DE2222801A1 - PROGRESSIVE EXPANSION FOR EXTRACTION PLANTS AND PROCESSES FOR THE DISMANTLING OF STORAGE FACILITIES, IN PARTICULAR IN BRIEF WITH EXTRACTING MACHINE IN FRONT OF THE HEAD - Google Patents

PROGRESSIVE EXPANSION FOR EXTRACTION PLANTS AND PROCESSES FOR THE DISMANTLING OF STORAGE FACILITIES, IN PARTICULAR IN BRIEF WITH EXTRACTING MACHINE IN FRONT OF THE HEAD

Info

Publication number
DE2222801A1
DE2222801A1 DE19722222801 DE2222801A DE2222801A1 DE 2222801 A1 DE2222801 A1 DE 2222801A1 DE 19722222801 DE19722222801 DE 19722222801 DE 2222801 A DE2222801 A DE 2222801A DE 2222801 A1 DE2222801 A1 DE 2222801A1
Authority
DE
Germany
Prior art keywords
expansion
frame
expansion according
extraction
mining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
DE19722222801
Other languages
German (de)
Inventor
Kunibert Becker
Franz Beulker
Joseph Kuti
Harry Rosenberg
Hans-Dieter Wieblitz
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gewerkschaft Eisenhutte Westfalia GmbH
Original Assignee
Gewerkschaft Eisenhutte Westfalia GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gewerkschaft Eisenhutte Westfalia GmbH filed Critical Gewerkschaft Eisenhutte Westfalia GmbH
Priority to DE19722222801 priority Critical patent/DE2222801A1/en
Priority to US00358558A priority patent/US3851480A/en
Priority to AU55491/73A priority patent/AU488093B2/en
Priority to GB2224073A priority patent/GB1420996A/en
Publication of DE2222801A1 publication Critical patent/DE2222801A1/en
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/0052Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor with advancing shifting devices connected therewith

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

Gewerkschaft Eisenhütte Westfalia, 4628 AltlünenWestfalia Ironworks Union, 4628 Altlünen

Schreitender Ausbau für Gewinnungsbetriebe und Verfahren zum Abbau von Lagerstätten, insbesondere in Kurzstreben mit vor Kopf arbeitender GewinnungsmaschineS c hreitender expansion of mining operations and procedures to reduce deposits, especially in short stays with working front head mining machine

Die Erfindung betrifft einen schreitenden Ausbau für Gewinnungsbetriebe, insbesondere für Kurzstreben, bei denen die Gewinnung mit Hilfe einer vor Kopf arbeitenden schneidenden Gewinnungsmaschine erfolgt, wobei der Ausbau aus mit Vorpfändkappen versehenen, zu einem Gespann verbundenen Ausbaurahmen besteht, die an ihren Sohlverbindungen zwischen den Stempeln über Achsschenkelstücke an eine Parallelführungs- und Rückvorrichtung angeschlossen sind. Ferner bezieht sich die Erfindung auf ein Verfahren zum Abbau einerThe invention relates to a progressive expansion for mining operations, especially for short struts, where the extraction with the help of a cutting head working in front of the head Extraction machine takes place, with the expansion from expansion frames provided with pre-pledged caps, connected to form a team exists, which at their base connections between the rams via steering knuckle pieces to a parallel guide and rear device are connected. The invention also relates to a method for dismantling a

309847/0187309847/0187

-P--P-

Lagerstätte in einem Kurzstrebbetrieb unter Verwendung eines aus Ausbaugespannen bestehenden Strebausbaus.Deposit in a short-walled operation using a longwall construction consisting of expansion teams.

Ausbaugestelle, bei denen zwei oder mehr Rahmen zu einem sogenannten Ausbaugespann derart verbunden sind, daß die Rahmen in wechselnder Folge und unter gegenseitiger Abstützung gerückt werden können, sind in verschiedenen Ausführungen bekannt. In der Praxis bewährt haben sich Ausbaugespanne, bei denen die Rahmen an ihren aus Blattfedern bestehenden Sohlverbindungen im Bereich zwischen den Stempeln über Achsschenkelstücke, die ebenfalls aus Blattfedern bestehen, mit einer zwischen den Rahmen angeordneten Parallelführungs- und Rückvorrichtung verbunden sind. Letztere besteht aus einem Rückzylinder mit durchgehender, beidseitig aus dem Zylinder herausgeführter Kolbenstange, an deren beiden Enden ein den Zylinder umgreifendes Schutzgehäuse befestigt ist. Dabei ist die Anordnung so getroffen, daß die Achsschenkelverbindung im mittleren Bereich des Rückzylinders von dem einen Rahmen her mit dem Schutzgehäuse und von dem benachbarten Rahmen her mit dem Zylinder erfolgt. Die Erfindung bezieht sich vor allem auf Ausbaugespanne dieser Art.Extension racks in which two or more frames become one so-called expansion team are connected in such a way that the frames in alternating sequence and with mutual support can be moved, are known in various designs. Expansion spans have proven themselves in practice, in which the frames at their sole connections consisting of leaf springs in the area between the stamps via steering knuckle pieces, which also consist of leaf springs, are connected to a parallel guide and return device arranged between the frames. The latter exists from a rear cylinder with a continuous piston rod protruding from the cylinder on both sides, on both of them Ends a protective housing encompassing the cylinder is attached. The arrangement is made so that the Steering knuckle connection in the middle area of the rear cylinder takes place from one frame with the protective housing and from the adjacent frame with the cylinder. the The invention relates primarily to expansion teams of this type.

Ausbaugespanne dieser oder ähnlicher Art werden so in G-ewinnungsbetrieben eingesetzt. daß sie das Hangende möglichst breitflächig und auf ganzem Flächeribereich zwischen Abbaustoß und Bruchraum unterfangen. Es ist dabei bekannt, den Kappen verschiebbare oder schwenkbare Vorpfändkappen zuzu-Expansion teams of this or a similar type are used in G-ewinnungsbetriebe used. that they cover the hanging wall as broadly as possible and over the entire surface area between the working face and fracture space undertake. It is known to provide the caps with slidable or pivotable pre-pledging caps.

30;; 347/018730 ;; 347/0187

ordnen, um das Hangende sofort nach Vorbeigang der Gewinnungsmaschine im Gewinnungsfeld unterfangen zu können.arrange to the hanging wall immediately after passing the mining machine to be able to undertake in the extraction field.

Zur Gewinnung in Kurzstreben, d.h. in solchen Gewinnungsbetrieben, bei denen die Kohle od.dgl. an einem verhältnismäßig kurzen Abbaustoß hereingewonnen wird, verwendet man u.a. vor Kopf arbeitende Gewinnungsmaschinen, wie z.B. einen sogenannten Continuous Miner, welche mit Verhiebtiefen von mehreren Metern, z.B. 3 m, arbeiten. Dabei ist es auch bekannt, an die Gewinnungsmaschine einen sogenannten Schleppförderer anzuhängen, der von der Gewinnungsmaschine bei der Gewinnungsfahrt nachgezogen und über den das gewonnene Gut zur Strecke od.dgl. hin abgefördert wird.For extraction in short struts, i.e. in those mining operations where the coal or the like. at a relatively short mining thrust is obtained, one uses, among other things, mining machines that work in front of the head, such as a so-called continuous miners, which work with excavation depths of several meters, e.g. 3 m. It is there too known to attach a so-called drag conveyor to the extraction machine, which is used by the extraction machine in the Extraction drive followed and over which the extracted good to the track or the like. is promoted towards.

Der Erfindung liegt vornehmlich die Aufgabe zugrunde, einen schreitenden Ausbau zu schaffen, der sich vor allem für den Einsatz in Gewinnungsbetrieben der letztgenannten Art eignet. Ferner bezweckt die Erfindung eine Verbesserung dieses letztgenannten Abbau- bzw. Gewinnungsverfahrens insbesondere in bezug auf die Ausbauarbeit und den Ladevorgang.The invention is primarily based on the object of a to create progressive expansion, which is particularly suitable for use in mining operations of the latter type. Furthermore, the invention aims to improve this last-mentioned mining or extraction process in particular in relation to the removal work and the charging process.

Der erfindungsgemäße Ausbau ist dadurch gekennzeichnet, daß an den Sohlverbindungen der Rahmen zwischen den Stempeln mindestens drei im gegenseitigen Abstand angeordnete Anschlußstellen für den lösbaren Anschluß der Achsschenkelstücke angeordnet sind.The expansion according to the invention is characterized in that at the bottom connections of the frame between the stamps at least arranged three mutually spaced connection points for the releasable connection of the steering knuckle pieces are.

