DE2057197A1 - Mobile machine for picking up, cleaning and reinstalling ballast ballast from railway tracks - Google Patents
Mobile machine for picking up, cleaning and reinstalling ballast ballast from railway tracksInfo
- Publication number
- DE2057197A1 DE2057197A1 DE19702057197 DE2057197A DE2057197A1 DE 2057197 A1 DE2057197 A1 DE 2057197A1 DE 19702057197 DE19702057197 DE 19702057197 DE 2057197 A DE2057197 A DE 2057197A DE 2057197 A1 DE2057197 A1 DE 2057197A1
- Authority
- DE
- Germany
- Prior art keywords
- ballast
- machine according
- conveyor
- conveyor belt
- belts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/06—Renewing or cleaning the ballast in situ, with or without concurrent work on the track
- E01B27/10—Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up track
- E01B27/105—Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up track the track having been lifted
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/01—Devices for working the railway-superstructure with track
- E01B2203/015—Devices for working the railway-superstructure with track present but lifted
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/02—Removing or re-contouring ballast
- E01B2203/022—Horizontal chain
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/04—Cleaning or reconditioning ballast or ground beneath
- E01B2203/045—Cleaning or reconditioning ballast or ground beneath the ballast having been taken up
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/06—Placing ballast
- E01B2203/065—Re-use of ballast
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/10—Track-lifting or-lining devices or methods
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/12—Tamping devices
- E01B2203/127—Tamping devices vibrating the track surface
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Processing Of Solid Wastes (AREA)
- Structure Of Belt Conveyors (AREA)
Description
Dip!, pKy«. Gethard Lied!Dip !, pKy «. Gethard Lied!
MCne-.·-.! 22, Steinsdbrfsfr. 21-22 2057197MCne-. · -.! 22, Steinsdbrfsfr. 21-22 2057197
i.'r., T*l. 393462i.'r., T * l. 393462
18. Oez. 196918. Oez. 1969
A 11 775/69A 11 775/69
FRANZ.PLASSER BAHNBAUMASCHINEN IN WIENFRANZ.PLASSER RAILWAY MACHINERY IN VIENNA
Fahrbare Maschine zum Aufnehmen, Reinigen und Wiedereinbringen des Bettungsschotters von EisenbahngleisenMobile machine for picking up, cleaning and reintroducing the ballast ballast Railroad tracks
Die Erfindung bezieht sich auf eine fahrbare Maschine zum Aufnehmen, Reinigen und Wiedereinbringen des Bettungsschotters von Eisenbahngleisen, mit einer mit einem waagrechten Trum unterhalb des Gleises verlaufenden Aushubkette, mindestens einem Reinigungssieb für den Schotter, mindestens einem Förderband od. dgl., zum Wiedereinbringen reinen Schotters und mindestens einem Förderband od. dgl. zum Wegbefördern des Abraums. t .The invention relates to a mobile machine for picking up, cleaning and reintroducing the ballast ballast of railway tracks, with an excavation chain running with a horizontal strand below the track, at least one cleaning sieve for the ballast, at least one conveyor belt or the like, for reintroducing pure ballast and at least one conveyor belt or the like for conveying away the spoil. t .
Bei bekannten Maschinen dieser Art wird der anfallende Abraum meistens nach vorne, bezogen auf die ArbeitsrichtungIn known machines of this type, the overburden is mostly forward, based on the working direction
109 8-2 6/0084109 8-2 6/0084
der Haschine, befördert und dort in Waggons verladen oder seitlich des Schienenstranges abgelegt. Es ergibt sich dabei der Nachteil, daß bei einem großen Anfall von Abraum vor der Maschine, eventuell auch seitlich vor der Haschine, viele Waggons aneinander gereiht werden nüssen, wozu der vorhandene Platz jedoch nicht immer ausreioht. Insbesondere ergeben sich aber bei Aneinanderreihung zu vieler Vaggons an einem iinde der Maschine Schwierigkeiten hinsichtlich des Bangierensthe machine, transported and loaded there into wagons or placed on the side of the rail track. It results This has the disadvantage that if there is a large accumulation of overburden in front of the machine, possibly also to the side in front of the machine, many wagons need to be lined up, but not the space available always enough. In particular, however, if too many vaggons are lined up on one side, the result is Machine trouble with banging
" dieser Waggons und hinsichtlich des Transports des Abraums von der Maschine au den Waggons. Auch war die Kapazität des einen Förderbandes nicht, imaer genügend, den anfallenden Abraum entsprechend der sonstigen Arbeitsgeschwindigkeit der Maschine wegzubefordern. Die selben llachteile treten auch dann auf, wenn, wie ebenfalls bereits vorgeschlagen wurde, ein nach hinten förderndes Abraumband vorgesehen v/ar. In einem solchen Fall verlagert sich die Ansammlung des Abraums bzw."of these wagons and with regard to the transport of the Debris from the machine on the wagons. That was also Capacity of one conveyor belt is not, always sufficient, to demand away the accumulating overburden according to the other working speed of the machine. The same disadvantages also occur if, as has also already been suggested, a backward movement conveying stripping belt provided v / ar. In such a case, the accumulation of overburden or
^ der V/aggons lediglich von vorne ,ns.cn hinten.^ the V / aggons only from the front, ns.cn behind.
