DE2205914B2 - Data processing system, in particular for telephone switching technology - Google Patents

Data processing system, in particular for telephone switching technology

Info

Publication number
DE2205914B2
DE2205914B2 DE19722205914 DE2205914A DE2205914B2 DE 2205914 B2 DE2205914 B2 DE 2205914B2 DE 19722205914 DE19722205914 DE 19722205914 DE 2205914 A DE2205914 A DE 2205914A DE 2205914 B2 DE2205914 B2 DE 2205914B2
Authority
DE
Germany
Prior art keywords
data processing
processing system
orders
limit value
upper limit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19722205914
Other languages
German (de)
Other versions
DE2205914C3 (en
DE2205914A1 (en
Inventor
Klaus Brandmaier
Hans Dipl.-Ing. Hoeschler
Wolfgang Dipl.-Ing. 8012 Riemerling Raimar
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to BE795144D priority Critical patent/BE795144A/en
Application filed by Siemens AG filed Critical Siemens AG
Priority to DE19722205914 priority patent/DE2205914C3/en
Priority to CH39573A priority patent/CH552250A/en
Priority to GB352573A priority patent/GB1398651A/en
Priority to AT74573A priority patent/AT323815B/en
Priority to LU66980D priority patent/LU66980A1/xx
Priority to DK65373A priority patent/DK141264C/en
Priority to IT2009773A priority patent/IT978867B/en
Priority to FR7304273A priority patent/FR2171776A5/fr
Priority to JP1606173A priority patent/JPS5346405B2/ja
Priority to NL7301805A priority patent/NL7301805A/xx
Publication of DE2205914A1 publication Critical patent/DE2205914A1/en
Priority to US05/777,513 priority patent/US4099235A/en
Publication of DE2205914B2 publication Critical patent/DE2205914B2/en
Application granted granted Critical
Publication of DE2205914C3 publication Critical patent/DE2205914C3/en
Expired legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q3/00Selecting arrangements
    • H04Q3/42Circuit arrangements for indirect selecting controlled by common circuits, e.g. register controller, marker
    • H04Q3/54Circuit arrangements for indirect selecting controlled by common circuits, e.g. register controller, marker in which the logic circuitry controlling the exchange is centralised
    • H04Q3/545Circuit arrangements for indirect selecting controlled by common circuits, e.g. register controller, marker in which the logic circuitry controlling the exchange is centralised using a stored programme
    • H04Q3/54575Software application
    • H04Q3/54591Supervision, e.g. fault localisation, traffic measurements, avoiding errors, failure recovery, monitoring, statistical analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F15/00Digital computers in general; Data processing equipment in general
    • G06F15/16Combinations of two or more digital computers each having at least an arithmetic unit, a program unit and a register, e.g. for a simultaneous processing of several programs
    • G06F15/161Computing infrastructure, e.g. computer clusters, blade chassis or hardware partitioning
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M3/00Automatic or semi-automatic exchanges
    • H04M3/22Arrangements for supervision, monitoring or testing
    • H04M3/36Statistical metering, e.g. recording occasions when traffic exceeds capacity of trunks
    • H04M3/365Load metering of control unit
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q3/00Selecting arrangements
    • H04Q3/42Circuit arrangements for indirect selecting controlled by common circuits, e.g. register controller, marker
    • H04Q3/54Circuit arrangements for indirect selecting controlled by common circuits, e.g. register controller, marker in which the logic circuitry controlling the exchange is centralised
    • H04Q3/545Circuit arrangements for indirect selecting controlled by common circuits, e.g. register controller, marker in which the logic circuitry controlling the exchange is centralised using a stored programme
    • H04Q3/54541Circuit arrangements for indirect selecting controlled by common circuits, e.g. register controller, marker in which the logic circuitry controlling the exchange is centralised using a stored programme using multi-processor systems
    • H04Q3/5455Multi-processor, parallelism, distributed systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Mathematical Physics (AREA)
  • Software Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Signal Processing (AREA)
  • Exchange Systems With Centralized Control (AREA)
  • Selective Calling Equipment (AREA)

Description

Es sind bereits Datenverarbeitungssysteme bekannt, die aus jeweils mehreren Recheneinheiten, Speichereinheiten und Eingangs-/Ausgangssteuereinheiten aufgebaut sind, die miteinander zusammenarbeiten. Die Zusammenarbeit wird dabei durch eine automatische Steueranlage koordiniert. Dabei wird die Arbeitsaufteilung entsprechend vorgeschriebenen Regeln vorgenommen, die die Priorität bestimmen. Die Priorität bzw. der Vorrang können dabei in Abhängigkeit von der Zeit, von äußeren Anforderungen sowie von Programmen und Funktionen von veränderlichen Bedingungen festgelegt werden. Die Steueranlage veranlaßt dementsprechend die Durchführung von Programmen, wobei auch die Beendigung von Programmen und Bedingungen für die Unterbrechungen von Programmen berücksichtigt werden (siehe DT-OS 14 49 532, Seite 1, h5 Seite 2, Anspruch 4, Anspruch 15). Bei dieser Zusammenarbeit von Teilen eines Datenverarbeitungssvsteins findet offensichtlich ein Verkehr zwischen denData processing systems are already known which are each constructed from a plurality of computing units, memory units and input / output control units that work together with one another. The cooperation is coordinated by an automatic control system. The division of work is carried out according to prescribed rules that determine the priority. The priority or the priority can be determined depending on the time, external requirements and programs and functions of changing conditions. The control system accordingly initiates the execution of programs, whereby the termination of programs and conditions for the interruptions of programs are also taken into account (see DT-OS 14 49 532, page 1, h5 page 2, claim 4, claim 15). With this cooperation of parts of a data processing stone, traffic obviously takes place between the erwähnten Teilen dieses Datenverarbeitungssystems statt, bei dem Daten zwischen diesen Teilen übertragen werden. Es ist nun auch bereits bekannt, daß verkehrsmäßige und statistische Betrachtungen für die zweckmäßige Struktur und Bemessung solcher Einrichtungen von Datenverarbeitungssystemen eine Rolle spielen. Es sind daher auch Fragen dieser Art bereits behandelt worden, konkrete Lösungen sind jedoch nicht angegeben worden (siehe »Elektronische Rechenanlagen«, 1970, Seite 249 bis 252).mentioned parts of this data processing system instead, in which data is transferred between these parts will. It is now already known that traffic and statistical considerations for the Appropriate structure and dimensioning of such facilities of data processing systems play a role to play. Questions of this kind have therefore already been dealt with, but there are no concrete solutions has been specified (see "Electronic Computing Systems", 1970, pages 249 to 252).

Gegebenenfalls können die vorstehend erwähnten Teile von Datenverarbeitungsanlagen zu mehreren vollständigen Datenverarbeitungsanlagen zusammengefaßt werden, die zusammen das Datenverarbeitungssystem bilden (siehe »Elektronik 1969«, Seite 217 bis 219). Die für ein derartiges Datenverarbeitungssystem anfallenden Aufträge können in Stapelverarbeitung abgewickelt werden, wobei sie zunächst gesammelt und danach verarbeitet werden. In sogenannter schritthaltender Datenverarbeitung, die auch Echt-Zeit-Verarbeitung genannt wird, wird im Unterschied dazu jeder Auftrag unmittelbar nach seinem Auftreten bearbeitet Die Aufträge kommen hier meist nicht in regelmäßigen Zeitabständen, sondern im Sinne der Wahrscheinlichkeitsrechnung statistisch verteilt an. Darauf muß beim Entwerfen eines Echt-Zeit-Datenverarbeitungssystems Rücksicht genommen werden, damit bei Häufung von Bearbeitungsfällen die Antwortzeit nicht überschritten wird (s. Löbel, Müller, Schmidt: Lexikon der Datenverarbeitung, 2. Auflage, S. 418, 419, 482). Ein derartiges Datenverarbeitungssystem ist darüber hinaus auch zweckentsprechend zu betreiben, damit die erzielbaren Vorteile ausgenutzt werden. Es genügt dabei nicht, mit Hilfe einer Steueranlage, die lediglich vorgegebene Prioritäten bzw. Vorränge berücksichtigt, die Zusammenarbeit der zum Datenverarbeitungssystem gehörenden Teile zu koordinieren. Daher hat man auch bereits Anordnungen geschaffen, bei denen zwei zugehörige programmgesteuerte Informationsverarbeitungseinheiten einander vertreten können (s. schweizerische Patentschrift 4 96 383). Dabei wird davon ausgegangen, daß normalerweise jede von zwei Verarbeitungseinheiten die Hälfte des Verkehrs abzuwickeln hat Bei dessen Verteilung wird die Eigenart der Aufträge nicht berücksichtigt. Wenn eine Verarbeitungseinheit gestört ist, wird sie durch die andere vertreten. Hierzu sind Einrichtungen zur Erkennung von Störungen vorgesehen, die zwar erfassen, wie sich die anfallenden Aufträge gemäß ihrer Anzahl verteilen, wodurch aber die Auslastung nicht eindeutig erfaßbar ist, wenn die Aufträge entsprechend ihrer Eigenart verteilt werden. Für die Vermeidung von Verzögerungen des Betriebes kann eine derartige Vertretung nicht ausgenutzt werden. Es sind daher auch keine Hilfsmittel vorgesehen, die eine derartige Vertretung veranlassen könnten.If necessary, the aforementioned parts of data processing systems can be combined into several complete data processing systems are summarized, which together form the data processing system (see "Electronics 1969", page 217 bis 219). The jobs that arise for such a data processing system can be processed in batches are processed, whereby they are first collected and then processed. In so-called real-time data processing, which is also called real-time processing, everyone will Order processed immediately after its occurrence The orders usually do not come here on a regular basis Time intervals, but statistically distributed in the sense of the probability calculation. Must be with Designing a real-time data processing system should be taken into account so that when there is an accumulation of Processing cases the response time is not exceeded (see Löbel, Müller, Schmidt: Lexikon der Data processing, 2nd edition, pp. 418, 419, 482). Such a data processing system is also also to operate appropriately so that the achievable advantages are exploited. It is sufficient not, with the help of a control system that only takes into account given priorities or priorities, to coordinate the cooperation of the parts belonging to the data processing system. Therefore one has arrangements have already been made in which two associated program-controlled information processing units can represent each other (see Swiss patent 4 96 383). It will be of this it is assumed that normally each of two processing units has to handle half of the traffic Orders not taken into account. If one processing unit fails, the other will represent. For this purpose, devices for the detection of faults are provided, although they detect how the Distribute incoming orders according to their number, but this means that the utilization cannot be clearly determined is when the orders are distributed according to their nature. Such a representation cannot be used to avoid delays in the operation be exploited. There are therefore no aids that would cause such a representation could.

