DE2041582A1 - Method and device for erecting road blocks - Google Patents

Method and device for erecting road blocks

Info

Publication number
DE2041582A1
DE2041582A1 DE19702041582 DE2041582A DE2041582A1 DE 2041582 A1 DE2041582 A1 DE 2041582A1 DE 19702041582 DE19702041582 DE 19702041582 DE 2041582 A DE2041582 A DE 2041582A DE 2041582 A1 DE2041582 A1 DE 2041582A1
Authority
DE
Germany
Prior art keywords
tailings
parallel
mining
sliding
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19702041582
Other languages
German (de)
Inventor
Mcluckie Alexander Dalrymple
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gullick Dobson Ltd
Original Assignee
Gullick Dobson Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gullick Dobson Ltd filed Critical Gullick Dobson Ltd
Publication of DE2041582A1 publication Critical patent/DE2041582A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/02Supporting means, e.g. shuttering, for filling-up materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

PATENTANWALT BODE . 4033 HÖSEL · POSTFACH ■ TELEFON 02102-61701 · TELEX 8585166PATENT ADVERTISER BODE. 4033 HÖSEL · POST BOX ■ TELEPHONE 02102-61701 · TELEX 8585166

P 6 - 5P 6 - 5

GULLICK DOBSON LIMITED Ince, Wigan, Lancashire, EnglandGULLICK DOBSON LIMITED Ince, Wigan, Lancashire, England

Verfahren und Vorrichtung zum Errichten von StreckendämmenMethod and device for erecting road dams

•Die Erfindung betrifft ein Verfahren zum Errichten von Streckendämmen aus Bergematerial sowie eine Vorrichtung zur Durchführung dieses Verfahrens.• The invention relates to a method for building Road dams from tailings and a device for carrying out this method.

Zum Schutz von Abbaustrecken in untertägigen Grubenbetrieben gegen starke Druckauswirkungen werden vielfach Streckendämme vorgesehen, die aus Bergematerial parallel zur Abbaustrecke zwischen dieser und dem sich an die Abbaustrecke anschließenden freien Strebraum bzw. dem alten Mann errichtet werden.For the protection of mining routes in underground mining operations Against the effects of strong pressure, road embankments are often provided that are made of tailings parallel to the excavation line between this and the one adjoining the mining section free face wall or the old man.

Es ist dabei bekannt, das ßergematerial innerhalb der Abbaustrecke zum vorgesehenen Einbauort zu fördern und mit quer zur Abbaustrecke arbeitenden Schiebevorrichtungen aus der Abbaustrecke heraus aus dem Bergematerial die Streckendämme zu errichten. Dieses Verfahren weist jedoch verschiedene Nachteile auf, insbesondere wenn die Abbaustrecke mit Bögen ausgebaut wird. Infolge des Böschungswinkels des Bergematerials läßt sich der Streckenausbau nämlich nur im Bereich des Liegenden, nicht jedoch bis zum Hangenden maschinell hinterfüllen, so daß ein Hohlraum zwischen Streckendamm und Streckenausbau bestehen bleibt. Hierdurch vergrößert sich jedoch der wirksame Streckenquerschnitt, was zu einer unerwünschtenIt is known that the ßergematerial within the mining route to convey to the intended installation location and with across working pushing devices from the Mining route to build the route dams out of the tailings. However, this method has several Disadvantages, especially if the mining route is expanded with arches. As a result of the slope angle of the tailings the extension of the route can only be done in the area of the lying, do not, however, backfill by machine up to the hanging wall, so that a cavity is created between the road embankment and the road construction remains. However, this increases the effective cross-section of the route, which is undesirable

-2 --2 -

1098 34/0201098 34/020

PATENTANWALT BODE - 4033 HÖSEL - POSTFACH · TELEFON 02102-61701 ■ TELEX 8585166PATENTANWALT BODE - 4033 HÖSEL - POST BOX · TELEPHONE 02102-61701 ■ TELEX 8585166

erhöhten Belastung des Streckenausbaues führt. Diese Auswirkung kann nach dem bekannten Verfahren nur durch manuelles Ausfüllen des genannten Hohlraumes mit Bergematerial vermieden werden. Weiterhin hat das bekannte Verfahren den Nachteil , daß die zu seiner Durchführung benötigte Vorrichtung viel Raum in der Abbaustrecke einnimmt und daher deren Befahrung behindert.leads to increased stress on the route expansion. According to the known method, this effect can only be achieved manually Filling the said cavity with tailings can be avoided. The known method also has the disadvantage that the device required for its implementation takes up a lot of space in the mining section and therefore hinders its use.

Andere bekannte Verfahren zum Errichten von Streckendämmen haben den Nachteil, daß besonders vorbereitetes Bergematerial verwendet werden muß oder daß das Bergematerial mit hoher Geschwindigkeit eingeschleudert wird, was im untertägigen Betrieb erhebliche Gefahren mit sich bringt.Other known methods for building road dams have the disadvantage that specially prepared tailings must be used or that the tailings are thrown in at high speed, which is in the underground Operation involves considerable dangers.

Aufgabe der Erfindung ist es > ein Verfahren zum Errichten von Streckendämmen zu schaffen, das die oben beschriebenen Nachteile nicht aufweist,und zwar insbesondere ein vollständiges maschinelles Hinterfüllen des Streckenausbaues ermöglicht und zu seiner Durchführung nur wenig Platz in der Abbaustrecke beansprucht.The object of the invention is> a method for erecting To create road dams that do not have the disadvantages described above, in particular a complete one Automated backfilling of the route extension enables and only little space in the dismantling route to carry it out claimed.

Gegenstand der Erfindung ist ein Verfahren zum Errichten von ψ Streckendämmen aus üergematerial, das sich dadurch kennzeichnet, daß das Bergematerial während des Einbringens und/oder Verdichtens in einer Richtung parallel oder nahezu parallel zur Abbaustrecke bewegt wird. Auf diese Weise ist ein vollständiges Hinterfüllen des Streckenausbaues auf maschinellem Wege möglich. Die Errichtung der Streckendämme erfolgt nicht aus der Abbaustrecke heraus, sondern aus dem Streb. Daher wird in der Abbaustrecke wenig Platz beansprucht. Die Einbringung und/oder Verdichtung erfolgt in einer senkrechtenThe invention relates to a method for erecting ψ track embankments üergematerial, which is characterized characterized in that the tailings during the introduction and / or compacting is moved in a direction parallel or nearly parallel to degradation route. In this way, a complete backfilling of the track extension is possible by machine. The construction of the road embankments will not take place from the mining section, but from the longwall. Therefore, little space is required in the mining section. The introduction and / or compression takes place in a vertical

10983^/020710983 ^ / 0207

PATENTANWALT BODE - 4033 HÖSEL ; POSTFACH - TELEFON 02102-61701 - TELEX 8585166PATENT ADVERTISER BODE - 4033 HÖSEL; POST BOX - TELEPHONE 02102-61701 - TELEX 8585166

oder anderen Richtung zum Abbaustoß , abhängig vom Winkel zwischen dem Abbaustofö und der Abbaustrecke.or other direction to the working face, depending on the angle between the mining material and the mining route.

