DE2337998C2 - Device for checking overload protection devices on hoists - Google Patents

Device for checking overload protection devices on hoists

Info

Publication number
DE2337998C2
DE2337998C2 DE19732337998 DE2337998A DE2337998C2 DE 2337998 C2 DE2337998 C2 DE 2337998C2 DE 19732337998 DE19732337998 DE 19732337998 DE 2337998 A DE2337998 A DE 2337998A DE 2337998 C2 DE2337998 C2 DE 2337998C2
Authority
DE
Germany
Prior art keywords
lever
shear pin
load
hoists
overload protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19732337998
Other languages
German (de)
Other versions
DE2337998A1 (en
Inventor
Gerhard 8000 München Reuter
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jakob Blaimer 8000 Muenchen De GmbH
Original Assignee
REUTER GEB STROBEL MARGARETE
REUTER MARGARETE 8000 MUENCHEN DE
Reuter Margarete 8000 Muenchen
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by REUTER GEB STROBEL MARGARETE, REUTER MARGARETE 8000 MUENCHEN DE, Reuter Margarete 8000 Muenchen filed Critical REUTER GEB STROBEL MARGARETE
Priority to DE19732337998 priority Critical patent/DE2337998C2/en
Publication of DE2337998A1 publication Critical patent/DE2337998A1/en
Application granted granted Critical
Publication of DE2337998C2 publication Critical patent/DE2337998C2/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/54Safety gear
    • B66D1/58Safety gear responsive to excess of load
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/22Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
    • B66C1/34Crane hooks
    • B66C1/40Crane hooks formed or fitted with load measuring or indicating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/88Safety gear
    • B66C23/90Devices for indicating or limiting lifting moment

Description

Die Erfindung betrifft eine Vorrichtung nach dem Oberbegriff.The invention relates to a device according to the preamble.

Bei einer solchen aus den DE-PS 19 11962 und DE-OS 19 60 765 bekannten Vorrichtung erfolgt die Anpassung an verschiedene Grenzlasten durch Einsetzen eines der betreffenden Grenzlast entsprechenden Scherstiftes. Dies macht die Bereithaltung von Scherstiften unterschiedlicher Dicke erforderlich, für die dann auch angepaßte Aufnahmeorgane zur Verfügung stehen müssen.In such a device known from DE-PS 19 11962 and DE-OS 19 60 765 takes place Adaptation to various limit loads by inserting one that corresponds to the relevant limit load Shear pin. This makes it necessary to keep shear pins of different thicknesses ready for the then adapted recording organs must also be available.

Der Erfindung liegt die Aufgabe zugrunde, den Aufwand der Bereithaltung unterschiedlicher Scherstifte zu vermeiden und trotzdem eine gute Trennbarkeit der Vorrichtung beizubehalten.The invention is based on the problem of keeping different shear pins ready to avoid and still maintain a good separability of the device.

Erfindungsgemäß geschieht dies durch die im Anspruch 1 gekennzeichneten Merkmale. Hierdurch sind gegenüber dem bekannten Stand der Technik folgende Vorteile zu erzielen:According to the invention, this is done by the features characterized in claim 1. Through this the following advantages can be achieved compared to the known state of the art:

1. Die Zahl der bereitzuhaltenden Scherstifte wird auf einen einheitlichen Scherstift mit einem Aufnahmeorgan reduziert.1. The number of shear pins to be kept ready is increased to reduced a uniform shear pin with a receiving organ.

2. Die Handhabung der Vorrichtung wird erheblich vereinfacht und Fehlerquellen durch Einsetzen falscher Scherstiftdurchmesser werden ausgeschaltet. 2. The handling of the device is considerably simplified and sources of error through insertion wrong shear pin diameter are switched off.

3. Die zur Sicherheit der zu prüfenden Hebezeuge nötige Trennbarkeit und Dämpfung der Trennbewegung ist einfacher möglich als früher beschrieben (DE-OS 19 60 765).3. The separability and damping of the separating movement necessary for the safety of the lifting equipment to be tested is easier than described earlier (DE-OS 19 60 765).

4. Die Wiederzusammensetzung der Vorrichtung nach erfolgter Trennung und Ansprechen der Dämpfungseinrichtungen ist ebenfalls äußerst vereinfacht. 4. The reassembly of the device after the disconnection and response of the Damping devices is also extremely simplified.

In den Zeichnungen sind Ausführungsbeispiele der Erfindung dargestellt. Es zeigtExemplary embodiments of the invention are shown in the drawings. It shows

F i g. 1 eine Vorrichtung mit einem gerade ausgebildeten Hebel und entsprechenden Dämpfungseinrichtungen der Trennbewegung,F i g. 1 shows a device with a straight lever and corresponding damping devices the separation movement,

F i g. 2 einen Schnitt durch die Lagerung des Scherstiftes in dieser Vorrichtung,F i g. 2 shows a section through the mounting of the shear pin in this device,

F i g. 3 eine Vorrichtung mit einem Winkelhebel.F i g. 3 a device with an angle lever.

