DE3642003C2 - - Google Patents

Info

Publication number
DE3642003C2
DE3642003C2 DE19863642003 DE3642003A DE3642003C2 DE 3642003 C2 DE3642003 C2 DE 3642003C2 DE 19863642003 DE19863642003 DE 19863642003 DE 3642003 A DE3642003 A DE 3642003A DE 3642003 C2 DE3642003 C2 DE 3642003C2
Authority
DE
Germany
Prior art keywords
load status
ivg
group control
control units
columns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19863642003
Other languages
German (de)
Other versions
DE3642003A1 (en
Inventor
Axel Dipl.-Phys. 6368 Bad Vilbel De Niebuhr
Michael Ing.(Grad.) 6000 Frankfurt De Bunkenburg
Phuoc Dr. 7120 Bietigheim-Bissingen De Tran-Gia
Gert Dipl.-Ing. 7000 Stuttgart De Willmann
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Robert Bosch GmbH
Original Assignee
Telenorma Telefonbau und Normalzeit GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Telenorma Telefonbau und Normalzeit GmbH filed Critical Telenorma Telefonbau und Normalzeit GmbH
Priority to DE19863642003 priority Critical patent/DE3642003A1/en
Publication of DE3642003A1 publication Critical patent/DE3642003A1/en
Application granted granted Critical
Publication of DE3642003C2 publication Critical patent/DE3642003C2/de
Granted legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M3/00Automatic or semi-automatic exchanges
    • H04M3/22Arrangements for supervision, monitoring or testing
    • H04M3/36Statistical metering, e.g. recording occasions when traffic exceeds capacity of trunks
    • H04M3/365Load metering of control unit

Description

Die Erfindung betrifft ein Verfahren zur dezentralen Abwehr von Überlastungen in Steuereinrichtungen von Kommunikations-, insbesondere Fernsprechvermittlungsanlagen nach dem Oberbegriff des Patentanspruchs 1.The invention relates to a method for decentralized Defense against overloads in control devices of Communication, in particular telephone switching systems according to the preamble of claim 1.

Aus der DE-OS 33 28 574 ist eine Schaltungsanordnung für Fernmeldeanlagen, insbesondere Fernsprechvermittlungsanlagen mit zentralen und/oder teilzentralen informationsverarbeitenden Schaltwerken bekannt. In den Patentansprüchen und der Beschreibung ab Seite 17 werden Maßnahmen beschrieben, die im Falle von starker Belastung des Zentralsteuerwerkes angewendet werden, um den Betrieb der Vermittlungsanlage auch in extremen Situationen aufrechtzuerhalten und Überlastungen abzubauen. Wie aus dem vorherigen Stand der Technik schon bekannt ist, geschieht dies dadurch, daß ein bestimmter Prozentsatz von Anforderungen oder Schaltaufträgen abgewiesen wird.From DE-OS 33 28 574 is a circuit arrangement for Telecommunications systems, in particular telephone switching systems with central and / or partially central information processors Derailleurs known. In the claims and the Description from page 17 describes measures those in the event of heavy loading on the central control unit applied to the operation of the switching system to maintain even in extreme situations and Reduce overloads. As from the previous state of the Technology is already known, this happens because a certain percentage of requests or Switch orders is rejected.

Um dies zu erreichen sind bei der in der DE-OS 33 28 574 beschriebenen Schaltungsanordnung in den teilzentralen Schaltwerken und/oder in den dezentralen Schalteinrichtungen Speicherschaltmittel vorgesehen, um den Prozentsatz der aufgrund der gerade herrschenden Belastungssituation abzuweisenden Verbindungsanforderungen oder Schaltaufträge zu speichern. Bei den Steuerprozeduren ist für diesen Zweck eine besondere Lastregulierphase vorgesehen, in der jeweils anpassende Änderungen dieses Prozentsatzes vorgenommen werden können. Hierfür wird also zusätzliche wertvolle Steuerungszeit benötigt, und es sind zusätzliche Steuer- und Bemessungseinrichtungen vorzusehen, um die Prozentsätze zu ermitteln und zu den Speicherschaltmitteln zu senden, damit sie eingespeichert werden können.To achieve this are in the DE-OS 33 28 574th described circuit arrangement in the sub-centers Switchgear and / or in the decentralized switching devices Storage switching means provided to the percentage of due to the current stress situation reject connection requests or switching orders save. The tax procedures for this is A special load regulation phase is provided in the purpose adapting changes to this percentage can be made. So this will be additional valuable control time is required, and there are additional ones Control and measurement devices to provide the To determine percentages and to the storage switching means to be sent so that they can be saved.

Die Aufgabe der vorliegenden Erfindung besteht darin, ein Verfahren anzugeben, bei dem die zentrale Steuereinrichtung durch die bei einer starken Belastung durchzuführenden Maßnahmen nicht zusätzlich belastet wird, indem der an zentraler Stelle erforderliche Aufwand an Steuerungszeit und zusätzlichen Steuer- und Bemessungseinrichtungen gering gehalten wird. Dabei soll es außerdem möglich sein, Einzelfunktionen in besonderer Weise auch unabhängig von der übrigen Verkehrsbelastung besonders zu berücksichtigen.The object of the present invention is specify a method in which the central control device through those to be carried out under heavy load  Measures are not additionally charged by the central effort required control time and additional control and measurement devices is kept low. It should also be possible Individual functions in a special way independent of the other traffic load.

Diese Aufgabe wird durch eine Merkmalskombination gelöst, wie sie im Patentanspruch 1 angegeben ist.This task is solved by a combination of features, as specified in claim 1.