Die Erfindung hat es sich zum Ziel gesetzt, die Nachteile der bekannten Maschinen i:u vermeiden und erreicht dies im wesentlichen dadurch, daß zum V/egbefordern des Abraums bzw. des ungereinigten Bettungs-Schotters mindestens ein, bezogen auf die Arbeitsrichtung der Maschine, nach vorne und mindestens ein nach hinten förderndes Förderbond od. d£l. vorgesehen ist.The invention has set itself the goal of avoiding the disadvantages of the known machines i: u and achieves this essentially by the fact that to move the overburden or the uncleaned ballast at least one, based on the working direction of the machine, after at the front and at least one backward conveying conveyor bond or d £ l. is provided.
109826/096A109826 / 096A
BAD ORKiINAL.BAD ORKiINAL.
Eine erfindungsgeinäBS ausgebildete Maschine kann viel leichter als die bekannten Haschinen an die jeweiligen Erfordernisse angepasst v/erden· Ist im Bereich vor der Maschine mehr Platz für die Abfuhr des Abraums, wird dieser nach vorne gefördert, ergibt sich platsmässig eine berssere Situation im Bereich hinter der Maschine, erfolgt die Förderung nach hinten. Im Falle eine grosse Menge an Abraum anfällt; bzw· wenn zufolge des übermässig hohen Verschmutzungsgrades des Bettungsschotters dieser nicht mehr gereinigt sondern durch frischen Schotter ersetzt wird, kann die Förde- ■ rung des Abraums bzw. des ungereinigten Bettungeschotters nach beiden Richtungen hin erfolgen.A machine designed according to the invention can much easier than the known machines to adapt to the respective requirements · Is in the area There is more space in front of the machine for the removal of the overburden, if this is conveyed to the front, this results There was an insane situation in the area behind the machine, the delivery takes place to the rear. In the event of a large amount of overburden; or if due to the excessively high degree of pollution of the Ballast can no longer be cleaned but replaced with fresh ballast, the ■ tion of the overburden or the uncleaned bed gravel be done in both directions.
I)Ie Anordnung zweier nach verschiedenen Richtungen weisenden Förderbändern bringt aber auch noch andere Vorteile mit sich. Ist nämlich nach einem weiteren Merkmal der Erfindung mindestens eines dieeer Förderbänder in verschiedenen Richtungen antreibbar, kann dieses Förderband zur Zufuhr frischen Schotters eingesetzt tterden. Bas eine Förderband fördert dann den Abraum bzw. den ungereinigten Bettungsschotter von der Maschine weg, das andere Förderbsnd fördert frischen Schotter zur Maschine hin.I) Ie arrangement of two in different directions pointing conveyor belts also has other advantages. Namely, is for another feature the invention at least one of these conveyor belts can be driven in different directions, this can Conveyor belt used to feed fresh gravel. A conveyor belt then conveys the overburden or the uncleaned ballast away from the machine, the other conveyor belt conveys fresh ballast towards the machine.
In diesem Zusammenhang sei darauf hingewiesen, daß in vorliegender Beschreibung der Besriff "Förderband od. dgl. n im weitesten 3inne gebraucht ist. Es sind daher als unter diesen Begriff fallend nicht nurIn this context it should be noted that in this specification the Besriff "conveyor belt od. Like. N in the broadest 3inne needed is. There are therefore considered to fall under this concept not only
109826/0964109826/0964
:, BAD ORIG|NAL :, BAD ORIG | NAL
Gummibänder, sondern auch Plattenbänder, Kratzerketten aber auch Schurren, Schwingförderrinnen und ähnliche ■ Förderprgane zu verstehen*Rubber belts, but also apron belts, scraper chains but also chutes, vibrating conveyors and the like ■ Understand funding programs *
Besonders günstig lässt sich der Einsatz der beiden Förderbänder den'jeweiligen Betriebsbedingungen anpassen, wenn sich die beiden nach verschiedenen Sichtungen weisenden Förderbander im Bereich Unterhalb des Siebes überlappen. Vorteilhaft ist dann dem im Bereich der Überlappung oberhalb angeordneten Förderband ein den Förderstrom zu dem (den) für die Wiedereinbrin^ung des Schotters vorgesehenen Förderband (bändern) leitendes Umlenkorgen, z.B. Lenkklappe zugeordnet.The use of the two conveyor belts can be adapted particularly favorably to the respective operating conditions, when the two conveyor belts pointing towards different sightings overlap in the area below the screen. The conveyor belt arranged above in the region of the overlap is then advantageous for the conveying flow to the one (s) for the reintroduction of the Ballast's intended conveyor belt (s) are assigned conductive deflection, e.g. steering flap.
7/eitere wesentliche Vorteile und Merkmale der Erfindung sind nachstehend anhand eines in den Zeichnungen dargestellten Ausführungsbeispieles der Erfindung, auf das diese jedoch keineswegs beschränkt ist, beschrieben. In der Zeichnung zeigt dabei die Fig. 1, teilweise geschnitten, die Ansicht einer erfindungsgemässen Maschine, die Fig. 2 gibt deren Aufsicht wieder. In der Fig. 3 W ist in vergrössertem RIa 13 st ab der Mittelteil der Maschine mit den verschiedenen Förderbändern und in Fig. 4 die Aufsicht auf diesen Mittelteil bei abgenommenen Sieb dargestellt.Further essential advantages and features of the invention are described below with reference to an exemplary embodiment of the invention shown in the drawings, to which, however, this is in no way limited. In the drawing, FIG. 1 shows, partially in section, the view of a machine according to the invention, and FIG. 2 shows its top view. In Fig. 3 W is shown in enlarged RIa 13 st from the middle part of the machine with the various conveyor belts and in Fig. 4 the plan view of this middle part with the screen removed.