Vorzugsweise besteht der erfindungsgemäße Ausbau aus einem Dreirahmengespann, bei dem der mittlere Eahmen jeweils überThe expansion according to the invention preferably consists of a three-frame combination, in which the middle frame in each case over

309847/0187309847/0187

Achsschenkelstücke und eine Parallelführungs- und Rückvorrichtung mit den äußeren Rahmen verbunden ist und bei dem die Sohlschienen der Rahmen jeweils aus zwei im Abstand übereinander angeordneten Blattfedern bestehen, die an der Achsschenkelbefestigungsstelle zu einem Knotenpunkt verbunden sind, wobei die Sohlverbindungen der äußeren Rahmen drei im gleichen Abstand angeordnete Knotenpunktstellen für den AchsSchenkelanschluß aufweisen. Der Achsschenkelanschluß kann mittels vertikaler Steckbolzen oder sonstiger lösbarer Verbindungsmittel, wie Keile od.dgl., erfolgen. An den freien Enden der Achsschenkel können zwischen den parallelen Blattfedern der Sohlschienen verschiebbare Blattfeder-Verbindungsund Distanzstücke angeordnet sein, derart, daß nach Lösen der Verbindungsorgane die Verbindungs- und Distanzstücke zwischen den parallelen Federblattschwellen der Sohlverbindungen zu einer anderen Anschlußstelle verschoben und hier mit den lederblattschwellen verbunden werden können.Steering knuckle pieces and a parallel guide and reverse device is connected to the outer frame and in which the sole rails of the frame each consist of two at a distance There are leaf springs arranged one above the other, which are connected to a node at the steering knuckle fastening point are, the sole connections of the outer frame three equally spaced node points for the Have axle-leg connection. The steering knuckle connection can be detachable by means of vertical socket pins or other means Connection means, such as wedges or the like., Take place. To the free ones Ends of the stub axles can be slidable leaf spring connection and between the parallel leaf springs of the sole rails Spacers be arranged in such a way that after loosening the connecting members, the connecting and spacing pieces moved between the parallel spring leaf sleepers of the sole connections to another connection point and here can be connected to the leather leaf sleepers.

Es empfiehlt sich, zwei parallel übereinander angeordnete Bl-attfeder-Achsschenkelstücke vorzusehen, wobei auch zwei Paare solcher Achsschenkelstücke an jeder Achsschenkelverbindung angeordnet werden können.It is advisable to have two parallel, one above the other Provide leaf spring steering knuckle pieces, also two Pairs of such steering knuckle pieces on each steering knuckle connection can be arranged.

Bei einem Ausbau dieser Ausgestaltung lassen sich die Rahmen der Gespanne entweder in der Mitte zwischen den hintereinander stehenden Stempeln verbinden, wobei die Rahmen in der Grundstellung auf gleicher Höhe nebeneinander stehen, oder es lassen sich die Rahmen an den außermittigen Anschluß-When expanding this configuration, the frames of the teams can either be in the middle between the one behind the other connect standing stamps, with the frames in the basic position next to each other at the same height, or the frames can be attached to the eccentric connection

309847/0187309847/0187

stellen kuppeln, so daß die Rahmen in der Grundstellung in Strebrichtung gegeneinander versetzt, also in gestaffelter Anordnung nebeneinander stehen. Dies bietet die Möglichkeit, den Ausbau entsprechend dem Verlauf des Abbaustoßes so anzuordnen, daß auch bei nicht geradlinigem Verlauf des Stoßes die erforderliche Hangendabstützung erzielt wird. Insbesondere ergibt sich die Möglichkeit, den Strebausbau entsprechend dem kurvenförmigen Verlauf, mit dem die vor Kopf arbeitende Gewinnungsmaschine von der Strecke her in den Streb hineinläuft, kurvenförmig bis in die Strecke herauszuziehen, wobei die Rahmen des Gespanns in diesem Strebeingangsbereich gestaffelt so angeordnet sind, daß sie das Hangende bis zum Abbaustoß hin wirkungsvoll unterfangen.make coupling so that the frame in the basic position is offset from one another in the direction of the struts, i.e. in a staggered manner Side by side arrangement. This offers the possibility of arranging the expansion according to the course of the excavation face in such a way that that the necessary slope support is achieved even if the joint is not straight. In particular there is the possibility of building the longwall according to the curved course with which the working in front of the head The mining machine runs from the track into the longwall, pulling it out in a curve into the track, wherein the frame of the team in this strut entrance area are staggered so that they up to the hanging wall Effective work towards the mining impact.

Nach einem weiteren, an sich selbständigen Merkmal der Erfindung ist an dem Ausbaugespann abbaustoßseitig ein vorschiebbarer Räumschild angeordnet. Vorzugsweise erstreckt sich der Räumschild über die gesamte Breite des Dreirahmengespanns j er ist dabei an dem mittleren Rahmen vorschiebbar angeordnet.According to a further, in itself independent feature of the invention, a push-forward device is provided on the excavation joint on the mining joint side Dozer blade arranged. The clearing blade preferably extends over the entire width of the three-frame combination j it is arranged on the middle frame so that it can be pushed forward.

Mit Hilfe des nach Art eines Planierschildes wirkenden Räumschildes kann das Liegende vor dem Ausbau soweit gesäubert werden, daß sich der Ausbau auf einem im wesentlichen glatten, sauberen Liegenden vorschieben läßt. Insbesondere ist es aber möglich, mit Hilfe der Räumschilde die von der Gewinnungsmaschine gelöste Kohle, soweit sie nicht unmittelbar auf den Schleppförderer gelangt, in diesen zu verladen, wo-With the help of the dozer blade, which acts like a dozer blade the lying surface can be cleaned before the expansion so that the expansion is on an essentially smooth, can be pushed forward to clean lying people. In particular, however, it is possible, with the help of the clearing blades, to remove those from the mining machine to load dissolved coal, if it does not get directly onto the drag conveyor, where-

309847/0107309847/0107

durch der Ladevorgang insgesamt verbessert wird. Der Schleppförderer weist zweckmäßig hinter der Gewinnungsmaschine eine Ladevorrichtung auf, die mit angetriebenen Ladearmen od.dgl. versehen sein kann, welche die Kohle dem Schleppförderer zuführen. Mit Hilfe der Räumschilde läßt sich die Kohle od.dgl. der Ladevorrichtung zuführen, so daß sie von den Ladearmen od.dgl. erfaßt und in den Schleppförderer transportiert wird. Es ist aber auch möglich, die Ladevorrichtung und/oder den Schleppförderer versatzseitig mit einer Laderampe zu versehen, über die die Kohle mit Hilfe der vorschiebbaren Eäumschilde in den Förderer verfrachtet wird.is improved overall by the charging process. Of the The drag conveyor expediently has a loading device behind the mining machine, which is driven by the Loading arms or the like. can be provided, which feed the coal to the drag conveyor. With the help of the blades can the coal or the like. the loading device so that they or the like of the loading arms. captured and in the Drag conveyor is transported. But it is also possible to use the loading device and / or the drag conveyor To be provided on the offset side with a loading ramp, via which the coal can be transported into the Conveyor is shipped.

Um die vor dem Ausbau liegende Kohle od.dgl. möglichst vollständig zu verladen, empfiehlt es sich, den Räumschild so auszubilden, daß er sich beim Vorschub gegen das Liegende andrückt. Vorzugsweise weist der Räumschild zu diesem Zweck eine sich gegen das Liegende andrückende, schaufelartig geneigte Zunge od.dgl. auf. Die Zunge od.dgl. ist dabei zweckmäßig um eine horizontale Achse schwenkbar angeordnet. Es empfiehlt sich, zu beiden Seiten der Sohlverbindung des mittleren Rahmens Führungen für mit dem Räumschild verbundene Führungsschienen od.dgl. anzuordnen, wobei die Führungsschienen zweckmäßig aus hochkant stehenden Blattfedern bestehen, um eine federelastische Führung und Verbindung des Räumschildes mit dem Ausbaugespann zu erzielen.To the coal or the like lying before the expansion. as complete as possible To load, it is advisable to design the dozer blade in such a way that it is against the lying surface when it is pushed forward presses. For this purpose, the clearing blade preferably has a shovel-like incline that presses against the lying surface Tongue or the like. on. The tongue or the like. is useful arranged pivotably about a horizontal axis. It is advisable to use the middle frame guides for guide rails connected to the blade or the like. to be arranged, the guide rails expediently consist of upright leaf springs to provide a resilient guide and connection of the To achieve clearing blade with the expansion team.

