durch das Aufschlagen der Oberkette auf die betreffende Kettenlaufbahn oder an den Übergangsstellen der Kettenkanäle zwischen den Förderrinnen. Andererseits entsteht das Schleifgeräusch, das durch die geringen Unebenheiten und Rauhigkeiten auf den gettenlaufbahnen bedingt ist. Beide Geräusche überlagern sich gegenseitig.It is well known that structure-borne noise is mechanical vibrations in the audible frequency range. The energy of the structure-borne sound is in the parts of a vibrating body included. These vibrations can generate airborne sound. the Sound radiation must be reduced if the resulting noise is reduced shall be. In a planing plant, normal operation causes a noise that can cause hearing damage to workers in the vicinity of such a system. The structure-borne noise responsible for the noise is generated in the plow chain guide on the one hand by the influence of the discontinuity point of the chain run, e.g. by hitting the upper chain on the relevant chain track or on the Transition points of the chain channels between the conveyor troughs. On the other hand arises the grinding noise caused by the slight bumps and roughness on the getten careers is conditional. Both noises are superimposed on each other.

Die eingangs bezeichnete Hobelkettenführung ist bereits bekannt (DBGM 1 936 054). Die Führung der Oberkette besteht aus mehreren garnrollenartigen Körpern, auf denen die Hobelkettenlaufbahn ausgebildet ist und zwischen denen die Oberkette nicht unterstutzt ist. Diese Körper sind zur Verschleißminderung und zur Lärmbekämpfung entweder aus einem für Bremsbeläge vorgesehenen Werkstoff hergestellt oder mit einem solchen Werkstoff belegt. Den gleichen Aufbau besitzen Zwischenstücke, welche benachbarte Rinnen überbrticken. Schließlich ist vorgesehen, aus diesem Werkstoff bestehende Streifen auf die Lauffläche des eingangs beschriebenen Kettenklobens in der Kettenführung zu kleben. Der Werkstoff selbst besteht aus einer Mischung von 3utadien-Acrylnitril-rolinerisat als Kautschukanteil und Phenol-Bormaldehyd-Novalac als Phenolharzanteil.The plow chain guide mentioned at the beginning is already known (DBGM 1 936 054). The leadership of the upper chain consists of several thread-roll-like bodies, on which the plow chain track is formed and between those the top chain is not supported. These bodies are designed to reduce wear and tear as well for noise abatement either made of a material intended for brake pads or coated with such a material. Intermediate pieces have the same structure, which bridge adjacent gutters. Finally, it is provided from this material existing strips on the tread of the chain block described above to stick in the chain guide. The material itself consists of a mixture of 3utadiene-acrylonitrile-rolinerisat as rubber component and phenol-boromaldehyde-Novalac as phenolic resin.

Die Kettenlaufbahnen der vorbekannten Hobelkettenführung verursachen beim Auftreten von Kraft stößen erhebliche Schlagbeanspruchungen auf den erwähnten garnrollenartigen Körpern. Auf diesen Körpern werden die Beanspruchungen nur unwesentlich gedämpft, weil das Material infolge seiner Verwendung für Bremsbeläge eine nur geringe innere Dämpfung aufweist. Da der Abstand zwischen den Körpern und damit zwischen den Kräften relativ groß ist, übersteigt er die Wellenlänge des Körperschalls, so daß der Körperschall in den Rinnen und den mit diesen verbundenen Teilen der Hobelkettenführung angeregt wird.The chain tracks of the previously known plow chain guide cause when force occurs, considerable impact stresses on the aforementioned thread-like bodies. The stresses on these bodies are only insignificant attenuated because the material is only a small one as a result of its use for brake pads has internal damping. Because the distance between the bodies and therefore between the forces is relatively large, it exceeds the wavelength of the structure-borne noise, so that the structure-borne noise in the channels and the parts of the plow chain guide connected to them is stimulated.

Es kommt sogar zu zusätzlichem Körperschall, bei dem sich die zunächst kleinen EUrperschallamplituden durch Rückkopplung gleichsam aufschaukeln. Das macht sich i.n ratternden Geräuschen in den Führungen und/oder Börderrinnen bemerkbar.There is even additional structure-borne noise, in which the initially create small EU noise amplitudes through feedback, as it were. That makes noticeable in rattling noises in the guides and / or conveyor channels.

Der Erfindung liegt die Aufgabe zugrunde, eine Hobelkettenführung der eingangs bezeichneten Art zu schaffen, bei der die Schlagbeanspruchungen herabgesetzt sind und die Körperschallenergie weitgehend durch äußere Dämpfung abgebaut wird.The invention is based on the object of a plow chain guide of the type described at the outset, in which the impact stresses are reduced and the structure-borne sound energy is largely reduced by external damping.