Geraäss den Zeichnungen ruht der Rahmen 1 der Maschine auf den beiden Drehgestellen 2, die auf den Schienen 3 · laufen. Die Schienen sind auf Ouerschvellen 4 befestigt,According to the drawings, the frame 1 of the machine is at rest on the two bogies 2, which run on the rails 3 ·. The rails are attached to Ouerschvellen 4,
109826/0964109826/0964
ΛΡιιλιμ λ ιΛΡιιλιμ λ ι
die im Bettungsschotter 5 lagern. Die zum Aufnehmen des Bettungsschotters 5 dienende Aushubkette 6 1st im Bereich ihrer oberen Enden bei 7 je Seiten- und höhenverschwenkbar gelagert. Die Kette ist im gezeichneten Beispiel im Dreieck über die beiden unteren Umlenkrollen 8 sowie über die obere, mit einem Antrieb versehene Umlenkrolle 11 geführt. Es. könnten aber auch unten, z.B. an jeder Seite zwei Umlenkrollen vorgesehen sein, sodass die Kette in einem Fünfeck geführt wäre.which are stored in ballast 5. The excavation chain 6, which is used to pick up the ballast 5, is in the area their upper ends at 7 each side and vertically pivotable stored. In the example shown, the chain is in a triangle guided over the two lower pulleys 8 and over the upper pulley 11 provided with a drive. It. but could also be at the bottom, e.g. two pulleys on each side be provided so that the chain would be guided in a pentagon.
Der durch die Aushubkette 6 aufgenommene und nach oben geforderte Schotter gelangt in ein Schwingsieb 1o, wird dort von dem durch die !,laschen durchfallenden Schmutz, Sand und dgl. befreit und der Abreaim kann entweder über das Förderband 11 nach hinten und oder das Förderband 12 und das kurze ',/urfförderband 13 nach vorne in ,Taggons verlB.den v/erden. Zur Steuerung des Förderstromes sind verschwenkbare Klappen 14 und 17 vorgesehen, die mit je einem, zweckmäßig hydraulischen und fornsteuerbaren Antrieb 14 bzw. 17' ausgestattet sind. Überdies ist eine Öffnung im Boden dew Fördertroges der Aushubkette β mit einem Schieber 15 verschlossen, der durch eine Hydraulik betätigt wird.The ballast picked up by the excavation chain 6 and pushed upwards reaches a vibrating screen 1o there from the dirt falling through the! Sand and the like. Freed and the Abreaim can either over the conveyor belt 11 to the rear and / or the conveyor belt 12 and the short conveyor belt 13 to the front in taggons leave the v / earth. To control the flow rate are pivotable flaps 14 and 17 are provided, each with an appropriately hydraulic and forward controllable drive 14 and 17 'are equipped. Moreover, there is one Opening in the bottom of the conveyor trough of the excavation chain β closed with a slide 15, which is operated by a hydraulic system is operated.
Die Abfuhr des Abraums bzw. des ungereinigten Bet"üungsschotters kann nun zufolge der erfindungsgemäss'en Anordnung auf verschiedene Art und .7eise durchgeführt werden: 1.) -Soll der gesamte Abraum nach vorne gefördert werden, laufen die Antrieb&trommeln beider Förderbänder 11 und 12The removal of the excavated material or the unpurified Bet "üungsschotters can now erfindungsgemäss'en the arrangement in various ways and .7 e ise be carried out according to: 1.) -Soll the entire tailings are conveyed forward, the drive of both conveyor belts 11 & running drum and 12th
1098 26/0964 BAD orjginal1098 26/0964 BAD orjginal
»f»F
entgegen der Richtung des Uhrzeigers und die unterhalb dee Siebes 1o vorgesehene Umlenkklappe 14 wird in die in Fig. 3 voll ausgezogene Stellung gebracht. Dadurch fällt ein !Peil des Abraumes direkt auf da3 Band 12, ein anderer Teil auf das Band 11, das den auf ihn fallenden Anteil weiter auf daa Band 12 fördert.Dies wird dadurch ermöglicht, daß sich die beiden Bänder im Bereich unterhalb des Siebes überlappen und das Band 11 im Bereich dieser Überlappung oberhalb des Bandes 12 angeordnet ist.counterclockwise and the deflection flap 14 provided below the sieve 1o is inserted into the brought in Fig. 3 fully extended position. This means that the bearing of the overburden falls directly onto tape 12, another part on the belt 11, which conveys the portion falling on it on to the belt 12. This is made possible by the fact that the two bands overlap in the area below the screen and that Band 11 is arranged above the band 12 in the region of this overlap.
2.) - Ist es erwünscht, den gesamten Abraum nach hinten zu fördern, wird das Band 11 in Richtung des Uhrzeigers angetrieben und die Klappe 14 in die strichliert eingezeichnete Stellung gebracht.2.) - If it is desired to convey the entire spoil backwards, the belt 11 is in the direction of the Driven clockwise and brought the flap 14 into the position shown in dashed lines.