Die Vorrichtung gemäß Fig. 1 und Fig.2 besitzt einen Lasthaken 1, an dem eine Überlast eingehängt werden kann. Dabei kann es sich auch um ein fest im Boden verankertes Bauteil handeln.The device according to FIGS. 1 and 2 has a load hook 1 on which an overload is suspended can be. This can also be a component that is firmly anchored in the ground.

Mit einem Aufhängebügel 14 wird die Vorrichtung vorzugsweise in den Lasthaken eines Hebezeugs eingehängtWith a suspension bracket 14, the device is preferably in the load hook of a hoist hooked

Der Lasthaken 1 überträgt in ihn eingeleitete Zugkräfte über eine Lasche 2, die mittels eines Bolzens 3 am Hebel 4, der aus den zwei Armen 8 und 9 besteht, befestigt ist, auf den einen Hebelarm 8. Der Hebel 4 besitzt an seiner Drehstelle eine Halbbohrung 5, die mit dem Bolzen 6 das Drehlager bildet Der Bolzen 6 durchsetzt ein doppelwandiges Gehäuse 7.The load hook 1 transmits tensile forces introduced into it via a bracket 2, which is secured by means of a bolt 3 is attached to the lever 4, which consists of the two arms 8 and 9, on the one lever arm 8. The lever 4 has a half-bore 5 at its pivot point which, together with the bolt 6, forms the pivot bearing. The bolt 6 penetrates a double-walled housing 7.

Der Hebel 4 ist im Gehäuse so angeordnet, daß die inThe lever 4 is arranged in the housing so that the in

seinem Arm 9 angebrachten Bohrungen 10, 11, 12 sich mit Stellen im Gehäuse decken, in die Aufnahmeorgane 25, 26, 27 für den Scherstift 19 eingeschraubt werden können.his arm 9 attached holes 10, 11, 12 coincide with points in the housing, in the receiving organs 25, 26, 27 can be screwed in for the shear pin 19.

Wird nun die in F i g. 1 dargestellte VorrichtungIf the in F i g. 1 shown device

zwischen einem Laothaken eines Hebezeugs und einer Last eingekuppelt und somit am Aufhängebügel 14 und am Haken 1 in der durch Pfeile angedeuteten Richtung belastet, so ergibt sich ein auf den rechten Arm 8 des Hebels 4 wirkendes Drehmoment, das diesen um den Drehpunkt 6 nach unten zieht. Dabei hat der linke Arm 9 des Hebels das Bestreben, sich nach oben zu drehen, wobei der die Bohrung 12 durchsetzende Scherstift 19 auf Abscherung beansprucht wird.coupled between a Lao hook of a hoist and a load and thus on the suspension bracket 14 and loaded on hook 1 in the direction indicated by arrows, this results in a on the right arm 8 of the Lever 4 acting torque that pulls it down around pivot point 6. The left arm has 9 the lever tends to turn upwards, wherein the shear pin 19 penetrating the bore 12 is subjected to shear stress.

Wenn nun die Abscherkraft den Abscherwert desIf now the shear force exceeds the shear value of the

Scherstiftes überschreitet, so wird dieser abgeschert, wobei sich der Hebel 4 um den Bolzen 6 im Uhrzeigersinn dreht. Diese Drehbewegung erreicht bei weiterem Anhalten des Zuges am Haken 1 in Pfeilrichtung einen Punkt, bei dem die Halbbohrung 5 des Hebels 4 vom Bolzen 6 abgleitet und der Haken 1 mit Lasche 2 und Hebel 4 sich vom Gehäuse 7 und Aufhängebügel 14 trennt.Shear pin exceeds, this is sheared, the lever 4 around the bolt 6 in the Rotates clockwise. If the pull on the hook continues to be stopped, this rotary movement reaches in Direction of the arrow a point at which the half-hole 5 of the lever 4 slides off the bolt 6 and the hook 1 with tab 2 and lever 4 separates from housing 7 and suspension bracket 14.

Diese Trennung ist einerseits gewollt, um ein Fortlaufen der am Hebezeug eingeleiteten Hubbewegung zu ermöglichen, andererseits muß sie abgedämpft werden, um ein zu plötzliches Entlasten des Hebezeugs nach Abscheren des Scherstifts zu vermeiden.On the one hand, this separation is intended in order to ensure that the lifting movement initiated on the hoist can continue to enable, on the other hand, it must be dampened in order to suddenly relieve the hoist to be avoided after shearing off the shear pin.