Zweckmäßig erfolgt eine Förderung von Bergematerial in die Bereiche, wo die Errichtung der Streckendämme erfolgt. Dabei ist es vorteilhaft, das Bergematerial zunächst zu einer Sammelstelle zu fördern, von welcher aus das Bergematerial zu seinem oder seinen Einbauorten «reitergefördert werden kann. Auf diese Weise kann den Sereichen, in denen die Errichtung der Streckendämme erfolgt, das Bergeraaterial gleichmäßig in der jeweils benötigten Menge zugeführt werden.Appropriately there is a promotion of tailings in the Areas where road embankments are being built. It is advantageous to first collect the tailings To promote the collection point from which the tailings can be conveyed to his or her installation sites. In this way the realms in which the establishment the road dams are carried out, the salvage material is supplied evenly in the required amount.

Aufgabe der Erfindung ist es weiterhin, eine Vorrichtung zur Durchführung des erfindungsgemäßen Verfahrens zu schaffen.The object of the invention is also to provide a device for To create implementation of the method according to the invention.

Gegenstand der Erfindung ist daher weiterhin eine Vorrichtung zur Durchführung des oben beschriebenen Verfahrens, die gekennzeichnet ist durch mindestens ein Strebausbauelement, welches an seiner dem Abbaustoß abgewandten Seite eine Schiebevorrichtung zum Einbringen und Verdichten des Bergematerials aufweist, wobei mit der Schiebevorrichtung eine Schiebebewegung vom Ausbauelement weg und parallel oder nahezu parallel zur Abbaustrecke ausführbar ist. Die Vorrichtung ist, da sie gleichzeitig aus Strebausbau dient, besonders raumsparend. Ferner erlaubt sie ein vollmechanisches Errichten von Streckendämmen.The invention therefore also relates to a device to carry out the method described above, which is characterized by at least one face building element, which, on its side facing away from the excavation face, has a pushing device for introducing and compacting the tailings having, with the sliding device a sliding movement can be carried out away from the expansion element and parallel or almost parallel to the dismantling section. The device is there serves at the same time from longwall construction, particularly space-saving. Furthermore, it allows a fully mechanical erection of Track dams.

Die Zuführung von Bergematerial zur Schiebevorrichtung erfolgt einer zweckmäßigen Weiterbildung der Erfindung durch eine Fördereinrichtung, die sich parallel zu mehreren Ausbauelementen zwischen mehreren von den Ausbauelementen getragenen The tailings are fed to the pushing device an expedient development of the invention by a Conveyor, which is parallel to several expansion elements between several carried by the expansion elements

109834/0 207109834/0 207

PATENTANWALT BODE . 4033 HÖSEL · POSTFACH ■ TELEFON 02102-61701 . TELEX 8585166PATENT ADVERTISER BODE. 4033 HÖSEL · POST BOX ■ TELEPHONE 02102-61701. TELEX 8585166

Schiebevorrichtungen und dem verdichteten Bergematerial, insbesondere senkrecht zur Längsachse der Abbaustrecke erstreckt. Auf diese Weise kann das Bergematerial aus der Abbaustrecke, wo es z.B. beim Nachreißen der Strecke anfällt, maschinell zu seinem Einbauort gefördert werden.Pushing devices and the compacted tailings, in particular extends perpendicular to the longitudinal axis of the mining section. In this way, the tailings from the mining section, where it occurs, for example, when the track is torn, it is mechanically conveyed to its installation location.

Gemäß einer bevorzugten Ausführungsform der Erfindung ist vorgesehen, daß die Schiebevorrichtungen hydraulisch betätigt sind, wobei mindestens ein Druckzylinder vorgesehen ist, der mit einem einseitig wirkenden Schiebeorgan verbunden ist, welches in Vorschubrichtung Bergematerial erfaßt und vorschiebt, in der Gegenrichtung jedoch über in seinem Weg liegendes Bergematerial hinweggleitet. Dadurch ist gewährleistet, daß das flergematerial nur in Richtung auf den Streckendamm befördert werden kann.According to a preferred embodiment of the invention is it is provided that the sliding devices are hydraulically operated, with at least one pressure cylinder being provided, which is connected to a unilaterally acting sliding element, which detects and in the advancing direction of tailings pushes forward, but slides away in the opposite direction over debris lying in its path. This ensures that the feral material can only be transported in the direction of the road embankment.

Die oben erwähnte Sammelstelle für Bergematerial besteht gemäß einer vorteilhaften Ausführungsform der Erfindung aus einer Sammelvorrichtung, die in der Abbaustrecke auf der dem Abbaustoß abgewandten Seite der in die Abbaustrecke hineinragenden Fördereinrichtung angeordnet ist. Von dieser Sammelvorrichtung kann das Bergematerial der Fördereinrichtung gleichmäßig aufgegeben werden.The above-mentioned collection point for tailings consists according to an advantageous embodiment of the invention a collecting device, which is located in the working section on the side facing away from the working face of the one protruding into the working section Conveyor is arranged. From this collecting device, the tailings can be transported to the conveying device be given up evenly.

In Abwandlung der oben beschriebenen Ausführungsform der Erfindung ist es auch möglich, daß an der Übergangsstelle zwischen Strecke und Streb eine Sammelplatte für Bergematerial angeordnet ist und daß sich über die Sammelplatte sowie zwischen Ausbauelementen und dem verdichteten Bergematerial eine etwa parallel zum Abbaustoß fördernde Schrappervorrichtung erstreckt.In a modification of the embodiment of the above-described In accordance with the invention, it is also possible that a collecting plate for tailings at the transition point between the track and the longwall face is arranged and that is on the collecting plate and between expansion elements and the compacted tailings a scraper device conveying approximately parallel to the working face extends.