3.) - Für den Fall, daß ein Teil des Abraums nach hinten, ein anderer Teil nach vorne verladen werden soll, wird das Förderband 11 ebenfalls in Richtung des Uhrzeigers angetrieben, wogegen die Klappe 14 in die voll ausgezogene lage verstellt wird. Das, Band 12 wird dann entgegen dem Uhrzeigersinn angetrieben.3.) - In the event that part of the spoil is to be loaded to the rear and another part to the front the conveyor belt 11 also in the clockwise direction driven, whereas the flap 14 is adjusted to the fully extended position. That, band 12 is then contrary to the Driven clockwise.
4.) - Soll der gesamte Bettungsschotter ungereinigt abgeführt werden, wird der Schieber 15 im Fördertrogboden der Aushubkette mit Hilfe der Hydraulik geöffnet, sodass der von der Kette 6 auogehobene Schotter bei oberer Stellung der Klappe 17 (strichliert) direkt auf das Band 12 fällt. In der unteren, voll ausgezogenen Stellung der Klappe 17» der oberen Stellung der Klappe 14 und bei entgegengesetzten Dreinrichtungen der Bänder 11 und 12 wird4.) - If the entire ballast ballast is to be removed uncleaned, the pusher 15 is in the conveyor trough floor the excavation chain opened with the help of the hydraulics, so that the ballast lifted by the chain 6 at the upper Position of the flap 17 (dashed lines) falls directly onto the belt 12. In the lower, fully extended position the flap 17 »the upper position of the flap 14 and at opposite three-way devices of the belts 11 and 12
109826/0964109826/0964
BAD ORfQiNAlBAD ORfQiNAl
der ungereinigte BettungBBchotter teile nEch vorne, teils nach hinten gefördert. Sind sowohl die Klappe 17 als auch die Klappe 14 in der unteren Lage, wird, der gesamte ungereinigte Bettungsschotter nach hinten gebracht. the uncleaned bedding gravel parts in the front, partly promoted backwards. Are both the flap 17 as well as the flap 14 in the lower position, the all uncleaned ballast brought to the rear.
Wie aus der Zeichnung ersichtlich ist, wird das Gleisgerippe während der Reinigung der Bettung angehoben, wobei zur eindeutigen Fee tle^-ng der Biegelinie des Gleiees swei Hebevorrichtungen an der Maschine angeordnet sinöj und zwar die Hebevorrichtung 18 im Bereich der Aushubstelle und die Hebevorrichtung 19 dahinter. Im gezeichneten ,Beispiel sind beide Hebevorrichtungen mit Seitenrichtwerkseugen ausgestattet, die mit 18a bew. 19a bezeichnet sind. In Pig. 4 ist auch die eur Beaufschlagung , der Seitenrichtwerkzeuge 18a dienende Hydraulikzylinderanordnung 18» eingezeichnet. Zwischen beiden Hebevorrichtungen ist eine Planier- und Veruichtvorrichtung 2o angeordnet, die den bsi A wieder eingebrachten reinen Schotter planiert und verdichtet, um eine .einwandfreie Auflage für das wieder abgelegte, aweckmässig sowohl der Höhe als auch der Seite n;-ch gerichtete Gleis zu schaffen. Der Verdichter ist dabei zweckraaesig als Vibrationsverdichter ausgebildet, dessen Vibrationsfrequenz in Abhängigkeit von der Arbeits-.bzw. VorschubgescJisiindiskeit der faschine regelbar ist. Es wird dadurch una~Dh£jigi£ von der Vorschub^eqchv/indigkeit eine im wesentlichen gleichbleibende Verdichtung des Bettungsschotters erzfelt. Um das Gleis in der gerichtetenAs can be seen from the drawing, the track frame is raised while the bedding is being cleaned, where for the clear fairy tle ^ -ng of the bending line of the track swei lifting devices are arranged on the machine, namely the lifting device 18 in the Area of the excavation site and the lifting device 19 behind it. In the example shown, both lifting devices are included Side straightening eyes equipped with 18a bew. 19a are designated. In Pig. 4 is also the eur charge, the hydraulic cylinder arrangement 18 »serving the side straightening tools 18a. Between the two lifting devices a leveling and Veruichtvorrichtung 2o is arranged, the pure gravel brought back into the bsi A is leveled and compacted to provide a perfect support for that which has been put down again, in terms of both height and height the side n; -ch directed track to create. The compressor is designed as a vibration compressor, its vibration frequency depending on the work .bzw. The machine's feed rate can be regulated. It thereby becomes una ~ Dh £ jigi £ from the advance ^ eqchv / indigkeit an essentially constant compression of the Ballast gravel. To the track in the directional
109826/0 9 64109826/0 9 64
Lage zu halten, wird zwischen die ßchwellen des wieder
abgelegten Öleisee bei B reiner Schotter über eine
Schurre 21 gefüllt, wodurch - . auch für einen nachfolgenden Stopfforgang, genügend Schotter vorgesehen wird.Able to hold, is between the thresholds of the again
deposited Öleisee at B pure gravel over a
Chute 21 filled, whereby -. enough gravel is also provided for a subsequent tamping hole.