Für den Vorschub des Raumschildes sind zweckmäßig Vorschub-For the advance of the space shield, it is advisable to use

309847/0187309847/0187

zylinder vorgesehen, die- vorteilhafterweise oberhalb der Befestigtingsstellen der Führungsschienen an dem Räumschild angelenkt sind. Weiterhin können zwei Schwenkzylinder vorgesehen sein, mit denen sich der Räumschild in der Horizontalebene schwenken läßt. Der Räumschild selbst wird vorteilhafterweise so ausgebildet, daß er sich durch Anbauteile in der Höhe aufstocken läßt. Each einem weiteren Merkmal der Erfindung ist der Räumschild so ausgebildet, daß er bzw. seine Zunge bei der Rückstellbewegung selbsttätig von dem Liegenden abgehoben wird, um zu verhindern, daß der Räumschild bei der Rückstellbewegung Kohle od.dgl. mitnimmt.cylinder provided, which - advantageously above the Fastening points of the guide rails on the dozer blade are hinged. Furthermore, two swivel cylinders can be provided with which the clearing blade is in the horizontal plane can pivot. The dozer blade itself is advantageously designed so that it can be turned into by attachments the height can be increased. Each a further feature of the invention, the clearing blade is designed so that it or his tongue is automatically lifted from the person lying down during the return movement in order to prevent the clearing blade in the return movement coal or the like. takes away.

Mit Hilfe des erfindungsgemäßen Ausbaus läßt sich eine Lagerstätte im Kurζstrebverfahren unter Verwendung einer vor Kopf arbeitenden Gewinnungsmaschine so abbauen, daß das Hangende auf ganzer Streblänge bis in die Strecke hinaus jederzeit wirkungsvoll unterstützt ist. Es empfiehlt sich, den aus den Gespannen bestehenden Ausbau bis in die Strecke hinaus zu führen, wobei die im Bereich der kurvenförmigen Einlaufbahn der Gewinnungsmaschine stehenden Ausbaurahmen gestaffelt so angeordnet sind, daß die Rahmen vom Strebinneren zur Strecke hin um ein Maß. welches um ein Mehrfaches kleiner ist als das Schreitmaß, gegeneinander versetzt sind.With the help of the expansion according to the invention, a storage facility can be created in the Kurζstrebverfahren using a before head Dismantle the working extraction machine so that the hanging wall along the entire length of the face right into the distance is at all times is effectively supported. It is recommended that the expansion consisting of the harnesses extend into the route to lead, whereby the extension frame standing in the area of the curved inlet track of the extraction machine is staggered are arranged so that the frame from the interior of the face to the track by a measure. which is several times smaller is than the walking measure, are offset against each other.

Das Rücken des Ausbaus erfolgt vorzugsweise so, daß die Rahmen der gesamten Ausbaureihe nach Vorbeigang der vorlaufenden Gewinnungsmaschine zunächst jeweils um zwei aufeinanderfolgende Schritte bei ausgeschobener Vorpfändkappe gerücktThe back of the expansion is preferably done so that the frame of the entire expansion series after the preceding mining machine has passed, initially by two successive ones Steps moved with the deposit cap extended

309847/0187309847/0187

und nach Vorbeigang der zurücklaufenden Gewinnungsmaschine um mindestens einen weiteren Schritt gerückt werden, wobei spätestens während des letzten Rückschritts die nach Vorbeigang der vorlaufenden Maschine ausgestellten Vorpfändkappe]! wieder zurückgestellt werden. Hierdurch wird sichergestellt, daß das Hangende sofort nach Vorbeigang der Gewinnungsmaschine im neuen Gewinnungsfeld wirkungsvoll unterfangen wird. Wie erwähnt, wird zum Abbau zweckmäßig eine vor Kopf arbeitende Gewinnungsmaschine verwendet, die nach jeder Gewinnungsfahrt leer in die Strecke zurückläuft und zweckmäßig mit einem von ihr nachgezogenen Schleppförderer versehen ist. Das Beladen des Schleppförderers kann zumindest teilweise mit Hilfe der am Ausbau angeordneten vorschiebbaren Räumschilde erfolgen.and after passing the returning mining machine be moved by at least one further step, at the latest during the last step backwards the one after passing on the advance machine issued pre-pledging cap]! be reset again. This ensures that the hanging wall is effectively undertaken immediately after the extraction machine has passed in the new extraction field will. As mentioned, a mining machine working before the head is expediently used for mining, the after every extraction run runs back empty into the route and, appropriately, with a drag conveyor that it has pulled behind is provided. The drag conveyor can be loaded at least partially with the aid of the displacers arranged on the extension Plow blades take place.

Die Erfindung sei nachstehend anhand der Zeichnung näher erläutert. In der Zeichnung zeigen:The invention is explained in more detail below with reference to the drawing explained. In the drawing show:

Fig. 1 ein Dreirahmengespann gemäß der Erfindung in Seitenansicht;1 shows a three-frame combination according to the invention in side view;

■Fig. 2 das Ausbaugespann gemäß Fig. 1 in einer Ansicht vom Abbaustoß her;■ Fig. 2 the expansion team according to FIG. 1 in a view from the mine face;

Fig. 5 das Ausbaugespann gemäß den Fig. 1 und 2 in Draufsicht auf die Sohlkonstruktionj5 shows the expansion team according to FIGS. 1 and 2 in a plan view of the sole construction

Fig. 4 in Draufsicht einen Kurzstrebbetrieb, bei dem der erfindungsgemäße Ausbau verwendet wird}Fig. 4 is a plan view of a Kurzstrebbetrieb in which the expansion according to the invention is used}

Fig. 5 in Draufsicht die vor Kopf arbeitende Gewinnungsmaschine mit einer Ladevorrichtung und einem Schlepp-Fig. 5 is a plan view of the mining machine working in front of the head with a loading device and a towing

309847/0187309847/0187

förderer sowie dem erfindungsgemäßen Ausbau im Bereich, der Gewinnungsmaschine.conveyor and the expansion according to the invention in the area of the extraction machine.

Der erfindungsgemäße Ausbau besteht aus einem Dreirahmengespann, dessen Rahmen mit I, II und III bezeichnet sind. Die Rahmen sind untereinander gleich ausgebildet j' sie weisen Jeweils zwei hydraulische Stempel 10 und 11 auf, die, wie bekannt, am Liegenden über eine Sohlverbindung und am Hangenden über eine Hangendkappe verbunden sind. Die Stempel 10 und 11 stehen mit ihren Füßen Jeweils auf einer breitflächigen Fußplatte 13- Die Fußplatten IJ der in Schreitrichtung R hintereinander stehenden Stempel 10 und 11 eines jeden Rahmens sind über zwei waagerechte, parallele Blattfederschwellen 14 und 15 verbunden, wobei die Blattfederschwellen mittels Bolzen 16 an den Fußplatten endseitig angeschlossen sind.The expansion according to the invention consists of a three-frame combination, the frames of which are denoted by I, II and III. The frames are designed the same as one another j 'they each have two hydraulic rams 10 and 11, which, as is known, are connected on the lying floor via a base connection and on the hanging wall via a hanging end cap. The stamp 10 and 11 each stand with their feet on a wide footplate 13- The footplates IJ of in Walking direction R one behind the other punch 10 and 11 of each frame are over two horizontal, parallel Leaf spring sleepers 14 and 15 connected, the Leaf spring sleepers are connected to the end of the footplates by means of bolts 16.

Die Stempel 10 und 11 eines Jeden Rahmens tragen auf ihren Köpfen eine mehrteilige Kappe, deren Kappenteile 17 und in einem Gelenk 19 gelenkig verbunden sind. Dem Gelenk 19 ist eine Blattfedervorrichtung 20 zugeordnet, welche ein Ausknicken des Gelenks im unbelasteten Zustand verhindert. Die Kappe 18 kragt weit zum Abbaustoß hin vor, wobei an dem auskragenden Kappenteil 18' eine Vorpfändkappe angeordnet ist. Diese besteht aus einer an der Unterseite der Kappe 18' angeordneten Schiebekappe 21, die "mittels eines hydraulischen Zylinders 22 zum Abbaustoß hin (in 'Pfeilrichtung R) vorschiebbar und in Gegenrichtung zurückschiebbar ist. Der unterhalbThe stamps 10 and 11 of each frame wear a multi-part cap on their heads, the cap parts 17 and are articulated in a joint 19. The joint 19 is assigned a leaf spring device 20 which has a Prevents the joint from buckling in the unloaded state. The cap 18 protrudes far to the working joint, with the cantilevered cap part 18 'is arranged a pre-pledging cap. This consists of an at the bottom of the cap 18 ' arranged sliding cap 21, which "by means of a hydraulic cylinder 22 to the working face (in 'arrow direction R) can be advanced and can be pushed back in the opposite direction. The one below

309847/0187309847/0187

des vorkragenden Kappenteils 18' angeordnete Zylinder 22 ist mit seiner Kolbenstange bei 23 an der Kappe angelenkt. Mit 24 ist ein Gelenk bezeichnet, in dem die Vorpfändkappe mit dem Vorschubzylinder verbunden ist.of the protruding cap part 18 'arranged cylinders 22 is hinged with its piston rod at 23 on the cap. With a joint is referred to, in which the pre-pledging cap is connected to the feed cylinder.

