DE2025138B - Guiding and aligning device for a mobile hydraulic expansion - Google Patents
Guiding and aligning device for a mobile hydraulic expansionInfo
- Publication number
- DE2025138B DE2025138B DE2025138B DE 2025138 B DE2025138 B DE 2025138B DE 2025138 B DE2025138 B DE 2025138B
- Authority
- DE
- Germany
- Prior art keywords
- frames
- support
- frame
- conveyor
- support frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 claims description 9
- 239000000463 material Substances 0.000 claims description 2
- 239000010410 layer Substances 0.000 claims 3
- 239000012530 fluid Substances 0.000 claims 1
- 230000035882 stress Effects 0.000 claims 1
- 239000002344 surface layer Substances 0.000 claims 1
- 240000000800 Allium ursinum Species 0.000 description 1
- 230000000875 corresponding Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000000284 resting Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Description
Fig, 4 einen Schnitt nach Linie IV-IV der F i g. 2.Fig, 4 is a section along line IV-IV of F i g. 2.
Wie aus Fig. 1 und 2 ersichtlich ist, besitzt das wandernde Ausbaugespann zwei Aus bau gestelle 1 und 2, die auf der Versatzseite nebeneinander quer zum am Abbaustoß befindlichen Fördermittel, in diesem Falie einem Förderer 3 angeordnet sind. Jedes der Gestelle I und 2 besteht aus einer auf der Flözsohle aufliegenden Sohlkonstruktion 4 und darauf angeordneten hydraulischen Teleskopstempeln 5, welche eine Kappe 6 tragen, die das Flözdach stützt und dessen Einbruch verhindert. Unter dem Schutz der Kappe 6 werden die Abbauarbeiten durchgeführt. As can be seen from Fig. 1 and 2, has the wandering expansion team two expansion frames 1 and 2, which are side by side on the offset side crosswise to the funds located at the working face, in this case a conveyor 3 are arranged. Each of the frames I and 2 consists of one on the seam floor resting sole construction 4 and hydraulic telescopic rams 5 arranged on it, who wear a cap 6 that supports the seam roof and prevents it from collapsing. Under the protection the cap 6, the dismantling work is carried out.
Die Ausbaugestelle 1 und 2 sind, um ihre Standfestigkeit zu erhöhen, paarweise miteinander durch zwei ineinandergeschobene und relativ zueinander bewegbare Führungselemente 7 und 8 gekoppelt, die parallel zur Längsachse 0-0 der lestelle 1 und 2 angeordnet sind.The support frames 1 and 2 are in pairs to increase their stability two nested guide elements 7 and 8 which can be moved relative to one another are coupled, which are arranged parallel to the longitudinal axis 0-0 of the position 1 and 2.
Das Führungselement 7 (F i g. 4) besteht aus einem aufgeschnittenen Rohr und ist mit einem Tragarm 9 des Gestells 2 verbunden, während das als Rundstab ausgebildete Führungselement 8, welches in das rohrförmige Führungselement 7 eingeschoben ist, mit einem Tragarm 10 des Gestells 1 verbunden ist. Die Tragarme 9 und 10 sind um parallel zur Längsachse der Sohlkonstruktion 4 angeordnete Achsen 11 schwenkbar an der entsprechenden Sohlkonstruktion des Gestells 1 bzw. 2 befestigt. Diese Anordnung ermöglicht es, daß sich die Gestelle 1 und 2 ungeachtet der Unebenheiten der Flözsohle oder von Aufschüttungen unter den Gestellen selbständig einstellen können.The guide element 7 (FIG. 4) consists of a cut-open tube and is provided with a support arm 9 of the frame 2 connected, while the guide element 8, which is designed as a round rod and which is inserted into the tubular Guide element 7 is inserted, is connected to a support arm 10 of the frame 1. the Support arms 9 and 10 are arranged around axes 11 arranged parallel to the longitudinal axis of the base structure 4 pivotally attached to the corresponding sole construction of the frame 1 or 2. This arrangement enables it that the frames 1 and 2 regardless of the unevenness of the seams or embankments can adjust independently under the racks.
Um ein seitliches Umkippen der Gestelle 1 und 2 in Richtung des Flözabfalls zu vermeiden, sind Ausrichtzylinder 12 vorgesehen, welche die Sohlkonstruktionen 4 der Gestelle 1 und 2 beim Vorrücken an die Flözsohle pressen.Alignment cylinders are used to prevent racks 1 and 2 from tipping over sideways in the direction of the seam waste 12 provided, which the sole structures 4 of the frames 1 and 2 when advancing press against the seam bottom.