Die Erfindung zeigt nun einen Weg, wie ein Datenverarbeitungssystem mit mindestens zwei selbständigen programmgesteuerten Echt-Zeit-Datenverarbeitungsanlagen besonders zweckmäßig betrieben werden kann, um unzulässige Zeitverzögerungen und weitere Nachteile zu vermeiden. Die Vermeidung von Zeitverzögerungen ist besonders wichtig bei Datenverarbeitungssystemen, die für die Fernsprechvermittlungstechnik eingesetzt werden. Dort sind nämlich Aufträge zeitgerecht abzuwickeln, die von einer großen Zahl von Teilnehmern ausgehen. Diese Aufträge werden in an sich bekannter Weise (s. DT-AS 15 49 522)The invention now shows a way in which a data processing system with at least two independent program-controlled real-time data processing systems can be operated particularly expediently in order to avoid impermissible time delays and to avoid further disadvantages. Avoiding time delays is particularly important in data processing systems that are used for telephone switching technology. There are namely To process orders in a timely manner, which come from a large number of participants. These orders are in a known manner (see DT-AS 15 49 522)

entsprechend ihrer unterschiedlichen Eigenart auf die Datenverarbeitungsanlagen verteilt Die Erfindung betrifft demgemäß ein Datenverarbeitungssystem, insbesondere für die Fernsprechvermittlungstechnik, mit mindestens zwei selbständigen programmgesteuerten s Echt-Zeit-Datenverarbeitungsanlagen, die die ihnen zugeleiteten Aufträge jeweils innerhalb einer bestimmten Zeit zu bearbeiten haben und bei dem die Auftrüge ihrerseits entsprechend ihrer unterschiedlichen Eigenart der einen oder einer anderen Datenverarbeitungsanlage ι ο zugeleitet werden. Dieses Datenverarbeitungssystem ist dadurch gekennzeichnet, daß an jede Datenverarbeitungsanlage (B, R; MW, M12) eine Meßeinrichtung (Mb, Mr; HM, MM) zur Messung der Auslastung angeschlossen ist, daß an die Meßeinrichtungen eine is Vergleichseinrichtung (Vl) zum Vergleich von Meßwerten unter Berücksichtigung eines vorgegebenen oberen Grenzwertes angeschlossen ist, daß an die Vergleichseinrichtung eine Auswahleinrichtung (A 1) angeschlossen ist, die unter Berücksichtigung der Vergleichsergebnisse die Datenverarbeitungsanlage bestimmt, zu der Aufträge vorübergehend umzuleiten sind und daß die Datenverarbeitungsanlagen über Leitungen (L) für einen erforderlichen Programmaustausch verbunden sind.distributed according to their different characteristics on the data processing systems. The invention accordingly relates to a data processing system, in particular for telephone switching technology, with at least two independent program-controlled real-time data processing systems, which have to process the orders sent to them within a certain time and in which the orders for their part, depending on their different characteristics, are fed to one or another data processing system ι ο. This data processing system is characterized in that a measuring device (Mb, Mr; HM, MM) for measuring the load is connected to each data processing system (B, R; MW, M 12), and a comparison device (Vl) for comparison is connected to the measuring devices of measured values is connected, taking into account a predetermined upper limit value, that a selection device (A 1) is connected to the comparison device, which, taking into account the comparison results, determines the data processing system to which orders are temporarily to be redirected and that the data processing systems via lines (L) for a required program exchange.

Durch die Umleitung der erwähnten Aufträge wird vorteilhafterweise eine unzulässige Häufung von Bearbeitungsfällen bei ein und derselben Datenverarbeitungsanlage vermieden. Damit verteilt sich der Verkehr auf die zugehörigen Datenverarbeitungsanlagen gleichmäßiger als sonst Damit werden vorteilhafterweise auch Verkehrshemmungen vermieden, die ihrerseits nachteilige Effekte zur Folge hätten. Durch eine Verkehrshemmung wurden Zugriffswünsche eines Rechnerkernes warten müssen und damit dessen Leistung sinken. Ferner würden die Wartezeiten für die Speicherzugriffe eines Eingabe-/Ausgabewerkes überschritten werden können (s. »Elektronische Rechenanlagen«, 1970, S. 249 und 250, Pos. 2).The rerouting of the mentioned orders advantageously results in an inadmissible accumulation of processing cases avoided in one and the same data processing system. This distributes the traffic on the associated data processing systems more evenly than otherwise also avoided traffic obstructions, which in turn would have negative effects. By a Traffic obstruction would have to wait for access requests from a computer core and thus its Performance decrease. Furthermore, the waiting times for memory access by an input / output unit would be exceeded (see "Electronic Computing Systems", 1970, pp. 249 and 250, item 2).

Es ist nun zwar bereits ein Verfahren zum Betrieb von zentral gesteuerten Vermittlungsanlagen bekannt, bei dem zentrale Steuereinrichtungen benutzt werden und bei dem laufend das Verhältnis aus der Anzahl von Steuervorgängen für die Durchschaltung im Koppelfeld und der Anzahl von sonstigen Steuervorgänj;en überwacht wird. Die Überwachung führt hier jedoch dazu, daß bestimmte Betriebsmöglichkeiten vorübergehend eingeschränkt werden (s. DT-AS 19 40 502). Eine derartige Einschränkung ist beim erfindungsgemäßen \'erfahren nicht vorgesehen. Darüber hinaus unterschei- so det sich dieses von dem bekannten Verfahren dadurch, daß die Überwachung selber auf andere Vorgänge als dort abgestellt ist Dies hat zur Folge, daß beim erfindungsgemäßen Datenverarbeitungssystem vorzugsweise als Auslastung jeweils das Verhältnis der Belegungszeit durch zugeleitete Aufträge zur davon freibleibenden Zeit gemessen wird. Hierbei ergibt sich ein ganz anderes Verhältnis als bei dem bekannten Verfahren.A method for operating centrally controlled switching systems is already known in the central control devices are used and in which the ratio of the number of Control processes for switching through in the switching network and the number of other control processes is monitored. However, the monitoring here means that certain operational options are temporary restricted (see DT-AS 19 40 502). One such limitation is in the present invention \ 'experienced not provided. In addition, they differ det this from the known method in that the monitoring itself on processes other than This has the consequence that preferably in the data processing system according to the invention as utilization, the ratio of the occupancy time due to orders sent to them free time is measured. This results in a completely different relationship than with the known one Procedure.

Wie bereits erwähnt, ist das erfindungsgemäße Datenverarbeitungssystem insbesondere für die Feirnsprechvermittlungstechnik vorgesehen. Hier kann es sich z. B. um ein Datenverarbeitungssystem handeln, das einen Bedienungsrechner und einen Verwaltungsrechner enthält, an die verschiedene Betriebsplätze für die t>-> Abwicklung von Betriebsdiensten angeschlossen sind. Es kann sich z. B. aber auch um ein Datenverarbeitungssystem handein, das ais Datenverarbeitungsanlagen zwei Markierer mit umschaltbarem Programm enthält, die zu einer indirekt gesteuerten Vermittlung gehören und die bestimmte Steuervorgänge durchzuführen haben. Einzelheiten für diese Anwendungsbeispiele werden im einzelnen an Hand der Figuren noch erläutert werden.As already mentioned, the data processing system according to the invention is particularly suitable for telephone switching technology intended. Here it can be B. be a data processing system that contains a service computer and an administration computer to which various operating locations for the t> -> Processing of operational services are connected. It can e.g. B. but also a data processing system that is ais data processing systems contains two markers with switchable programs belonging to an indirectly controlled switch and who have to perform certain control processes. Details for these application examples will be explained in detail with reference to the figures.

Davon zeigt F i g. 1 ein Datenverarbeitungssystem mit einem Bedienungsrechner und einem Verwaltungsrechner und daran angeschlossenen Betriebsplätzen sowie zusätzliche Einrichtungen. Fig.2 zeigt zwei Markierer, die zu einer Fernsprechvermittlung gehören, und zusätzliche Einrichtungen.Of these, FIG. 1 a data processing system with a service computer and an administration computer and operating stations connected to them as well as additional facilities. Fig. 2 shows two markers belonging to a telephone exchange, and additional facilities.

Die Fig.3 zeigt die Gliederung einer indirekt gesteuerten Vermittlung, zu der unter anderem die in F i g. 2 gezeigten Markierer gehören.3 shows the structure of an indirectly controlled exchange to which, among other things, the in F i g. 2 include markers shown.