Damit wird in vorteilhafter Weise erreicht, daß die dezentralen Gruppensteuerwerke weitgehend selbständig die zum Erkennen einer Überlast erforderlichen Parameter ermitteln und gezielte Abwehrmaßnahmen einleiten. Durch die verschiedenartigen jeweils einer vermittlungstechnischen oder steuerungstechnischen Funktion zugeordneten Spalten innerhalb der einzelnen Bereiche des Laststatusregisters können die einzelnen Abwehrmaßnahmen für Überlastungen gezielt an der Stelle eingesetzt werden, wo der zu erwartende Effekt am größten ist. Dabei sind auch einzelne periphere Abweisvorgänge durchführbar, ohne daß die zentrale Steuereinrichtung irgendwelche Meldungen erhalten muß.It is advantageously achieved that the decentralized group control units largely independent the parameters required to detect an overload identify and initiate countermeasures. Through the different types of switching technology or columns assigned to the control function within the individual areas of the load status register the individual countermeasures for overloading be used specifically at the point where the expected effect is greatest. There are also some peripheral rejection operations can be carried out without the central control device received any messages got to.

Mit den in den Unteransprüchen angegebenen Weiterbildungen der Erfindung wird die Effektivität bei der Überlastabwehr in Steuereinrichtungen von Vermittlungsanlagen noch verbessert.With the training specified in the subclaims The invention is the effectiveness in the protection against overload in control systems of switching systems still improved.

Ein Ausführungsbeispiel der Erfindung wird nachfolgend anhand von Zeichnungen näher erläutert. Es zeigtAn embodiment of the invention is as follows explained in more detail with reference to drawings. It shows

Fig. 1 die Zusammenschaltung von Steuereinrichtungen und Anschlußorganen in einer Vermittlungsanlage, Fig. 1 shows the interconnection of control means and connection members in a switching system,

Fig. 2 den Aufbau eines Laststatusregisters. Fig. 2 shows the structure of a load status register.

Bei dem Blockschaltbild über die Zusammenschaltung der Steuereinrichtungen in einer Vermittlungsanlage in Fig. 1 sind mehrere zentrale Steuereinrichtungen IVZ 1 bis IVZn dargestellt, die über einen zentralen Datenkanal ZDK mit informationsverarbeitenden Gruppensteuerwerken IVG 1 bis IVGn zusammenarbeiten. An jedes der Gruppensteuerwerke, z. B. IVG 1 sind mehrere periphere informationsverarbeitende Steuereinrichtungen, z. B. IVP 1.1 bis IVP 1. n angeschlossen. Zum Informationsaustausch dient jeweils ein peripherer Datenkanal, z. B. PDK 1. An jede periphere Steuereinrichtung IVP ist ein Teil der gesamten Anzahl von Anschlußorganen, z. B. AO 1.1 bis AO 1. n angeschlossen, die zu einer Gruppe gehören und von dem zuständigen Gruppensteuerwerk IVG 1 gesteuert werden. In den peripheren Steuereinrichtungen werden die von den Anschlußorganen AO kommenden Zustandsänderungen erkannt und zum Gruppensteuerwerk IVG weitergegeben. In umgekehrter Richtung werden die von dem Gruppensteuerwerk IVG erzeugten Befehle zu den peripheren Steuereinrichtungen IVP geleitet, um dort in spezielle Schaltkennzeichen umgesetzt zu werden. Wenn in einem informationsverarbeitenden Gruppensteuerwerk IVG erkannt wird, daß eine zentrale Steuereinrichtung IVZ angefordert werden muß, so wird der zentrale Datenkanal ZDK belegt und die entsprechende zentrale Steuereinrichtung IVZ adressiert. Diese Einzeladressierung ist in der Zeichnung als Auswahlschalter dargestellt, womit ausgesagt werden soll, daß die von einem Gruppensteuerwerk IVG ausgesendete Information gezielt an eine bestimmte zentrale Steuereinrichtung IVZ gebracht werden kann. Dabei kann es sich auch um einen bestimmten Eingangsspeicher innerhalb einer alle Funktionen bearbeitenden gemeinsamen zentralen Steuereinrichtung handeln.In the block diagram of the interconnection of the control devices in a switching system in FIG. 1, several central control devices IVZ 1 to IVZn are shown, which work together with information processing group control units IVG 1 to IVGn via a central data channel ZDK . To each of the group control units, e.g. B. IVG 1 are several peripheral information processing control devices, for. B. IVP 1.1 to IVP 1. n connected. A peripheral data channel, e.g. B. PDK 1 . To each peripheral control device IVP is a part of the total number of connection elements, for. B. AO 1.1 to AO 1. n connected, which belong to a group and are controlled by the responsible group controller IVG 1 . In the peripheral control devices, the state changes coming from the connection organs AO are recognized and passed on to the group control unit IVG . In the reverse direction the data generated by the group control unit IVG commands to the peripheral control devices IVP are directed to be implemented in order to there specific shift indicator. If it is recognized in an information processing group control unit IVG that a central control device IVZ has to be requested, the central data channel ZDK is occupied and the corresponding central control device IVZ is addressed. This individual addressing is shown in the drawing as a selection switch, which is intended to state that the information transmitted by a group control unit IVG can be brought to a specific central control device IVZ in a targeted manner. This can also be a specific input memory within a common central control device that processes all functions.

In ähnlicher Weise arbeiten die peripheren Steuereinrichtungen IVP mit dem jeweils zuständigen Gruppensteuerwerk IVG zusammen. Hierbei ergibt sich eine Vereinfachung, weil prinzipiell nur ein informationsverarbeitendes Gruppensteuerwerk IVG pro Gruppe vorgesehen ist. Auch hierbei ist durch die zeichnerische Darstellung eines Auswahlschalters die Einzeladressierung gezeigt.The peripheral control devices IVP work in a similar manner with the relevant group control unit IVG . This results in a simplification because in principle only one information processing group control unit IVG is provided for each group. Here too, the individual addressing is shown by the graphic representation of a selection switch.