109834/0?07109834/0? 07

PATENTANWALT BODE . 4033 HÖSEL · POSTFACH ■ TELEFON 02102-61701 , TELEX 8585166PATENT ADVERTISER BODE. 4033 HÖSEL · POST BOX ■ TELEPHONE 02102-61701, TELEX 8585166

Die Schiebevorrichtung kann so ausgebildet sein, daß sie nicht nur parallel oder nahezu parallel zur Abbaustrecke,*sondern auch in bankrechter Richtung bewegbar ist. Sie wird dann zum Vorschieben des Bergematerials herabgelassen, während sie zur Rückbewegung angehoben wird« um dabei kein Bergematerial zu erfassen.The sliding device can be designed so that they do not can only be moved parallel or almost parallel to the mining section, * but also in the direction perpendicular to the bank. It then becomes the Advancing the tailings lowered while they is raised for the return movement «in order to avoid any tailings capture.

Gemäß einer weiteren vorteilhaften Weiterbildung der Erfindung ist vorgesehen, daß der oder die Druckzylinder zum Betätigen der Schiebevorrichtung in ausziehbaren Schutzkästen angeordnet sind. Diese Schutzkästen entlasten die Druckzylinder von eventuell auftretenden Biegebeanspruchungen.According to a further advantageous development of the invention it is provided that the pressure cylinder or cylinders for actuation the sliding device are arranged in pull-out protective boxes. These protective boxes relieve the pressure cylinder from possibly occurring bending stresses.

Werden zwei Druckzylinder zum Betätigen der Schiebevorrichtung verwendet, so ist es zweckmäßig, daß die Druckzylinder hydrau» lisch so miteinander in Verbindung stehen, daß ihre Hübe zwangsweise gleich groß sind und daß ihre Hubbewegungen synchron ablaufen. .Are two pressure cylinders to operate the sliding device used, it is advisable that the pressure cylinder hydraulic lisch are so connected to each other that their strokes are necessarily the same size and that their stroke movements run synchronously. .

Das erfindungsgemäße Verfahren ist im folgenden an Hand der Zeichnung erläutert, in welcher Ausführungsbeispiele der Vorrichtung zur Durchführung des erfindungsgemäßen Verfahrens dargestellt sind. Es zeigen:The method according to the invention is described below with reference to the Drawing explains in which embodiments of the device for performing the method according to the invention are shown. Show it:

Fig. 1 eine Seitenansicht anes Strebausbauelementes mit einem Teil einer Vorrichtung zum Errichten von Streckendämmen gemäß der Erfindung,Fig. 1 is a side view of anes longwall construction element with part of a device for building road dams according to the invention,

Fig. 2 eine Draufsicht auf einen Strebausbau mit einer Vorrichtung nach Fig. 1,FIG. 2 shows a plan view of a longwall construction with a device according to FIG. 1,

109834/0207109834/0207

PATENTANWALT BODE · 4033 HÖSEL - POSTFACH - TELEFON 02102-61701 . TELEX 8585166 PATENTANWALT BODE 4033 HÖSEL - POST BOX - TELEPHONE 02102-61701. TELEX 8585166

— s —- s -

Fig. 3 eine Seitenansicht einea Streckenortausbaues mit einem Teil der Vorrichtung zum Errichten von Streckendämmen,Fig. 3 is a side view of a route location extension part of the device for the construction of road embankments,

Fig. 4 eine Vorderansicht einer abgewandelten Ausführungaform der Vorrichtung zum Errichten von Streckendämmen,4 shows a front view of a modified embodiment of the device for building road dams,

Fig. 5, 6 und 7Figures 5, 6 and 7

Detailansichten von Abschiebevorrichtungen der ™ Vorrichtung zum Errichten von Streckendämmen,Detailed views of the push-off devices ™ device for the construction of road embankments,

Fig. 8 eine perspektivische Teilansicht einer Weiterbildung der Abschiebevorrichtung gemäß Fig. 7,FIG. 8 shows a perspective partial view of a further development of the pushing device according to FIG. 7,

Fig. 9 eine hydraulische Schaltung für eine zwei Druckzylinder aufweisende Abschiebevorrichtung,9 shows a hydraulic circuit for a push-off device having two pressure cylinders,

Fig.10 eine Draufsicht ähnlich Fig. 2, jedoch mit der abgewandelten Vorrichtung nach Fig. 4,10 is a plan view similar to FIG. 2, but with the modified device according to Fig. 4,

Fig.11 eine Vorderansicht eines Teils der Vorrichtung nach Fig. 10,11 is a front view of part of the device according to FIG Fig. 10,

Fig.12 einen Querschnitt durch die Anordnung nach Fig.FIG. 12 shows a cross section through the arrangement according to FIG.

™ In Fig. 1 ist ein Ausbauelement 10 für einen Streb für den™ In Fig. 1 is an expansion element 10 for a longwall for the Langfrontabbau dargestellt, das mittels eines Rückzylinders unter Benutzung eines Strebförderers C als Widerlager gegen die Abbaufront F vorgerückt worden ist. Das Ausbauelement IO weist einen Grundkasten 12, am Grundkasten 12 befestigte hydraulische Stempel 17 und 17' sowie eine von den Stempeln 17 und 17' getragene Kappenkonstruktion auf, die aus einem hinteren Kappenteil 1<4, einem vorderen Kappenteil IS, einer Vorpfändkappe 16 und einer gegenüber dem hinteren Kappenteil It ausziehbarenLong front mining shown, the means of a rear cylinder using a face conveyor C as an abutment against the Removal front F has been advanced. The expansion element IO has a base box 12, hydraulic rams 17 and 17 'attached to the base box 12 and a cap construction carried by the rams 17 and 17', which consists of a rear cap part 1 <4, a front cap part IS, a pre-pledged cap 16 and one that can be pulled out opposite the rear cap part It

109834/0207109834/0207

PATENTANWALT BODE - 4033 HOSEL - POSTFACH-IElEFON 02102-61701 -TELEX 8585166PATENTANWALT BODE - 4033 HOSEL - POSTBOX-ELEFON 02102-61701 -TELEX 8585166

; -. 7 - ..;■■■;..-■■.; -. 7 - ..; ■■■; ..- ■■.

versatzseitigen Kappe 13 besteht. Bas vordere Kappenteil 15, das auf dem vorderen Stempel 17' ruht, ist bei IS* gelenkig mit dem hinteren Kappenteil 14 verbunden. Me-Vorpfändkappe 16 ist bei 16 * schwenkbar und verschiebbar mit dem vorderen Kappenteil 15 verbunden, wobei durch geeignete Mittel dafür gesorgt ist, daß die Vorpfändkappe 16 in ihrer Lage üen Hangenden angepaßt werden kann. offset-side cap 13 is made. The front cap part 15, which rests on the front punch 17 ', is articulated to the rear cap part 14 in the case of IS *. Me-pre-pledged cap 16 is pivotably and slidably connected to the front cap part 15 at 16 *, whereby it is ensured by suitable means that the position of the pre- pledged cap 16 can be adjusted over hanging walls.