Gemäß der Erfindung wird diese Aufgabe dadurch gelöst, daß die schalldämpfende Kettenlaufbahn mit einem abriebfesten, hochelastischen und selbstverlöschenden Gummi versehen ist und die ihr zugeordnete Kette längs jeder Förderrinne durchgehend unterstützt, und daß zwischen den Förderrinnen die Gummiteile bis zu den Spalten reichen, welche die Kettenlaufbahn unterbrechen, die auf einer oder mehreren Leisten ausgebildet ist, welche die Kettenkanäle begrenzt.According to the invention, this object is achieved in that the sound-absorbing Chain track with an abrasion-resistant, highly elastic and self-extinguishing rubber is provided and supports the chain assigned to it continuously along each conveyor trough, and that between the conveyor troughs the rubber parts extend to the gaps, which interrupt the chain track that is formed on one or more strips which limits the chain channels.

Das bezeichnete Gummitmaterial ist bekannt und wird im Untertage-bergbau auch bereits eingesetzt. Hier dient es u.a. zur Verschleißminderung in Bunkereinläufen und zur Reparatur von Fördergurten, weil es sich mit sich selbst und mit Stahlteilen durch Kalt-und Warmvulkanisation spaltfrei verbindet. Es handelt sich hierbei um eine unter der Bezeichung Chloropren-Rubber für den Steinkohlenbergbau unter Tage zugelassenen Werkstoff mit Shore-Härten von 25 - 90 Grad.The designated rubber material is known and is used in underground mining also already used. Here it serves, among other things, to reduce wear in bunker inlets and to repair conveyor belts because it deals with itself and with steel parts joins without gaps through cold and hot vulcanization. This is one called chloroprene rubber for underground hard coal mining approved material with Shore hardnesses of 25 - 90 degrees.

Dieser Werkstoff hat eine hohe iimere Dämpftmg ohne gleichzeitig beim Kettenlauf starken Abnutzungser scheinungen unterworfen zu sein. Die hohe innere Dämpfung führt dazu, daß die sich in Form von Longitudinalwellen durch die Hobelkettenführung verbreitende Körperschallenergie in dem Gummimaterial in Wärme umgesetzt und dadurch abgebaut wird.This material has a high level of damping without at the same time Chain run to be subject to severe signs of wear. The high inner Attenuation leads to the fact that the in the form of Longitudinal waves Structure-borne sound energy in the rubber material dissipating through the plow chain guide is converted into heat and thereby degraded.

Die durchgehende Unterstützung der Kette mit diesem Gummimaterial hat zur Folge, daß Kraftstöße zu wesentlich geringeren Schlagbeanspruchungen führen. Die Körperschallenergie wird dadurch entscheidend herabgesetzt. Außerdem werden die bei Kraftstößen auftretenden, Körperschall erzeugenden Kräfte in geringem Abstand voneinander gehalten, so daß sie wesentlich kleiner als die Wellenlänge des Körperschalles voneinander entfernt sind.The continuous support of the chain with this rubber material has the consequence that impulses lead to significantly lower impact loads. This significantly reduces the structure-borne sound energy. Also be the forces that generate structure-borne noise during impulses at a short distance held from each other so that they are much smaller than the wavelength of the structure-borne sound are distant from each other.

Hierdurch wird wird der Luftschall seinerseits stark vermindert. Zudem fällt das bislang auftretende Rattergeräusch durch den Fortfall der Selbsterregung fort.This in turn greatly reduces the airborne noise. In addition the rattling noise that has occurred so far falls due to the cessation of self-excitation away.

Die Spalte dienen einerseits zur Abführung des Kohlenkleins bzw. anderer Verunreinigungen aus den Kettenkanälen. Im Rahmen des Erfindungsgedankens wirken sie aber auch schalldämmend, d.h. der Körperschallpegel in den hintereinander geschalteten Hobelkettenführungen aufeinanderfolgender Rinnen ist unterschiedlich und kann sich nicht von Rinne zu Rinne addieren.The gaps serve on the one hand to discharge the coal or other Impurities from the chain channels. Act within the scope of the inventive concept But they are also sound-absorbing, i.e. the structure-borne sound level in the one behind the other Plow chain guides of successive channels is different and can do not add from channel to channel.

Die Erfindung hat den Vorteil, daß sie eine wesentliche Herabsetzung des Luftschalles ermöglicht, der bislang an Hobelkettenführungen entstanden ist. Das ist von beträchtlicher Bedeutung für den Schallschutz, weil bislang die im Bereich solcher Gewinnungsanlagen eingesetzten Arbeitskräfte mit Kapselgehörschützern ausgerüstet werden mußten. Wegen der klimatischen Bedingungen und wegen des Staubes sind solche Gehörschutzmaßnahmen im allgemeinen nicht sehr wirksam.The invention has the advantage that it is a substantial reduction of the airborne noise that has so far been generated on plow chain guides. This is of considerable importance for noise protection, because so far it has been in the area Workers employed in such extraction systems are equipped with earmuffs had to be. Because of the climatic conditions and because of the dust there are such Hearing protection measures are generally not very effective.