Neben der Einzeladressierung von peripheren Steuerein­ richtungen IVP und auch von Gruppensteuerwerken IVG ist sowohl bei den peripheren Datenkanälen PDK 1 bis PDKn als auch beim zentralen Datenkanal ZDK eine Sammeladressierung möglich, wobei Meldungen, die in Richtung zur Peripherie gehen, an mehrere Gruppensteuerwerke IVG oder periphere Steuereinrichtungen IVP zugleich addressiert werden können. Es handelt sich dabei um Meldungen, die für alle Steuerwerke oder Steuereinrichtungen gemeinsam wichtig sind, wobei gleichartige Befehle ausgelöst werden sollen oder Schaltzustände eingestellt werden. Diese Art der Meldungsabgabe in Form einer Sammeladressierung wird, wie später noch beschrieben wird, vorwiegend bei der Einleitung von Überlast-Abwehrmaßnahmen angewendet. In der Fig. 1 ist dargestellt, daß in jedem Gruppensteuer­ werk IVG 1 bis IVGn ein Laststatusregister LSR vorhanden ist, wie es nachfolgend anhand der Fig. 2 näher erläutert wird. Auch in den zentralen Steuereinrichtungen IVZ 1 bis IVZn sind Laststatusspeicher ZLS vorhanden, worin Werte gespeichert sind, die Angaben liefern über die jeweilige Belastung einer zentralen Steuereinrichtung, beispielsweise IVZ 1. Diese in den zentralen Steuereinrichtungen IVZ angeordneten Laststatusspeicher ZLS dienen dazu, die einzelnen Belastungssituationen jeweils den einzelnen Funktionen zugeordnet als Information an die Laststatusregister LSR der Gruppensteuerwerke IVG abzugeben.In addition to the individual addressing of peripheral control devices IVP and also of group control units IVG , collective addressing is possible both in the peripheral data channels PDK 1 to PDKn and in the central data channel ZDK , with messages going in the direction of the periphery to several group control units IVG or peripheral control units IVP can be addressed at the same time. These are messages that are important for all control units or control devices together, whereby similar commands are to be triggered or switching states are set. This type of message submission in the form of collective addressing, as will be described later, is mainly used when initiating overload countermeasures. In Fig. 1 it is shown that in each group control IVG 1 IVGN factory to a load status register LSR is present, as will be explained below with reference to FIG. 2. Load status memories ZLS are also present in the central control devices IVZ 1 to IVZn , in which values are stored which provide information about the respective load on a central control device, for example IVZ 1 . These load status memories ZLS arranged in the central control devices IVZ serve to deliver the individual load situations assigned to the individual functions as information to the load status register LSR of the group control units IVG .

Das in der Fig. 2 dargestellte Laststatusregister LSR ist in mehrere Bereiche BZ, BG, BA aufgeteilt und enthält zusätzlich eine Gesamtlaststatusspalte GLS. Jeder Bereich BZ, BG, BA des Laststatusregisters LSR ist in mehrere Spalten SZ 1 bis SZn, SG 1 bis SGn, SA 1 bis SAn unterteilt. In jede einzelne dieser Spalten S wird ein Wert eingegeben, der eine Aussage liefert über die Belastungssituation einer bestimmten Funktions- oder Anschlußorgankategorie.The load status register LSR shown in FIG. 2 is divided into several areas BZ, BG, BA and additionally contains a total load status column GLS . Each area BZ, BG, BA of the load status register LSR is divided into several columns SZ 1 to SZn , SG 1 to SGn , SA 1 to SAn . A value is entered into each of these columns S , which provides information about the load situation of a specific functional or connecting organ category.

Wie bereits beschrieben wurde, wird der von den zentralen Steuereinrichtungen IVZ stammende Teil der in das Laststatusregister LSR einzutragenden Information über den zentralen Datenkanal ZDK angeboten. Dieser Teil der Information gelangt in den dafür zuständigen Bereich BZ des Laststatusregisters LSR. Die in diesem Bereich BZ befindlichen Spalten SZ 1 bis SZn sind jeweils bestimmten Funktionen fest zugeordnet, so daß beispielsweise im einzelnen erkannt werden kann, welche Steuerungsfunktionen gerade einen bestimmten Laststatus aufweisen. So kann beispielsweise eine der Spalten SZ 1 zuständig sein für Verbindungsaufbauprozeduren, beispielsweise Wegesuche und ähnliches. Eine andere Spalte könnte für abzubauende Verbindungen vorgesehen sein. Weitere Spalten SZ dieses Bereiches BZ können für zusätzliche Merkmale in Vermittlungsanlagen vorgesehen sein, wie sie in der Fernsprechnebenstellentechnik üblich sind. So kann eine besondere Spalte SZ existieren für Rückfragevorgänge, eine weitere Spalte für Umlegefunktionen, und es können eine oder mehrere Spalten für die zentrale Gesprächsdaten­ erfassung vorgesehen sein. Die Anzahl und die Zuordnung der jeweiligen Spalten SZ hängen selbstverständlich von den Merkmalen ab, die in der betreffenden Vermittlungsanlage verarbeitet werden können und von deren einzelnen Bedeutung innerhalb des gesamten Verkehrsaufkommens.As has already been described, the part of the information to be entered in the load status register LSR from the central control devices IVZ is offered via the central data channel ZDK . This part of the information reaches the area BZ of the load status register LSR which is responsible for this. The columns SZ 1 to SZn located in this area BZ are each assigned specific functions, so that it can be recognized, for example, in detail which control functions have a certain load status. For example, one of the columns SZ 1 can be responsible for connection establishment procedures, for example route searches and the like. Another column could be provided for connections to be cleared down. Further columns SZ of this area BZ can be provided for additional features in switching systems, as are common in telephone private branch exchange technology. So there can be a special column SZ for inquiry processes, another column for transfer functions, and one or more columns can be provided for the central call data acquisition. The number and the assignment of the respective columns SZ depend, of course, on the features that can be processed in the switching system in question and on their individual meaning within the entire traffic volume.