Auf der Versatsc-eite des. *Ausbaueleaentes 10 befindet sich eine Absciiiebeplatte 18, die über eine sterafömige Stütz vorrichtung IS ait einem Druc zylinder 20. verbunden ist, welcher am Grundkasten 12 befestigt ist. Auf der Versatzseite und unterhalb der Absciiiebeplatte la befindet sich bei diesem Ausführungsbeispiel ein Versatzförc'srar 21, der an der Versatzseite des Strebausbaus entlanggeführt ist. Das Hangende über· dem Versatzförderer 21 wird durch die Versatsseitigen Kappen 13 unterstützt.On the opposite side of the expansion element 10 there is a shut-off plate 18 which is connected to a pressure cylinder 20 via a sterile support device IS, which is attached to the base box 12. On the offset side and below the screening plate la, in this exemplary embodiment, there is an offset conveyor 21, which is guided along the offset side of the longwall structure. The hanging wall above the offset conveyor 21 is supported by the caps 13 on the offset side.

Die mit P bezeichneten Berge werden» wie weiter unten beschrieben wird» mit Hilfe der Abschiebeplatte 18 in den Versatzraum gepreßt.The mountains marked with P are »as described below is »with the help of the pusher plate 18 in the offset space pressed.

In Fig. 2 ist ein aus dem Ausbauelement IQ und weiteren gleich aufgebauten Ausbauelementen 103· - i07 bestehender Strebausbau im Bereich beiderseits einer Abbaustrecke'.R dargestellt. Die Abbatistrecke R ist mit Streckenbogen A ausgebaut. Das Streckenort ist mit einem Streckesiortausbau 22 ausgebaut, der in Fig» noclteinmal in Seitenansicht gezeigt ist. Her Streckenortausbau 22 «reist eine Grundplatte 23, darauf befestigte hydraulische Stempel 25 sowie eine von den Stempeln 25 getragene Kappen» konstruktion 2h auf. In der Äbbaustrecke R ist im Bereich des Versat3sfÖrderers 21 eine SanBiielplatte 26 angeordnet, die mittelsIn FIG. 2, a longwall structure consisting of the support element IQ and further support elements 10 3 · - 10 7 of the same structure is shown in the area on both sides of a mining route'.R. The Abbati route R is expanded with route curve A. The route location is expanded with a route reserve extension 22, which is shown in FIG. 1 once in a side view. The extension of the route 22 "travels through a base plate 23, hydraulic rams 25 attached to it and a cap" construction 2h carried by the rams 25. In the mining section R in the area of the delivery conveyor 21, a SanBiielplatte 26 is arranged, which by means of

BAD ORIGINAL 109834/0207BATH ORIGINAL 109834/0207

PATENTANWALT BODE ■ 4033 HOSEL · POSTFACH · TELEFON 02102-61701 · TELEX 8585166PATENT ADVERTISER BODE ■ 4033 HOSEL · POSTBOX · TELEPHONE 02102-61701 · TELEX 8585166

eines hydraulischen Zylinders 27 schwenkbar ist, so daß mit ihrer Hilfe das beim Nachreißen der Abbaustrecke R anfallend« Haufwerk gesammelt und auf den Versatzförderer 21 verladen werden kann.a hydraulic cylinder 27 is pivotable so that with her Help the heap that arises when tearing down the mining route R. can be collected and loaded onto the offset conveyor 21.

In Fig. f und andeutungsweise auch in Fig. 2 ist eine Abwandlung der Ausführungsform gemäß Fig. 1 und 3 dargestellt. Der Versatz» förderer 21 ist dabei durch eine Schrappervorrichtung ersetzt} die einen Schrapperkasten 29 aufweist, welcher über eine endlose Kette 30 durch einen Antrieb 31 hin- und herbewegbar ist. Der " Schrapperkasten 29 fördert das von einer festen Sammelplatte 28In Fig. F and also hinted at in Fig. 2 is a modification the embodiment of FIGS. 1 and 3 shown. The offset » conveyor 21 is replaced by a scraper device} which has a scraper box 29, which has an endless Chain 30 can be moved back and forth by a drive 31. The scraper box 29 conveys this from a solid collecting plate 28

aufgefangene Haufwerk aus der Abbaustrecke R ab. Durch entsprechende Vorrichtungen ist dafür gesorgt, daß das Haufwerk nach beiden Seiten der Abbaustrecke R abgefördert werden kann. Weitere Einzelheiten der Schrappervorrichtung werden weiter unten an Hand der Fig. 10-12 beschrieben.collected debris from the mining route R. Appropriate devices ensure that the pile can be conveyed away on both sides of the mining section R. Further details of the scraper device are described below with reference to FIGS. 10-12.

In den Fig. 5 und 6 ist die Abschiebeplatte 18 in Vorder- und Seitenansicht näher dargestellt. Sie arbeitet nur in einer Richtung. Ober Gelenke 18a ist die Abschiebeplatte 16 an ihrem oberen Ende mit der sternförmigen Stützvorrichtung 19 verbunden, während sie mit ihrem unteren Ende ohne Verbindung an der sternförmigen Stützvorrichtung 19 anliegt. Daher kann die Abschiebeplatte 18, wenn der Druckzylinder 20 eingefahren wird, mit ihrem unteren Ende von der sternförmigen Stützvorrichtung 19 abheben und über im Wege liegendes Haufwerk hinweggleiten.In Figs. 5 and 6, the pushing plate 18 is in front and Side view shown in more detail. It only works in one direction. The push-off plate 16 is on its upper joints 18a upper end connected to the star-shaped support device 19, while its lower end without connection to the star-shaped support device 19 rests. Therefore, when the pressure cylinder 20 is retracted, the push-off plate 18 can lift off with their lower end from the star-shaped support device 19 and slide over debris lying in the way.