Die Einzelheiten, weiteren Merkmale und andere Vorteile der Erfindung ergeben sich aus der nachfolgenden Beschreibung von Ausführungsbeispielen anhand der Figuren in der Zeichnung.The details, other features, and other advantages of the invention emerge from the following description of exemplary embodiments of the figures in the drawing.

Es zeigen: Fig. 1 in abgebrochener Darstellung einen Querschnitt durch eine Förderrinne an der Bergseite zur Darstellung einer ersten husführungsform der erfindungsgemäßen Houelkettenführung, Fig. 2 eine Ansieht der Bergeeite der Förderrine nach Fig. 1 im Schnitt längs der Linie II-II der Fig. 1, Fig. 3 in abgebrochener Darstellung eine Ansicht der Hobelkettenführung von der Bergeseite, Fig. 4 die in der Hobelkettenführung nach den Fig.The figures show: FIG. 1 in a broken-away representation, a cross section through a conveyor trough on the mountain side to represent a first husführungform of the Houel chain guide according to the invention, Fig. 2 a view of the recovery side of the conveyor mine according to Fig. 1 in section along the line II-II of Fig. 1, Fig. 3 in a broken representation a view of the plow chain guide from the mountain side, Fig. 4 in the plow chain guide according to Fig.

1 bis 3 als Kettenlaufbahn der Oberkette benutzte Leiste in einer Ansicht von vorn, Fig. 5 eine Draufsicht auf den Gegenstand der Fig. 4, Fig. 6 schematisch, d.h. unter Fortlassung aller für das Verständnis der Erfindung nicht erforderlichen Einzelheiten eine andere Ausführungsform im wesentlichen in der Fig. 1 entsprechender Darstellung, Fig. 7 eine weitere Ausführungsform in der Fig. 6 entsprechender Darstellung, Pig. 8 eine abgeänderte Ausführungsform in den Fig. 6 und 7 entsprechender Darstellung, Fig. 9 eine weitere Ausführungsform in den Fig. 1 to 3 bar used as the chain track of the upper chain in one Front view, FIG. 5 a top view of the object of FIG. 4, FIG. 6 schematically, i.e. omitting all that are not necessary for an understanding of the invention Details of another embodiment essentially corresponding in FIG. 1 Representation, FIG. 7 shows a further embodiment in the representation corresponding to FIG. 6, Pig. 8 shows a modified embodiment in the representation corresponding to FIGS. 6 and 7, 9 shows a further embodiment in FIGS.

6 bis 8 entsprechender Darstellung und Fig.10 eine für sich bekannte Hobelkettenführung, die erfindungsgemäß weitergebildet ist. 6 to 8 corresponding representation and FIG. 10 a known per se Plow chain guide, which is developed according to the invention.

Die in Fig. 1 wiedergegebene Förderrinne 1 hat einen Boden 2 und Seitenwangen, von denen jedoch nur eine bei 3 wiedergegeben ist. Aufgrund der Führungen, die ober- und unterhalb des Rinnenbodens 2 mit der Seitenwange 3 gebildet werden, ergibt sich ein Einsprung, der mit 4 bezeichnet ist. In Abständen sind an dieser Stelle der Förderrinne Bleche 6 mit ihren oberen und unteren Kanten 7 bzw. 8 eingeschweißt. Jedes dieser Bleche hat einen seitlich offenen Schlitz 9, der zur Einführung einer Schraube 10 dient, welche mit einem Hammerkopf 11 versehen ist. Aufgrund der Formgebung des Schlitzes 9 läßt sich die Schraube so einführen, daß der Hammerkopf 11 das axiale Abziehen der Schraube verhindert.The conveyor trough 1 shown in Fig. 1 has a bottom 2 and side walls, but only one of which is shown at 3. Due to the guided tours and are formed below the channel bottom 2 with the side wall 3, results an entry, which is denoted by 4. The Conveyor trough sheets 6 welded with their upper and lower edges 7 and 8, respectively. Each of these sheets has a laterally open slot 9, the introduction of a Screw 10, which is provided with a hammer head 11, is used. Because of the shape of the slot 9, the screw can be inserted so that the hammer head 11 is the axial Prevents the screw from being pulled off.