Im Laststatusregister LSR sind zwei weitere Bereiche BG und BA vorgesehen, bei denen die in die einzelnen Spalten SG 1 bis SGn und SA 1 bis SAn einzutragenden Werte in dem informationsverarbeitenden Gruppensteuerwerk IVG selbst ermittelt werden. Einer dieser zuletzt genannten Bereiche BG ist für die Aufnahme von Informationen vorgesehen, welche die Belastungssituation des eigenen Gruppensteuerwerkes IVG betreffen. Auch die in diesen Bereich BG vorhandenen Spalten SG 1 bis SGn sind einzelnen vom Gruppensteuerwerk IVG durchzuführenden Steuer­ prozeduren zugeordnet, wobei es darauf ankommt, ob Meldungen zu den zentralen Steuereinrichtungen IVZ oder zu den peripheren Einrichtungen IVP abzusetzen sind. Es wird dabei außerdem bei der Zuordnung von Spalten SG 1 bis SGn beachtet, um welchen vermittlungstechnischen Vorgang es sich jeweils handelt, damit unterschieden werden kann zwischen Anreizen, die voraussichtlich weitere Anreize nach sich ziehen und solchen Anreizen, die einen Übergang in den Ruhezustand zur Folge haben. In den Spalten SG 1 bis SGn des Bereiches BG sind Angaben über die jeweilige Anzahl von Steuerprozeduren eingespeichert, die innerhalb des Gruppensteuerwerkes IVG zur Bearbeitung anstehen. Es können dabei Zähler eingesetzt sein, die bei jedem neu hinzukommenden Anreiz um einen Schritt vorwärts und beim Beenden der jeweiligen Steuerprozedur um einen Schritt rückwärts gezählt werden. Im Bereich BG des Laststatusregisters LSR ist also detailliert aufgeschlüsselt die jeweils aktuelle Belastungsinformation des eigenen Gruppensteuerwerkes IVG abgelegt.Two further areas BG and BA are provided in the load status register LSR , in which the values to be entered in the individual columns SG 1 to SGn and SA 1 to SAn are determined in the information processing group control unit IVG itself. One of these last-mentioned areas BG is intended for the recording of information relating to the load situation of one's own group control unit IVG . The columns SG 1 to SGn in this area BG are also assigned to individual control procedures to be carried out by the group control unit IVG , it being important whether messages are to be sent to the central control units IVZ or to the peripheral units IVP . When assigning columns SG 1 to SGn, it is also taken into account which switching process is involved, so that a distinction can be made between incentives that are likely to entail further incentives and those incentives that result in a transition to idle status to have. In the columns SG 1 to SGn of the area BG , information about the respective number of control procedures are stored which are to be processed within the group control unit IVG . In this case, counters can be used, which are counted up one step for each new incentive and downward when the respective control procedure is ended. In the area BG of the load status register LSR , the current load information of the own group control unit IVG is stored in detail.