Die Kappe 17 weist an ihrem bruchseitigen Ende einen angelenkten Bruchabweiser 25 auf. Ferner ist das Ausbaugespann hier mit einem Bruchschutzschild 26 versehen, der über Gelenkbolzen 27 an Konsolen 28 der beiden äußeren Rahmen I und III angelenkt ist. Der Bruchschutzschild 26 ist mit Seitenschildplatten 29 versehen.At its end on the fracture side, the cap 17 has an articulated fracture deflector 25. Furthermore, the expansion team here provided with a break protection shield 26, which over hinge pins 27 is hinged to consoles 28 of the two outer frames I and III. The break protection shield 26 is with Side shield plates 29 are provided.

Zwischen dem mittleren Rahmen II und den beiden äußeren Rahmen I und III ist jeweils eine Parallelführungs- und Rückvorrichtung 30 angeordnet, die, wie bekannt, aus zwei parallelen, vertikal übereinander angeordneten stangenartigen Führungselementen 31 und 32 (Fig. 2) und einem seitlich darüberliegenden Schreitzylinder 62 besteht. Die beiden Führungsstangen sind an ihren Enden untereinander und mit einem Schutzgehäuse 33 (Fig. 3) verbunden, in welchem ein Doppelgleitstück liegt. Das Schutzgehäuse ist in bekannter Weise mit einem Längsschlitz versehen, um die Verbindung zwischen dem DoppeIgleitstück und dem einen der beiden Rahmen herstellen zu können.Between the middle frame II and the two outer frames I and III there is a parallel guide and rearward device 30 arranged, which, as is known, consists of two parallel, rod-like guide elements 31 and 32 arranged vertically one above the other (FIG. 2) and one on the side overlying step cylinder 62 consists. The two guide rods are at their ends with each other and with a protective housing 33 (Fig. 3) connected, in which a double sliding piece is located. The protective housing is well known Way provided with a longitudinal slot to the connection between the DoppeIgleitstück and one of the two frames to be able to manufacture.

Die Schreitzylinder 62 mit den Kolbenstangen 63 sind rl^er-The crying cylinders 62 with the piston rods 63 are rl ^ er

30S847 /018730S847 / 0187

seits bei 65 gelenkig an dem Schutzgehäuse 33 und andererseits bei 64- an dem zugehörigen Außenstempel der hinteren Stempel 11 über Eonsolen od.dgl. gelenkig befestigt.on the one hand at 65 articulated on the protective housing 33 and on the other hand at 64- on the associated outer stamp of the rear stamp 11 via Eonsolen or the like. hinged.

An den aus den Federblattschwellen 14- und 15 bestehenden Sohl verb indungen der Rahmen I,· II und III sind in untereinander gleichen Abständen drei Anschlußstellen 35? 36 und 37 für die Parallelführungs- und Rückvorrichtung mit den benachbarten Rahmen verbindende Achsschenkelstücke vorgesehen. Die Achsschenkelverbindung erfolgt hier mittels Blattfedern 38, die, wie die I"ig. 1 und 3 erkennen lassen, paarweise neben- und übereinanderliegen, derart, daß jeweils zwei Blattfederpaare vorgesehen sind. Die Blattfedern 38 des mittleren Rahmens II sind seitlich an dem Schutzgehäuse 33 der beiden Parallelführung- und Rückvorrichtungen 30 angeschlossen,während die Blattfedern 38 der äußeren Rahmen I und III mit den Doppelgleitstücken der Rückvorrichtungen verbunden sind. Wie S1Ig. 3 zeigt, sind die Blattfedern hier jeweils an den mittleren Anschlußstellen 36 der Sohlverbindungen 14, 15 angeschlossen. Statt dessen ist es aber auch möglich, die Blattfedern an den vorderen Anschlußstellen 35 oder den hinteren Anschlußstellen 37 anzuschließen, wobei in diesem EaIl die Rahmen I, II und III in Schreitrichtung R um den Abstand der Anschlußstellen 35 uncL 37 von der mittleren Anschlußstelle 36 in Schreitrichtung gegeneinander versetzt sind. Zum Anschluß der Blattfedern 38 an denOn the base connections of the frames I, II and III consisting of the spring leaf sleepers 14 and 15, three connection points 35? 36 and 37 provided for the parallel guiding and rearward device connecting stub axle pieces to the adjacent frame. The stub axle connection is made here by means of leaf springs 38, which, as can be seen in FIGS of the two parallel guiding and rear devices 30, while the leaf springs 38 of the outer frames I and III are connected to the double sliding pieces of the rear devices. As S 1 Ig Instead, however, it is also possible to connect the leaf springs to the front connection points 35 or the rear connection points 37, in which case the frames I, II and III in the walking direction R by the distance between the connection points 35 and 37 from the central connection point 36 are offset from one another in the walking direction

309847/0187309847/0187

_ 1 O_ 1 O

Sohl verbindungen 14, 15 sind leicht lösbare Verbindungsorgane vorgesehen. Beispielsweise sind die Blattfedern 38 endseitig mit z.B. U-förmigen Gleit-Distanzstücken 39 verbunden, die zwischen den parallelen Federblattschwellen 14 und 15 der Sohlverbindungen liegen und zwischen diesen in Schreitrichtung verschiebbar sind. Zur Verbindung dieser Gleit-Distanzstücke 39 mit den Federblattschwellen 14 und 15 können vertikale Steckbolzen 40 verwendet werden.Sole connections 14, 15 are easily detachable connecting organs intended. For example, the leaf springs 38 are connected at the end with e.g. U-shaped sliding spacers 39, which lie between the parallel spring leaf sleepers 14 and 15 of the sole connections and between these in the walking direction are movable. To connect these sliding spacers 39 with the spring leaf sleepers 14 and 15, vertical socket pins 40 can be used.

Das Dreirahmengespann I, II, III weist abbaustoßseitig einen Räumschild 50 auf, der sich über die gesamte Breite des Ausbaugespanns erstreckt. Der Räumschild 50 besteht aus einem etwa vertikal stehenden kastenförmigen Schildteil 51, der sich durch Aufstocken weiterer Schildteile in der Höhe einstellen läßt. Mit diesem Schildteil 51 ist eine schräg zum Liegenden geneigte schaufelartige Zunge 52 über Gelenke 53 mit horizontaler Gelenkachse schwenkbar verbunden. Die Schildzunge 52 weist rückseitig stegartige Stützorgane 54 auf, die sich an der Rückseite des Schildteils 51 abstützen können. Im Normalzustand ist die Schildzunge 52 gegen das Liegende geklappt, wobei sich die Stützorgane 54- gegen den Schildteil 51 rückseitig abstützen. Der gesamte Räumschild 50 ist mittels doppeltwirkender hydraulischer Vorschubzylinder 55 zum Abbaustoß hin vorschiebbar und in Gegenrichtung zurückstellbar. Die beiden parallelen Vorschubzylinder 55 sind bei 56 im oberen Bereich an dem Schildteil 51 angelenkt. DieThe three-frame combination I, II, III has on the working face side a clearing blade 50 which extends over the entire width of the extension combination extends. The clearing blade 50 consists of an approximately vertically standing box-shaped shield part 51, the can be adjusted in height by adding more shield parts. With this shield part 51 is an oblique to Lying inclined shovel-like tongue 52 over joints 53 pivotally connected to the horizontal joint axis. The back of the shield tongue 52 has web-like support members 54 which can be supported on the back of the shield part 51. In the normal state, the shield tongue 52 is against the lying folded, with the support members 54- against the shield part Support 51 from the rear. The entire dozer blade 50 is can be advanced towards the working face and reset in the opposite direction by means of double-acting hydraulic feed cylinders 55. The two parallel feed cylinders 55 are articulated to the shield part 51 at 56 in the upper region. the