Bevor die Anwendungsbeispiele im einzelnen beschrieben werden, sind noch einige Maßnahmen in allgemeiner Form anzugeben, die auch bei anderen als diesen Anwendungsbeispielen benutzt werden können. So ist es zweckmäßig, bei dem erfindungsgemäßen Datenverarbeitungssystem jeweils Aufträge zu derjenigen Datenverarbeitungsanlage umzuleiten, die die am wenigsten ausgelastete ist, wenn mehr als zwei Datenverarbeitungsanlagen vorhanden sind. Für die Umleitung von Aufträgen können als deren Quellen wirkende periphere Einrichtungen von der überlasteten Datenverarbeitungsanlage abgeschaltet und bei einer nicht voll ausgelasteten Datenverarbeitungsanlage angeschaltet werden. Sehr zweckmäßig ist es, von vornherein die Aufträge gemäß ihrer Eigenart derart den Datenverarbeitungsanlagen zuzuordnen, daß die jeweils höchste Auslastung der Datenverarbeitungsanlagen zu unterschiedlichen Zeiten zu erwarten ist. In diesem Falle kann weitgehend vermieden werden, daß mehrere Datenverarbeitungsanlagen zugleich die höchste Auslastung haben. Die vorübergehende Umleitung von Aufträgen wird aufgehoben, wenn der vorgegebene obere Grenzwert hinreichend unterschritten wird. Es ist auch sehr zweckmäßig, vorzusehen, daß in Anpassung an unterschiedliche Überschreitungsstufen des vorgegebenen oberen Grenzwertes ein unterschiedlicher Teil der Aufträge umgeleitet wird. Dies kann z. B. dadurch geschehen, daß unterschiedliche Arten von Aufträgen umgeleitet werden oder daß die Umleitung jeweils nur für bestimmte Zeitintervalle wirksam ist. Zusätzliche Aufträge, die im Stapelbetrieb abwickelbar sind, können einer Datenverarbeitungsanlage zugeleitet werden, deren Auslastung wesentlich unter dem vorgegebenen Grenzwert liegt.Before the application examples are described in detail, a few measures must be taken in in a general form that can also be used in examples other than these. In the data processing system according to the invention, it is useful to assign jobs to the one in each case Redirect computing equipment that is the least busy, if more than two Data processing systems are available. For the rerouting of orders you can use Acting peripheral devices are switched off from the overloaded data processing system and when a not fully utilized data processing system are switched on. It is very useful from assign the orders according to their characteristics in advance to the data processing systems in such a way that the maximum utilization of the data processing systems is to be expected at different times. In In this case, it can be largely avoided that several data processing systems are the highest at the same time Have occupancy. The temporary rerouting of orders is canceled if the specified is sufficiently below the upper limit value. It is also very useful to provide that in adaptation a different part of the different levels of exceedance of the specified upper limit value of orders is diverted. This can e.g. B. happen that different types of orders be redirected or that the redirection is only effective for certain time intervals. Additional Orders that can be processed in batch mode can be sent to a data processing system, whose utilization is significantly below the specified limit value.

Bei den in den F i g. 1 und 2 jeweils gezeigten Datenverarbeitungssystemen sind jeweils besondere Einrichtungen vorgesehen, die bei dem erfindungsgemäßen Verfahren benutzt werden. Es ist dort jeweils an jede Datenverarbeitungsanlage eine Meßeinrichtung zur Messung der Auslastung angeschlossen. So sind an die zu dem in F i g. 1 gezeigten Datenverarbeitungssystem gehörenden Datenverarbeitungsanlagen B und R die Meßeinrichtungen Aft und Mr angeschlossen. An die zu dem in F i g. 2 gezeigten Datenverarbeitungssystem gehörenden Datenverarbeitungsanlagen MW und M12 sind die Meßeinrichtungen HAf und \2Mangeschlossen. Alle diese Meßeinrichtungen erhalten Meßsignale von den zugehörigen Datenverarbeitungsanlagen. Wird z. B. jeweils das Verhältnis der Belegungszeit durch zugeleitete Aufträge zur davon freibleibenden Zeit gemessen, so kann dies dadurch geschehen, daß während der Belegungszeit ein Meßsignal zur betreffenden Meßeinrichtung geschickt wird, die dann ihrerseits unterIn the case of the FIGS. In the data processing systems shown in each case 1 and 2, special devices are provided which are used in the method according to the invention. A measuring device for measuring the load is connected to each data processing system there. So are to the in F i g. 1 data processing system belonging to the data processing systems B and R connected to the measuring devices Aft and Mr. To the one in FIG. The data processing systems MW and M 12 belonging to the data processing system shown in FIG. 2 are connected to the measuring devices HAf and \ 2M . All of these measuring devices receive measuring signals from the associated data processing systems. Is z. B. in each case the ratio of the occupancy time measured by incoming orders to the time remaining free of it, this can be done by sending a measurement signal to the relevant measuring device during the occupancy time, which in turn is then under

Mitwirkung einer Zeitmeßeinrichtung einen Meßwert weitergibt, der der Auslastung entspricht. An die Meßeinrichtungen ist jeweils eine Vergleichseinrichtung Vl bzw. V 2 zum Vergleich von Meßwerten unter Berücksichtigung eines vorgegebenen unterhalb einer Überlastung liegenden oberen Grenzwertes angeschlossen. Ein derartiger oberer Grenzwert wird jeweils von dem Grenzwertgenerator G1 bzw. G 2 geliefert, der ebenfalls jeweils an eine Vergleichseinrichtung V1 bzw. V 2 angeschlossen ist.With the help of a time measuring device, a measured value that corresponds to the load is passed on. A comparison device V1 or V2 for comparing measured values, taking into account a predetermined upper limit value lying below an overload, is connected to each of the measuring devices. Such an upper limit value is supplied by the limit value generator G 1 or G 2 , which is also connected to a comparison device V1 or V 2.

Die zum Datenverarbeitungssystem gemäß F i g. 1 gehörende Vergleichseinrichtung Vl liefert dann Vergleichsergebnisse zwischen dem vorgegebenen oberen Grenzwert und den von den Meßeinrichtungen Wound Mrgelieferten Meßwerten. Diese Vergleichsergebnisse geben an, ob die Auslastung der Datenverarbeitungsanlagen B und R über oder unter dem vorgegebenen oberen Grenzwert liegen. Von der an die Vergleichseinrichtung Vl angeschlossenen Auswahleinrichtung A1 wird dann unter Berücksichtigung dieser Vergleichsergebnisse diejenige Datenverarbeitungsanlage bestimmt, zu der Aufträge umzuleiten sind. Hierzu weist die Auswahleinrichtung A 1 eine ganze Reihe von Ausgängen auf. Überschreitet die Auslastung der Datenverarbeitungsanlage B den vorgegebenen oberen Grenzwert, so liefert mindestens einer der Ausgänge abi, ab 2 und ab 3 ein Steuersignal. Überschreitet dagegen die Auslastung der Datenverarbeitungsanlage R den oberen Grenzwert, so liefert mindestens einer der Ausgänge arl, ar2 und ar 3 ein Steuersignal. Solche Steuersignale veranlassen die Umleitung von Aufträgen. Hierzu werden hier als Quellen von Aufträgen wirkende periphere Einrichtungen von der überlasteten Datenverarbeitungsanlage abgeschaltet und bei der nicht überlasteten Datenverarbeitungsanlage angeschaltet. Als periphere Einrichtungen sind hier die Einrichtungen FEE, FEU, FEA, AM, RE und 5 vorgesehen. Sie sind hier jeweils an beide Datenverarbeitungsanlagen über Umschalteeinrichtungen Ua 1, Ua 2, Ua 3, Ur 1, Ur2 und Ur3 angeschlossen. Die Umschalteeinrichtungen ihrerseits sind für ihre Betätigung an die Auswahleinrichtung A 1 angeschlossen, und zwar individuell an deren bereits erwähnte Ausgänge ab \... ar 3. Überschreitet z. B. die Auslastung der Datenverarbeitungsanlage B den vorgegebenen oberen Grenzwert, die Auslastung der Datenverarbeitungsanlage R diesen oberen Grenzwert dagegen nicht, so liefert die Vergleichseinrichtung Vl der Auswahleinrichtung A 1 solche Vergleichsergebnisse, daß diese mindestens über einen ihrer Ausgänge ab 1, so ab 2 und ab 3 ein Steuersignal liefert. Dieses Steuersignal gelangt zu einem der Umschalteeinrichtungen Ua 1, Ua 2 und Ua 3 und veranlaßt, daß diese betätigt wird und damit die zugehörigen peripheren Einrichtungen nicht mehr an die Datenverarbeitungsanlage B sondern nunmehr an die Datenverarbeitungsanlage R angeschlossen ist. Damit wird die Auslastung der Datenverarbeitungsanlage B verringert und die der Datenverarbeitungsanlage R vergrößert. Bei der niedrigsten in Frage kommenden von unterschiedlichen wi Überschreitungsstufen des vorgegebenen Grenzwertes wird z. B. nur über den Ausgang ab 1 ein Steuersignal geliefert. Dementsprechend werden dann mit Hilfe der Umschalteeinrichtung Ua 1 die peripheren Einrichtungen FEE von der Datenverarbeitungsanlage B zur m-Datenverarbeitungsanlage R umgeschaltet. Bei einer sehr großen Überschrcitungsstufe des vorgegebenen Grenzwertes können dagegen z. B. über die beiden Ausgänge ab 1 und ab 2 Steuersignale geliefert werden, was zur Folge hat, daß zusätzlich auch die peripheren Einrichtungen FEU über die Umschalteeinrichtung UA 2 von der Datenverarbeitungsanlage B zur Datenverarbeitungsanlage R umgeschaltet werden. Durch je zwei Steuersignale, die über verschiedene Kombinationen der Ausgänge ab 1, ab 2 und ab 3 geliefert werden, können mehrere unterschiedliche Überschreitungsstufen des vorgegebenen Grenzwertes sinngemäß berücksichtigt werden. In entsprechender Weise, wie es vorstehend beschrieben wurde, können die peripheren Einrichtungen AM, RE oder 5 von der Datenverarbeitungsanlage R zur Datenverarbeitungsanlage B umgeschaltet werden, wenn Steuersignale über mindestens einen der Ausgänge ar I, ar 2 und ar 3 geliefert werden, was der Fall ist, wenn nur die Datenverarbeitungsanlage R eine Auslastung hat, die den vorgegebenen oberen Grenzwert überschreitet. Zweckmäßigerweise wird hier wie auch bei anderen Anwendungsbeispielen der vorgegebene obere Grenzwert derart bemessen, daß nach seinem Überschreiten noch ein gewisser Spielraum für einen ungehinderten Betrieb der Datenverarbeitungsanlagen vorhanden ist.The data processing system according to FIG. The comparison device V1 belonging to 1 then supplies comparison results between the predetermined upper limit value and the measured values supplied by the measuring devices Wound Mr. These comparison results indicate whether the utilization of the data processing systems B and R is above or below the specified upper limit value. The selection device A 1 connected to the comparison device V1 then determines that data processing system to which orders are to be redirected, taking these comparison results into account. For this purpose, the selection device A 1 has a number of outputs. If the utilization of the data processing system B exceeds the predetermined upper limit value, at least one of the outputs abi, ab 2 and ab 3 supplies a control signal. If, on the other hand, the utilization of the data processing system R exceeds the upper limit value, then at least one of the outputs ar1, ar2 and ar3 delivers a control signal. Such control signals cause orders to be rerouted. For this purpose, peripheral devices acting as sources of orders are switched off from the overloaded data processing system and switched on when the data processing system is not overloaded. The FEE, FEU, FEA, AM, RE and 5 facilities are provided as peripheral facilities. They are each connected to both data processing systems via switching devices Ua 1, Ua 2, Ua 3, Ur 1, Ur2 and Ur3 . For their actuation, the switching devices are connected to the selection device A 1, specifically individually to the aforementioned outputs from \ ... ar 3. Exceeds z. B. the utilization of the data processing system B the predetermined upper limit value, the utilization of the data processing system R this upper limit value, however, so the comparison device Vl supplies the selection device A 1 such comparison results that these at least one of its outputs from 1, so from 2 and from 3 supplies a control signal. This control signal arrives at one of the switching devices Ua 1, Ua 2 and Ua 3 and causes it to be actuated and thus the associated peripheral devices are no longer connected to the data processing system B but now to the data processing system R. The utilization of the data processing system B is thus reduced and that of the data processing system R is increased. In the case of the lowest possible of different wi exceedance levels of the predetermined limit value, z. B. A control signal is only supplied via the output from 1 onwards. Accordingly, the peripheral devices FEE are then switched from the data processing system B to the m-data processing system R with the aid of the switching device Ua 1. In contrast, if the predetermined limit value is exceeded, z. B. via the two outputs from 1 and from 2 control signals are supplied, which has the consequence that the peripheral devices FEU are also switched from the data processing system B to the data processing system R via the switching device UA 2 . With two control signals each, which are supplied via different combinations of the outputs from 1, from 2 and from 3 , several different levels of exceedance of the specified limit value can be taken into account accordingly. In a corresponding manner, as described above, the peripheral devices AM, RE or 5 can be switched from the data processing system R to the data processing system B if control signals are supplied via at least one of the outputs ar I, ar 2 and ar 3, which is the case is when only the data processing system R has a load that exceeds the predetermined upper limit value. Expediently, here as well as in other application examples, the predetermined upper limit value is dimensioned in such a way that, after it has been exceeded, there is still a certain margin for unhindered operation of the data processing systems.