Der Ausrichtzylinder 12 des Gestells 1 ist auf dem Tragarm 10 und der Ausrichtzylinder 12 des Gestells 2 auf einem Zusatzhagarm 13, der auf der Achse IJ befestigt ist, aufgesetzt. Aus F i g. 2 und 4 ist ersichtlich, daß die die Ausrichtzylinder 12 tragenden Tragarme 10 und 13 über der Sohlkonstruktion 4 der Gestelle in Flözansteigerichtung angeordnet sind.The alignment cylinder 12 of the frame 1 is on the support arm 10 and the alignment cylinder 12 of the frame 2 placed on an additional hagarm 13 which is attached to the axis IJ. From Fig. 2 and 4 it can be seen that the support arms 10 and 13 carrying the alignment cylinders 12 above the base structure 4 of the racks are arranged in the direction of the seam rise.
Die Schwenkkraft der Tragarme 9, 10 und 13 wird durch die elastischen Dämpfungsvorrichtungen 14 und 15 aufgenommen, die in Form von Zwischenlagen aus elastischem Werkstoff gebildet sind. Die Zwi-The pivoting force of the support arms 9, 10 and 13 is reduced by the elastic damping devices 14 and 15, which are formed in the form of intermediate layers made of elastic material. The intermediate
schenlagen sind beim Gestell 1 zwischen den Stirnflächen der Tragarme 9 und 13 angeordnet, welche durch eine Schraube 16 miteinander verbunden sind und beim Gestell 2 an der Stirnfläche des Tragarms 10 durch eine Schraube 17 befestigt.Scheme layers are arranged in the frame 1 between the end faces of the support arms 9 and 13, which are connected to one another by a screw 16 and in the case of frame 2 on the end face of the support arm 10 fastened by a screw 17.
ίο Die Ausbaugestell 1 und 2 und der sich am Abbaustoß befindliche Förderer 3 werden unmittelbar nach dem Vorrücken des Abbaustoßes durch Rückzylinder 18 (F i g. 2 und 4) vorgeschoben, deren eines Ende an der Sohlkonstruktion 4 der Gestelle 1 und 2 und deren anderes Ende an dem in Form eines steifen Trägers ausgebildeten Zugelement 19 angelenkt ist. Dieses Zugelement 19 verbindet die gekoppelten Ausbaugestelle 1 und 2 üu.- Federn 20, 21 und eine Schraube 22 mit dem Fördermittel 3. Das Zugelement 19 kann auch auf andere Weise, z. B. mit Hilfe eines geeigneten Gelenks mit dem Förderer 3 verbunden werden.ίο The support frame 1 and 2 and the one on the dismantling joint Located conveyors 3 are immediately after the advancement of the working face by return cylinders 18 (Figs. 2 and 4), one end of which is attached to the sole construction 4 of the frames 1 and 2 and the other end of which is articulated to the tension element 19, which is in the form of a rigid support. This tension element 19 connects the coupled support frames 1 and 2 üu.- springs 20, 21 and one Screw 22 with the conveyor 3. The tension element 19 can also in other ways, for. B. with help be connected to the conveyor 3 by a suitable hinge.
Das Zugelement 19 besitzt Längsführungen 23, welche durch Führungsaugen 24 von Hebeln 25 und 26 umfaßt werden. Die Hebel 25 und 26 sind an der Vorderseite der Sohlkonstnjktion 4 der Gestelle 1 und 2 befestigt.The tension element 19 has longitudinal guides 23 which by guide eyes 24 of levers 25 and 26 are included. The levers 25 and 26 are at the front of the sole construction 4 of the frames 1 and 2 attached.
Während des Vorrückens des Abbaustoßes werden zunächst mit Hilfe der Rückzylinder 18 abwechselnd die Ausbaugestelle 1 und 2 verschoben, wobei zuerst ein Gestell, in diesem Falle das Gestell 1, entlastet und an das Fördermittel 3 herangezogen wird, während das Gestell 2 verspannt bleibt. Dann wird das verschobene Gestell 1 verspannt, das Gestell 2 entlastet und an den Förderer 3 herangezogen. Dieser Vorgang wiederholt sich in derselben Reihenfolge bei allen Ausbaugestellen. Dann wird mit Hilfe der Rückzylinder 18 der Förderer 3 in Richtung des Abbaustoßes verschoben. Hierbei sind die Gestelle 1 und 2 verspannt.During the advancement of the working face, the rear cylinders 18 are initially used alternately the expansion racks 1 and 2 moved, with a frame, in this case the frame 1, relieved first and is used on the conveyor 3, while the frame 2 remains clamped. Then that will displaced frame 1 clamped, the frame 2 relieved and pulled to the conveyor 3. This The process is repeated in the same order for all extension racks. Then with the help of the Rear cylinder 18 of the conveyor 3 moved in the direction of the working face. The racks 1 and 2 braced.