In Fig. 7 ist eine bevorzugte Abwandlung der Vorschubvorrichtung für die Abschiebeplatte 18 dargestellt. Die Vorschubvorrichtung besteht hier aus zwei Druckzylindern 20a, die an je einer Seite des Grundkastens 12 befestigt sind und gemeinsam die Abschiebeplatte 18 tragen, die in Fig. 8 näher dargestellt, sind dieIn Fig. 7 is a preferred modification of the advancing device shown for the push-off plate 18. The feed device here consists of two pressure cylinders 20a, each on one side of the base box 12 are attached and jointly carry the push-off plate 18, which are shown in more detail in FIG. 8, are the

10983 4/020710983 4/0207

PATENTANWALT BODE · 4033 HÖSEL · POSTFACH · TELEFON 02102-61701 · TELEX 8585166PATENTANWALT BODE 4033 HÖSEL POST BOX TELEPHONE 02102-61701 TELEX 8585166

Druckzylinder 20a in kastenförmigen Gehäusen angeordnet, die ein äußeres Kastenteil 32 und ein inneres ausziehbares Kastenteil 3H aufweisen. Die äußeren Kastenteile 32 sind bei 32a gelenkig mit dem Grundkasten 12 verbunden und erhalten durch Führungen 33 eine begrenzte Schwenkbarkeit in bankrechter Richtung. Die Abschiebeplatte 18 ist mit den inneren Kastenteilen 34 verbunden und kann infolge der Schwenkbarkeit ihrer Vorschubvorrichtung nach Art einer Planierschaufel bewegt werden» Pressure cylinder 20a arranged in box-shaped housings which have an outer box part 32 and an inner pull-out box part 3H. The outer box portions 32 are at 32a articulated to the base box 12 and are given by guides 33 a limited pivotability in the bank-straight Direction. The push-off plate 18 is with the inner box parts 34 connected and can due to the pivotability of their Feed device can be moved in the manner of a leveling shovel »

In Fig. 9 ist eine hydraulische Schaltung für eine zwei Druckzylinder 20a aufweisende Vorschubeinrichtung fUr die Abschiebeplatte 18 dargestellt. Der eine Druckzylinder 20a ist mit seinem Zylinderteil 35 unmittelbar oder über Zwischenglieder mit der Abschiebeplatte 18 verbunden, während er mit seiner Kolbenstange 37 am Grundkasten 12 befestigt ist. Der andere Druckzylinder 20a ist mit seinem Zylinderteil 38 am Grundkästen befestigt, während er mit seiner durchgehend ausgebildeten Kolbenstange 36 mit der Abschiebeplatte 13 verbunden ist. Wird dem Zylinderteil 35 über eine Leitung 39 Druckflüssigkeit zugeführt y so fährt der obere Druckzylinder 20a aus und bewegt die Abschiebeplatte 18 vorwärts. Dabei wird die im Ringraum 35a dieses Druckzylinders 20a enthaltene Druckflüssigkeit über eine Verbindungsleitung HO in den der Abschiebeplatte 18 abgewandten Ringraum 38a des unteren Druckzylinders 20a gepreßt. Der untere Druckzylinder 20a fährt dadurch um den gleichen Weg aus, wie der obere Druckzylinder 20a.In FIG. 9, a hydraulic circuit for a feed device for the push-off plate 18, which has two pressure cylinders 20a, is shown. The one pressure cylinder 20a is with its cylinder part 35 is connected directly or via intermediate links to the push-off plate 18, while it is connected to its piston rod 37 is attached to the base box 12. The other pressure cylinder 20a is attached to the base box with its cylinder part 38, while it is connected to the push-off plate 13 with its continuously formed piston rod 36. Will the The cylinder part 35 is supplied with hydraulic fluid via a line 39 y so the upper pressure cylinder 20a extends and moves the Push-off plate 18 forward. The pressure fluid contained in the annular space 35a of this pressure cylinder 20a is via a Connecting line HO is pressed into the annular space 38a of the lower pressure cylinder 20a facing away from the slide plate 18. The lower As a result, printing cylinder 20a extends in the same way as the upper printing cylinder 20a.

Da8 erfindungsgemäße Verfahren wird mit Hilfe der oben beschriebenen Vorrichtung folgendermaßen durchgeführt: The method according to the invention is carried out as follows with the aid of the device described above:

- 10 -- 10 -

109834/020-7109834 / 020-7

PATENTANWALT BODE ■ 4033 HÖSEL - POSTFACH · TELEFON 02102-61701 · TELEX 8585166PATENTANWALT BODE ■ 4033 HÖSEL - POST BOX · TELEPHONE 02102-61701 · TELEX 8585166

- 10 -- 10 -

Das Bergematerial, das als Haufwerk in der Abbaustrecke bzw. im Streckenort anfällt, wird durch die schwenkbare Samraelplatte 26 bzw. die feste Samaelplatte 29 aufgefangen. Mit der schwenkbaren Sammelplatte 26 wird das Bergematerial auf den Versatzförderer 21 verladen oder auf der festen Sammelplatte 28 für den Abtransport durch den Schrapperkasten 29 bereitgehalten. Der Versatζförderer 21 oder der Schrapperkasten 29 befördert das Bergematerial in den Arbeitsbereich der Abschiebeplatten 18. Die Abschiebeplatten 18 schieben das Bergematerial unter gleich-The tailings that accumulate as heaps in the excavation route or in the route location are held by the swiveling Samrael plate 26 or the solid Samael plate 29 caught. With the pivotable collecting plate 26, the tailings are loaded onto the offset conveyor 21 or on the fixed collecting plate 28 for held ready for removal by the scraper box 29. The Versatζförderer 21 or the scraper box 29 conveys the Tailings into the working area of the push-off plates 18. The push-off plates 18 push the tailings under the same

ψ zeitiger Verdichtung vom Versatzförderer 21 bzw. vom Liegenden in den Versatzraum und errichten so die Streckendämme. Die Vorschubrichtung der Abschiebeplatte 18 verläuft parallel oder nahezu parallel zur Abbaustrecke R. Dadurch werden insbesondere die Räumen hinter den in Fig. Ί z.3. rait 3 und B1 bezeichneten Bergemauern, die die Abbaustrecke gegen den Streckendamm abschirmen, gut hinterfüllt. Wegen des Böschungswinkels des Bergematerials ist die Frontfläche des Streckendammes geneigt, d.h. ihre Oberkante springt gegenüber der Abschiebeplatte 18 in den Versatzraum zurück. Daher wird das Bergematerial bia zum Hangenden hinauf geschoben, obwohl die Abschiebeplatte mit ihrer Oberkante nicht bis an das Hangende reicht. Dadurch ψ early compression from the offset conveyor 21 or from the horizontal in the offset area and thus build the road dams. The direction of advance of the push-off plate 18 runs parallel or almost parallel to the excavation section R. In particular, the spaces behind the in Fig. Ί z.3. rait 3 and B 1 marked mountain walls, which shield the mining section from the road embankment, well backfilled. Because of the angle of repose of the tailings material, the front surface of the road embankment is inclined, ie its upper edge jumps back into the offset space opposite the push-off plate 18. Therefore, the tailings are pushed up to the hanging wall, although the upper edge of the push-off plate does not extend to the hanging wall. Through this

k wird eine vollständige Ilinterfüllung des Streckenausbaus und eine gute Unterst(Itzung des Hangenden beiderseits der Abbaustrecke erreicht.k will be a complete filling of the line expansion and Good support of the hanging wall on both sides of the mining section was achieved.