Wird das Datenverarbeitungssystem gemäß F i g. 1 noch um weitere Datenverarbeitungsanlagen ergänzt, so sind an die Vergleichseinrichtung Vl noch die dazugehörigen Meßeinrichtungen anzuschließen. Die Vergleichseinrichtung Vl liefert dementsprechend mehr als zwei Vergleichswerte, die der Auswahleinrichtung A 1 zuzuführen sind. Die Auswahleinrichtung A 1 hat dann zur Bestimmung der betreffenden Datenverarbeitungsanlage mehr als zwei Vergleichswerte bei einem Auswahlvorgang zu berücksichtigen.If the data processing system according to FIG. 1 is supplemented by further data processing systems, the associated measuring devices have to be connected to the comparison device V1. The comparison device V1 accordingly supplies more than two comparison values which are to be fed to the selection device A 1. The selection device A 1 then has to take into account more than two comparison values in a selection process in order to determine the relevant data processing system.

An die zum Datenverarbeitungssystem gemäß F i g. 2 gehörende Vergleichseinrichtung V2 sind die bereits erwähnten Meßeinrichtungen WM und 12Ai angeschlossen. Der Grenzwertgenerator G 2 liefert den bereits erwähnten oberen Grenzwert für die Auslastung derjenigen Datenverarbeitungsanlage, deren Auslastung ohne besondere Maßnahmen in unzulässiger Weise überschritten werden könnte. Dies ist hier nur die Datenverarbeitungsanlage Mti. Im gegebenen Fall sind anfallende Aufträge zur Datenverarbeitungsanlage M12 umzuleiten. Dies soll hier jedoch nur dann geschehen, wenn deren Auslastung einen für sie maßgebenden besonderen oberen Grenzwert nicht überschreitet, der z. B. wesentlich niedriger als der zuerst berücksichtigte obere Grenzwert liegt. Die Vergleichseinrichtung V2 ist daher hier derart eingerichtet, daß sie noch einen besonderen oberen Grenzwert für die Belastung der Datenverarbeitungsanlage M12 berücksichtigt, zu der gegebenenfalls Aufträge umzuleiten sind. Der Grenzwertgenerator G 2 liefert daher zwei verschiedene unterschiedliche obere Grenzwerte, wobei der zuletzt genannte besondere obere Grenzwert niedriger als der zuerst angegebene obere Grenzwert ist. Die Vergleichsergebnisse zwischen den erwähnten oberen Grenzwerten und den von den Meßeinrichtungen it M und i2M gelieferten Meßwerten werden der Auswahleinrichtung A 2 zugeführt, die daraufhin gegebenenfalls die Umleitung von Aufträgen mit Hilfe eines Steuersignals bestimmt, das von ihrem Ausgang zur Abschalteeinrichtung UH und zum ODER-Glied Y geschickt wird. Die Abschalteeinrichtung U11 schaltet die Zuführung bestimmter Aufträge ab, die sonst zum Markierer MIl gelangen können. Über das ODER-Glied V wird das Steuersignal zu dem Eingang e des Markierers M12 geschickt,To the data processing system according to FIG. 2 belonging comparison device V2, the already mentioned measuring devices WM and 12Ai are connected. The limit value generator G 2 supplies the above-mentioned upper limit value for the utilization of that data processing system, the utilization of which could be exceeded in an impermissible manner without special measures. This is only the data processing system Mti here. In the given case, incoming orders are to be redirected to the data processing system M 12. However, this should only be done here if their utilization does not exceed a particular upper limit value that is relevant for them. B. is much lower than the first considered upper limit. The comparison device V2 is therefore set up here in such a way that it also takes into account a special upper limit value for the load on the data processing system M 12, to which orders may be diverted. The limit value generator G 2 therefore supplies two different, different upper limit values, the last-mentioned particular upper limit value being lower than the upper limit value given first. The comparison results between the upper limit values mentioned and the measured values supplied by the measuring devices it M and i2M are fed to the selection device A 2 , which then, if necessary, determines the rerouting of orders with the aid of a control signal which is sent from its output to the disconnection device UH and to the OR element Y is sent. The switch-off device U 11 switches off the supply of certain jobs that could otherwise reach the marker MI1 . The control signal is sent via the OR gate V to the input e of the marker M 12,

worauf dieser veranlaßt wird, sich mit Hilfe des Kontaktes pv 12 an die Leitung ν anzuschalten, über die nunmehr vom Markierer M11 nicht mehr abgewickelte Aufträge eintreffen. Die damit zustande gebrachte vorübergehende Umleitung von Auftragen wird zumindest dann aufgehoben, wenn der für den Markierer M11 vorgegebene obere Grenzwert hinreichend unterschritten wird. Die Unterschreitungsspanne ist so groß zu machen, daß eine zu schnelle Folge von vorübergehenden Umleitungen vermieden wird. Diese Maßnahme empfiehlt sich auch für das in F i g. 1 gezeigte Anwendungsbeispiel. Zur Anpassung an unterschiedliche Überschreitungsstufen des vorgegebenen oberen Grenzwertes kann hier der umgeleitete Teil der Aufträge jeweils dadurch unterschiedlich gemacht werden, daß die Umleitung jeweils nur für durch Pausen getrennte Zeitintervalle stattfindet, und zwar z. B. mit Hilfe eines impulsförmigen Steuersignals.whereupon this is caused to connect to the line ν with the help of the contact pv 12, via which orders no longer processed by the marker M 11 arrive. The temporary diversion of applications thus brought about is canceled at least when the upper limit value specified for the marker M 11 is sufficiently undershot. The shortfall range must be made so large that a too rapid sequence of temporary diversions is avoided. This measure is also recommended for the in FIG. 1 application example shown. To adapt to different levels of exceedance of the predetermined upper limit value, the diverted part of the orders can be made different in each case by the fact that the rerouting takes place only for time intervals separated by pauses. B. with the help of a pulse-shaped control signal.