Zum Einhalten der Richtung beim Verschieben sind die Führungen 7, 8 und 23 vorgesehen. Während des Entlastens und Verschiebens der Gespanne werden sie durch Ausrichlzylinder 12 an die Flözsohle gepreßt, wodurch eine größere Standfestigkeit der Gestelle erzielt und auch ein Herabrutschen des Förderers 3 verhindert wird.The guides 7, 8 and 23 are provided to maintain the direction when moving. While the relieving and shifting of the teams they are by aligning cylinder 12 to the seam bottom pressed, whereby a greater stability of the frames achieved and also a sliding down of the conveyor 3 is prevented.
Hierzu 1 Blatt Zeichnungen1 sheet of drawings
Claims (1)
Nachstehend wird die Erfindung an einem Ausführungsbeispiel unter Hinweis auf die Zeichnung näher erläutert. Es zeigtDue to the guide connection between the support frame and conveyor as well as the axially centered position of the articulated connection between the two support frames and the fact that each support frame cnlhäll an alignment cylinder and elastic damping devices, the support frame can align itself when it is moved and adapt better to the unevenness of the Underground. When aligning one frame, no constraining forces are exerted on the other frame.
The invention is explained in more detail below using an exemplary embodiment with reference to the drawing. It shows
Family
ID=
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3024465A1 (en) * | 1980-06-28 | 1982-01-28 | Gewerkschaft Eisenhütte Westfalia, 4670 Lünen | PROGRESSIVE EXTENSION FOR UNDERGROUND EXTRACTION COMPANIES, IN PARTICULAR SHIELD REMOVAL |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3024465A1 (en) * | 1980-06-28 | 1982-01-28 | Gewerkschaft Eisenhütte Westfalia, 4670 Lünen | PROGRESSIVE EXTENSION FOR UNDERGROUND EXTRACTION COMPANIES, IN PARTICULAR SHIELD REMOVAL |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2018926C2 (en) | Telescopic boom for a crane | |
DE2540048B1 (en) | DEVICE WITH A REAR CYLINDER FOR A STRUCTURAL STRUCTURE MOVING WITH A STRUT CONVEYOR, IN PARTICULAR SHIELD REMOVAL FRAME AND WITH A DURING THE BACK, THE LYING SLEEVE ON THE LYING SLIDE PISTON | |
DE2449059B2 (en) | Feed device for a traveling longwall construction frame | |
DE1805339A1 (en) | Method and device for moving a mining machine along a mining shock | |
DE2604316C3 (en) | Guide and straightening device for movable support frames | |
DE2416617C3 (en) | Device for aligning walking hydraulic jacks when hovering | |
DE2025138C (en) | Guiding and aligning device for a traveling hydraulic expansion | |
DE2025138B (en) | Guiding and aligning device for a mobile hydraulic expansion | |
DE1924749A1 (en) | Machine for applying webs in rolls | |
DE2146811C3 (en) | Bracing device for a face conveyor | |
DE2746074C2 (en) | Return conveyor for face conveyor and support frame | |
DE1902042A1 (en) | Wandering longwall construction for underground mining operations | |
DE1127842B (en) | Mobile longwall member | |
DE2935162C2 (en) | Returning and adjusting device for a face conveyor. | |
DE2646815C2 (en) | Hydraulic expansion for blow molding plants | |
DE1206383B (en) | Stepping suspension or fixing device (bracing) for the end station of a conveyor, especially in planing struts | |
DE2849726C2 (en) | Filter press with expanding cloth device | |
DE2350577C2 (en) | Device for pressing in sheet piles or the like | |
DE1758165B2 (en) | DEVICE FOR PROMOTING A LOADING MACHINE USED IN THE UNDERGROUND WORK | |
DE1608498C (en) | Stepping hydraulic support frame | |
DE1816955C (en) | Link assembly for a wandering longwall mining, especially in sloping storage sites | |
DE2059471A1 (en) | Bracing device for a face conveyor or the like. | |
DE2319967C3 (en) | Bracing device for a face conveyor | |
DE4114904C2 (en) | Device for driving tunnel or tunnel lining elements supported in the tunnel or gallery | |
DE1483910C2 (en) | Traveling extension unit in the form of a three-man team |