Um zu verhindern, daß sich an den Enden des Versatzförderers unerwünschtes Haufwerk ansammelt, kann auch dort je ein Auebauelement nach Art des Ausbauelementes 10 mit Abschiebevorrichtungen angeordnet werden, mit deren Hilfe das Haufwerk in Richtung auf den alten Mann befördert werden kann.To prevent unwanted debris from accumulating at the ends of the offset conveyor, a building element of the type of expansion element 10 can also be arranged there with push-off devices, with the aid of which the debris can be conveyed towards the old man.

- 11 -- 11 -

109834/0207109834/0207

PATENTANWALT BODE · 4033 HDSEL · POSTFACH - TELEFON 02102-61701 · TELEX 8585166PATENTANWALT BODE 4033 HDSEL POST BOX - TELEPHONE 02102-61701 TELEX 8585166

- it■ - ■'■■'■- it ■ - ■ '■■' ■

Die Vorrichtung zum Errichten der Streckendänmte hat im Vergleich zum Querschnitt der Abbaustrecke kleine Abmessungen, so daß sie die Vortriebsarbeit in der Atolaaustrecke nicht nennenswert behindert.The device for erecting the road dam has in comparison to the cross-section of the mining section small dimensions, so that they do not mention the tunneling work in the Atolaau stretch with special needs.

In Fig. 10 ist .die bereits oben erwähnte Sehrappervorriehtung dargestellt, deren-Kette- 30 zwischen den wieder mit 10, IQ^-IQ7 bezeichneten Ausbauelementen und dan Abschiebeplatten 18 angeordnet ist« Dar Schrapperkasten 29 ist in einer mittleren Position dargestellt.In Fig. 10 the above-mentioned visual cutter device is shown, the chain 30 of which is arranged between the extension elements , again denoted by 10, IQ ^ -IQ 7 , and the push-off plates 18. The scraper box 29 is shown in a central position.

In Fig. 11 und -υ iöL der .Schrapperkasten 29 näher dargestellt. Er weist zwei ir-fr \b^tand.voneinander .angeordnete-Seitenplatten 29a und 29b auf 3Ie Seitenplatten 29a und 29b sind durch zwei Querstä be 29e miteinander verbunden. Der Schrapperkasten 29 ist durch Anschlagvorrichtungen 29e »it dem Untertrum der Kette 30 verbunden. Zwischen den beiden Seitenplatten 29a und 29b ist eine Schrapperplatte 29f angeordnet, die den Zwischenraum zwischen den beiden Seitenplatten 29a und 29b ausfüllt und in ihrer Querachse mittels einer Welle 29g drehbar gelagert ist. Die Welle 29g ist durch die Seitenplatte 29a hindurchgeführt und trägt an ihrem aus der Seitenplatte 29a hinausragenden Ende ein Zahnrad 29h. Das Zahnrad 29n steht mit einem Ritzel 29i in Eingriff, welches ebenfalls sm. der Seitenplatte 29a gelagert ist und zwar über eine Welle 29j, die außerdem noch eine Laufrolle 29k trägt. An den Unterseiten der beiden Seitenplatten 29a und 29b ist weiterhin ein diese verbindender Anschlag 29d angeordnet, an dem die Schrapperplatte 29f bei Drehung mit ihrem jeweils unteren Ende anschlägt.In Fig. 11 and -υ iöL the .Schrapperkasten 29 shown in more detail. He has two ir- f r \ b ^ tand.voneinander .angeordnete side plates 29a and 29b 3iE side plates 29a and 29b are connected by two Querstä be 29e. The scraper box 29 is connected to the lower run of the chain 30 by stop devices 29e. A scraper plate 29f is arranged between the two side plates 29a and 29b, which fills the space between the two side plates 29a and 29b and is rotatably supported in its transverse axis by means of a shaft 29g. The shaft 29g is passed through the side plate 29a and carries a gear 29h at its end protruding from the side plate 29a. The gear 29n meshes with a pinion 29i, which is also sm. the side plate 29a is mounted via a shaft 29j, which also carries a roller 29k. On the undersides of the two side plates 29a and 29b, a stop 29d connecting them is also arranged, on which the scraper plate 29f strikes with its respective lower end when it is rotated.

.- 12 BAD ORIGINAL 109834/0207.- 12 ORIGINAL BATHROOM 109834/0207

PATENTANWALT BODE · 4033 HÖSEL · POSTFACH · TELEFON 02102-61701 · TELEX 8585166PATENTANWALT BODE 4033 HÖSEL POST BOX TELEPHONE 02102-61701 TELEX 8585166

•m 12"" • m 12 ""

Die Funktionsweise des oben beschriebenen Schrapperkastens ist folgende;The function of the scraper box described above is as follows;

Wird der Schrapperkasten 29 in seinem in Fig. 11 dargestellten Zustand durch das Untertrum der Kette 30 nach rechts gesogen, so erfaßt er mit der Schrapperplatte 29f auf der Sammelplatte liegendes Haufwerk und transportiert es nach rechts, da die Schrapperplatte 29f sich mit ihrem unteren Ende gegen den Anschlag 29d abstützt. Wird der Schrapperkasten anschließend von rechts nach links bewegt, so wird durch das sich in diesem * Fall nach rechts bewegende Obertrum der Kette 30 die Laufrolle 29k im Uhrzeigersinn gedreht, so da& sich, angetrieben über das Ritzel 29i und das Zahnrad 29h, die Schrapperplatte 29f auf der Welle 29g gegen den Uhrzeigersinn dreht und das nach rechts geförderte Haufwerk freigibt. Nach einer Drehung der Schrapperplatte 29f um etwa 180° stößt diese mit ihrem nunmehr unteren Ende gegen die in Fig. 11 linke Seite des Anschlages 29d, so daß sie bereit ist, Haufwerk von der Sammelplatte 28 nach links zu befördern. Wird der Schrapperkasten 29, nachdem er Haufwerk nach links gefördert hat, wieder nach rechts bewegt, so lÄuft ein analoger Vorgang in umgekehrter Richtung ab.If the scraper box 29 in its state shown in FIG. 11 is sucked to the right through the lower run of the chain 30, so he grips with the scraper plate 29f lying on the collecting plate and transports it to the right, since the Scraper plate 29f is supported with its lower end against the stop 29d. If the scraper box is then used by Moved right to left, the upper run of the chain 30, which in this case moves to the right, becomes the roller 29k rotated clockwise so there & yourself, powered over the pinion 29i and the gear 29h, the scraper plate 29f on the shaft 29g rotates counterclockwise and that after right released debris. After the scraper plate 29f has been rotated by approximately 180 °, it now hits with it 11 against the left side of the stop 29d so that it is ready to collect debris from the collecting plate 28 to convey to the left. If the scraper box 29 is moved to the right again after it has conveyed debris to the left, an analog process works in the opposite direction.