Zur Durchführung dieser Dämpfungsaufgabe ist in dem hier dargestellten Ausführungsbeispiel ein Seil 18 mit dem Lasthaken 1 über die Lasche 2 verbunden. Dieses Seil wird eineinhalbmal über eine Reibscheibe 20 geführt und dann noch durch einstellbare Reibelemente 21,22,23.To carry out this damping task, a rope 18 is connected to the load hook 1 via the bracket 2 in the exemplary embodiment shown here. This rope is guided one and a half times over a friction disc 20 and then through adjustable friction elements 21, 22, 23.

Durch zugkraftabhängige Anpressung des die Reibscheibe 20 voll umschlingenden Seilstranges über eine Doppellasche 13 und Druckrolle 17 wird ein Auslaufen der Dämpfung von stark auf schwach erreicht. Die Anschlageinrichtung 15, 16, 24 dient zur Begrenzung der maximalen Seilreibung.By tension-dependent pressing of the rope strand fully wrapping around the friction disc 20 via a Double flap 13 and pressure roller 17, the damping is reduced from strong to weak. the Anchor device 15, 16, 24 is used to limit the maximum rope friction.

In Fig.2 ist die Lagerung des Scherstiftes 19 in vergrößerter Darstellung im Schnitt gezeigt. Insbesondere ist hier die Einbringung der Scherstift-Aufnahmeorgane 26 im Gehäuse 7 gezeigt. Diese sind mit Gewinde 25 und Rändelscheibe 27 ausgestattet.In Figure 2, the mounting of the shear pin 19 is shown in an enlarged view in section. In particular the introduction of the shear pin receiving members 26 in the housing 7 is shown here. These are with Thread 25 and knurled washer 27 equipped.

In F i g. 3 ist ein Ausführungsbeispiel dargestellt, das zur Übertragung der Scherkräfte einen Winkelhebel 28 verwendet, wobei dieser im Prinzip das Gehäuse der F i g. 1 ersetzt und die Gewinde für die Aufnahmeorgane des Scherstiftes enthält. Der Winkelhebel ist mit seinem einen Hebelarm 29 U-förmig ausgebildet und umgreift einen Stab 31, in dem sich die auch hier verschieden weit vom Drehlager 32 angebrachten Scherstiftbohrungen 33, 34, 35 und 35 befinden. Der andere Hebel 30 ist hier als Nase ausgebildet, an der derIn Fig. 3 shows an exemplary embodiment which has an angle lever 28 for transmitting the shear forces used, this being in principle the housing of FIG. 1 replaced and the thread for the receiving organs of the shear pin. The angle lever is U-shaped with its one lever arm 29 and encompasses a rod 31 in which the pivot bearings 32 are also attached at different distances here Shear pin bores 33, 34, 35 and 35 are located. The other lever 30 is designed here as a nose on which the

1 zum Anschlagen der Last befestigt ist, welche hmoment entgegen dem Uhrzeigersinn erzeugt, b 31 ist der Aufnahmebügel 14 zum Anschlagen haken des Hebezeugs befestigt,
alie des Abscherens des Scherstiftes 19 findet ne Schwenkbewegung in Pfeiirichtung statt, welche zur Betätigung eines auf einer Grundplatte 38 montierten Endschalter 37 mit Schaltstift 39 herangezogen werden kann und ein akustisches oder optisches Signal auslöst oder die Ausschaltung des Hubwerkes durch Eingriff in die Kransteuerung bewirkt.
1 is attached to attach the load, which generates the torque in a counterclockwise direction, b 31 the mounting bracket 14 is attached to the attachment hook of the hoist,
All of the shearing off of the shear pin 19 takes place ne pivoting movement in the direction of arrow, which can be used to actuate a limit switch 37 with switch pin 39 mounted on a base plate 38 and which triggers an acoustic or optical signal or causes the lifting mechanism to be switched off by intervening in the crane control.

Hierzu 2 Blatt ZeichnungenFor this purpose 2 sheets of drawings

Claims (1)