309847/0187309847/0187

Eo Ib en stangen 57 der Vorschubzylinder sind versatz sed/big über Gelenke 58 mit dem mittleren Rahmen II bzw. hieran angeschlossenen Teilen verbunden* Zur Führung des Räumschildes _ sind zwei parallele Führungsschienen 59 vorgesehen, die in den Fig. 1 und 3> lediglich gestrichelt angedeutet sind. Die Führungsschienen 59 bestehen aus hochkant stehenden Federblättern, welche bei 60 (Fig. 1) an dem Schildteil 51 angelenkt sind.. Die Gelenice 60 liegen im Abstand unterhalb der Gelenke 56 der Vorschubzylinder. Die Führungsschienen 59 sind gemäß Fig. 2 in Führungstaschen 61 in Schreitrichtung R verschiebbar geführt. Die Führungstasehen 61 sind seitlich neben dem mittleren Rahmen II, d.h. zwischen dem mittleren Rahmen und den Parallelführungs- und Rückvorrichtungen 30 angeordnet.Eo Ib en rods 57 of the feed cylinders are offset sed / big via joints 58 with the middle frame II or connected thereto Parts connected * Two parallel guide rails 59 are provided to guide the clearing blade _, which are shown in 1 and 3> are only indicated by dashed lines. the Guide rails 59 consist of upright spring leaves, which is hinged to the shield part 51 at 60 (FIG. 1) are .. The gelenice 60 are at a distance below the joints 56 of the feed cylinder. The guide rails 59 are guided in guide pockets 61 in the walking direction R in accordance with FIG. The guide pockets 61 are on the side next to the middle frame II, i.e. between the middle frame and the parallel guiding and rearward devices 30 arranged.

Mit Hilfe der beiden Vorschubzylinder 55 läßt sich somit der Räumschild 50 in Pfeilrichtung R vorschieben, wobei der Schildteil 51 durch die Vorschubzylinder geringfügig in der Vertikalebene gekippt wird und sich die Schildzunge 52 gegen das Liegende drückt. Werden die Vorschubzylinder in entgegengesetzter Richtung vom Druck beaufschlagt, so wird der Räumschild wieder zurückgestellt. Beim Zurückfahren des Räumschildes kann die Liegendzunge 52 in Pfeilrichtung P hochschwenken, so daß sie etwaige Hindernisse auf dem Liegenden frei überprüfen kann. Beim Vorschub des Räumschildes ist dagegen die Liegendzunge 52 mit den Stützorganen 5^ rückseitigWith the help of the two feed cylinders 55 can thus advance the dozer blade 50 in the direction of arrow R, with the Shield part 51 is tilted slightly in the vertical plane by the feed cylinder and the shield tongue 52 is against the lying presses. The feed cylinders are in opposite directions Direction acted upon by the pressure, the dozer blade is set back again. When retracting the snow blade the lying tongue 52 can pivot up in the direction of arrow P, so that she can freely check any obstacles on the lying surface. On the other hand, when the dozer blade is advanced the lying tongue 52 with the supporting organs 5 ^ on the back

309847/0187309847/0187

am Schildteil 51 abgestützt, so daß sie unter Beibehaltung ihrer Berührung mit dem Liegenden das vor dem Räumschild liegende Gut vor sich herschiebt.supported on the shield part 51, so that they while maintaining their contact with the lying person that in front of the clearing blade pushes lying goods in front of him.

Um den Räumschild 50 etwas schräg zur Schreitrichtimg R ausstellen, d.h. in der Vertikalebene verschwenken zu können, werden die doppeltwirkenden Vor schub zylinder 55 gegenläufig, d.h. der eine in Ausscliubrichtung und der andere in Einschubrichtung beaufschlagt.To raise the clearing blade 50 at a slight angle to the Schreitrichtimg R, i.e. to be able to pivot in the vertical plane, if the double-acting feed cylinder 55 rotates in opposite directions, i.e. one in the direction of extraction and the other in direction of insertion applied.

In Fig. 4 ist ein Kurzstreb dargestellt, bei dein der erfinaungsgeinäße Aiisbau verwendet wird. Mit r/0 ist der Streb bezeichnet, in aera die Kohle od.dgl., aiisgehend von einer Begleitstrecke 71 mit Hilfe einer vor Kopf arbeitenden Gewinnungsmaschine (Continuous Hirer) gewonnen v/iixU Der Ausbau besteht aus Breirahmengespannen geriäß den i'ig. 1 bis '';. , wobei die einzelnen Gespanne mit A. B. G usv;. bezeichnet sind. Der Ausbau ist bis in die Begleit strecke 71 herausgeführt, wobei die im Bereich der Begleitstrecke und des Strebeingangs stehenden Ausbaugespanne mit A bis E bezeichnet sind. Der Abbaustoß 72 verläuft „,rierhalb des Kurz strebe geradlinig; am Strebeingang verläuft er bei 7r kurvenförmigIn Fig. 4 a short strut is shown, in which the inventive construction is used. The longwall is designated with r / 0 , in aera the coal or the like, extracted from an accompanying route 71 with the help of a mining machine (continuous hirer) working in front of the head. 1 to '';. , the individual teams with AB G etc .; are designated. The expansion is led out into the accompanying route 71, with the expansion units standing in the area of the accompanying route and the strut entrance being denoted by A to E. The working face 72 runs “outside of the short strut in a straight line; at the strut entrance it runs in a curve at 7r

3 0 9 8 4 7/ C 1 8 7 ORIGINAL INSPECTED3 0 9 8 4 7 / C 1 8 7 ORIGINAL INSPECTED

in die Strecke 71 hinein. Um das Hangende nicht nur innerhalb des Strebs. sondern auch im Bereich der Strecke und des Strebeingangs möglichst bis zum Abbaustoß hin wirkungsvoll abzufangen, sind die Eahmen der Gespanne G, D und E in der Grundstellung jeweils gegeneinander versetzt, wie dies Fig. 4 erkennen läßt. Außerdem sind die Vorpfändkappen 21 dieser Eahmen voll ausgeschoben, so daß sie etwa bis zum Abbaustoß 73 reichen. Entsprechend sind die Kappen der in der Strecke 71 stehenden Gespanne A und B ausgeschoben, wobei die Eahmen dieser Gespanne jedoch nicht gegeneinander versetzt angeordnet sind. Die gestaffelte Anordnung der Eahmen der Gespanne G, D und E läßt sich durch Umstecken der Achsschenkelverbindungen 38 an den Anschlußorganen 35 bis 37 erreichen, wie dies vorstehend in Verbindung mit den Fig. 1 bis 3 erläutert wurde. into route 71. Not just inside the hanging wall of the longwall. but also in the area of the route and the strut entrance as effectively as possible up to the working face to intercept, the frames of the teams G, D and E are offset from each other in the basic position, like this can be seen in FIG. In addition, the pre-pledging caps 21 of this frame are fully pushed out so that they are approximately up to reach the mining joint 73. Correspondingly, the canopies of teams A and B standing in route 71 are pushed out, However, the frames of these teams are not offset from one another. The staggered arrangement The frame of the sidecars G, D and E can be changed by repositioning the steering knuckle connections 38 on the connecting members 35 to 37, as explained above in connection with FIGS. 1 to 3.

Die innerhalb des Kurzstrebs stehenden Gespanne F bis Q sind nicht gegeneinander versetzt; ihre Eahmen sind demgemäß über die mittleren Anschlußstellen 36 verbunden. Außerdem sind die Vorpfändkappen dieser Gespanne eingeschoben, wobei jedoch die vorkragenden Kappenteile 18' nahezu bis zum Abbaustoß 70 reichen.The teams F to Q standing within the short strut are not offset from one another; their frames are accordingly connected via the central connection points 36. In addition, the pre-pledging caps of these teams are inserted, however, the protruding cap parts 18 'extend almost to the working joint 70.