Der bei 10 dargestellte Schaft der Schraube dient zur Besfestigung einer allgemein mit 12 bezeichneten Leiste, deren Einzelheiten in den Fig. 4 und 5 wiedergegeben sind und einer Abdeckung 13, welche zwei übereinanderliegende Kettenkanäle 14 bzw. 15 in Richtung auf den Bergestoß abdeckt. Die Abdeckung 13 dient ihrerseits zur Befestigung von Bracken 5, welche den Füllquerschnitt der Rinne 1 erhöhen und hinter denen ein Kabelkanal 16 liegt, in dem verschiedene Versorgungsleitungen verlegt sind.The shaft of the screw shown at 10 is used for fastening a bar generally designated 12, the details of which in FIGS. 4 and 5 are shown and a cover 13, which two superposed chain channels 14 or 15 in the direction of the mountain shock. The cover 13 in turn serves for fastening brackets 5, which increase the filling cross-section of the channel 1 and behind which there is a cable duct 16 in which various supply lines are laid are.

Im oberen Kettenkanal 15 läuft der rückführende Teil 17 einer Hobelkette, deren ziehendes Teil im Kettenkanal 14 verlegt ist. An diese Unterkette ist mit Hilfe eines Klobens 18 ein Hobel 19 angeschlagen, von dem der eigentliche Hobelkörper nicht dargestellt ist, weil er an der Kohlenstoßseite der Förderrinne 1 läuft.The return part 17 of a plow chain runs in the upper chain channel 15, whose pulling part is laid in the chain channel 14. This sub-chain is with Using a block 18 a plane 19 struck, of which the actual Plane body is not shown because it runs on the coal face side of the conveyor trough 1.

Die Oberseite 20 der allgemein mit 12 bezeichneten Leiste dient als Kettenlaufbahn für die Oberkette 17 und kann gedreht werden. Daher ist es möglich, die Unterseite 21 als Kettenlaufbahn für die Oberkette 17 zu verwenden, sobald die Kettenlaufbahn auf der Fläche 20 verschlissen ist.The top 20 of the bar, generally designated 12, serves as a Chain track for the upper chain 17 and can be rotated. Therefore it is possible to use the bottom 21 as a chain track for the top chain 17 as soon as the Chain track on surface 20 is worn.

Wie sich aus Fig. 3 ergibt, hat Jede Förderrinne 1 insgesamt drei Abdeckungen 13, wodurch zwischen den Abdeckungen Platz geschaffen wird, um die auf der Kettenlaufbahn befindliche Feinkohle aus der Kette führung austragen zu können. Die Leiste 12 endet an einem mit 23 bezeichneten Spalt, dessen andere Seite von der anschließenden Leiste 24 der folgenden Börderrinne 25 gebildet wird. Auch in diesem Spalt können Feinkohle und andere Fremdkörper aus der Hobelkettenführung ausgetragen werden.As can be seen from FIG. 3, each conveyor trough 1 has a total of three Covers 13, whereby space is created between the covers to the to be able to carry out the fine coal from the chain guide. The bar 12 ends at a designated 23 gap, the other side of the adjoining bar 24 of the following conveyor channel 25 is formed. Also in Coal and other foreign bodies can get out of the plow chain guide in this gap be carried out.

Die Leiste 12 hat eine Flachstahleinlage 26, welche auf ihren größeren Flächen eine starke Auflage 27 bzw. 28 des eingangs beschriebenen abriebfesten, hochelastischen und selbs goXschenden Gummis trägt.The bar 12 has a flat steel insert 26, which on its larger A strong support 27 or 28 of the abrasion-resistant, wears highly elastic and self-absorbing rubbers.

Dieser Werkstoff ist mit der Stahlprofileinlage 2S so fest verbunden, daß an den Grenzflächen zwischen der Stahlprofileinlage und den Gummiauflagen .-7 bzw.This material is so firmly connected to the steel profile insert 2S, that at the interfaces between the steel profile insert and the rubber pads.-7 respectively.

28 keine Reibungskräfte entstehen können. Wie Fig. 4 erkennen läßt, bilden im übrigen die Außenseiten der Aulagen 27 und 28 diejenigen Seiten der Leiste 12, auf denen die Kettenlaufbahnen ausgebildet sind.28 no frictional forces can arise. Like Fig. 4 recognize leaves, form the rest of the outer sides of the Aulagen 27 and 28 those pages the bar 12 on which the chain tracks are formed.