Vorstehend wurden solche Erläuterungen für das erfindungsgemäße Verfahren zum Betrieb eines Daten-Verarbeitungssystems gegeben, die insbesondere die sowohl bei dem Anwendungsbeispiel gemäß F i g. 1 als auch bei dem Anwendungsbeispiel gemäß Fig.2 vorgesehenen Meßeinrichtungen, Vergleichseinrichtungen und Auswahleinrichtungen betreffen. Bei beiden Anwendungsbeispielen werden die Aufträge nach ihrer Umleitung bei der betreffenden Datenverarbeitungsanlage jeweils nach Programmumschaltung bearbeitet Zur Auslösung dieser Programmumschaltung wird hier beispielsweise der Umstand ausgenutzt, daß die umgeleiteten Aufträge jeweils über andere Eingänge eintreffen als die nicht umgeleiteten Aufträge. So treffen bei der Datenverarbeitungsanlage R des in Fig. 1 gezeigten Datenverarbeitungssystems die umgeleiteten Aufträge über Eingänge ein, die an die Umschalteeinrichtungen Ua i, Ua 2 und Ua 3 angeschlossen sind, während nicht umgeleitete Aufträge über Eingänge eintreffen, die an die Umschalteeinrichtungen Ur 1, Ur 2 und Ur 3 angeschlossen sind. Bei der Datenverarbeitungsanlage M12 des in F i g. 2 gezeigten Datenverarbeitungssystems treffen umgeleitete Aufträge über den an einem Eingang liegenden Kontakt pvl2 ein, während nicht ungeleitete Aufträge über den an einem anderen Eingang liegenden Kontakt pw 12 eintreffen.Explanations of the kind given above for the method according to the invention for operating a data processing system include, in particular, both the application example according to FIG. 1 as well as in the application example according to FIG. 2 provided measuring devices, comparison devices and selection devices. In both application examples, the orders are processed after they have been redirected to the relevant data processing system after a program switch. In the data processing system R of the data processing system shown in FIG. 1, the diverted orders arrive via inputs that are connected to the switching devices Ua i, Ua 2 and Ua 3, while orders that have not been redirected arrive via inputs that are sent to the switching devices Ur 1, Ur 2 and Ur 3 are connected. In the data processing system M 12 of the FIG. 2, diverted orders arrive via the contact pvl2 located at one input, while orders that are not undirected arrive via the contact pw 12 located at another input.

Es werden nun noch mehrere Angaben über die Eigenart der in den F i g. 1 und 2 gezeigten Datenverarbeitungssysteme gemacht Dabei werden auch ergänzende Maßnahmen zur Ausgestaltung der Erfindung behandelt.There are now several details about the nature of the in the F i g. 1 and 2 shown data processing systems made Supplementary measures for the development of the invention are also dealt with.

Das Datenverarbeitungssystem gemäß F i g. 1 ist für die Fernsprechvermittlungstechnik bestimmt. Die Datenverarbeitungsanlage B stellt hier einen sogenannten Bedienungsrechner dar. Ein derartiger Bedienungsrechner dient zur Unterstützung der Arbeit, die in zentralen Wartungsstellen für den Fernsprechvermittlungsbetrieb anfällt (siehe »Informationen Fernsprech-Vermittlungstechnik« 1970, S. 8 und S. 10). Es werden hier Daten erfaßt, die bei einer Entstörungsstelle, einer Unterhaltungsdienststelle und einer Fernsprechauftragsdienststelle anfallen. Dieser Rechner kann unter anderem die eo betreffenden Daten für Dokumentation und Statistik speichern, sie über Datensichtgeräte und Bedienungsblattschreiber ausgeben und sie dabei auch interpretieren und gemäß ihrer Dringlichkeit ordnen. Auch Speicherabfragen können durch einen derartigen Bedienungsrechner wirkungsvoll unterstützt werden (siehe auch Offenlegungsschrift 21 39 275). Dementsprechend sind an den Bedienungsrechner B für die Abwicklung von Betriebsdiensten folgende Plätze angeschlossen: Betriebsplätze FEE für die Entstörungsstelle, Betriebsplätze FEU für die Unterhaltungsdienststelle und Betriebsplätze FEAD für die Fernsprechauftragsdienststelle. In die von diesen Betriebsplätzen zum Bedienungsrechner B führenden Leitungen sind die bereits erwähnten Umschalteeinrichtungen Ua 1, Ua 2 und Ua 3 eingefügt, mit deren Hilfe von diesen Betriebsplätzen her anfallende Aufträge auch gegebenenfalls zur Datenverarbeitungsanlage R umgeleitet werden können. Die Datenverarbeitungsanlage R ist hier als Verwaltungsrechner ausgenutzt Es sind dort für die Abwicklung von Betriebsdiensten folgende Plätze angeschlossen: Betriebsplätze AM für die Anmeldestelle, Betriebsplätze RE für die Rechnungsstelle und sonstige Betriebsplätze S. Auch in diejenigen Leitungen, über die diese Betriebsplätze mit dem Verwaltungsrechner verbunden sind, sind bereits erwähnte Umschalteeinrichtungen eingefügt, nämlich die Umschalteeinrichtung Ur i, Ur2 und i/r3. Durch deren Betätigung können Aufträge zum Bedienungsrechner B umgeleitet werden.The data processing system according to FIG. 1 is intended for telephone switching technology. The data processing system B represents a so-called service computer. Such a service computer is used to support the work that occurs in central maintenance points for the telephone exchange (see "Information on telephone switching technology" 1970, p. 8 and p. 10). Data are recorded here that arise at a fault clearance center, an entertainment service center and a telephone service center. This computer can, among other things, save the relevant data for documentation and statistics, output them via visual display devices and service sheet recorders and also interpret them and arrange them according to their urgency. Memory queries can also be effectively supported by such a service computer (see also laid-open specification 21 39 275). Accordingly, the following places are connected to the operating computer B for the processing of operational services: operational places FEE for the fault clearance point , operational places FEU for the entertainment service and operational places FEAD for the telephone service point. The already mentioned switching devices Ua 1, Ua 2 and Ua 3 are inserted into the lines leading from these operating locations to the service computer B , with the aid of which orders arising from these operating locations can also be diverted to the data processing system R if necessary. The data processing system R is used here as an administration computer. The following places are connected there for the processing of operational services: operational areas AM for the registration point, operational areas RE for the billing center and other operational areas S. Also in those lines via which these operational areas are connected to the administration computer , the switching devices already mentioned have been inserted, namely the switching devices Ur i, Ur2 and i / r3. By pressing them, orders can be redirected to the service computer B.

Zum Arbeitsbereich einer Entstörungsstelle gehört die Anlage einer Störungskartei, der Betrieb von Prüf- und Leitplätzen u. dgl. Zum Arbeitsbereich der Unterhaltungsdienststelle gehört die Überwachung von Einrichtungen, die Änderung von Teilnehmer- und Betriebsdaten, das Starten von Prüfprogrammläufen, die Erfassung von Beschaltungsdaten von Verteilern u. dgl. Bei einer Fernsprechauftragsdienststelle werden Aufträge für besondere Dienste für Teilnehmer entgegen genommen und es wird ihre Ausführung veranlaßt. Durch den Bedienungsrechner wird ermöglicht, daß Fernsprech-Auftragsdienste automatisch abgewickelt werden. Jn der Anmeldestelle werden Neuanmeldungen und Änderungen von Teilnehmeranschlüssen bearbeitet. Hierbei sind die bereits vorhandenen Leitungen, Verteiler u. dgl. zu berücksichtigen. Die Angaben darüber sind im Datenspeicher des Verwaltungsrechners enthalten. Der Verwaltungsrechner kann hierbei auch noch bei weiteren Betriebsvorgängen mitwirken. Hierzu sind dort die mit »S« bezeichneten sonstigen Betriebsplätze vorgesehen. Bei der Abwicklung all dieser Betriebsvorgänge wirken die Datenverarbeitungsanlagen B und R durch Datenlieferung und Datenverarbeitung mit. Es ist zweckmäßig, hierbei die Mithilfe von Datensichtgeräten in Anspruch zu nehmen. Die betreffende Datenverarbeitungsanlage wirkt in diesem Fall bei der Bearbeitung dadurch mit, daß sie die erforderlichen Daten über ein Datensichtgerät ausgibt und im Zuge eines Dialogverkehrs von ihr erarbeitete Daten über zu benutzende Einrichtungen liefert, die sie auf Grund des vorliegenden Auftrages gefunden hat. An den Verwaltungsrechner R sind noch die Betriebsplätze RE einer Rechnungsstelle angeschlossen. Dort werden z. B. die Einzel- und Sammelabfragen von Gebührenständen abgewickelt. Die Verteilung all dieser Betriebsstellen auf die beiden Datenverarbeitungsanlagen B und R kann zur Folge haben, daß auch ein Datenaustausch zwischen dem Bedienungsrechner und dem Verwaltungsrechner erforderlich ist, wobei sie in an sich bekannter Weise zusammenarbeiten. Für diese Zusammenarbeit dienen die Verbindungsleitungen L Über diese Leitungen können auch Daten und Programme übertragen werden, wenn dies anläßlich einer Umleitung von Aufträgen erforderlich ist. Es ist daher zweckmäßig, wenn die Datenverarbeitungsanlagen B und R räumlich benachbart sind. Wird die an sichThe work area of a fault clearance center includes the creation of a fault file, the operation of test and control stations, etc.The work area of the maintenance service center includes the monitoring of facilities, changing subscriber and operating data, starting test program runs, recording wiring data from distributors and the like. At a telephone service center, orders for special services for subscribers are received and their execution is initiated. The service computer enables telephone order services to be handled automatically. New registrations and changes to subscriber lines are processed at the registration office. The existing lines, distributors and the like must be taken into account. The information about this is contained in the data memory of the administration computer. The administration computer can also participate in other operational processes. For this purpose, the other operating locations marked with an »S« are provided there. The data processing systems B and R participate in the handling of all these operational processes through data delivery and data processing. It is advisable to use data display devices for this. In this case, the data processing system in question participates in the processing by outputting the required data via a data display device and, in the course of dialog traffic, delivering data it has worked out about facilities to be used that it has found on the basis of the present order. The operating locations RE of a billing center are also connected to the administration computer R. There z. B. handled the individual and collective queries of charge levels. The distribution of all these operating points to the two data processing systems B and R can have the consequence that a data exchange between the service computer and the administration computer is necessary, whereby they work together in a manner known per se. The connecting lines L are used for this cooperation. These lines can also be used to transmit data and programs if this is necessary in the event of a rerouting of orders. It is therefore useful if the data processing systems B and R are spatially adjacent. Will that in itself

bekannte Technik der Simultanarbeit von Datenverarbeitungsanlagen (s. »Elektronische Rechenanlagen«, 1960, S. 117 bis 128) angewendet, so kann bei einer Datenübertragung eine störende Belastung der jeweils anderen Datenverarbeitungsanlage weitgehend vermieden werden.known technology of simultaneous work by data processing systems (see "Electronic computer systems", 1960, pp. 117 to 128) applied, a disruptive load on the respective other data processing system can be largely avoided.