Fig. 4 zeigt den Streb und den Ausbau in der Ausgangsstellung vor der Gewinnung. Die Gewinnung erfolgt gemäß Fig. mittels einer vor Kopf arbeitenden Gewinnungsmaschine 74-(Gontinuous Miner), die mit einer heb- und senkbaren, rotierenden Schneidwalze 71P ausgerüstet ist, welche den Ab-Fig. 4 shows the face and the expansion in the starting position before extraction. The extraction takes place according to FIG. By means of an extraction machine 74- (Gontinuous Miner) working in front of the head, which is equipped with a lifting and lowering, rotating cutting roller 7 1 P , which the Ab-

309847/0187309847/0187

baustoß 70 in einer Verhiebtiefe von z.B. 3 m schneidend hereingewinnt. Mit der Gewinnungsmaschine ist in bekannter Weise ein Schleppförderer 76 verbunden, über den die von der Gewinnungsmaschine gelöste Kohle zur Strecke 7I hin abgefördert wird. Die Gewinnungsmaschine zieht bei der Gewinnungsfahrt den Schleppförderer hinter sich her, wobei das Ende des Schleppförderersinnerhalb der Strecke 71 auf einen (nicht dargestellten) Streckenförderer austrägt. Die Gewinnungsmaschine 74- beginnt ihre Gewinnungsfahrt in der Strecke 71> sie läuft von der Strecke her auf einem bogenähnlichen Weg 77 in den Kurzstreb hinein, wobei sie den Abbaustoß im Strebeingangsbereich bei 73 um die Verhiebtiefe hereingewinnt. Unmittelbar nach Vorbeigang der Gewinnungsmaschine werden die Ausbaugespanne A bis E im Streckenbereich bei ausgeschobenen Vorpfändkappen 21 in mehreren Schritten vorgerückt, so daß das von der Gewinnungsmaschine freigelegte Hangende bis zum Abbaustoß 70 hin sofort unterfangen wird.building site 70 in a cutting depth of, for example, 3 m. A drag conveyor 76 is connected to the extraction machine in a known manner, by means of which the coal released by the extraction machine is conveyed to the route 7I. The extraction machine pulls the drag conveyor behind it during the extraction journey, the end of the drag conveyor within the route 71 being discharged onto a route conveyor (not shown). The mining machine 74 begins its mining journey in the route 71> it runs from the route on an arch-like path 77 into the short strut, where it wins the mining impact in the strut entrance area at 73 by the depth of the excavation. Immediately after the mining machine has passed, the expansion spans A to E are advanced in several steps in the route area with the Vorpfändkappen 21 pushed out, so that the hanging wall exposed by the mining machine is immediately underpinned up to the excavation joint 70.

Das Rücken des Ausbaus innerhalb des Strebs läßt sich der Fig. 5 entnehmen. Sobald die Gewinnungsmaschine 74· an einem Ausbaugespann, z.B. dem Ausbaugespann M vorbeigefahren ist, wird zunächst der mittlere Rahmen II dieses Gespanns durch Druckbeaufschlagung der Rückzylinder um den Rückzylinderhub, der z.B. 1 m beträgt, vorgeschoben, wobei zugleich die Vorpfändkappe 21 dieses Rahmens ausgeschoben wird. Anschließend werden die beiden äußeren Rahmen I und III umThe back of the extension within the longwall can be seen in FIG. As soon as the extraction machine 74 · at a Expansion team, e.g. the expansion team M has driven past, the middle frame II of this team is first by applying pressure to the rear cylinder by the rear cylinder stroke, which is e.g. 1 m, advanced at the same time the Vorpfändkappe 21 of this frame is pushed out. Then the two outer frames I and III are around

309847/018 7309847/018 7

den Rückzylinderhub nachgeholt, wie dies in Fig. 5 "bei dem Gespann Ii dargestellt ist. Zugleich werden auch die Yorpfändkappen dieser Rahmen I und III vorgeschoben. Dann wird der mittlere Rahmen II wiederum um den Rückzylinderhub (Im) vorgeschoben, wie dies bei dem Gespann E dargestellt ist. Anschließend werden die äußeren Rahmen I und III um den Rückzylinderhub nachgeholt. Die Ausbaugespanne sind jetzt in zwei Schritten von jeweils 1 m, d.h. um ein Schreitmaß von insgesamt 2 m, vorgeschoben, wobei die dabei ausgeschobenen Vorpfändkappen 21 das Hangende bis etwa zum Abbaustoß 70 hin sichern. In Fig. 5 sind die Gespanne G, H und J um zwei Stufen vorgeschoben.the return cylinder stroke made up, as shown in Fig. 5 "in the Sidecar Ii is shown. At the same time, the Yorpfändkappen this frame I and III advanced. Then the middle frame II is again increased by the return cylinder stroke (Im) advanced, as shown in the E team. Then the outer frames I and III are around the Return cylinder stroke made up. The expansion margins are now in two steps of 1 m each, i.e. by a walking distance of 2 m in total, with the ones being pushed out Vorpfändkappen 21 secure the hanging wall up to about the working face 70. In Fig. 5, the margins G, H and J are around advanced two steps.

Auf diese Weise wird die gesamte Reihe der Ausbaugespanne unmittelbar hinter der Gewinnungsmaschine während der Gewinnungsfahrt zunächst um zwei Schritte gerückt. Am Ende der Gewinnungsfahrt läuft die Gewinnungsmaschine in Pfeilrichtung S zur Strecke 71 hin zurück, wobei sie den Schleppförderer 76 vor sich herschiebt und in die Strecke zurückdrückt. Sobald bei der Rückfahrt die Gewinnungsmaschine an dem Ausbau vorbeigelaufen ist, werden die einzelnen Gespanne um einen weiteren Schritt von 1 m zum Stoß 70 kin gerückt, wobei zugleich die Vorpfändkappen 21 eingeschoben sind. Die Ausbaugespanne befinden sich jetzt wieder in der in 3?ig. gezeigten Stellung, in der die vorkragenden Kappenteile 18' das Hangende bis in unmittelbarer Nähe des Abbaustoßes 70 unterfangen.In this way, the entire row of expansion teams is immediately behind the extraction machine during the extraction journey initially moved two steps. At the end of the mining run, the mining machine runs in the direction of the arrow S to route 71 back, taking the drag conveyor 76 pushes in front of him and pushes back into the track. As soon as the mining machine has passed the expansion on the way back, the individual teams are moved by a further step of 1 m to the joint 70 kin, at the same time the pre-pledging caps 21 are inserted. The expansion teams are now back in the 3? Ig. position shown in which the protruding cap parts 18 ' the hanging wall up to the immediate vicinity of the working face 70 undertake.

309847/0187309847/0187

— ίο —- ίο -

Derselbe Arbeitsablauf wiederholt sich bei der nächsten Gewinnungsfahrt der Gewinnungsmaschine 7^· Es ist erkennbar, daß durch das stufenweise Rücken der Gespanne und den Ausschub der Vorpfändkappen das Hangende sofort nach seinem Freilegen auf ganzer Streblänge bis zur Strecke 71 hin unterfangen wird..The same workflow is repeated on the next extraction run of the extraction machine 7 ^ It can be seen that by the gradual backing of the teams and the extension the Vorpfändkappen the hanging wall immediately after his Exposing the entire length of the face up to the route 71 will..

Das von der Gewinnungsmaschine gelöste Gut wird über einen Zwischenförderer 76' dem Schleppförderer 76 zugeführt und von diesem zur Strecke hin abgefördert. Mit 78 ist eine mit der Gewinnungsmaschine verbundene Ladevorrichtung bezeichnet die mit angetriebenen Ladeorganen, hier in Form von schwenkbaren Ladearmen 79 versehen ist, welche die vor dem Ausbau liegende Restkohle dem Schleppförderer zuführen. Die unmittelbar vor dem Ausbau auf dem Liegenden verbleibende Kohle kann mit Hilfe der am Ausbau angeordneten Räumschilde 50 dem Schleppförderer zugeführt werden. Zu diesem Zweck werden die Räumschilde durch Druckbeaufschlagung der Vorschubzylinder vorgeschoben, wobei sie die Kohle der Ladevorrichtung 78 zuführen, so daß sie mit Hilfe der Ladearme 79 in den Schleppförderer verfrachtet werden kann. Es besteht die Möglichkeit, die Ladevorrichtung an der Versatzseite ramp.enförmig auszubilden, so daß die Räumschilde die Kohle über die Laderampe in den Schleppförderer schieben. Auf diese Weise läßt sich eine nahezu restlose Gewinnung der Kohle erreichen. Mit Hilfe der Räumschilde läßt sich außerdem das Liegende vor den einzelnen Ausbaugespannen säubern, so daß der Ausbau auf einem glatten Liegenden gerückt werden kann.The material loosened by the extraction machine is fed to the drag conveyor 76 via an intermediate conveyor 76 'and conveyed away by this to the track. At 78 there is one with The loading device connected to the mining machine refers to the loading device with driven loading elements, here in the form of pivotable ones Loading arms 79 is provided, which feed the residual coal lying before the expansion to the drag conveyor. The immediate Coal remaining on the surface before the expansion can be removed with the aid of the clearing blades 50 arranged on the expansion be fed to the drag conveyor. For this purpose, the dozer blades are pressurized to the feed cylinder advanced, feeding the coal to the loading device 78 so that it can be loaded with the aid of the loading arms 79 in the drag conveyor can be shipped. It is possible to ramp the loading device on the offset side train so that the blades push the coal over the loading ramp into the drag conveyor. To this Almost complete extraction of the coal can be achieved. This can also be done with the help of the clearing blades Clean the lying in front of the individual extension spans so that the extension can be moved to a smooth lying surface.