Die Leiste ist in entsprechenden Abständen mit Bohrungen 30 versehen, welche die Schraubenbolzen 10 aufnehmen. Die Schraubenbolzen sind mit einem verhältnismäßig großen Spiel in den Bohrungen 30 enthalten, tragen aber Exzenterscheiben 31, welche sich auf Buchsen 32 abstützen, welche an der Vorderseite der Leiste abgebracht sind. Hierdurch ist es möglich, die Hohenlage der Kettenlaufbahnen 20 und 21 einzustellen und dadurch verschiedenen Rinnenprofilhöhen zu tragen.The bar is provided with holes 30 at appropriate intervals, which receive the screw bolts 10. The bolts are with a relative contain large play in the bores 30, but carry eccentric discs 31, which are supported on sockets 32, which are attached to the front of the bar. This makes it possible to adjust the height of the chain tracks 20 and 21 and thus to carry different gutter profile heights.

Die Stahleinlage 26 ist, wie Fig. 5 erkennen läßt, breiter als die Auflagen 27 bzw. 28, so daß an der RUckseite 33 der Auflagen die Stahleinlage in Richtung auf die Bergestoßseite bei 34 vorsteht. Hierdurch ist es möglich, die Abdeckungen 13 Init einer Vertiefung 35 zu versehen, so daß deren Anbringung erleichtert wird.The steel insert 26 is, as shown in FIG. 5, wider than that Supports 27 and 28, so that on the back 33 of the supports the steel insert in Protruding towards the ridge face at 34. This makes it possible to use the covers 13 Init to provide a recess 35 so that its attachment is facilitated.

Wie die Darstellung der Fig. 3 erkennen läßt, wird das rückführende Teil 17 der Hobelkette durch die Leiste 12 über die gesamte Länge der Förderrinne 1 unterstützt, und die Kettenlaufbahn reicht jeweils bis zu den Spalten 23 zwischen zwei aneinander anschließenden Förderrinnen 1 bzw. 25. Die Kettenlaufbahn ist bei dem Ausführungsb ei spiel nach den Fig. 1 bis 5 eben auf einer Leiste ausgebildet. Diese Leiste 12 bildet die Trennwand zwischen den beiden Xettenkanälen 14 und 15.As the illustration of FIG. 3 shows, the return is Part 17 of the plow chain through the bar 12 over the entire length of the conveyor trough 1 supports, and the chain track extends up to the gaps 23 between two adjoining conveyor troughs 1 and 25. The chain track is at to the Ausführungsb ei game according to FIGS. 1 to 5 just formed on a bar. These Bar 12 forms the partition between the two Xette channels 14 and 15.

Daß ist auch bei der Ausführiwgsform nach Fig. 6 der Fall. In dieser und in den folgenden Ausführungsformen bezeichnen gleiche Bezugszeichen einander entsprechende Teile.This is also the case with the embodiment according to FIG. In this and in the following embodiments, like reference numerals denote each other corresponding parts.

Im Ausführungsbeispiel nach Fig. 6 hat die Leiste 12 einen allgemein U-förmigen Querschnitt. Einer der Schenkel 40 bildet die Trennwand zwischen den beiden gettenkanälen 41 bzw. 42, und der andere Schenkel 43 dient zur Ausbildung der Laufbahn für die Unterkette. Der Steg 44 deckt die Innenseite 45 der Abdeckung 46 im Kettenkanal 42 ab.In the embodiment of Fig. 6, the bar 12 has a general U-shaped cross section. One of the legs 40 forms the partition between the two getten channels 41 and 42, and the other leg 43 is used for training the career path for the lower chain. The web 44 covers the inside 45 of the cover 46 in the chain channel 42.

Im Ausführungsbeispiel nach Fig. 6 besteht die gesamte Leiste 12 aus dem abriebfesten, hochelastischen und ver selbst/löschenden Gummi.In the embodiment according to FIG. 6, the entire bar 12 consists of the abrasion-resistant, highly elastic and self-extinguishing rubber.

Im Ausführungsbeiepiel nach Fig. 7 entspricht die Form und Anbringung der Leiste 12 im wesentlichen der Ausbildung, die im Zusammenhang mit den Fig. 1 bis 5 dargestellt und vorstehend beschrieben ist. Unterschiedlich ist Jedoch, daß eine der Schmalseiten 47 der Stahlprofileinlage 26 ebenfalls mit einer Auflage 48 aus dem Gummi versehen ist. Hierdurch erfolgt eine Dämpfung des Körperschalls, der von der Leiste 12 bzw.In the exemplary embodiment according to FIG. 7, the shape and attachment correspond of the bar 12 essentially of the training that in connection with FIG. 1 through 5 and described above. What is different, however, is that one of the narrow sides 47 of the steel profile insert 26 also with a support 48 from which rubber is provided. This results in a damping of the structure-borne noise, the from bar 12 resp.

von den sie umgebenden Maschinenteilen ausgeht.from the surrounding machine parts.