Die Betriebsplätze sind hier auf die beiden Datenverarbeitungsanlagen B und R unter dem Gesichtspunkt verteilt, zu erzielen, daß die jeweils höchste Auslastung der Datenverarbeitungsanlagen zu unterschiedlichen Zeiten zu erwarten ist Beim Bedienungsrechner B sind hier solche Betriebsstellen angeschlossen, für die ein Zeitzwang gegeben ist Die dort abzuwickelnden Betriebsvorgänge werden nämlich von Fernsprechteilnehmern veranlaßt, auf die von der Fernsprechverwaltung kein Einfluß dafür ausgeübt werden kann, ihre Aufträge gleichmäßig über die zur Verfügung stehende Zeit zu verteilen. Darüber hinaus sind die anfallenden Aufträge jeweils möglich schnell abzuwickeln. Diejenigen Aufträge dagegen, die für die Betriebsdienste anfallen, bei denen der Verwaltungsrechner R mitwirkt, kommen in der Regel von Angestellten der Fernsprechverwaltung. Für diese Aufträge kann daher veranlaßt werden, daß sie sich in bestimmter Weise über die zur Verfugung stehende Zeit verteilen. Dadurch kann veranlaßt werden, daß die höchste Auslastung des Ve^waltungsrechners zu einer anderen Zeit zu erwarten ist als beim Bedienungsrechner B. Insgesamt ergibt es sich, daß zwar der Bedienungsrechner unbedingt im Echt-Zeit-Betrieb zu arbeiten hat, der Betrieb des Verwaltungsrechners dagegen hinsichtlich seiner Inanspruchnahme durch das Personal gewisse Ähnlichkeiten mit dem Stapelbetrieb hat Dadurch wird in besonders zweckmäßiger Weise zustande gebracht, daß jeweils auch tatsächlich Gelegenheit vorhanden ist, die Umleitung von Aufträgen nach dem erfindungsgemäßen Verfahren vorzunehmen. Wenn nämlich die höchste Auslastung des Bedienungsrechners zu erwarten ist, kann eine besonders niedrige Auslastung des Verwaltungsrechne's vorgegeben werden, so daß dann Aufträge vom Bedienungsrechner B zum Verwaltungsrechner R umgeleitet werden. Andererseits können dem Bedienungsrechner B zu Zeiten besonders niedriger Auslastung Aufträge zugeleitet werden, die sonst vom Verwaltungsrechner R auszuführen sind.The operating spaces are B and R distributed here to the two data processing systems from the standpoint of achieving that the respectively highest utilization of data processing systems is to be expected at different times during operation of computer B such operating points are connected here, for which a time constraint is given the settled there Operations are namely initiated by telephone subscribers over which the telephone administration cannot influence to distribute their orders evenly over the available time. In addition, the incoming orders can be processed quickly. On the other hand, those orders that arise for the operational services in which the administration computer R is involved, usually come from employees of the telephone administration. For these orders, it can therefore be arranged that they are distributed in a certain way over the time available. This can cause the maximum utilization of the management computer to be expected at a different time than that of the service computer B. Overall, the result is that although the service computer has to work in real-time, the operation of the management computer on the other hand has certain similarities with the batch operation with regard to its use by the staff. It is thereby brought about in a particularly expedient manner that in each case there is actually an opportunity to carry out the rerouting of orders according to the method according to the invention. If the maximum utilization of the operating computer is to be expected, a particularly low utilization of the administrative computer can be specified, so that orders from the operating computer B to the administrative computer R are then diverted. On the other hand, jobs that would otherwise have to be carried out by the administration computer R can be sent to the service computer B at times of particularly low workload.

Auch das in F i g. 2 gezeigte Datenverarbeitungssystem ist für die Fernsprechvermittlungstechnik bestimmt Die als Datenverarbeitungsanlagen dazugehörigen beiden Markierer AfIl und M12 haben Steuervorgänge für die Abwicklung von Verbindungsanforderungen für ein Koppelfeld durchzuführen. Dabei sind unterschiedliche Steuervorgänge für dieselbe Verbindung zeitlich aufeinanderfolgend und Steuervorgänge für verschiedene Verbindungen gleichzeitig abwickelbar. Die Markierer sind gemäß F i g. 2 gerade so geschaltet, daß sie unterschiedliche Steuervorgänge abwickeln. Dies ergibt sich aus der Betriebslage der gezeigten zugehörigen Kontakte. Es ist nämlich beim Markierer M11 der Kontakt pvii geschlossen, während der Kontakt pwii geöffnet ist, und umgekehrt ist beim Markierer M12 der Kontakt pv\2 geöffnet, während der Kontakt pw\2 geschlossen ist. Die Markierer werden über diese Kontakte zur Tätigkeit angefordert. Hierzu sind diese Kontakte an die Anforderungsleitungen wund ν angeschlossen. Über die Anforderungsleitung w trifft jeweils ein Auftrag für den einen Steuervorgang und über die Anforderungsleitung ν trifft jeweils ein Auftrag für den anderen Steuervorgang ein. Welche Steuervorgänge von den Markierern ausgeführt werden, wird durch die Betriebslage der zugehörigen Kontakte bestimmt. Ein Auftrag wird nämlich nur dann bei einem Markierer wirksam, wenn derjenige Kontakt geschlossen ist, über den er mit der zugehörigen Anforderungsleitung verbunden ist. Wenn bei einem Markierer beide vorgesehenen Kontakte geschlossen sind, kann er für die Ausführung beider Steuervorgänge in Tätigkeit gesetzt werden. JederAlso that in FIG. The data processing system shown in FIG. 2 is intended for telephone switching technology. The two markers AfIl and M12 belonging to it as data processing systems have to carry out control processes for the processing of connection requests for a switching network. Different control processes for the same connection are sequential in time and control processes for different connections can be processed simultaneously. The markers are shown in FIG. 2 just switched so that they handle different control processes. This results from the operating position of the associated contacts shown. In the case of marker M11, contact pvii is closed while contact pwii is open, and conversely, contact pv \ 2 is open in marker M12 while contact pw \ 2 is closed. The markers are requested through these contacts for the activity. For this purpose, these contacts are connected to the request lines wound ν. An order for one control process is received via the request line w and an order for the other control process is received via the request line ν. Which control processes are carried out by the markers is determined by the operating position of the associated contacts. An order only becomes effective for a marker when the contact through which it is connected to the associated request line is closed. If both contacts provided for a marker are closed, it can be activated to carry out both control processes. Everyone

ίο Markierer weist einen zugehörigen Speicher auf. Zum Markierer MIl gehört der Speicher QIl, zum Markierer M 12 gehört der Speicher Q12. Jeder Markierer ist so eingerichtet, daß er nach einem der in seinen Speicher eingegebenen Programme arbeitet.ίο marker has an associated memory. For markers Mil is one of the memory Qll, for marker M 12 of the memory part 12. Each Q marker is adapted to operate according to one of entered in its memory programs.

is Eine Programmumschaltung kann z. B. durch Signale zustande gebracht werden, die auch auf die Speicher einwirken.is A program change can e.g. B. by signals be brought about, which also affect the memory.

Gegebenenfalls kann der Markierer M12 zur Aushilfe sowohl die von vornherein für ihn vorgesehenen Steuervorgänge als auch solche Steuervorgänge ausführen, die sonst nur vom Markierer MIl ausgeführt werden. Dies ist hier der Fall, wenn der Markierer M11 sonst überlastet wird. Bei völligem Ausfall eines Markierers kann der jeweils andere sogar alle Steuervorgänge übernehmen, solange er nicht überlastet ist Von den Markierern erarbeitete Daten werden von ihren Sendeausgängen s aus über die zentrale Datenschiene D weitergeleitet. Von dort können auch den Markierern bestimmte Daten zugeleitet werden.If necessary, as an aid, the marker M12 can carry out both the control processes provided for it from the start and those control processes which are otherwise only carried out by the marker MI1. This is the case here if the marker M11 is otherwise overloaded. In the complete failure of a marker of each other even all control operations can take as long as it is not overloaded by the markers obtained data are forwarded by their broadcasting s outputs via the central data track D. From there, certain data can also be sent to the markers.