Um die Gchottersuführung dem jeweiligen Bedarf anpassen zu können, lot es im Rahmen der Erfindung zweckmässig, I im Zuge der Förderung zum Wiedereinbringen reinen Schotters ] einen Speicher, für den Schotter anzuordnen, der zweckmässig \ als Durchlaufspeicher ausgebildet ist. Im gezeichneten Bei- ITo Gchottersuführung to adapt to the respective requirements, it practical lot in the context of the invention to arrange I as part of the promotion for reintroducing pure ballast] a memory for the gravel that is practical trained \ as a continuous memory. In the illustrated case I
spiel bestallt dieser Speicher aus einem oben offenen jgame, this memory consists of a j open at the top
Behälter 22, der unterhalb zweier Förderbänder 22 ange- jContainer 22, which is attached below two conveyor belts 22
ordnet ißt. Diese beiden, wie in Fig. 2 angedeutet ist, ίarranges eats. These two, as indicated in Fig. 2, ί
in Querrichtung schwenkbaren Förderbänder v/erden auf die ; im Folgenden noch beschriebene Weise mit reinem Schotter I beschickt und können diesen Schotter entweder, in den jin the transverse direction swiveling conveyor belts v / ground on the; In the manner described below, they are charged with pure ballast I and can either put this ballast into the j
Behälter 22 oder direkt an die Verfüllstelle A abgeben, ίHand in container 22 or directly to filling point A, ί
wobei im letzteren Fall zufolge der Versclnvenkbarkoit \ where in the latter case, according to the pivotability \
der Bänder eine gleichmässige Verteilung des Schotters } of the belts an even distribution of the ballast }
über die gesainte Breite gewährleistet ist. Um diese gleich- * mäßige Verteilung auch bei einem Verfüllen über den } is guaranteed over the total width. To ensure this even distribution even when backfilling over the }
Speicher zu erreichen, reicht dieser, wie aus Fig. 4 ersichtlich ist, zumindest über die gesainte Breite des aus ;
Schienen 3 und Querechv/ellen 4 bestehenden Gfleisgerippes, ;
vorzugsweise bis über die beiden Flanken des Schotterbettes
hinaus.To achieve memory, this is sufficient, as can be seen from FIG. 4, at least over the total width of the; Rails 3 and transverse vertical rails 4 existing track frames,; preferably over the two flanks of the ballast bed
out.
Der Behälter 22 wird durch eine mit einem zwecknüßig
fernsteuerbaren, hyüriiuliöchen Antrieb 24' verseheneThe container 22 is useful by one with one
remotely controllable, hyüriiuliöchen drive 24 'provided
109826/0964109826/0964
BADBATH
■V, ■■'■■,, Ii "■ i!,11'11' ■ V, ■■ '■■ ,, Ii "■ i !, 11 ' 11 '
Klappe 24 in zwei Räume 25 und 26 unterteilt. Der vordere, der Verfüllstelle zu gelegene Raum 25 besitzt einen verstellbaren Boden 27 und der hintere Raum 26 ein nach unten klappbares J Bodenstück 28» Der Behälterboden ist in seiner Gesamtheit schräg nach vorne abfallend ausgebildet, sodaß der im Behälter befindliche Schotter, vorausgesetzt der Bodenteil 28 ist geschlossen, selbsttätig nach vorne rutscht.Flap 24 divided into two spaces 25 and 26. The front, the Verfüllstelle to preferred space 25 has an adjustable base 27 and the rear space 26 a folding downwards J bottom piece 28 'of the container bottom in its entirety is formed obliquely sloping to the front, so that the dirt in the container, the bottom part provided 28 is closed, automatically slides forward.
Entspricht der Bedarf an reinem Schotter an den Verfüllstellen A und B dem vom Sieb 1o gelieferten gereinigten Schotter, wird der Boden 27 in die in Pig, 3 strichliert eingezeichnete hintere Stellung verschoben und die Klappe 24 geschlossen. Der von den Förderbändern 23 geförderte reine Schotter wird · dann direkt bei A verfüllt. Die Zufuhr des vom Sieb 1o kommenden Sehotters auf die Bänder 23 wird durch eine Klappe 29 geregelt, die gleichzeitig auch die Zuführung des Schotters zur Schurre besorgt. Die Aufteilung des vom Sieb kommenden Schotters einerseits zu den Bändern 23 anderseits zur Schurre 21 hängt daher von der jeweiligen ebenfalls fernsteuerbaren Stellung der Klappe 29 ab.Corresponds to the need for pure gravel at the filling points A and B the cleaned gravel delivered by the sieve 1o, the bottom 27 is drawn in with dashed lines in Pig, 3 moved rear position and the flap 24 closed. The pure ballast conveyed by the conveyor belts 23 is then filled directly at A. The supply of the coming from the sieve 1o Sehotters on the belts 23 is regulated by a flap 29, which at the same time also takes care of feeding the ballast to the chute. The division of the gravel coming from the sieve on the one hand to the belts 23 on the other hand to the chute 21 therefore depends on the respective remote-controllable position the flap 29.