309847/0187309847/0187

Claims (18)

AnsprücheExpectations 1. Schreitender Ausbau für Gewinnungsbetriebe, insbesondere für Kurzstreben, bei denen die Gewinnung mit Hilfe einer vor Kopf arbeitenden schneidenden Gewinnungsmaschine erfolgt , wobei der Ausbau aus- mit Vorpfändkappen versehenen, zu einem Gespann verbundenen Ausbaurahmen besteht, die an ihren Sohlverbindungen zwischen den Stempeln über Achs schenkel stücke an eine Par al Ie !führung s- und Rückvorrichtung angeschlossen sind, dadurch gekennzeichnet, daß an den Sohlverbindungen (14, 15) der Rahmen (I, II, III) zwischen den Stempeln (10, 11) mindestens drei im gegenseitigen Abstand angeordnete Anschlußstellen (35, 36, 37) für den lösbaren Anschluß der Achs schenkel stücke (38) angeordnet sind.1. Gradual expansion for mining operations, in particular for short struts in which the extraction takes place with the help of a cutting extraction machine working in front of the head , whereby the removal is provided with pre-pledging caps, there is an expansion frame connected to a team that has its sole connections between the rams Axle leg pieces on a parallel guide and rear device are connected, characterized in that at the base connections (14, 15) of the frame (I, II, III) between the punches (10, 11) at least three mutually spaced connection points (35, 36, 37) for the releasable connection of the axle leg pieces (38) are arranged. 2. Ausbau nach Anspruch 1, dadurch gekennzeichnet, daß er in bekannter Weise aus einem Dreirahmengespann (I, II, III) besteht, bei dem der mittlere Rahmen (II) jeweils über Achsschenkelstücke (38) und eine Parallelführung- und Rückvorrichtung (30) mit den äußeren Rahmen (I, III) verbunden ist und bei dem die Sohlschienen der Rahmen jeweils aus zwei im Abstand übereinander angeordneten Eederblattschwellen (14, 15) bestehen, die an der Achsschenkelbefestigungsstelle zu einem Knotenpunkt verbunden sind„ wobei die Sohlverbindungen der äußeren Rahmen drei im gleichen Abstand angeordnete Knotenpunktstellen2. Expansion according to claim 1, characterized in that it consists of a three-frame team (I, II, III) in a known manner consists, in which the middle frame (II) each via steering knuckle pieces (38) and a parallel guide and Rear device (30) is connected to the outer frame (I, III) and in which the sole rails of the frame respectively consist of two spaced apart Eeder leaf sleepers (14, 15) which are attached to the steering knuckle attachment point are connected to a node "with the sole connections of the outer frame three equally spaced junction points 309847/0187309847/0187 (35, ί>6, 37) für den Achsschenkelanschluß aufweisen.(35, ί> 6, 37) for the steering knuckle connection. 3- Ausbau nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß der Achsschenkelanschluß mittels vertikaler Steckbolzen (40) erfolgt.3- expansion according to claim 1 or 2, characterized in that that the steering knuckle connection takes place by means of vertical socket pins (40). 4. Ausbau nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß an den freien Enden der Achsschenkel (38) zwischen den parallelen Federblattschwellen (14, 15) der Sohlschienen verschiebbare Blattfeder-Verbindungs- und Distanzstücke (39) angeordnet sind.4. Expansion according to one of claims 1 to 3, characterized in that that at the free ends of the stub axles (38) between the parallel spring leaf sleepers (14, 15) of the Base rails displaceable leaf spring connecting pieces and spacers (39) are arranged. 5· Ausbau nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß an dem Ausbaugespann abbaustoßseitig ein vorschiebbarer Eäumschild (50) angeordnet ist.5. Expansion according to one of claims 1 to 4, characterized in that that a retractable Eäumschild (50) is arranged on the expansion team on the working joint side. 6. Ausbau nach Anspruch 5· dadurch gekennzeichnet, daß der Eäumschild (50) sich über die gesamte Breite des Dreirahmengespanns erstreckt und an dem mittleren Eahmen (II) vorschiebbar angeordnet ist.6. Expansion according to claim 5 · characterized in that the Eäumschild (50) extends over the entire width of the three-frame combination and is attached to the middle frame (II) Is arranged to be advanced. 7- Ausbau nach Anspruch 5 oder 6, dadurch gekennzeichnet, daß der Eäumschild (50) eine sich gegen das Liegende andrückende , zum Liegenden schaufelartig geneigte Zunge (52) aufweist.7- expansion according to claim 5 or 6, characterized in that that the Eäumschild (50) has a tongue which presses against the lying down and is inclined like a shovel to the lying down (52). 8. Ausbau nach Anspruch 7 ■> dadurch gekennzeichnet, daß die Zunge (52) um eine horizontale Achse (53) schwenkbar ist.8. Expansion according to claim 7 ■> characterized in that the tongue (52) is pivotable about a horizontal axis (53). 9· Ausbau nach einem der Ansprüche 5 his 8. dadurch gekeim-9 · Expansion according to one of claims 5 to 8. 309847/018 7309847/018 7 zeichnet, daß zu beiden Seiten der Sohl verbindung (14-,
15) des mittleren Rahmens (II) Führungen (61) für mit
dem Räumschild (50) verbundene Führungsschienen (59) angeordnet sind.
shows that on both sides of the sole connection (14-,
15) of the middle frame (II) guides (61) for with
the clearing blade (50) connected guide rails (59) are arranged.
10. Ausbau nach Anspruch 9, dadurch gekennzeichnet, daß die
Führungsschienen (59) aus hochkant stehenden Blattfedern bestehen.
10. Expansion according to claim 9, characterized in that the
Guide rails (59) consist of leaf springs standing on edge.
11. Ausbau nach Anspruch 9 oder 10, dadurch gekennzeichnet,
daß oberhalb der Befestigungsstellen der Führungsschienen (59) an dem Räumschild (50) Vorschubzylinder (55) angelenkt sind.
11. Expansion according to claim 9 or 10, characterized in that
that above the fastening points of the guide rails (59) on the clearing blade (50) feed cylinders (55) are articulated.
12. Ausbau nach einem der Ansprüche 5 bis H? dadurch gekennzeichnet, daß durch Gegenbeaufschlagung der Vorschubzylinder (55) der Räumschild (50) in der Horizontalebene
schwenkbar ist.
12. Expansion according to one of claims 5 to H? characterized in that by counteracting the feed cylinder (55) the clearing blade (50) in the horizontal plane
is pivotable.
IJ. Ausbau nach einem der Ansprüche 5 bis 12, dadurch gekennzeichnet, daß der Räumschild (50) bzw. die Zunge (52) bei der Rückstellung selbsttätig vom Liegenden abhebbar ist.IJ. Expansion according to one of Claims 5 to 12, characterized in that that the clearing blade (50) or the tongue (52) can automatically be lifted from the person lying down when it is reset. 14-. Ausbau nach einem der Ansprüche 5 bis 13, dadurch gekennzeichnet, daß der Räumschild (50) durch Anbauteile in der Höhe aufstockbar ist.14-. Expansion according to one of Claims 5 to 13, characterized in that that the blade (50) can be increased in height by attachments. 15. "Verfahren zum Abbau einer Lagerstätte in einem Kurzstrebbetrieb mittels einer vor Kopf arbeitenden, von einer15. "Procedure for mining a deposit in a short-walled operation by means of one working in front of one's head, of one - 22 309847/0187 - 22 309847/0187 OO — - OO - Strecke her auf einer bogenförmigen Einlaufbahn in den Streb hineinfahrenden schneidenden Gewinnungsmaschine unter Verwendung eines Ausbaus gemäß einem oder mehreren der Ansprüche 1 bis 14. wobei die zweckmäßig als Dreirahmengespanne ausgebildeten, in Streblängsrichtung nebeneinander stehenden Ausbaugespanne mit Vorpfändkappen versehen sind, die nach Vorbeigang der Gewinnungsmaschine ausgestellt werden, dadurch gekennzeichnet, daß die Rahmen (I, II, III) der Ausbaugespanne nach Vorbeigang der vorlaufenden Gewinnungsmaschine (72O zunächst jeweils um zwei aufeinanderfolgende Schritte bei ausgeschobener Vorpfändkappe (21) gerückt und nach Vorbeigang der zurücklaufenden Gewinnungsmaschine um mindestens einen weiteren Schritt gerückt werden, wobei spätestens während des letzten Rückschritts die nach Vorbeigang der vorlaufenden Maschine ausgestellten Vorpfändkappen (21) wieder zurückgestellt werden.A cutting mining machine driving into the longwall face on an arc-shaped inlet track using an extension according to one or more of claims 1 to 14, the extension teams, which are expediently designed as three-frame teams and standing next to one another in the longitudinal direction of the face, are provided with pre-pledged caps, which are issued after the mining machine has passed , characterized in that the frames (I, II, III) of the extension spans after the advancing extraction machine (7 2 O has passed) initially moved by two successive steps with the pre-pledging cap (21) pushed out, and after the returning extraction machine has passed by at least one further step are, at the latest during the last step back, the pre-pledging caps (21) issued after the passing machine has been put back again. 16. Verfahren nach Anspruch 15, dadurch gekennzeichnet, daß der aus den Gespannen bestehende Ausbau bis in die Strekke (71) hinausgeführt wird, wobei die im Bereich der kurvenförmigen Einlaufbahn stehenden Rahmen gestaffelt so angeordnet sind, daß vom Strebinneren zur Strecke hin die Rahmen um ein Maß. welches um ein Mehrfaches kleiner ist als das Schreitmaß, gegeneinander versetzt sind.16. The method according to claim 15, characterized in that the expansion consisting of the harnesses is extended into the route (71), with the one in the area of the curved Infeed track standing frames are staggered so that from the interior of the face to the track the frame by a measure. which is several times smaller than the walking distance, are offset against each other. 17. Verfahren nach Anspruch 15 oder 16, dadurch gekennzeichnet, daß zum Abbau eine an sich bekannte, nach jeder Ge-17. The method according to claim 15 or 16, characterized in that that for the dismantling a known per se 309847/018 7309847/018 7 winnungsfahrt leer in die Strecke zurückfahrende Gewinnungsmaschine mit einem Schleppförderer (76) verwendet wird.extraction drive empty extraction machine returning to the route is used with a drag conveyor (76). 18. Verfahren zum Beladen eines von einer vor Kopf arbeitenden Gewinnungsmaschine nachgezogenen Schleppförderers, dadurch gekennzeichnet, daß die Beladung des Schleppförderers mit Hilfe von zum" Abbaustoß hin vorschiebbaren, mit dem schreitenden Ausbau verbundenen Räumschilden (50) erfolgt.18. Method for loading a drag conveyor that is pulled by a mining machine working in front of the head, characterized in that the loading of the drag conveyor with the aid of the "mining face" can be advanced, clearing blades associated with the progressive expansion (50) he follows. 0 9 8 4 7/01870 9 8 4 7/0187 Le e rs eLe e rs e itit
DE19722222801 1972-05-10 1972-05-10 PROGRESSIVE EXPANSION FOR EXTRACTION PLANTS AND PROCESSES FOR THE DISMANTLING OF STORAGE FACILITIES, IN PARTICULAR IN BRIEF WITH EXTRACTING MACHINE IN FRONT OF THE HEAD Ceased DE2222801A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
DE19722222801 DE2222801A1 (en) 1972-05-10 1972-05-10 PROGRESSIVE EXPANSION FOR EXTRACTION PLANTS AND PROCESSES FOR THE DISMANTLING OF STORAGE FACILITIES, IN PARTICULAR IN BRIEF WITH EXTRACTING MACHINE IN FRONT OF THE HEAD
US00358558A US3851480A (en) 1972-05-10 1973-05-09 Mine roof support assemblies
AU55491/73A AU488093B2 (en) 1972-05-10 1973-05-09 Improvements in mine roof support assemblies
GB2224073A GB1420996A (en) 1972-05-10 1973-05-09 Mine roof support assemblies