Zum Beispiel können über diese Datenschiene den Markierern auch Anforderungszeichen zugeleitet werden, die dort bei dem jeweiligen Empfangseingang e eintreffen und dort ausgewertet werden. Sie können auch für die Umschaltung auf den angeforderten Steuervorgang ausgenutzt werden. Dies ermöglicht hier, das von der Auswahleinrichtung A 2 gelieferte Anforderungszeichen über das ODER-Glied Y zum Eingang e des Markierers M12 weiterzuleiten.For example, request characters can also be sent to the markers via this data rail, which arrive at the respective receiving input e and are evaluated there. They can also be used to switch to the requested control process. This makes it possible here to forward the request character supplied by the selection device A 2 via the OR element Y to the input e of the marker M12.

Der Markierer MH und M12 können zu einer anThe markers MH and M12 can be connected to one

*> sich bekannten Fernsprechvermittlung gehören (s. DT-OS 18 12 192). Der Aufbau einer derartigen Vermittlung ist in der F i g. 3 gezeigt. Es sind dort außer den Markierern MH und M12 noch die Markierer M21... M32 vorgesehen. Das zugehörige Koppelfeld besteht aus mehreren Teilkoppelfeldern TKFi, TKF2 und TKF3, denen jeweils ein Paar von Markierern zugeordnet ist. So ist das Teilkoppelfeld TKFi mit den Markierern MIl und M12 verbunden. Jedes Teilkoppelfeld umfaßt mehrere Koppelstufen. Die Teilkoppel-*> well-known telephone exchange belong (see DT-OS 18 12 192). The structure of such an exchange is shown in FIG. 3 shown. In addition to the markers MH and M12, the markers M21 ... M32 are also provided there. The associated switching network consists of several sub- switching networks TKFi, TKF2 and TKF3, each of which is assigned a pair of markers. The sub- switching network TKFi is thus connected to the markers MI1 and M12. Each sub-switching network comprises several switching stages. The partial coupling

so felder hängen miteinander dadurch zusammen, daß zum Teil ihre Ausgänge parallel geschaltet sind, nämlich bei den Teilkoppelfeldern 7XFl und TKF2, wie es an sich bereits bekannt ist, und dadurch, daß Rücküberläufe rk zwischen den Teilkoppelfeldern TKFZ und TKF2 so fields are interrelated in that some of their outputs are connected in parallel, namely in the sub-switching matrices 7XFl and TKF2, as it is already known, and in that back overflows rk between the sub- switching matrices TKFZ and TKF2

SS vorgesehen sind, wie sie an sich ebenfalls bereits bekannt sind, Den Markierern zuzuführende Daten, wozu gegebenenfalls auch die bereits erwähnten für die Steuervorgänge spezifischen Anforderungszeichen gehören, sowie von den Markierern erarbeitete DatenSS are provided, as they are already in themselves are known, the markers to be fed data, including possibly the already mentioned for the Control processes belong to specific request characters, as well as data worked out by the markers

eo werden über die verdoppelte Datenschiene Da-Db geschickt, an die die Markierer angeschlossen sind. Die Markierer werden von den Einrichtungen 51 und S 2 angefordert, wozu die Anforderungsleitungen sum vorgesehen sind. Die Einrichtungen 51 und 52 stelleneo are sent over the doubled data rail Da-Db to which the markers are connected. The markers are requested by the devices 51 and S 2 , for which purpose the request lines sum are provided. The devices 51 and 52 provide

es hier Steuersätze dar, die bei der Abwicklung von Aufträgen für Steuervorgänge mitwirken. Es sind noch die beiden Zuordner Ii/ und 2 U vorhanden, die hierbei ebenfalls mitwirken.it represents tax rates that are involved in the processing of orders for tax transactions. The two allocators Ii / and 2 U are still available, which also contribute to this.

Es wird nun noch die Eigenart der unterschiedlichen Steuervorgänge beschrieben. So kann der Markierer MIl jeweils einen Steuervorgang als Vorprüfmarkierer ausführen, wobei er feststellt, ob in einem durch eine Verbindungsanforderung vorgegebenen vom Koppelfeld bzw. Teilkoppelfeld abgehenden Leitungsbündel sich mindestens eine freie Leitung befindet u. dgl. In diesem Zusammenhang kann dann der Markierer M12 einen Steuervorgang als Wegemarkierer ausführein, wobei im Koppelfeld bzw. im Teilkoppelfeld freie Verbindungswege ausgesucht werden, einer davon ausgewählt und durchgeschaltet wird u. dgl. Eine Verbindungsanforderung wird in diesem Fall wie folgt abgewickelt. Über die Anforderungsleitung ν wird den Markierern Af 11 und Af12 zunächst ein Auftrag für den is Steuervorgang für die Vorprüffunktion zugeleitet. Der Markierer Af11 führt diesen Steuervorgang aus, hierbei erforderliche und dabei erarbeitete Daten werden über die Datenschiene D bzw. Da-Db mit anderen Einrichtungen ausgetauscht. Gleichzeitig kann ein Auftrag für den anderen Steuervorgang, nämlich zur Wegesuche, Auswahl und Durchschaltung, der über die Anforderungsleitung w ansteht, vom Markierer M12 abgefertigt werden. Dieser Steuervorgang wird für eine andere Verbindung als der vorhergehende Steuervorgang abgewickelt. Es werden also hierbei Steuervorgänge für verschiedene Verbindungen gleichzeitig abgewikkelt. Danach ist zu erwarten, daß der Markierer M112 noch einmal als Wegemarkierer zu arbeiten hat, und zwar zur Abwicklung eines Steuervorganges für diejenige der beiden erwähnten Verbindungen, für die dieser Steuervorgang noch nicht abgewickelt wurde. Wie bereits beschrieben, kann insbesondere der Markierer M12 auch nacheinander die unterschiedlichen Steuervorgänge selber abwickeln.The nature of the different control operations will now be described. Thus, the marker MIl can each perform a control process as a preliminary test marker, whereby it determines whether there is at least one free line in a line bundle outgoing from the switching network or sub-switching network specified by a connection request as a route marker, free connection routes are selected in the switching network or in the sub-switching network, one of them is selected and switched through, etc. In this case, a connection request is processed as follows. Via the request line ν, the markers Af 11 and Af12 are initially sent an order for the control process for the pre-test function. The marker Af11 carries out this control process, and the data required and developed in the process are exchanged with other devices via the data rail D or Da-Db. At the same time, an order for the other control process, namely for route search, selection and connection, which is pending via the request line w , can be processed by the marker M 12. This control process is handled for a different connection than the previous control process. Control processes for different connections are processed simultaneously. It is then to be expected that the marker M 112 will have to work again as a route marker, specifically to process a control process for those of the two mentioned connections for which this control process has not yet been processed. As already described, the marker M 12 in particular can also handle the different control processes one after the other.

Wenn ein sehr starker Fernsprechverkehr herrscht, z. B. während der sogenannten Hauptverkehrsstunde, ist bevorzugt damit zu rechnen, daß der Vorprüfmarkie rer AfIl zumindestens bei der ersten Prüfung keine freie Leitung findet. Falls mehrere Leitungsbündel vorhanden sind, die getrennt zu prüfen sind, hat er dann den für die Prüfung erforderlichen Steuervorgang ein- oder mehrfach zu wiederholen. Es kann sich auch dann ergeben, daß er keine freie Leitung findet. Insgesamt ergibt es sich unter diesen Verhältnissen, daß auf einen Steuervorgang, der durch den Wegemarkierer Af 12 auszuführen ist, im Durchschnitt mehrere Steuervorgänge entfallen, die vom Vorprüfmarkierer M11 auszuführen sind. Ohne besondere Maßnahmen kann dies dann weiterhin zur Folge haben, daß dadurch der Vorprüfmarkierer überlastet wird. Abhilfe bringt dann hier die Anwendung des erfindungsgemäßen Verfahrens, bei dem bei Überschreiten eines vorgegebenen unterhalb einer Überlastung liegenden oberen Grenzwertes auch der Wegemarkierer M12 für die Vorprüffunktion mit ausgenutzt wird. Hierzu wird in der bereits beschriebenen Weise ein Teil der Aufträge für den Vorprüfmarkierer M11 zum Wegesuchmarkierer M12 umgeleitet, der die umgeleiteten Aufträge jeweils nach Programmumschaltung bearbeitet.When there is very heavy telephone traffic, e.g. B. during the so-called rush hour, it is preferable to expect that the Vorprüfmarkie rer AfIl does not find a free line at least during the first test. If there are several trunk groups that need to be checked separately, he must then repeat the control process required for the check one or more times. It can also then turn out that he cannot find a free line. Overall, under these circumstances, a control process that is to be carried out by the path marker Af 12 is accounted for on average by several control processes that are to be carried out by the preliminary test marker M 11. Without special measures, this can then have the further consequence that the preliminary test marker is overloaded as a result. The remedy here is the use of the method according to the invention, in which when a predetermined upper limit value below an overload is exceeded, the path marker M 12 is also used for the preliminary test function. For this purpose, in the manner already described, some of the orders for the preliminary test marker M 11 are diverted to the route search marker M 12, which processes the diverted orders after each program switchover.