Wird über das Sieb 1o mehr Schotter geliefert, als zum Verfüllen an den Stellen A und B erforderlich ist, kann durch Klappen 3o> die über die Bänder 23 schwenkbar sind, ein Teil des Schotters oder auch der gesamte Schotter in den Raum 26 des Speichere 22 gefördert werden. Inj Fig* 4 ist die in der Zeichnung obpre Kloppe 3o in einer Bolchen Stellung gezeigt, in der der SJohotte^in den Raum 26 atigelenkt wird. Beide Klappen 3o flind mit fernsteuerbaren Antrieben 3o' versehen,If more gravel is delivered through the sieve than to Backfilling at points A and B is required, can be done by flaps 3o> which can be pivoted via the belts 23, a part of the ballast or the entire ballast into the space 26 of the memory 22 are promoted. Inj Fig * 4 is that in the Drawing above Kloppe 3o shown in a bolt position, in which the SJohotte ^ is steered into room 26. Both Provide flaps 3o flind with remote controllable drives 3o ',
108826/0064108826/0064
ORiGIfMLORiGIfML
Anderseits kann bei einem Zuwenig an durch die Bänder 23 herangebrachten Schotter zusätzlich vom Speicher her gefüllt werden. An der Stelle A erfolgt dies durch entsprechendes Öffnen der Klappe 24 (gestrichelt dargestellte Stellung); zwischen den Schwellen kann durch Senken des Bodenteiles 28 reiner Schotter verfüllt, werden.On the other hand, if there is not enough ballast brought by the belts 23, it can also be filled from the store will. At point A, this is done by opening the flap 24 accordingly (position shown in dashed lines); Pure gravel can be filled between the sleepers by lowering the bottom part 28.
Überdies ist es auch möglich, den Boden 27 nach vorne zu verschieben, sodass die Bänder -23 in den Raum 25 fördern, wobei die Abgabe des Schotters an der Stelle A durch die entsprechende Steuerung der Stellung des Bodens 27 erfolgt.In addition, it is also possible to move the floor 27 forwards so that the belts -23 promote into the space 25, with the discharge of the ballast at point A takes place through the corresponding control of the position of the floor 27.
In jenen Fällen, in denen das Sieb 1o zu wenig oder gar keinen gereinigten Schotter liefert, z.B. weil der gesamte ausgehobene Schotter wegen zu starker Verschmutzung über das Förderband 12 abgeführt wird, kann über das Band 11 zusätzlich reiner Schotter zugeführt werden. Um die Ziifuhr dieses reinen Schotters zu den Förderbändern 23 zu gewährleisten, ist im gezeichneten Beispiel ein auf das Band 11 absenkbares keilartiges Lehkorgan 31 vorgesehen, das ebenfalls mit einem fernsteuerbaren Antrieb 31* ausgestattet ist.In those cases in which the sieve 1o delivers too little or no cleaned gravel, e.g. because the whole excavated ballast is discharged via the conveyor belt 12 due to excessive contamination, can also use the belt 11 pure gravel can be fed. To the rate of this pure To ensure ballast to the conveyor belts 23 is a wedge-like lowerable on the belt 11 in the example shown Lehkorgan 31 is provided, which is also equipped with a remote-controlled drive 31 *.
• / Im Rahmen der Erfindung sind noch zahlreiche Abänderungen möglich. So köftnte unter Beibehaltung des- Hauptgedankens der Erfindung die Anordnung der Förderbänder anders als in den Zeichnungen dargestellt sein. Es wäre auqh möglich, den Schotterspeicher nicht am Ende des Schotterkreislaufes sondern an einer anderen Stelle anzuordnen. Weiters könnte z.B. parallel• / There are still numerous modifications within the scope of the invention possible. So, while maintaining the main idea, the Invention, the arrangement of the conveyor belts may be different than shown in the drawings. It would also be possible that Ballast storage not at the end of the ballast cycle but to be arranged in a different place. Furthermore, e.g. parallel
' Ϊ'Ϊ
109826/0964109826/0964
2Q571972Q57197
zum Förderband 11 ein zweites Förderband angeordnet werden, so daß es möglich wäre, einerseits Abraum nach'und reinen Schotter von hinten zu fördern. Bei einer weiteren zweckmässigen Ausführungsvariante ist der Speicher mit einem vibrierenden Boden versehen, wobei der Schwingförderantrieb vorzugsweise vom Antrieb des Vibrationsverdichters abgeleitet ist. a second conveyor belt can be arranged for the conveyor belt 11, so that it would be possible, on the one hand, to convey overburden to 'and pure gravel from behind. In a further expedient embodiment variant, the accumulator is provided with a vibrating base, the vibratory conveyor drive preferably being derived from the drive of the vibration compressor.
Es soll auch noch hervorgehoben werden, daß es durch die erfindungsgemässe Anordnung möglich geworden ist, zwei Arten von Fördergut durch ein Förderband zu fördern. Wird nämlich das Lenkorgan 31 auf das Band 11 abgesenkt und reiner Schotter zu den Förderbändern 23 gefördert, kann gleichzeitig über den vorderen Teil des Bandes 11 Abraum auf das Band 12 gefördert werden, wie es bei der Beschreibung der verschiedenen Fördermöglichkeiten vorne unter 1 beschrieben ist.It should also be emphasized that it is through the arrangement according to the invention has become possible to convey two types of conveyed goods through a conveyor belt. Will namely, the steering member 31 is lowered onto the belt 11 and Pure gravel conveyed to the conveyor belts 23 can simultaneously overburden 11 over the front part of the belt can be conveyed onto the belt 12, as described in the description of the various funding options under 1 is described.