Ein weiterer Bereich BA ist im Laststatusregister LSR vorgesehen, um die Belegungszustände und/oder Belegungsarten der Anschlußorgane AO aufzunehmen. Die in diesem Bereich BA befindlichen Spalten SA 1 bis SAn können bestimmten Anschlußorgan-Kategorien und/oder dazugehörigen Belegungsarten zugeordnet werden. So kann in einer Spalte, beispielsweise SA 1, eingetragen sein, wie viele Teilnehmer­ anschlüsse frei bzw. besetzt sind. Eine weitere Spalte SA kann dafür vorgesehen sein, die Anzahl der Gesprächszustände von Teilnehmeranschlüssen aufzunehmen. Auf die gleiche Weise lassen sich die unterschiedlichen Belegungsarten, beispielsweie kommend/gehend - besetzt bzw. frei, von den verschiedenen Leitungsübertragungen, die in der Fig. 1 ebenfalls als Anschlußorgane AO dargestellt sind, festhalten. Besondere Spalten sind vorgesehen für die Aufnahme der Anzahl von Verbindungswünschen, die noch nicht zum Gesprächszustand geführt haben. Gerade bei dieser Belegungsart sind weitere Anreize zu erwarten, beispielsweise dadurch, daß durch die abgegebene Wahlinformation Steuerprozeduren ausgelöst werden müssen. Der Inhalt der Bereiche BZ, BG, BA des Laststatusregisters LSR wird vom Gruppensteuerwerk IVG laufend abgefragt, wobei eine individuelle Gewichtung der einzelnen Spalten S stattfindet, indem beispielsweise der jeweilige Inhalt mit einem vorbestimmten Faktor multipliziert wird. Aus den so gewonnenen gewichteten Einzelwerten wird eine Gesamtsumme gebildet, die mit jeweils festgelegten Schwellwerten verglichen wird. Bei diesem Vergleich ergibt sich ein Gesamtlaststatuswert, der in die dafür vorgesehene besondere Spalte GLS eingetragen wird. Dieser Gesamtlaststatuswert ist ein wesentliches Kriterium bei den vom Gruppensteuerwerk IVG selbsttätig einzuleitenden Überlast-Abwehrmaßnahmen. Da der sich aus den gewichteten Einzelwerten zusammen­ gesetzte Summenwert sich laufend ensprechend der sich ändernden Belastung ändert, muß auch der Gesamtlaststatus­ wert immer aktualisiert werden. Ein neuer höherer Gesamtlaststatuswert wird jedoch nur dann in die besondere Spalte GLS eingetragen, wenn der jeweils vorgegebene Schwellwert für eine Laststatuskategorie überschritten wird. Für die Verringerung des Gesamtlaststatuswertes sind andere Schwellwerte vorgegeben, wobei ein verringerter Gesamtlaststatuswert nur dann eingetragen wird, wenn der jeweils niedrigere Schwellwert unterschritten wird. Es ergibt sich dabei eine Hysteresefunktion, womit erreicht wird, daß innerhalb des Gruppensteuerwerkes IVG nicht häufiger als unbedingt erforderlich Änderungen des Gesamtlaststatuswertes vorgenommen werden, womit dann auch eine Änderung der für die Überlastabwehr vorgesehenen Steuerprozeduren erforderlich wären.Another area BA is provided in the load status register LSR in order to record the occupancy states and / or occupancy types of the connection organs AO . The columns SA 1 to SAn located in this area BA can be assigned to specific connection organ categories and / or associated types of assignment. How many subscriber connections are free or busy can be entered in a column, for example SA 1 . Another column SA can be provided to record the number of call states of subscriber lines. In the same way, the different types of assignment, for example incoming / outgoing - occupied or free, can be recorded by the different line transmissions, which are also shown in FIG. 1 as connection elements AO . Special columns are provided for recording the number of connection requests that have not yet led to the state of the call. Especially with this type of occupancy, further incentives are to be expected, for example due to the fact that control procedures must be triggered by the election information provided. The content of the areas BZ, BG, BA of the load status register LSR is continuously queried by the group control unit IVG , an individual weighting of the individual columns S taking place, for example by multiplying the respective content by a predetermined factor. A total sum is formed from the weighted individual values obtained in this way, which is compared with the respectively defined threshold values. This comparison results in a total load status value which is entered in the special GLS column provided for this purpose. This total load status value is an essential criterion for the overload control measures to be initiated automatically by the IVG group control unit. Since the total value composed of the weighted individual values changes continuously in accordance with the changing load, the total load status value must always be updated. However, a new, higher total load status value is only entered in the special GLS column if the predefined threshold value for a load status category is exceeded. Other threshold values are predefined for the reduction of the total load status value, a reduced total load status value being entered only if the respective lower threshold value is undershot. The result is a hysteresis function, with the result that changes in the total load status value are not made more frequently than absolutely necessary within the group control unit IVG , which would then also require a change in the control procedures provided for overload protection.

Nachfolgend soll anhand einer Funktionsbeispiele beschrieben werden, wie sich vom Gruppensteuerwerk IVG selbsttätig einzuleitende Überlastabwehrmaßnahmen ergeben.In the following, a functional example will be used to describe how overload protection measures to be initiated automatically by the group control unit IVG result.

Bei von Anschlußorganen AO kommenden Neubelegungen wird zunächst der Gesamtlaststatuswert GLS abgefragt. Danach wird entschieden, ob eine sofortige Bearbeitung erfolgen kann (Laststatus 0 oder 1), ob eine verzögerte Bearbeitung möglich ist (Laststatus 2 oder 3), oder ob eine Zurückweisung bzw. Sperrung von Anschlußorganen AO erfolgen muß (Laststatus 4 oder größer). Eine verzögerte Bearbeitung von Anreizen kann erreicht werden, indem ein Sperrbefehl zu einer peripheren Steuerung IVP gegeben und gleichzeitig ein Zeitzähler gestartet wird. Nach dessen Ablauf erfolgt automatisch eine Freigabe der Anreize. Bei einer Sperrung von Anschlußorganen AO (Laststatus 4) erfolgt eine Freigabe erst dann, wenn sich ein niedriger Gesamtlaststatuswert einstellt. Dabei können ganze Teilgruppen, z. B. die von einer peripheren Steuerung IVP bedient werden, vorübergehend abgeschaltet werden.In the case of new assignments coming from AO connection elements, the total load status value GLS is first queried. Then a decision is made as to whether immediate processing can take place (load status 0 or 1), whether delayed processing is possible (load status 2 or 3), or whether rejection or blocking of AO connection elements must be carried out (load status 4 or greater). Delayed processing of incentives can be achieved by issuing a lock command to a peripheral controller IVP and at the same time starting a time counter. After the expiration of the incentives. If the AO connection elements (load status 4) are blocked, they are only released when the total load status value is low. Whole sub-groups, e.g. B. which are operated by a peripheral controller IVP , can be temporarily switched off.

Eine Verzögerung oder Sperrung von Anreizen kann auch dann ohne Rücksicht auf den Gesamtlaststatuswert GLS erfolgen, wenn in der für diese Belegungsart zuständigen Spalte im Bereich BG des Laststatusregisters LSR ein Wert eingespeichert ist, der oberhalb eines vorgegebenen Grenzwertes liegt.Incentives can also be delayed or blocked regardless of the overall load status value GLS if a value is stored in the column responsible for this type of occupancy in the BG area of the load status register LSR that is above a specified limit value.

In Abhängigkeit vom Gesamtlaststatuswert und unter Berücksichtigung der Spalteninhalte in den Bereichen BG und BA des Laststatusregisters LSR wird außerdem festgelegt, welche Arten von Anschlußorganen für eine Verzögerung oder Sperrung von Anreizen in Frage kommen. So können von Verbindungsleitungen oder Amtsleitungen, also von anderen Vermittlungsstellen ankommende Anreize noch freizügig bearbeitet werden, während bei Teilnehmeranschlußorganen bereits Überlastabwehrmaßnahmen eingeleitet sind.Depending on the total load status value and taking into account the column contents in the areas BG and BA of the load status register LSR , it is also determined which types of connection elements are suitable for delaying or blocking incentives. Incentives arriving from connecting lines or trunk lines, that is to say from other switching centers, can still be freely processed, while measures to prevent overloading have already been initiated in the subscriber line elements.

Die Überlastabwehrmaßnahmen insbesondere bei Neubelegungen dienen dazu, weitere als Folge davon entstehende Anreize zu verhindern. Die von Anschlußorganen AO kommenden Neubelegungen verursachen eine Reihe von Folgeanreizen dadurch, daß Wahlziffern abgegeben und verarbeitet werden müssen, daß Verbindungswege geschaltet werden müssen, und daß der gewünschte Anschluß angesteuert werden muß. Mit Überlastabwehr­ maßnahmen wird also erreicht, daß derartige Folgeanreize nicht auftreten, wodurch außer dem Gruppensteuerwerk IVG insbesondere auch die zentralen Steuereinrichtungen IVZ entlastet werden. The anti-overload measures, especially for new occupancies, serve to prevent further incentives that may arise as a result. The new assignments coming from connection organs AO cause a series of follow-up incentives in that dialing digits have to be submitted and processed, that connection paths have to be switched and that the desired connection has to be activated. With anti-overload measures it is thus achieved that such follow-up incentives do not occur, which, in addition to the IVG group control unit, in particular also relieves the central control units IVZ .

Steuerungsanreize, die im Zuge eines Verbindungsaufbaus die Ansteuerung eines Anschlußorgans AO erfordern, werden auch in einer Überlastsituation möglichst verzögerungsfrei bearbeitet, weil nach dem Abschluß eines Verbindungsauf­ baus sich im allgemeinen ein Verbindungszustand (Gesprächszustand) einstellt, der eine längere Zeit andauert, ohne daß mit einer größeren Anzahl von neuen Anreizen zu rechnen ist. Deshalb werden bei Verzögerungen und/oder Sperrungen von solchen Steuerungsanreizen andere Maßstäbe angelegt, indem andere Werte aus dem Laststatusregister LSR zugrunde gelegt werden als bei den zuvor beschriebenen Neubelegungen.Control incentives, which require the activation of a connection element AO in the course of establishing a connection, are processed as quickly as possible even in an overload situation, because after the completion of a connection establishment, a connection state (call state) generally sets up, which lasts for a long time without any larger number of new incentives can be expected. Therefore, in the event of delays and / or blockages of such control incentives, different standards are applied by using different values from the load status register LSR than the previously described reassignments.

Mit Hilfe des Laststatusregisters LSR können auch Ergänzungsmerkmale einer Vermittlungsanlage beeinflußt werden. So ist es beispielsweise möglich, in einer Fernsprechnebenstellenanlage das Aufbauen von Ferngesprächen vorübergehend einzuschränken, wenn bereits viele Fernverbindungen bestehen. Durch die Zählung während des Gespräches, insbesondere bei internationalem Fernverkehr kann nämlich der Zweig einer zentralen Steuereinrichtung IVZ, der mit einer zentralen Gesprächsdatenerfassung befaßt ist, stark belastet sein. Dies wird im Laststatusregister LSR an einem Zahlenwert erkannt, der in einer für dieses Merkmal zuständigen Spalte SZ des Bereiches BZ eingetragen ist. Da dieser Wert, der ausschließlich die Belastung der zentralen Gesprächsdatenerfassung angibt, keinen großen Einfluß auf den Gesamtlaststatuswert GLS haben muß, kann dieser Wert direkt für das Einleiten von Überlastabwehrmaßnahmen herangezogen werden. Durch eine zeitweise Einschränkung beim Aufbauen von neuen Fernverbindungen wird dann erreicht, daß keine Engpässe bei der zentralen Gesprächsdatenerfassung für bereits bestehende Verbindungen auftreten, indem eine zusätzliche Belastung ausgeschlossen wird.With the help of the load status register LSR , additional features of a switching system can also be influenced. For example, it is possible to temporarily restrict the establishment of long-distance calls in a private branch exchange if many long-distance connections already exist. Because of the counting during the call, particularly in the case of international long-distance traffic, the branch of a central control device IVZ , which is concerned with central call data acquisition, can be heavily loaded. This is recognized in the load status register LSR by a numerical value which is entered in a column SZ of the area BZ which is responsible for this feature. Since this value, which only indicates the load on the central call data acquisition, does not have to have a major influence on the overall load status value GLS , this value can be used directly for the initiation of overload protection measures. A temporary restriction when establishing new long-distance connections then ensures that there are no bottlenecks in the central call data acquisition for existing connections by excluding an additional load.