Hierzu 3 Blatt ZeichnungenFor this purpose 3 sheets of drawings

Claims (4)

Patentansprüche:Patent claims: 1. Datenverarbeitungssystem, insbesondere für die Fernsprechvermittlungstechnik, mit mindestens zwei selbständigen programmgesteuerten Echt-Zeit-Datenverarbeitungsanlagen, die die ihnen zugeleiteten Aufträge jeweils innnerhalb einer bestimmten Zeit zu bearbeiten haben, und bei dem die Aufträge ihrerseits entsprechend ihrer unterschiedli- ι ο chen Eigenart der einen oder einer anderen Datenverarbeitungsanlage zugeleitet werden, dadurch gekennzeichnet, daß an jede Datenverarbeitungsanlage (B, R; Ml 1, M12) eine Meßeinrichtung (Mb, Mr; UM, UM) zur Messung 1S der Auslastung angeschlossen 1st, daß an die Meßeinrichtungen eine Vergleichseinrichtung (Kl) zum Vergleich von Meßwerten unter Berücksichtigung eines vorgegebenen oberen Grenzwertes angeschlossen ist, daß an die Vergleichseinrichtung w eine Auswahleinrichtung (A 1) angeschlossen ist, die unter Berücksichtigung der Vergleichsergebnisse die Datenverarbeitungsanlage bestimmt, zu der Aufträge vorübergehend umzuleiten sind und daß die Datenverarbeitungsanlagen über Leitungen (L) für einen erforderlichen Programmaustausch verbunden sind.1. Data processing system, in particular for telephone switching technology, with at least two independent program-controlled real-time data processing systems, which have to process the orders sent to them within a certain period of time, and in which the orders in turn correspond to their different characteristics of the one or another data processing system, characterized in that a measuring device (Mb, Mr; UM, UM) for measuring 1S of the load is connected to each data processing system (B, R; Ml 1, M 12), that a comparison device is connected to the measuring devices (Kl) is connected to the comparison of measured values taking into account a predetermined upper limit value, that a selection device (A 1) is connected to the comparison device w , which, taking into account the comparison results, determines the data processing system to which orders are temporarily to be redirected and that the Da processing systems are connected via lines (L) for a required program exchange. 2. Datenverarbeitungssystem nach Anspruch 1, dadurch gekennzeichnet, daß durch die Meßeinrichtung (Mr, Mb, UM, t2M) die jeweils durch das Verhältnis der Belegungszeit durch zugeleitete Aufträge zur davon freibleibenden Zeit bestimmte Auslastung meßbar ist2. Data processing system according to claim 1, characterized in that the measuring device (Mr, Mb, UM, t2M) can measure the utilization determined by the ratio of the occupancy time by orders sent to the time remaining free 3. Datenverarbeitungssystem nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Vergleichseinrichtung (V2) derart eingerichtet ist, daß sie einen zusätzlich vorgegebenen oberen Grenzwert für die Belastung derjenigen Datenverarbeitungsanlage berücksichtigt, zu der Aufträge umzuleiten sind.3. Data processing system according to claim 1 or 2, characterized in that the comparison device (V2) is set up in such a way that it takes into account an additionally predetermined upper limit value for the load on that data processing system to which orders are to be diverted. 4. Da*enverarbeitungssystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß in Anpassung an unterschiedliche Überschreitungsstufen des vorgegebenen oberen Grenzwertes eine unterschiedliche Anzahl von Aufträge liefernden Quellen umschaltbar ist.4. Da * en processing system according to one of the preceding claims, characterized in that a different number of orders in adaptation to different levels of excess of the predetermined upper limit value supplying sources is switchable.
DE19722205914 1972-02-08 1972-02-08 Data processing system, in particular for telephone switching technology Expired DE2205914C3 (en)

Priority Applications (12)

Application Number Priority Date Filing Date Title
BE795144D BE795144A (en) 1972-02-08 PROCESS FOR THE OPERATION OF A DATA PROCESSING SYSTEM, USED IN PARTICULAR BY TELEPHONY
DE19722205914 DE2205914C3 (en) 1972-02-08 1972-02-08 Data processing system, in particular for telephone switching technology
CH39573A CH552250A (en) 1972-02-08 1973-01-11 METHOD FOR OPERATING A DATA PROCESSING SYSTEM, IN PARTICULAR FOR TELE-COMMUNICATION TECHNOLOGY.
GB352573A GB1398651A (en) 1972-02-08 1973-01-24 Data processing systems
AT74573A AT323815B (en) 1972-02-08 1973-01-29 ARRANGEMENT WITH SEVERAL DATA PROCESSING SYSTEMS, IN PARTICULAR FOR TELEPHONE SWITCHING TECHNOLOGY
LU66980D LU66980A1 (en) 1972-02-08 1973-02-06
DK65373A DK141264C (en) 1972-02-08 1973-02-07 DATA PROCESSING SYSTEM, NECESSARY FOR TELEPHONE INTERMISSION TECHNOLOGY, WITH AT LEAST TWO INDEPENDENT PROGRAMMED DATA PROCESSING SYSTEMS
IT2009773A IT978867B (en) 1972-02-08 1973-02-07 SPE CIE DATA PROCESSING SYSTEM FOR TELEPHONE SWITCHING TECHNIQUE
FR7304273A FR2171776A5 (en) 1972-02-08 1973-02-07
JP1606173A JPS5346405B2 (en) 1972-02-08 1973-02-08
NL7301805A NL7301805A (en) 1972-02-08 1973-02-08
US05/777,513 US4099235A (en) 1972-02-08 1977-03-14 Method of operating a data processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19722205914 DE2205914C3 (en) 1972-02-08 1972-02-08 Data processing system, in particular for telephone switching technology

Publications (3)

Publication Number Publication Date
DE2205914A1 DE2205914A1 (en) 1973-08-16
DE2205914B2 true DE2205914B2 (en) 1978-06-01
DE2205914C3 DE2205914C3 (en) 1979-02-01

Family

ID=5835394

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19722205914 Expired DE2205914C3 (en) 1972-02-08 1972-02-08 Data processing system, in particular for telephone switching technology

Country Status (11)

Country Link
JP (1) JPS5346405B2 (en)
AT (1) AT323815B (en)
BE (1) BE795144A (en)
CH (1) CH552250A (en)
DE (1) DE2205914C3 (en)
DK (1) DK141264C (en)
FR (1) FR2171776A5 (en)
GB (1) GB1398651A (en)
IT (1) IT978867B (en)
LU (1) LU66980A1 (en)
NL (1) NL7301805A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0109981B1 (en) * 1982-12-07 1987-06-16 Ibm Deutschland Gmbh Fail-safe data processing equipment
US6732139B1 (en) * 1999-08-16 2004-05-04 International Business Machines Corporation Method to distribute programs using remote java objects
GB2374168B (en) * 2001-03-07 2005-06-08 Hewlett Packard Co User account handling on aggregated group of multiple headless computer entities

Also Published As

Publication number Publication date
DK141264C (en) 1980-08-04
JPS5346405B2 (en) 1978-12-13
BE795144A (en) 1973-08-08
DK141264B (en) 1980-02-11
CH552250A (en) 1974-07-31
IT978867B (en) 1974-09-20
AT323815B (en) 1975-07-25
JPS4889643A (en) 1973-11-22
DE2205914C3 (en) 1979-02-01
GB1398651A (en) 1975-06-25
FR2171776A5 (en) 1973-09-21
DE2205914A1 (en) 1973-08-16
LU66980A1 (en) 1973-04-19
NL7301805A (en) 1973-08-10

Similar Documents

Publication Publication Date Title
EP0121236B1 (en) Circuit arrangement for telecommunication installations, especially for telephone exchanges comprising information processors and devices for overload control
DE3311900A1 (en) CIRCUIT ARRANGEMENT FOR TELECOMMUNICATION SYSTEMS, ESPECIALLY TELECOMMUNICATION SYSTEMS WITH INFORMATION-PROCESSING SWITCHGEAR AND DEVICES TO DEFEND OVERLOAD
DE2205914C3 (en) Data processing system, in particular for telephone switching technology
EP0454218B1 (en) Time division multiplex transfer system
EP0213408B1 (en) Circuit arrangement for telecommunication exchanges, in particular for telephone exchanges equipped with control processors and traffic-measuring devices
DE3606846C2 (en)
DE3743401C2 (en)
EP0380951B1 (en) Circuit arrangement for communication exchanges, especially telephone exchanges, with remote switches, distributed switching and central switching arrangements
DE2046744A1 (en) Arrangement for the timely query of waiting calls in telephone systems
DE3642003C2 (en)
DE1812192B2 (en) CIRCUIT ARRANGEMENT FOR AN INDIRECTLY CONTROLLED SWITCHING SYSTEM, IN PARTICULAR TELEPHONE SWITCHING SYSTEM
DE3522945C1 (en) Circuit arrangement for automatic announcement of changed telephone numbers
DE2008585C3 (en) Circuit arrangement for connecting a plurality of data processing units to a peripheral memory device
AT234162B (en) Circuit arrangement for separating the traffic direction in telephone systems with markers
AT240922B (en) System for carrying out switching tasks, in particular for telephone purposes
DE2828841A1 (en) Centrally controlled telephone exchange - has extra memory banks used for semi-permanent signals read cyclically in normal operation
DE2749787A1 (en) Telephone exchange with rerouting equipment - sends data identifying information position from connecting circuit to switching circuit
DE2846722A1 (en) Telephone exchange switching state control unit - has common control with stores updated by cyclical scan of switching unit gated crosspoints and referred back to long-term store condition
DE2056535B2 (en) CIRCUIT ARRANGEMENT FOR REMOTE SIGNALING, IN PARTICULAR TELEPHONE SWITCHING SYSTEMS THAT ARE CENTRALLY CONTROLLED BY AT LEAST TWO COMPUTERS
EP0673146A1 (en) Method for assigning of ring signal units arranged in pairs in a multiple time division telephone exchange
DE1284469B (en) Circuit arrangement for telecommunication, especially telephone systems with hunt groups
DE1213006B (en) Switching matrix for coordinate dialers with sticking relays that can be excited via row and column lines for telecommunications, especially telephone exchanges
DE2846041A1 (en) Control system for telex installation - uses discrete subroutines to regulate specific functions so that faults can be rapidly traced
DE1215216B (en) Circuit arrangement for telecommunication, in particular telephone systems with marking
DE1190999B (en) Circuit arrangement for centrally controlled telephone switching systems

Legal Events

Date Code Title Description
C3 Grant after two publication steps (3rd publication)
8339 Ceased/non-payment of the annual fee