109826/096 4109826/096 4
Claims (3)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT1177569A AT316617B (en) | 1969-12-18 | 1969-12-18 | Mobile machine for picking up, cleaning and reinstalling ballast ballast from railway tracks |
Publications (3)
Publication Number | Publication Date |
---|---|
DE2057197A1 true DE2057197A1 (en) | 1971-06-24 |
DE2057197B2 DE2057197B2 (en) | 1979-05-10 |
DE2057197C3 DE2057197C3 (en) | 1980-01-03 |
Family
ID=3630620
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE2057197A Expired DE2057197C3 (en) | 1969-12-18 | 1970-11-20 | Mobile machine for picking up, cleaning and reintroducing ballast ballast from railway tracks |
Country Status (14)
Country | Link |
---|---|
US (1) | US3685589A (en) |
JP (1) | JPS5011127B1 (en) |
AT (1) | AT316617B (en) |
CA (1) | CA937456A (en) |
CH (1) | CH534255A (en) |
CS (1) | CS190353B2 (en) |
DE (1) | DE2057197C3 (en) |
ES (1) | ES386591A1 (en) |
FR (1) | FR2072980A5 (en) |
GB (1) | GB1338598A (en) |
HU (1) | HU164488B (en) |
NL (2) | NL168282C (en) |
PL (1) | PL72945B1 (en) |
YU (1) | YU34552B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2517127A1 (en) * | 1974-07-05 | 1976-01-22 | Plasser Bahnbaumasch Franz | GRUB BED CLEANING MACHINE WITH LEVELING DEVICE |
DE3318992A1 (en) * | 1982-12-29 | 1984-07-19 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft Mbh, Wien | TRACKABLE CONVEYOR FOR SCHUETTGUT |
DE9213617U1 (en) * | 1992-10-09 | 1992-12-10 | Hermann Wiebe Grundstücks- und Maschinenanlagen KG, 2800 Bremen | Weed killers for rail vehicles |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT343714B (en) * | 1974-08-14 | 1978-06-12 | Plasser Bahnbaumasch Franz | CONVEYOR CHAIN FOR TRACK CONSTRUCTION MACHINES WITH CHAIN TENSIONER |
US4043398A (en) * | 1974-08-14 | 1977-08-23 | Franz Plasser Bahnbaumaschinen-Industrie-Gesellschaft M.B.H. | Mobile ballast cleaning machine |
CH616472A5 (en) * | 1976-05-31 | 1980-03-31 | Plasser Bahnbaumasch Franz | |
AT354502B (en) * | 1977-03-22 | 1980-01-10 | Plasser Bahnbaumasch Franz | TRACK CONSTRUCTION MACHINE, IN PARTICULAR BOTTLE BED CLEANING MACHINE, WITH A CONVEYOR CHAIN ARRANGEMENT |
AT359113B (en) * | 1978-06-16 | 1980-10-27 | Plasser Bahnbaumasch Franz | SELF-DRIVE TRACK BED CLEANING MACHINE |
AT377551B (en) * | 1983-01-10 | 1985-04-10 | Plasser Bahnbaumasch Franz | FOERDER- OR SPACE CHAIN ARRANGEMENT FOR TRACKING MACHINES |
IT1168813B (en) * | 1983-08-05 | 1987-05-20 | Sergio Valditerra | RAILWAY MASSIVE REGENERATION MACHINE |
AT378385B (en) * | 1983-11-04 | 1985-07-25 | Plasser Bahnbaumasch Franz | TRACK CONSTRUCTION MACHINE WITH SCREENING SYSTEM |
DE3660874D1 (en) * | 1986-04-02 | 1988-11-10 | Plasser Bahnbaumasch Franz | Ballast cleaning machine with cribbing means |
ATE117752T1 (en) * | 1991-02-12 | 1995-02-15 | Plasser Bahnbaumasch Franz | CLEANING MACHINE. |
DE59102841D1 (en) * | 1991-02-12 | 1994-10-13 | Plasser Bahnbaumasch Franz | Cleaning machine. |
AUPQ814200A0 (en) * | 2000-06-14 | 2000-07-06 | Queensland Rail | Track sledding machine |
AT3918U3 (en) * | 2000-07-13 | 2001-08-27 | Plasser Bahnbaumasch Franz | MACHINE FOR RENEWING A TRACK |
AT515413B1 (en) * | 2014-03-25 | 2015-09-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Method for rehabilitating a ballast bed of a track |
AT519194B1 (en) * | 2016-10-04 | 2019-05-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Machine and method for cleaning ballast of a track |
US11408131B2 (en) * | 2019-04-25 | 2022-08-09 | Herzog Railroad Services, Inc. | Track-lifting and ballast-spreading apparatus |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1793389A (en) * | 1928-07-07 | 1931-02-17 | Elmer William | Ballast-cleaning apparatus |
US2737901A (en) * | 1950-11-17 | 1956-03-13 | Drouard Jacques | Machine for clearing away the ballast from under the railway track sleepers |
US2791410A (en) * | 1953-06-17 | 1957-05-07 | Material Ind S A | Apparatus for continuously cleaning railroad track ballast |
-
1969
- 1969-12-18 AT AT1177569A patent/AT316617B/en not_active IP Right Cessation
-
1970
- 1970-11-20 DE DE2057197A patent/DE2057197C3/en not_active Expired
- 1970-12-07 FR FR7043874A patent/FR2072980A5/fr not_active Expired
- 1970-12-07 CH CH1807370A patent/CH534255A/en not_active IP Right Cessation
- 1970-12-10 US US96774A patent/US3685589A/en not_active Expired - Lifetime
- 1970-12-14 YU YU3056/70A patent/YU34552B/en unknown
- 1970-12-15 JP JP45112307A patent/JPS5011127B1/ja active Pending
- 1970-12-15 CS CS708470A patent/CS190353B2/en unknown
- 1970-12-16 CA CA100758A patent/CA937456A/en not_active Expired
- 1970-12-17 GB GB5988870A patent/GB1338598A/en not_active Expired
- 1970-12-17 PL PL1970145061A patent/PL72945B1/pl unknown
- 1970-12-17 HU HUPA1090A patent/HU164488B/hu not_active IP Right Cessation
- 1970-12-18 NL NLAANVRAGE7018470,A patent/NL168282C/en not_active IP Right Cessation
- 1970-12-18 ES ES386591A patent/ES386591A1/en not_active Expired
-
1982
- 1982-01-07 NL NL8200039A patent/NL8200039A/en active Search and Examination
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2517127A1 (en) * | 1974-07-05 | 1976-01-22 | Plasser Bahnbaumasch Franz | GRUB BED CLEANING MACHINE WITH LEVELING DEVICE |
DE3318992A1 (en) * | 1982-12-29 | 1984-07-19 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft Mbh, Wien | TRACKABLE CONVEYOR FOR SCHUETTGUT |
DE9213617U1 (en) * | 1992-10-09 | 1992-12-10 | Hermann Wiebe Grundstücks- und Maschinenanlagen KG, 2800 Bremen | Weed killers for rail vehicles |
Also Published As
Publication number | Publication date |
---|---|
YU34552B (en) | 1979-09-10 |
CS190353B2 (en) | 1979-05-31 |
NL7018470A (en) | 1971-06-22 |
AT316617B (en) | 1974-07-25 |
DE2057197C3 (en) | 1980-01-03 |
NL8200039A (en) | 1982-05-03 |
DE2057197B2 (en) | 1979-05-10 |
YU305670A (en) | 1979-02-28 |
JPS5011127B1 (en) | 1975-04-28 |
NL168282B (en) | 1981-10-16 |
US3685589A (en) | 1972-08-22 |
HU164488B (en) | 1974-02-28 |
CA937456A (en) | 1973-11-27 |
GB1338598A (en) | 1973-11-28 |
CH534255A (en) | 1973-02-28 |
FR2072980A5 (en) | 1971-09-24 |
NL168282C (en) | 1982-03-16 |
ES386591A1 (en) | 1973-03-16 |
PL72945B1 (en) | 1974-08-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2057197A1 (en) | Mobile machine for picking up, cleaning and reinstalling ballast ballast from railway tracks | |
DE2057182C3 (en) | Method and machine for the treatment of ballast ballast on railway tracks | |
EP0240648B1 (en) | Ballast cleaning machine with cribbing means | |
DE4343148C2 (en) | Mobile track bed processing machine | |
DE3634399C2 (en) | Mobile track tamping, leveling and straightening machine | |
DE1800144A1 (en) | Mobile machine for clearing, picking up and / or distributing the ballast ballast of the railway superstructure | |
DE3634397A1 (en) | MOBILE SYSTEM FOR CLEANING AND CONNECTING COMPRESSION OF THE GRAVEL BED OF RAILWAYS | |
DE4104395C2 (en) | Machine for spreading and leveling the ballast ballast | |
DE3424668A1 (en) | TRACK CONSTRUCTION MACHINE, IN PARTICULAR BOTTLE BED CLEANING MACHINE WITH SCREENING SYSTEM | |
DE2853099C2 (en) | Self-propelled track bed cleaning machine with storage device | |
DE4312585A1 (en) | PLANT FOR THE CONTINUOUS RESTORATION OF A GRAVEL BED OF A TRACK | |
EP0096236B2 (en) | Track conveyer waggon, transport train and method of loading and unloading materials for railroad construction | |
EP0436757B1 (en) | Railway track tamping machine | |
CH616472A5 (en) | ||
DE1459622B2 (en) | MOBILE MACHINE FOR PICKING THE BED BALL UNDER RAILWAY TRACKS | |
DE2057128C3 (en) | Mobile machine for picking up, cleaning and reintroducing ballast ballast from railway tracks | |
DD218640A5 (en) | SCHOTTERBETT CLEANING MACHINE WITH SIEVE SYSTEM | |
AT3918U2 (en) | MACHINE FOR RENEWING A TRACK | |
AT378973B (en) | SCHUETTGUTLADWAGEN, ESPECIALLY FOR THE WASTE LOADING OF A GRAVEL BED CLEANING MACHINE | |
DE2057248C3 (en) | Mobile machine for picking up ballast from railway tracks | |
AT404947B (en) | TROLLEYS FOR THE GRADUATION OF A TRACK | |
DE3519208A1 (en) | Bridge device for removing dumps of loose material | |
DE3623641A1 (en) | Apparatus for the distribution and levelling of granular materials | |
DE1936319C3 (en) | Transfer device from a chain scraper conveyor to a downstream conveyor, especially for the longwall face transfer in long-front coal construction | |
EP0744493A1 (en) | Arrangement of track-bound wagons |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OD | Request for examination | ||
C3 | Grant after two publication steps (3rd publication) | ||
8339 | Ceased/non-payment of the annual fee |