Patentanspruch:Claim: Vorrichtung zum Überprüfen von Überlastsicherungen an Hebezeugen mit einem bei Überschreiten der zulässigen Grenzbelastung den Kraftfluß des Lastorgans trennenden Scherstift, dadurch gekennzeichnet, daß im Kraftfluß des Lasttragorgans ein zweiarmiger Hebel (4,28) angeordnet ist, der in seinem Drehpunkt (Bolzen 6, 32) in einer Halbbohrung (5) gelagert ist, dessen einer Arm (8, 30) durch die aufgebrachte Belastung beansprucht wird und dessen anderer Arm mit mehreren, vom Drehpunkt (6, 32) des Hebels (4, 28) unterschiedlich weit entfernten, gleich starken Bohrungen (10—12 und 33—36) zur Aufnahme des Scherstiftes (19) versehen ist, der seinerseits in entsprechenden Aufnahmen (26, 27) in einem am Hebezeug angeschlagenen Gehäuse (7) bzw. Stab (31) gelagert ist.Device for checking overload protection devices on hoists with one if exceeded the permissible limit load the force flow of the load organ separating the shear pin, characterized in that, that a two-armed lever (4,28) is arranged in the power flow of the load bearing element, which is mounted in its pivot point (bolts 6, 32) in a half-hole (5), one arm of which (8, 30) is stressed by the applied load and its other arm with several, from The pivot point (6, 32) of the lever (4, 28) equally spaced holes (10-12 and 33-36) is provided for receiving the shear pin (19), which in turn is in corresponding Recordings (26, 27) mounted in a housing (7) or rod (31) attached to the hoist is.
DE19732337998 1973-07-26 1973-07-26 Device for checking overload protection devices on hoists Expired DE2337998C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19732337998 DE2337998C2 (en) 1973-07-26 1973-07-26 Device for checking overload protection devices on hoists

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19732337998 DE2337998C2 (en) 1973-07-26 1973-07-26 Device for checking overload protection devices on hoists

Publications (2)

Publication Number Publication Date
DE2337998A1 DE2337998A1 (en) 1975-02-13
DE2337998C2 true DE2337998C2 (en) 1983-10-13

Family

ID=5888063

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19732337998 Expired DE2337998C2 (en) 1973-07-26 1973-07-26 Device for checking overload protection devices on hoists

Country Status (1)

Country Link
DE (1) DE2337998C2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102016007723A1 (en) * 2016-06-23 2017-12-28 Liebherr-Werk Ehingen Gmbh Load weighing on the load hook

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1960765A1 (en) * 1969-12-03 1971-06-09 Gerhard Reuter Device for checking overload protection devices on hoists

Also Published As

Publication number Publication date
DE2337998A1 (en) 1975-02-13

Similar Documents

Publication Publication Date Title
EP0003561A1 (en) Conveying device for prefabricated concrete elements
DE2846112C2 (en) Device for wedging loads carried under an aircraft
DE2634116A1 (en) AUTOMATIC LIFTING DEVICE FOR MOTOR OPERATED HOISTING EQUIPMENT
DE2451466B2 (en) ROPE CONNECTION WITH SLEEP ROPE BRAKE RELEASE ON A CABLE CAR
DE2812073A1 (en) ROPE CLAMP
DE2337998C2 (en) Device for checking overload protection devices on hoists
DE2911603C2 (en) Device for determining external loads on aircraft
WO2018095914A1 (en) Fall protection device for a hoist
DE3120165A1 (en) Overload and slack-rope safeguard
DE10042724A1 (en) Measurement device for braking force, has hoisting rope with one end wound to drum winch and another end connected flexibly with fixed point via dynamometer
DE3341414A1 (en) Device for testing overload safety devices on lifting appliances
DE1124312B (en) Draw hook, especially for hoists or the like.
DE2704198A1 (en) DEVICE FOR QUICKLY FASTENING ONE OR MORE METAL ROPES TO A FIXED BODY, FOR EXAMPLE TO THE CAB OF A LIFT
DE1156211B (en) Device for measuring and monitoring the load torque on crane systems or the like.
DE2019412A1 (en) Device for supporting the pedal force in motor vehicle clutches, especially for heavy vehicles
DE1483639B2 (en)
DE1753262A1 (en) Group opening system for tilting or folding parts
DE867365C (en) Safety and catch device for sliding windows
DE2513128B2 (en) Drawing table with height and tilt adjustable drawing board
AT368597B (en) LOCKING DEVICE FOR A HORIZONTAL SLIDING GATE
DE102015109609A1 (en) Overload protection for a hoist and hoist hereby
DE2941066A1 (en) ROLLER LIFTING HOOK
DE1105581B (en) Overload protection for grab cranes
DE1911962C (en) Device for checking overload protection on hoists
DE8326565U1 (en) LIFTING DEVICE

Legal Events

Date Code Title Description
OGA New person/name/address of the applicant
OD Request for examination
8139 Disposal/non-payment of the annual fee
8136 Disposal/non-payment of the fee for publication/grant
8180 Miscellaneous part 1

Free format text: WIEDEREINSETZUNG IN DEN VORIGEN STAND

D2 Grant after examination
8327 Change in the person/name/address of the patent owner

Owner name: JAKOB BLAIMER GMBH, 8000 MUENCHEN, DE

8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee