DE2110355A1 - JACQUARD INTERIOR - Google Patents

JACQUARD INTERIOR

Info

Publication number
DE2110355A1
DE2110355A1 DE19712110355 DE2110355A DE2110355A1 DE 2110355 A1 DE2110355 A1 DE 2110355A1 DE 19712110355 DE19712110355 DE 19712110355 DE 2110355 A DE2110355 A DE 2110355A DE 2110355 A1 DE2110355 A1 DE 2110355A1
Authority
DE
Germany
Prior art keywords
board
choir
holes
harness cords
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19712110355
Other languages
German (de)
Inventor
Karl Kohl
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Karl Mayer Textilmaschinenfabrik GmbH
Original Assignee
Karl Mayer Textilmaschinenfabrik GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Karl Mayer Textilmaschinenfabrik GmbH filed Critical Karl Mayer Textilmaschinenfabrik GmbH
Priority to DE19712110355 priority Critical patent/DE2110355A1/en
Priority to US00231570A priority patent/US3724512A/en
Priority to GB1011072*[A priority patent/GB1335643A/en
Publication of DE2110355A1 publication Critical patent/DE2110355A1/en
Pending legal-status Critical Current

Links

Classifications

    • DTEXTILES; PAPER
    • D03WEAVING
    • D03CSHEDDING MECHANISMS; PATTERN CARDS OR CHAINS; PUNCHING OF CARDS; DESIGNING PATTERNS
    • D03C3/00Jacquards
    • D03C3/24Features common to jacquards of different types

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Installation Of Indoor Wiring (AREA)
  • Insertion, Bundling And Securing Of Wires For Electric Apparatuses (AREA)
  • Manufacturing Of Electrical Connectors (AREA)

Description

Die Erfindung betrifft eine Jacquardeinrichtung mit einem auf- und abbeweglichen Platinenboden, einem im Abstand darunter angeordneten Chorbrett und einer Drangstifbarre, wobei die Platinen mittels Harnischschnüre mit den Drängstiften verbunden sind.The invention relates to a jacquard device with a board base that can be moved up and down, a choir board arranged at a distance below and a pin bar, the sinkers by means of harness cords with the urging pins are connected.

Bei Jacquardeinrichtungen wird als Hubmittel für die Platinen, um diese mit ihrem oberen Haken von den Messern abzuheben, in den meisten Fällen der Platinenboden verwendet, auf dem die Platinen mit ihren unteren federartig umgebogenen Enden aufsitzen, an denen die unter Federspannung stehenden Harnischschnüre mittel- oder unmittelbar angreifen. Der Platinenboden ist auf- und abbeweglich angeordnet und steht mit dem Maschinenantrieb in Verbindung. Die Harnischschnüre laufen von den mit dem Platinenboden auf- und abbeweglichen Platinen über eine Umlenkvorrichtung bzw. direkt durch die Löcher des Chorbrettes und unmittel-In the case of jacquard devices, the lifting means for the sinkers, to lift them off the knives with their upper hook, in most cases the bottom of the board is used, on which the sinkers sit with their lower, spring-like bent ends, on which the under spring tension standing harness cords directly or indirectly attack. The bottom of the board can be moved up and down and is connected to the machine drive. The harness cords run from the sinkers, which can be moved up and down with the sinker base, over a deflection device or directly through the holes in the choir board and

— 2 —- 2 -

309822/001$309822 / $ 001

* mittelbar bzw. mit einer starken Richtungsänderung durch die Löcher einer Chorleiste zu den Drängstiften.* indirectly or with a strong change of direction the holes of a choir strip to the urging pins.

Bei diesen bekannten Einrichtungen entstehen an dem unter dem Platinenboden angeordneten Chorbrett und an den durch dessen Löcher hindurchlaufendenHarnischschnüren schon nach kurzer Betriebszeit Verschleißerscheinungen, die die Arbeitsweise der Einrichtung ungenau machen bzw. einen häufigen mit langwierigen Montagearbeiten verbundenen Austausch erforderlich machen.In these known devices arise on the choir board arranged under the board bottom and on the through armor cords running through its holes show signs of wear and tear after a short period of operation Make the operation of the device inaccurate or a frequent exchange associated with lengthy assembly work make necessary.

Aufgabe der Erfindung ist es, den Verschleiß dieser Teile einer Jacquardeinrichtung auf ein Mindestmaß zu verringern.The object of the invention is to reduce the wear and tear on these parts of a jacquard device to a minimum.

Erfindungsgemäß wird dies dadurch erreicht, daß das Chorbrett fest mit dem Platinenboden verbunden ist.According to the invention this is achieved in that the choir board is firmly connected to the bottom of the board.

Zwischen den das Chorbrett verlassenden und durch eine Chorleiste geführten Harnischschnüren und der letzteren entsteht insbesondere durch die Schnurumlenkung eine Reibung, die aber dadurch auf ein praktisch nicht in Erscheinung tretendes Mindestmaß verringert werden können, daß der Abstand der Löcher in dieser Chornleiste geringer gemacht wird als der der Drängstifte in der Stiftbarre.Between the harness cords that leave the choir board and run through a choir strip and the latter In particular, the line deflection creates friction, but this can be reduced to a practically non-apparent minimum that the distance between the holes in this chorus bar is made smaller than that of the urging pins in the pin bar.

Hierdurch ergibt sich zwar ein geringer seitlicher Zug auf die Drängstifte, der aber durch die durchweg gute StiftführungThis results in a slight lateral pull on the urging pins, but this is due to the consistently good pin guidance

309822/0015309822/0015

in der Barre sich nicht störend bemerkbar macht. Andererseits kann man hei Anordnung einer Chorleiste diese ebenfalls mit dem Platinenhoden "bzw* mit dem Chorbrett fest verbinden, so daß auch hier keine Relativbewegung zwischen den Harnischschnüren und der Leiste entsteht.in the bar is not noticeable in a disturbing way. on the other hand you can also arrange this with a choir strip with the platinenhoden "or * firmly connect with the choir board, so that there is no relative movement between the harness cords and the groin.

Auf der Zeichnung ist ein Ausführungsbeispiel der Erfindung dargestellt.In the drawing is an embodiment of the invention shown.

Von der Jacquardeinrichtung sind lediglich die wesentlichen hier interessierenden Teile in der Zeichnung enthalten. Die von den Messern 1 an ihrem oberen Haken 2 gehaltenen und von den quer dazu liegenden Hadeln 3 gesteuerten Jacquardplatinen 4 sitzen mit ihres unteren umgebogenen Ende 5 auf dem in Ifeilrichtung 6 auf- und abbeweglichen Platinenboden 7 auf und sind durch Strippen 8 über einen Karabinerhaken 9 mit den Harnischschnüren 10 verbunden, die ihrerseits am anderen Ende an den Drängstiften 11 angreifen. Unterhalb des Platinenbodens 7 ist das Chorbrett 12 angeordnet, das mit Löchern 13 zur Durchführung der Harnischschnüre versehen ist. Außerdem ist es durch beliebige Mittel, wie Bolzen 14 od.dgl. fest mit dem Platinenboden 7 verbunden, so daß es dessen Auf-und Abbewegung im vollen Umfang mit macht. Hierdurch entfällt jegliche Relativbewegung zwischen den Harnischschnüren 10 und dem Chorbrett 12 bzw. dessen Löcher 13· Unterhalb des Chorbrettes befindet sich die Chorleiste 15, die ebenfalls Löcher 16 zur Durchführung der HarnischschnüreOnly the essential parts of the Jacquard device that are of interest here are contained in the drawing. The jacquard sinkers held by the knives 1 on their upper hook 2 and controlled by the hadels 3 lying across them 4 sit with their lower bent end 5 on the bottom of the board that can be moved up and down in the direction 6 7 on and are by stripping 8 over a snap hook 9 connected to the harness cords 10, which in turn attack the urging pins 11 at the other end. Below of the board bottom 7, the choir board 12 is arranged, which is provided with holes 13 for the implementation of harness cords is. In addition, it is by any means, such as bolts 14 or the like. firmly connected to the board bottom 7 so that it its up and down movement to the full extent. Through this there is no relative movement between the harness cords 10 and the choir board 12 or its holes 13 Below the choir board is the choir strip 15, which also has holes 16 for the implementation of the harness cords

309822/0Q1S309822 / 0Q1S

10 aufweist. TJm die seitliche Ablenkung der Harnischschnüre beim Austritt aus den Löchern 13 des Chorbrettes 12 zu verringern, ist bei dem vorliegenden Beispiel vorgesehen, den Abstand 17 der Löcher 16 der Chorleiste 15 geringer zu machen als den Abstand 18 zweier nebeneinander biegender Drängstifte 11. Es wird hierdurch erreicht, daß die Relativbewegung zwischen den Harnischschnüren 10 und der Chorleiste 15 bzw. den Löchern 16 eine stark verminderte Reibung ergeben, so daß der hier etwa entstehende Verschleiß geringfügig ist.10 has. TJm the lateral deflection of the harness cords to reduce when exiting the holes 13 of the choir board 12 is provided in the present example, the To make the distance 17 of the holes 16 of the choir strip 15 less than the distance 18 of two adjacent bending Urge pins 11. It is thereby achieved that the relative movement between the harness cords 10 and the choir bar 15 or the holes 16 result in a greatly reduced friction, so that the wear that occurs here is insignificant.

Es kann auch besonders zweckmäßig sein, die Chorleiste 15 ihrerseits fest mit dem Chorbrett 12 bzw. dem Platinenboden 7 zu verbinden, so daß auch die zuletzt erwähnte Relativbewegung zwischen den Harnischschnüren und der Leiste wegfällt .It can also be particularly expedient for the choir strip 15 in turn to be fixed to the choir board 12 or the board base 7 to connect so that the last mentioned relative movement between the harness cords and the bar is omitted .

- 5 - 309822/0015- 5 - 309822/0015

Claims (3)

PATENTANSPRÜCHE:PATENT CLAIMS: 1. Jacquardeinrichtung mit einem auf- und abgehenden Platinenboden, einem im Abstand darunter angeordneten Chorbrett und einer Drängstiftbarre, wobei die Platinen mittels Harnischschnüre mit den DrÜngstiften verbunden sind, dadurch gekenn zeichnet, daß das Chorbrett (12) fest mit dem Platinenboden verbunden ist.1. Jacquard device with an up and down Board bottom, a choir board arranged at a distance below and a push pin bar, wherein the boards by means of harness cords with the pinch pins are connected, characterized in that the choir board (12) is firmly connected to the bottom of the board. 2. Jacquardeinrichtung nach Anspruch 1, dadurch gekennzeichnet , daß zwischen dem Chorbrett (12) und der Stiftbarre (19) eine Chorleiste (15) angeordnet ist, deren löcher (16) für die Harnischschnüre (10) einen geringeren Abstand (17) als die Dringstifte (11) der Barre (19) haben.2. Jacquard device according to claim 1, characterized in that between the choir board (12) and the pin bar (19) a choir bar (15) is arranged, the holes (16) for the harness cords (10) have a smaller distance (17) than the urging pins (11) of the bar (19). 3. Jacquardeinrichtung nach Anspruch 1, dadurch gekennze ichne t , daß sich zwischen dem Chorbrett (12) und der Drängstiftbarre (19) eine mit Löchern (16) für die Harnischschnüre (10) versehene Chorleiste (15) befindet, die mit dem Chorbrett (12) bzw. mit dem Platinenboden (7) fest verbunden ist.3. Jacquard device according to claim 1, characterized in that there is between the Choir board (12) and the push pin bar (19) one provided with holes (16) for the harness cords (10) Choir strip (15) is located, which is firmly connected to the choir board (12) or to the board base (7) is. 3 0 9822/001&3 0 9822/001 & L e e r s e i t eL e r s e i t e
DE19712110355 1971-03-04 1971-03-04 JACQUARD INTERIOR Pending DE2110355A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
DE19712110355 DE2110355A1 (en) 1971-03-04 1971-03-04 JACQUARD INTERIOR
US00231570A US3724512A (en) 1971-03-04 1972-03-03 Jacquard mechanism
GB1011072*[A GB1335643A (en) 1971-03-04 1972-04-03 Jacquard mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19712110355 DE2110355A1 (en) 1971-03-04 1971-03-04 JACQUARD INTERIOR

Publications (1)

Publication Number Publication Date
DE2110355A1 true DE2110355A1 (en) 1973-05-30

Family

ID=5800524

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19712110355 Pending DE2110355A1 (en) 1971-03-04 1971-03-04 JACQUARD INTERIOR

Country Status (3)

Country Link
US (1) US3724512A (en)
DE (1) DE2110355A1 (en)
GB (1) GB1335643A (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3728513A1 (en) * 1987-08-26 1989-03-09 Grosse Webereimaschinen Gmbh HOLDING DEVICE FOR WAVING MACHINES CONTROLLED BY JACQUARD MACHINES
FR2726011B1 (en) * 1994-10-25 1996-12-20 Staubli Sa Ets NEW REMOVABLE HARNESS FOR JACQUARD MECHANICS
DE19731447A1 (en) 1997-07-22 1999-01-28 Textilma Ag Weaving harness and jacquard weaving machine with weaving harness
FR2825723B1 (en) * 2001-06-08 2003-08-08 Staubli Lyon GUIDE BODY, JACQUARD HARNESS AND CROWD FORMING DEVICE INCLUDING SUCH A BODY AND GUIDING METHOD FOR THE WIRE OF A JACQUARD CRAFT
FR2849066B1 (en) * 2002-12-24 2005-04-29 Staubli Lyon GUIDING MEMBER, JACQUARD HARNESS INCORPORATING SUCH AN ORGAN, METHOD FOR MANUFACTURING SUCH AN ORGAN AND WEAVING COMPRISING SUCH AN ORGAN

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL275111A (en) *
DE208222C (en) *
FR1564798A (en) * 1968-03-01 1969-03-17

Also Published As

Publication number Publication date
US3724512A (en) 1973-04-03
GB1335643A (en) 1973-10-31

Similar Documents

Publication Publication Date Title
EP0107099B1 (en) Device to control a single heald in a loom having a shedding mechanism
EP0381613B1 (en) Control mechanism for the hooks of shedding machines, particularly jacquard machines
DE2110355A1 (en) JACQUARD INTERIOR
DD240223A1 (en) PATTERN CONTROL DEVICE FOR TEXTILE MACHINES
DE2507488A1 (en) JACQUARD MACHINE
DE3023952A1 (en) Warp knitting machine
DE2340714A1 (en) CONTACT RAIL ARRANGEMENT FOR THE WARP THREAD GUARD OF A WEAVING MACHINE
DE2344363C3 (en) One-legged, resilient, flexible plate of the harness pull of a double-stroke open-shed jacquard machine
DE4028390A1 (en) ELECTROMAGNETICALLY WORKING JACQUARD CONTROL DEVICE
DE2846792C2 (en) Double-stroke open-shed jacquard machine
DE7108172U (en) DEVICE AT A JACQUARD FACILITY
DE908761C (en) Limit switch for machine tools or the like.
DE3147698C1 (en) Double-lift open-shed jacquard machine
DE932022C (en) Point setting device that can be converted into a tongue safety device
DE3011190C2 (en) Double-stroke open-shed jacquard machine
DE370383C (en) Switch protection
DE186570C (en)
DE488665C (en) Jacquard facility
DE248348C (en)
DE609881C (en) Deck shoe for flat knitting machines
DE581087C (en) Jacquard flat knitting machine
AT242635B (en) Double-stroke, full-open jacquard machine
AT262902B (en) Jacquard machine
DE564006C (en) Control device for Schuerfkuebelbagger
DE572568C (en) Jacquard flat knitting machine