Claims (8)

Verfahren zur dezentralen Abwehr von Überlastungen in Steuereinrichtungen von Kommunikations-, insbesondere Fernsprechvermittlungsanlagen, wobei neben zentralen Steuereinrichtungen dezentrale informationsverarbeitende Gruppensteuerwerke und periphere Steuereinrichtungen vorgesehen sind, und in den Gruppensteuerwerken Speicher zur Aufnahme von Belastungsinformation vorhanden sind, die laufend von der zentralen Steuereinrichtung an die Gruppensteuerwerke gemeldet werden, dadurch gekennzeichnet, daß in den Gruppensteuerwerken (IVG) vorgesehene Laststatusregister (LSR) in mehrere Bereiche (BZ, BG, BA) unterteilt sind, die zentralen Steuereinrichtungen (IVZ), dem eigenen Gruppensteuerwerk (IVG) und den davon steuerbaren Anschlußorganen (AO) zugeordnet sind, daß jeder einzelne Bereich (BZ, BG, BA) aus mehreren Spalten (SZ 1 bis SZn, SG 1 bis SGn, SA 1 bis SAn) besteht, die jeweils einer vermittlungstechnischen oder steuerungstechnischen Funktion, bzw. einer Belegungsart der Anschlußorgane (AO), fest zugeordnet sind, und entsprechende Belastungswerte aufnehmen, daß jede von der zentralen Steuereinrichtung (IVZ) an die Gruppensteuerwerke (IVG) gemeldete Veränderung des Belastungszustandes in den jeweils zuständigen Bereich (BZ) des Laststatusregisters (LSR) eingetragen wird, daß eine besondere Spalte (GLS) vorgesehen ist, worin der Wert eines Gesamtlaststatus eingetragen wird, welcher durch eine unterschiedlich gewichtete Bewertung der einzelnen Spalten innerhalb der Bereiche (BZ, BG, BA) während der Bearbeitung eines Steuervorgangs durch das Gruppensteuerwerk (VG) selbst ermittelt wird, und daß in Abhängigkeit von dem in der besonderen Spalte (GLS) eingetragenen Gesamtlaststatuswert bestimmte Kategorien von Anschlußorganen (AO) und/oder Steuerprozeduren gesperrt, verzögert freigegeben oder abgewiesen werden. Method for decentralized protection against overloads in control devices of communication, in particular telephone switching systems, whereby in addition to central control devices, decentralized information processing group control units and peripheral control units are provided, and in the group control units there are memories for recording load information, which are continuously reported by the central control unit to the group control units are characterized in that the load status registers (LSR ) provided in the group control units (IVG) are divided into several areas (BZ, BG, BA) , the central control units (IVZ) , the own group control unit (IVG) and the connection elements (AO ) are assigned to the fact that each individual area (BZ, BG, BA) consists of several columns (SZ 1 to SZn , SG 1 to SGn , SA 1 to SAn) , each with a switching or control function, or a type of assignment of the connection elements (AO) , are permanently assigned, and record the corresponding load values so that each change in the load status reported by the central control device (IVZ) to the group control units (IVG) is entered in the relevant area (BZ) of the load status register (LSR) that a special column (GLS) is provided, in which the value of a total load status is entered, which is determined by a differently weighted evaluation of the individual columns within the areas (BZ, BG, BA) during the processing of a control process by the group control unit (VG) itself, and that, depending on the total load status value entered in the special column (GLS), certain categories of connection elements (AO) and / or control procedures are blocked, released with delay or rejected. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Spalten innerhalb der einzelnen Bereiche (BZ, BG, BA) mindestens zum Teil aus Zählern gebildet werden, die vom Gruppensteuerwerk (IVG) bei jedem neuen Belegungs-, Anreiz- oder Einspeichervorgang um einen Schritt vorwärts und bei jedem Freischalte- oder Ausspeichervorgang um einen Schritt rückwärts gezählt werden.2. The method according to claim 1, characterized in that the columns within the individual areas (BZ, BG, BA) are formed at least in part from counters by the group control unit (IVG) with each new allocation, incentive or saving process by one Step forward and count down one step for each activation or withdrawal process. 3. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die zur Eintragung eines höheren Gesamtlaststatus­ wertes in die besondere Spalte (GLS) führende, aus den Spalten gewonnene gewichtete Summe größer ist als der zur Eintragung eines niedrigeren Gesamtlaststatuswert führende Summenwert, womit bei Änderung des Gesamtlaststatuswertes eine Hysteresefunktion bewirkt wird.3. The method according to claim 1, characterized in that the weighted sum resulting from the columns leading to the entry of a higher total load status value in the special column (GLS) is greater than the total value leading to the entry of a lower total load status value, thus changing the total load status value a hysteresis function is effected. 4. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß bei den in den Spalten der einzelnen Bereiche (BZ, BG, BA) befindlichen Werten Grenzwerte festgelegt sind, bei deren Überschreitung ohne Rücksicht auf den Gesamtlaststatuswert gezielte Überlastabwehrmaßnahmen eingeleitet werden.4. The method according to claim 1, characterized in that in the values in the columns of the individual areas (BZ, BG, BA) limit values are defined, if exceeded, targeted overload protection measures are initiated regardless of the total load status value. 5. Verfahren nach Anspruch 4, dadurch gekennzeichnet, daß beim Informationsaustausch zwischen zentralen Steuereinrichtungen (IVZ) oder Gruppensteuerwerken (IVG) im Laststatusregister (LSR) gezielt der Laststatus derjenigen Spalte in dem entsprechenden Bereich (BZ, BG, BA) abgefragt wird, die der betreffenden Funktion zugeordnet ist, wobei dann entschieden wird, ob eine Meldung abgegeben oder zurückgehalten wird.5. The method according to claim 4, characterized in that when information is exchanged between central control devices (IVZ) or group control units (IVG) in the load status register (LSR), the load status of that column in the corresponding area (BZ, BG, BA) is queried which the is assigned to the relevant function, in which case it is decided whether a report is to be made or withheld. 6. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß für die Überlastabwehr spezielle besondere Anschlußorgan-Kategorien festgelegt werden, die unabhängig von bereits bestehenden Verkehrs- und/oder Funktionsberechtigungen sind, wobei für die Überlastabwehr relevante, durch Verkehrsbeobachtung ermittelte Gegebenheiten berücksichtigt werden.6. The method according to claim 1, characterized, that special for overload protection Affiliate Categories are established that regardless of existing traffic and / or Functional permissions are, whereby for the Protection against overload relevant through traffic monitoring determined circumstances are taken into account. 7. Verfahren nach einem der Ansprüche 1 oder 6, dadurch gekennzeichnet, daß bei der Bildung von Anschlußorgan-Kategorien die in einer Vermittlungsanlage bestehenden Berechtigungs­ klassen und/oder Typenkennzeichnungen herangezogen werden.7. The method according to any one of claims 1 or 6, characterized, that in the formation of affiliate categories the existing authorization in a switching system classes and / or type designations will. 8. Verfahren nach einem der Ansprüche 6 oder 7, dadurch gekennzeichnet, daß bei aufgrund besonderer Überlastsituationen einzuleitenden Überlastabwehrmaßnahmen eine Verknüpfung von Berechtigungsklassen und/oder Typenkennzeichnungen mit den speziell für die Überlastabwehr festgelegten zusätzlichen Klassifizierungen vorgenommen wird.8. The method according to any one of claims 6 or 7, characterized, that due to special overload situations linkage to be initiated of authorization classes and / or type designations with those specifically designed for overload protection additional classifications is made.
DE19863642003 1986-12-09 1986-12-09 Method for decentralised prevention of overload in control devices of communications switching systems, in particular telephone switching systems Granted DE3642003A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19863642003 DE3642003A1 (en) 1986-12-09 1986-12-09 Method for decentralised prevention of overload in control devices of communications switching systems, in particular telephone switching systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19863642003 DE3642003A1 (en) 1986-12-09 1986-12-09 Method for decentralised prevention of overload in control devices of communications switching systems, in particular telephone switching systems