Patentansprüche:Patent claims:

III/BoIII / Bo

- 13 -- 13 -

109834/0207109834/0207

Claims (12)

PATENTANWALT BODE · 4033 HÖSEL · POSTFACH -TELEFON 02102-61701 · TELEX 8585166 - 13 - P 6 - 5 Patentansprüche:PATENTANWALT BODE 4033 HÖSEL POST BOX TELEPHONE 02102-61701 TELEX 8585166 - 13 - P 6 - 5 Patent claims: 1. Verfahren zum Errichten von Streckendämmen aus Bergematerial, d a d u r c h ge k e η η ζ eic h η et , daß das Bergematerial während des Einbringens und/oder Verdichtens in einer Richtung parallel oder nahezu parallel zur Abbaustrecke (R) bewegt wird.1. Procedure for the construction of road embankments from tailings, d a d u r c h ge k e η η ζ eic h η et that that Tailings during the introduction and / or compaction in a direction parallel or almost parallel to the excavation section (R) is moved. 2» Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Einbringung und/oder Verdichtung in einer senkrechten oder anderen Richtung zum Abbaustoß (F) erfolgt, abhängig vom Winkel zwischen Abbaustoß (F) und Abbaustrecke (R).2 »Method according to claim 1, characterized in that the introduction and / or compression in a perpendicular or other direction to the working face (F) takes place, depending on the angle between the working joint (F) and mining line (R). 3. Verfahren nach den Ansprüchen 1 und 2, g ekenn ζ e i ehrt a t du rc h die Förderung von Bergematerial in die Bereiche, wo die Errichtung der Streckendämme (P) erfolgt.3. The method according to claims 1 and 2, g ekenn ζ e i honors a t du rc h the promotion of tailings in the Areas where the construction of the road embankments (P) takes place. H. Verfahren nach den Ansprüchen 1-3, g e k e η η ze ic hn e t durch die Förderung des Bergematerials zu einer Sammelstelle (26, 28), von welcher aus das Bergematerial zu seinem oder seinen Einbauorten weitergefördert werden kann.H. The method according to claims 1-3, g e k e η η ze ic hn e t by promoting the tailings too a collection point (26, 28) from which the tailings are conveyed to his or her installation sites can be. 5. Vorrichtung zur Durchführung des Verfahrens nach den Ansprüchen !-«♦,gekennzeichnet durch mindestens ein Strebausbauelement (10), welches an seiner dem Abbaustoß abgewandteη Seite eine Schiebevorrichtung (18, 19,20) zum Einbringen und Verdichten des Bergematerials5. Device for performing the method according to claims! - «♦, characterized by at least one face building element (10), which on its side facing away from the working face has a sliding device (18, 19.20) for bringing in and compacting the tailings 109834/0207109834/0207 PATENTANWALT BODE . 4033 HÖSEL - POSTFACH ■ TELEFON 02102-6Ϊ701 - TELEX 8585166PATENT ADVERTISER BODE. 4033 HÖSEL - POST BOX ■ TELEPHONE 02102-6Ϊ701 - TELEX 8585166 aufweist, wobei mit dar Schiebevorrichtung (18,19,20) eine Schiebebewegung vom Strebausbauelement (10) weg und parallel oder nahezu parallel zur Äbbaustrecke CR) ausfahrbar ist.having, with the sliding device (18,19,20) a Sliding movement away from the face construction element (10) and parallel or can be extended almost parallel to the mining section CR). 6. Vorrichtung nach Anspruch S9 gekennzeichnet durch eine Fördereinrichtung (21), die sich parallel zu mehreren Ausbauelenenten (10, IG^ - 107) zwischen mehreren von den Ausbauelenanten <10, 10* - I07) getragenen Schiebevorrichtungen (18,19,20) und dem verdichteten Bergematerial (P) insbesondere senkrecht zur Längsrichtung der Abbau6. The device according to claim S 9, characterized by a conveyor (21) which extends parallel to several expansion elements (10, IG ^ - 10 7 ) between several of the expansion elements <10, 10 * - I0 7 ) carried sliding devices (18,19 , 20) and the compacted tailings material (P) in particular perpendicular to the longitudinal direction of the mining strecke (R) erstreckt.stretch (R) extends. 7. Vorrichtung nach Anspruch S und/oder 6, dadurch gekennzeichnet , daß die Schiebevorrichtungen (18,19,20) hydraulisch betätigt sind, wobei mindestens ein Druckzylinder (20) vorgesehen ist, der mit einen einseitig wirkenden Schiebeorgan (18) verbunden ist, welches in Vorschubrichtung Bergematerial erfaßt und vorschiebt, in der Gegenrichtung jedoch Über in seinem Weg liegendes Bergematerial hinweggleitet.7. Apparatus according to claim S and / or 6, characterized characterized in that the sliding devices (18,19,20) are hydraulically operated, at least one Pressure cylinder (20) is provided, which is connected to a unilaterally acting sliding member (18) which detects and advances waste material in the feed direction Opposite direction, however, slides away over mountain material lying in its path. 8. Vorrichtung nach einem oder mehreren der Anspruch 5-7, dadurch gekennzeichnet, daß in der8. Device according to one or more of claims 5-7, characterized in that in the Abbaustrecke (R) auf der de» Abbaustoß abgewandten Seite der in die Abbaustrecke (R) hineinragenden Fördereinrichtung (21) eine Sammelvorrichtung (26) für Bergematerial angeordnet ist.Mining section (R) on the side facing away from the mining face a collecting device (26) for tailings is arranged in the conveying device (21) protruding into the excavation section (R). 9. Vorrichtung nach Anspruch S, dadurch gekennzeichnet , daß an der Übergangsstelle zwischen Strecke (R) und Streb eine Sammelplatte (28) für Bergematerial9. Apparatus according to claim S, characterized in that at the transition point between the route (R) and face a collecting plate (28) for tailings - 15 -- 15 - 109834/0207109834/0207 PATENTANWALT BODE - 4033 HÖSEL - POSTFACH - TELEFON 02102-61701 . TELEX 8585166PATENTANWALT BODE - 4033 HÖSEL - POST BOX - TELEPHONE 02102-61701. TELEX 8585166 angeordnet ist und daß sich über die Sainmdtplatte (28) sowie zwischen Ausbauelementen ClO, 101 - 107) und dem verdichteten Bergematerial CP) eine etwa parallel zum Abbaustoß CF) fördernde Schrappervorrichtung C29,30»31) erstreckt.is arranged and that over the Sainmdtplatte (28) and between expansion elements ClO, 10 1 - 10 7 ) and the compacted tailings CP) a scraper device C29,30 »31) extends approximately parallel to the working face CF). 10. Vorrichtung nach einem oder mehreren der Ansprüche 7 - 9, dadurch gekennzeichnet , daß die -Schiebevorrichtung (18, 20a, 32-34) nicht nur parallel oder nahezu parallel zur Abbaustrecke CR), sondern auch in bankrechter Richtung bewegbar ist.10. The device according to one or more of claims 7-9, characterized in that the sliding device (18, 20a, 32-34) is not only parallel or almost parallel to the mining stretch CR), but can also be moved in the bank-right direction. 11. Vorrichtung nach einem oder mehreren der Ansprüche 7-10, dadurch gekennzeic h net, daß der oder die Druckzylinder (20a) zum Betätigen der Schiebevorrichtung (18, 20a, 32-3t» > in ausziehbaren Schutzkästen (32, 34) angeordnet sind«11. Device according to one or more of claims 7-10, characterized in that the or the pressure cylinders (20a) for actuating the sliding device (18, 20a, 32-3t »> are arranged in pull-out protective boxes (32, 34) « 12. Vorrichtung nach einen oder mehreren der Ansprüche 7-11, ge k e η η ζ ei c h η e t du r eh zwei Druckyzlinder C20a) zum Betätigen der Schiebevorrichtung (18,2Oa, 35-39), die hydraulisch so miteinander in Verbindung stehen, daß ihre Hübe zwangsweise gleich groß sind und daß ihre Hubbewegungen synchron ablaufen«12. Device according to one or more of claims 7-11, ge k e η η ζ ei c h η e t du r eh two pressure cylinders C20a) to operate the sliding device (18,2Oa, 35-39), which are hydraulically connected to each other in such a way that their strokes are necessarily the same and that their stroke movements run synchronously " Ill/BoIll / Bo 109834/0207109834/0207 LeerseiteBlank page
DE19702041582 1970-02-14 1970-08-21 Method and device for erecting road blocks Pending DE2041582A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB719570 1970-02-14