Im Ausführungsbeispiel nach Fig. 8 ist die Leiste 12 einstückig mit der Abdeckung 46 ausgebildet. Sämtliche, die Kettenkanäle 41 bzw. 42 begrenzenden Flächen der Liste 46 sind mit einer durchgehenden Gummiauflage 49 versehen.In the embodiment of FIG. 8, the bar 12 is integral with the cover 46 is formed. All the chain channels 41 and 42 delimiting Areas of the list 46 are provided with a continuous rubber pad 49.

Im Ausführungsbeispiel nach Fig. 9 wird die gleiche Form der Leiste 12 wie im Ausführungsbeispiel nach Fig. 6 benutzt. Unterschiedlich ist die Stahleinlage 26, die ihrerseits U-förmig profiliert ist. Dementsprechend bildet einer der Schenkel 50 die Einlage für den Schenkel 40, d.h. die Trennwand zwischen den beiden Kettenkanälen 41 bzw. 42. Der andere Schenkel 51 verstärkt den unteren Schenkel 43, auf dem die Kettenlaufbahn der Unterkette ausgebildet ist, und der Steg 52 liegt der Abdeckung 46 unmittelbar an.In the embodiment of Fig. 9, the same shape of the bar 12 as used in the embodiment of FIG. The steel insert is different 26, which in turn is profiled in a U-shape. Accordingly, one of the legs forms 50 the insert for the leg 40, i.e. the partition between the two chain channels 41 or 42. The other leg 51 reinforces the lower leg 43 on which the Chain track of the lower chain is formed, and the web 52 is the cover 46 immediately.

Die Kettenführung im Ausführungsbeispiel nach Fig. 10 besteht aus zwei Leisten 54 bzw. 55, welche je eine Hälfte der beiden Kettenkanäle 41 bzw. 42 ausbilden und entsprechend dem Ausführungsbeispiel nach Fig. 8 auf sämtlichen einander zugekehrten Seiten Auflagen 56 bzw. 57 aus dem beschriebenen abriebfesten, weichelastischen und selbstverlöschenden Gummi tragen.The chain guide in the embodiment according to FIG. 10 consists of two strips 54 and 55, which each have one half of the two chain channels 41 and 42 train and according to the embodiment of FIG. 8 on all one another facing sides supports 56 and 57 from the abrasion-resistant, soft-elastic described and wear self-extinguishing rubber.

Diese Ausbildung des Kettenkanals hat den Vorteil, daß beide Leisten 54 und 55 Jeweils um 180 ° bei eingetretenem Verschleiß gedreht werden können und sich auf diese Weise zweimal einsetzen lassen. Außerdem befinden sich an den einander zugekehrten Flächen der Leisten 54 und 55 doppelte Auflagen wie bei 58 dargestellt, welche dämpfend auf die Übertragung von Körperschall wirken.This design of the chain channel has the advantage that both bars 54 and 55 can each be rotated by 180 ° when wear has occurred and themselves insert twice like this. They are also located on each other facing surfaces of the strips 54 and 55 double supports as shown at 58, which have a dampening effect on the transmission of structure-borne noise.

Patentansprüche L e e r s e i t eClaims L e r s e i t e

Claims (10)