Publications (2)

Publication Number Publication Date
DE3642003A1 DE3642003A1 (en) 1988-06-23
DE3642003C2 true DE3642003C2 (en) 1989-05-11

Family

ID=6315785

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19863642003 Granted DE3642003A1 (en) 1986-12-09 1986-12-09 Method for decentralised prevention of overload in control devices of communications switching systems, in particular telephone switching systems

Country Status (1)

Country Link
DE (1) DE3642003A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10129293B4 (en) * 2001-06-18 2004-11-11 Tenovis Gmbh & Co. Kg Method for operating a telecommunication system and telecommunication system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3328574C2 (en) * 1983-08-08 1997-03-06 Siemens Ag Circuit arrangement for telecommunications systems, in particular telephone switching systems
DE3328572A1 (en) * 1983-08-08 1985-02-28 Siemens AG, 1000 Berlin und 8000 München CIRCUIT ARRANGEMENT FOR TELECOMMUNICATION SYSTEMS, IN PARTICULAR TELEPHONE SWITCHING SYSTEMS, WITH CENTRAL AND / OR PARTIAL CENTRAL INFORMATION PROCESSING SWITCHGEARS
DE3418408A1 (en) * 1984-05-17 1985-11-21 Siemens AG, 1000 Berlin und 8000 München Method to prevent overloading of the central controller of a computer-controlled telephone system, and a device to carry out the method

Also Published As

Publication number Publication date
DE3642003A1 (en) 1988-06-23

Similar Documents

Publication Publication Date Title
DE1774513A1 (en) Circuit arrangement for determining the priority ratio between several request signals for program-controlled data processing systems
EP0466948B1 (en) Communications system with a multi-processor system serving as the central control
EP0432746B1 (en) Telecommunications terminal
EP0523276A1 (en) Method and circuit for arranging virtual circuits over a bundle of ATM-connecting lines
DE3642003C2 (en)
DE3730761C2 (en)
DE2658912B2 (en) Circuit arrangement for a centrally controlled telecommunications, in particular telephone exchange
DE1537879A1 (en) Circuit arrangement for a centrally controlled telecommunications, in particular telephone switching system
DE3248393C2 (en)
DE1512855C3 (en) Decimal phone number position number converter
DE3725061C2 (en)
DE1512912C3 (en) Circuit arrangement for identifying feeder lines
DE2828841A1 (en) Centrally controlled telephone exchange - has extra memory banks used for semi-permanent signals read cyclically in normal operation
DE1524210C (en) Circuit arrangement for controlling the data traffic between peripheral devices and a central unit of a data processing system
CH650372A5 (en) Procedure for the settlement of vermittlungsvorgaengen in telephone systems, particularly telephone private exchanges.
DE1762453C3 (en) Circuit arrangement for a telephone exchange with electronic selection of a free link line
DE2247830C2 (en) Circuit arrangement for centrally controlled telecommunications switching systems with switching fields and route seekers
DE1801849C3 (en) Circuit arrangement for signs
DE2808706C2 (en) Centrally controlled telephone exchange with subscribers of different lengths
DE3223565A1 (en) Method and arrangement for rapidly sorting the values of a group of values
AT240922B (en) System for carrying out switching tasks, in particular for telephone purposes
DE1537827A1 (en) Circuit arrangement for monitoring multi-digit codes for blocking and / or releasing connections in telephone systems, in particular in centrally controlled telephone extension systems
DE1213008B (en) Circuit arrangement for querying termination circuits in switching systems
CH670023A5 (en)
DE3529169A1 (en) Circuit arrangement for telecommunications systems, in particular telephone switching systems, with information-polling devices cyclically activating answering stations

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
D2 Grant after examination
8364 No opposition during term of opposition
8327 Change in the person/name/address of the patent owner

Owner name: TELENORMA GMBH, 6000 FRANKFURT, DE

8327 Change in the person/name/address of the patent owner

Owner name: ROBERT BOSCH GMBH, 70469 STUTTGART, DE

8339 Ceased/non-payment of the annual fee