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19722222801 DE2222801A1 (en) 1972-05-10 1972-05-10 PROGRESSIVE EXPANSION FOR EXTRACTION PLANTS AND PROCESSES FOR THE DISMANTLING OF STORAGE FACILITIES, IN PARTICULAR IN BRIEF WITH EXTRACTING MACHINE IN FRONT OF THE HEAD

Publications (1)

Publication Number Publication Date
DE2222801A1 true DE2222801A1 (en) 1973-11-22

Family

ID=5844544

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19722222801 Ceased DE2222801A1 (en) 1972-05-10 1972-05-10 PROGRESSIVE EXPANSION FOR EXTRACTION PLANTS AND PROCESSES FOR THE DISMANTLING OF STORAGE FACILITIES, IN PARTICULAR IN BRIEF WITH EXTRACTING MACHINE IN FRONT OF THE HEAD

Country Status (3)

Country Link
US (1) US3851480A (en)
DE (1) DE2222801A1 (en)
GB (1) GB1420996A (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1472552A (en) * 1974-11-15 1977-05-04 Gullick Dobson Ltd Mine roof supports
RU2709894C1 (en) * 2019-05-29 2019-12-23 Федеральное государственное бюджетное научное учреждение "Федеральный исследовательский центр угля и углехимии Сибирского отделения Российской академии наук" (ФИЦ УУХ СО РАН) Powered support section with coal discharge device
CN110469352A (en) * 2019-08-16 2019-11-19 郑州煤矿机械集团股份有限公司 Excavation support with function of removing obstacles
CN113622969B (en) * 2021-08-21 2023-09-22 华东矿用设备有限公司 Mining hydraulic supporting device

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1200233B (en) * 1964-04-21 1965-09-09 Gewerk Eisenhuette Westfalia Walking hydraulic pit support frame
GB1171944A (en) * 1965-11-30 1969-11-26 Karl Maria Groetschel Improvements relating to Roof Supports for Mine Workings.
DE1276579B (en) * 1966-06-04 1968-09-05 Gewerk Eisenhuette Westfalia Wandering pit support
US3490243A (en) * 1966-11-16 1970-01-20 Karl Maria Groetschel Roof supports for mine workings
US3431737A (en) * 1967-02-14 1969-03-11 Wild A G & Co Ltd Hydraulic roof supports
DE1583091A1 (en) * 1967-10-21 1970-06-11 Gewerk Eisenhuette Westfalia Three-frame combination
US3570255A (en) * 1968-06-10 1971-03-16 Mastabar Mining Equipment Co L Mine roof support

Also Published As

Publication number Publication date
US3851480A (en) 1974-12-03
GB1420996A (en) 1976-01-14
AU5549173A (en) 1974-11-14

Similar Documents

Publication Publication Date Title
DE2806982C2 (en) Striding extension for blow molding plants in inclined storage
DE2509810A1 (en) PROGRESSIVE EXPANSION FOR USE IN MIGHTY FLOEZEN
CH627232A5 (en) Heading machine
DE3827403C1 (en) Apparatus for placing temporary support in the rise heading for longwall faces in collieries
DE2222801A1 (en) PROGRESSIVE EXPANSION FOR EXTRACTION PLANTS AND PROCESSES FOR THE DISMANTLING OF STORAGE FACILITIES, IN PARTICULAR IN BRIEF WITH EXTRACTING MACHINE IN FRONT OF THE HEAD
DE2928150A1 (en) SHIELD EXTENSION RACK
DE2240872C3 (en) Walking gear for a part-cut road tunneling machine equipped with a chassis
DE19721201B4 (en) Extraction facility for underground ore mining operations
DE2353230C2 (en) Extraction device, in particular for floating mining in half or steep storage
DE2401832C2 (en) Backfill wall tracked as the expansion progresses, especially for thick seams and flush backfill
DE3031113C2 (en)
DE1921314A1 (en) Framework for mining operations
DE3145365C2 (en)
DE1993012U (en) TRAVELING FRAME FOR UNDERGROUND MINING.
DE3343311A1 (en) Arrangement for placing hydraulic self-advancing powered support units in an underground winning operation, in particular in a steep face
DE3024464C2 (en)
DE2343939A1 (en) ANCHORING BRACKET, IN PARTICULAR FOR THE ANCHORING OF A DRIVING OR EQUIPMENT
DE2146811C3 (en) Bracing device for a face conveyor
DE1205036B (en) Wandering longwall with frame
DE19750484B4 (en) Extraction device, in particular for the coal production in unterertätigen extraction struts
DE3240843C2 (en)
DE916287C (en) Wedge-shaped sledge for laying face conveyors
DE1283178B (en) Remote drive station for conveyors and extraction equipment
DE2530127C3 (en) Shoring shield for driving tunnels, galleries and the like
DE19732946B4 (en) Extraction device for underground mining, especially for coal mining in longwall mining

Legal Events

Date Code Title Description
OD Request for examination
8131 Rejection