Publications (1)

Publication Number Publication Date
DE2041582A1 true DE2041582A1 (en) 1971-08-19

Family

ID=9828421

Family Applications (2)

Application Number Title Priority Date Filing Date
DE19702041582 Pending DE2041582A1 (en) 1970-02-14 1970-08-21 Method and device for erecting road blocks
DE19707031383 Expired DE7031383U (en) 1970-02-14 1970-08-21 STRUCTURAL STRUCTURE ELEMENT FOR STRUCTURAL STRUCTURE IN THE AREA OF A MOUNTAIN DAM TO BE ADDED TO THE STREO.

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE19707031383 Expired DE7031383U (en) 1970-02-14 1970-08-21 STRUCTURAL STRUCTURE ELEMENT FOR STRUCTURAL STRUCTURE IN THE AREA OF A MOUNTAIN DAM TO BE ADDED TO THE STREO.

Country Status (3)

Country Link
JP (1) JPS5129082B1 (en)
DE (2) DE2041582A1 (en)
GB (1) GB1340491A (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4065929A (en) * 1976-03-08 1978-01-03 Atlantic Richfield Company Mine roof support and method in longwall mining of thick mineral seams
JPS5637847U (en) * 1979-08-30 1981-04-10
GB2120301A (en) * 1982-05-21 1983-11-30 Dowty Meco Ltd Mining of minerals
US8590982B2 (en) 2009-07-10 2013-11-26 Joy Mm Delaware, Inc. Longwall mining roof supports
CN111255514B (en) * 2020-03-29 2021-09-28 新汶矿业集团有限责任公司 Deep non-roadside filling gob-side entry retaining supporting structure and supporting method

Also Published As

Publication number Publication date
GB1340491A (en) 1973-12-12
JPS5129082B1 (en) 1976-08-23
DE7031383U (en) 1973-10-31

Similar Documents

Publication Publication Date Title
DE2407584A1 (en) METHOD OF DRIVING TUNNELS
DE2041582A1 (en) Method and device for erecting road blocks
DE2928150C2 (en) Shield support frame
DE2257828C2 (en) Device for the shield-like expansion of underground mining operations
DE2533518C3 (en) Method and device for extracting coals with the aid of a screw cutting and conveying device
DE3423842C2 (en) Device for producing underground cavities with inaccessible cross-sections
DE3720080C2 (en)
DE3009923A1 (en) METHOD AND DEVICE FOR DISASSEMBLING THE PILLARS IN CHAMBER PILLAR CONSTRUCTION
DE19721201B4 (en) Extraction facility for underground ore mining operations
DE19737936B4 (en) Dredging device for underground mining, especially for coal mining in longwall mining
DE2706244A1 (en) Tunnel driving system with simultaneous concreting - has segments formed in succession in peripheral direction using internal shuttering only
DE19736662B4 (en) Dredging device for underground mining
DE2047769C3 (en) Pit construction for the striving
DE2233751A1 (en) HIKING EXTENSION ELEMENT
DE3409002C2 (en)
DE2019063C3 (en) Device for introducing rock backfilling
DE3501509A1 (en) Conveying device for roadway drivage in underground mining
DE19619532C2 (en) Method for producing a walkable tunnel connection between two adjacent, drilled shaft bores and device for carrying out the method
EP0233979B1 (en) Sealing of dumps
DE2501302C2 (en) Method and device for supporting and securing the hacking against coal that is released during the advance and falling in an uncontrolled manner
DE2436381A1 (en) DEVICE FOR SHOOTING BROKEN MOUNTAIN DISPOSAL IN THE UNDERGROUND MINE
DE2630036A1 (en) DEVICE FOR INTRODUCING OFFSET MATERIAL, ESPECIALLY IN UNDERGROUND MINING
DE2041582B (en)
DE2620388C3 (en) Device for extracting and conveying coal
DE2530127C3 (en) Shoring shield for driving tunnels, galleries and the like