Patentansprüche Oi. Hobelkettenführung für Gewinnungsanlagen des Untertagebetriebes, die au der Rückseite von Rinnen eines Fördermittels befestigt, beispielsweise angeschraubt ist und für die umlaufende Hobelkette zwei übereinander angeordnete Kettenkanäle aufweist, in denen zur Unterstützung der Ober- und An-ter'.ette Kettenlaufbahnen ausgebildet sind, von denen wenigstens die der Oberkette zugeordneten Kettenlaufbahnen aus schalldämmendem Werkstoff bestehen oder auf denen schalldammender Werkstoff befestigt ist, dadurch gekennzeichnet, daß die schallgedämpfte Kettenlaufbahn (20, 21) mit einem abriebfesten, hochelastischen und selbst ver löschenden Gummi (27, 28) versehen ist und die ihr zugeordnete Kette (17) längs jeder Förderrinne durchgehend unterstützt, und daß zwischen den Förderrinnen (1, 25) die Gummiteile (27, 28) bis zu Spalten (23) reichen, welche die Kettenlaufbahnen (20, 21) unterbrechen, die auf einer oder mehreren Leisten (12) augebildet sind, welche die Kettenkanäle (14, 15) begrenzet. Claims Oi. Plow chain guide for extraction systems of Underground operation, which is attached to the rear of the chutes of a conveyor, for example, is screwed on and two on top of each other for the circulating plow chain has arranged chain channels in which to support the upper and anter'.ette Chain tracks are formed, of which at least those assigned to the upper chain Chain tracks are made of sound-absorbing material or on which sound-absorbing Material is attached, characterized in that the sound-damped chain track (20, 21) with an abrasion-resistant, highly elastic and self-extinguishing rubber (27, 28) is provided and the chain (17) assigned to it along each conveyor trough continuously supported, and that between the conveyor troughs (1, 25) the rubber parts (27, 28) up to gaps (23) which interrupt the chain tracks (20, 21), which are formed on one or more strips (12) which form the chain channels (14, 15) limited. 2. Hobelkettenführung nach Anspruch 1, dadurch gekennzeichnet, daß die Leiste (12) die Trennwand der beiden Kettenkanäle (14, 15) bildet.2. Plow chain guide according to claim 1, characterized in that the bar (12) forms the partition between the two chain channels (14, 15). 3. Hobelkettenführung nach den Ansprüchen 1 oder 2, dadurch gekennzeichnet, daß die Leiste (12) einen rechteckigen Querschnitt und eine Stahlprofileinlage aufweist, welche auf einander gegenüberliegenden Seiten Auflagen (27, 28) aus Gummi trägt sowie an einer Läng seite einen überstand (34) zur Befestigung von Teilen (13) der Hobelkettenführung aufweist.3. Plow chain guide according to claims 1 or 2, characterized in that that the bar (12) has a rectangular cross-section and a steel profile insert, which on opposite sides supports (27, 28) made of rubber and on one longitudinal side a protrusion (34) for attaching parts (13) of the Has plow chain guide. 4. Hobelkettenführung nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß die Stahlprofileinlage (26) der Leiste (12) zur Aufnahme von Befestigungsschrauben (10) vorgesehen ist, für deren Anbringung außen an den Rinnen (1) Aufnahmen (6 - 8) mit Schlitzen (9) zur Abstützung von Köpfen (11) der Schrauben (10) vorgesehen sind.4. Plow chain guide according to one of claims 1 to 3, characterized in that that the steel profile insert (26) of the bar (12) for receiving fastening screws (10) is provided, for their attachment on the outside of the channels (1) receptacles (6 - 8) provided with slots (9) to support the heads (11) of the screws (10) are. 5. Hobelkettenführung nach Anspruch 4, dadurch gekennzeichnet, daß die Befestigungsschrauben Ezzenterscheiben (31) zur Abstützung in Buchsen (32) für die Höheneinstellung der Leiste (12) aufweisen.5. plow chain guide according to claim 4, characterized in that the fastening screws eccentric washers (31) for support in sockets (32) for have the height adjustment of the bar (12). 6. Hobelkettenführung nach einem der AnspriIche 1 bis 5, dadurch gekennzeichnet, daß die Leiste (12) einen U-förmigen Quorschnitt aufweist, dessen unterer Schenkel (43) die Kettenlaufbahn für die Unterkette bildet.6. Plow chain guide according to one of Claims 1 to 5, characterized in that that the bar (12) has a U-shaped cross section, the lower leg of which (43) forms the chain track for the lower chain. 7. Hobelkettenfuhrung nach Anspruch 6, dadurch gekennzeichnet, daß die U-förmige Leiste (12) eine Einlage (26) von U-Profil aufweist, und daß der dem die Trennwand bildenden Schenkel (40) der Leiste (12) zugeordnete Schenkel (50) der Einlage auf seiner Stirnseite mit einer Auflage (48) aus Gummi versehen ist.7. plow chain guide according to claim 6, characterized in that the U-shaped bar (12) has an insert (26) of U-profile, and that the dem the limbs (40) forming the partition wall of the bar (12) associated limbs (50) the insert is provided with a rubber pad (48) on its front side. 8. Hobelkettenführung nach einem der Ansprüche 1 bis 7, d a d u r c h g e k e n n z e i c h n e t daß eine aus Flacheisen bestehende Einlage (26) an ihrer der Rinne (1) zugewandten Stirnseite (47) mit einer Auflage (48) aus Gummi versehen ist.8. plow chain guide according to one of claims 1 to 7, d a d u r c h g e k e n n n z e i c h n e t that an insert consisting of flat iron (26) on its end face (47) facing the channel (1) with a support (48) made of rubber is provided. 9. Hobelkettenführung nach einem der Ansprüche 1 biß 8, dadurch gekennzeichnet, daß die Leiste (46) die bergestoßseitige Abdeckung der Kettenkanäle (41, 42) bildet und auf sämtlichen der Förderrinne (1) zugekehrten Seiten mit einer Guitimlauflage (49) versehen ist.9. Plow chain guide according to one of claims 1 to 8, characterized in that that the bar (46) forms the cover of the chain channels (41, 42) on the mountain side and on all sides facing the conveyor trough (1) with a Guitimlauflage (49) is provided. 10. Hobelkettenführung nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, daß sie aus zwei Leisten (54, 55) zusammengesetzt ist, welche auf den einander zugekehrten Seiten Gummiauflagen (56, 57) tragen und durch eine 1)ämpfung (58) in der Trennwand der beiden Kettenkanäle (41, 42) voneinander abgetrennt sind.10. Plow chain guide according to one of claims 1 to 9, characterized in that that it is composed of two strips (54, 55) which face each other Wear rubber pads (56, 57) on the sides and 1) cushioning (58) in the partition of the two chain channels (41, 42) are separated from one another.
DE19762609930 1976-03-10 1976-03-10 Plow chain guide for mining systems in underground mining Expired DE2609930C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19762609930 DE2609930C2 (en) 1976-03-10 1976-03-10 Plow chain guide for mining systems in underground mining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19762609930 DE2609930C2 (en) 1976-03-10 1976-03-10 Plow chain guide for mining systems in underground mining

Publications (2)

Publication Number Publication Date
DE2609930A1 true DE2609930A1 (en) 1977-09-15
DE2609930C2 DE2609930C2 (en) 1985-08-08

Family

ID=5972025

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19762609930 Expired DE2609930C2 (en) 1976-03-10 1976-03-10 Plow chain guide for mining systems in underground mining

Country Status (1)

Country Link
DE (1) DE2609930C2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10348091A1 (en) * 2003-10-16 2005-05-19 Kolbus Gmbh & Co. Kg Conveyor with profiled sidewalls

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1756682U (en) * 1957-04-12 1957-11-21 Beien Maschfab SCRAPER CONVEYORS, IN PARTICULAR DOUBLE CHAIN SCRAPER CONVEYORS FOR UNDERGROUND PIT OPERATION.
DE1785587U (en) * 1959-01-22 1959-03-19 Carl Clarus Fa LOCK WITH SLIDER FOR SCRAPER CONVEYOR.
DE1936054A1 (en) * 1969-07-16 1971-01-28 Busatis Geb Disc mower

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1756682U (en) * 1957-04-12 1957-11-21 Beien Maschfab SCRAPER CONVEYORS, IN PARTICULAR DOUBLE CHAIN SCRAPER CONVEYORS FOR UNDERGROUND PIT OPERATION.
DE1785587U (en) * 1959-01-22 1959-03-19 Carl Clarus Fa LOCK WITH SLIDER FOR SCRAPER CONVEYOR.
DE1936054A1 (en) * 1969-07-16 1971-01-28 Busatis Geb Disc mower

Also Published As

Publication number Publication date
DE2609930C2 (en) 1985-08-08

Similar Documents

Publication Publication Date Title
DE69907403T2 (en) saw wire
DE2262203A1 (en) RUNNING AND GUIDE RAILS FOR ESPECIALLY ESCALATORS AND MOVING WALKS
DE2705122A1 (en) SWITCH FOR RAIL VEHICLES
DE2609930A1 (en) Coal plough haulage chain guide - has high elastic nonabrading rubbers on strips forming chain tracks and chain channel partition
DE2229025A1 (en) Centerpiece with movable heart tip
DE102014001006A1 (en) Traction chain for a caterpillar track of a tracked vehicle and kit for a caterpillar track
DE3004892A1 (en) CHAIN SCRATCH CONVEYOR
DE2944059A1 (en) DEVICE ON BLEEDING DRUM
DE102010009619A1 (en) Profile for the elastic mounting of rails
EP3416876A1 (en) Wear pad for a track of a tracked vehicle, track, and construction machine
DE202009013326U1 (en) Feed system for mine-mining machine, rack and drive gear for this
DE2536575C3 (en) Emergency skid for high-speed rapid transit railways
DE2943953A1 (en) WEBSITE STAFF
DE2063060C3 (en) Chain conveyor
DE3242915A1 (en) Elastic rail support for rail vehicles
EP0070506A2 (en) Cutter-jib of a cutting machine
DE3609911C2 (en) Rock drills, in particular for hammer drills
DE2631433C2 (en) Lining for a rail joint, in particular for track systems in underground mining
DE2042726C3 (en) Coal extraction device, consisting of a conveyor and a coal plow
EP3608473B1 (en) Railway sleeper
DE7622085U1 (en) LINING FILLING PIECE FOR A RAIL JOINT, IN PARTICULAR OF TRACK SYSTEMS IN THE UNDERGROUND MINING
DE941598C (en) Scraper conveyor
DE4209992C2 (en) ski
DE896549C (en) Rope thimbles binding for conveyor baskets
DE2924823A1 (en) Railway track reinforcement near track brake buffers - involves elastic spacer layer between rails and reinforcing supports

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
D2 Grant after examination
8364 No opposition during term of opposition
8330 Complete disclaimer