DE202010011672U1 - Force-fitting upgrade of a steel plate / console and the dowel / anchor via Harzinjektage to tensile structure / Aussentragwerk - Google Patents
Force-fitting upgrade of a steel plate / console and the dowel / anchor via Harzinjektage to tensile structure / Aussentragwerk Download PDFInfo
- Publication number
- DE202010011672U1 DE202010011672U1 DE202010011672U DE202010011672U DE202010011672U1 DE 202010011672 U1 DE202010011672 U1 DE 202010011672U1 DE 202010011672 U DE202010011672 U DE 202010011672U DE 202010011672 U DE202010011672 U DE 202010011672U DE 202010011672 U1 DE202010011672 U1 DE 202010011672U1
- Authority
- DE
- Germany
- Prior art keywords
- anchor
- console
- steel plate
- harzinjektage
- tensile structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 81
- 239000010959 steel Substances 0.000 title claims abstract description 81
- 239000011347 resin Substances 0.000 claims abstract description 69
- 229920005989 resin Polymers 0.000 claims abstract description 69
- 230000002787 reinforcement Effects 0.000 claims abstract description 67
- 238000002347 injection Methods 0.000 claims abstract description 51
- 239000007924 injection Substances 0.000 claims abstract description 51
- 239000000853 adhesive Substances 0.000 claims abstract description 7
- 230000001070 adhesive effect Effects 0.000 claims abstract description 7
- 238000013022 venting Methods 0.000 claims abstract description 5
- 239000004567 concrete Substances 0.000 claims description 16
- 239000000463 material Substances 0.000 claims description 16
- 239000000758 substrate Substances 0.000 claims description 14
- 238000000034 method Methods 0.000 claims description 11
- 230000007797 corrosion Effects 0.000 claims description 9
- 238000005260 corrosion Methods 0.000 claims description 9
- 238000009434 installation Methods 0.000 claims description 8
- 239000002184 metal Substances 0.000 claims description 8
- 229910052751 metal Inorganic materials 0.000 claims description 8
- 230000003068 static effect Effects 0.000 claims description 7
- 229920001296 polysiloxane Polymers 0.000 claims description 6
- 238000007789 sealing Methods 0.000 claims description 6
- 229920001410 Microfiber Polymers 0.000 claims description 5
- 206010038743 Restlessness Diseases 0.000 claims description 5
- 150000002739 metals Chemical class 0.000 claims description 5
- 239000003658 microfiber Substances 0.000 claims description 5
- 239000012212 insulator Substances 0.000 claims description 4
- 239000011859 microparticle Substances 0.000 claims description 4
- 239000011150 reinforced concrete Substances 0.000 claims description 4
- 239000003566 sealing material Substances 0.000 claims description 4
- 239000000126 substance Substances 0.000 claims description 4
- 230000001629 suppression Effects 0.000 claims description 4
- 208000001431 Psychomotor Agitation Diseases 0.000 claims description 3
- 239000002131 composite material Substances 0.000 claims description 3
- 239000004033 plastic Substances 0.000 claims description 3
- 229920003023 plastic Polymers 0.000 claims description 3
- 238000009864 tensile test Methods 0.000 claims description 3
- 239000002023 wood Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 claims description 2
- 239000007788 liquid Substances 0.000 claims description 2
- 239000000565 sealant Substances 0.000 claims description 2
- 210000002700 urine Anatomy 0.000 claims description 2
- 238000009420 retrofitting Methods 0.000 claims 5
- 230000007547 defect Effects 0.000 claims 3
- 238000005516 engineering process Methods 0.000 claims 2
- 230000002745 absorbent Effects 0.000 claims 1
- 239000002250 absorbent Substances 0.000 claims 1
- 238000013475 authorization Methods 0.000 claims 1
- 239000011230 binding agent Substances 0.000 claims 1
- 230000015556 catabolic process Effects 0.000 claims 1
- 239000003795 chemical substances by application Substances 0.000 claims 1
- 238000000576 coating method Methods 0.000 claims 1
- 239000000805 composite resin Substances 0.000 claims 1
- 238000007596 consolidation process Methods 0.000 claims 1
- 238000005336 cracking Methods 0.000 claims 1
- 238000006731 degradation reaction Methods 0.000 claims 1
- 239000004744 fabric Substances 0.000 claims 1
- 230000035515 penetration Effects 0.000 claims 1
- 229920002635 polyurethane Polymers 0.000 claims 1
- 239000004814 polyurethane Substances 0.000 claims 1
- 238000004321 preservation Methods 0.000 claims 1
- 230000003014 reinforcing effect Effects 0.000 claims 1
- 238000012360 testing method Methods 0.000 claims 1
- 238000010626 work up procedure Methods 0.000 claims 1
- 238000005728 strengthening Methods 0.000 abstract description 2
- 230000003993 interaction Effects 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 238000002604 ultrasonography Methods 0.000 description 3
- 241000209035 Ilex Species 0.000 description 2
- XUIMIQQOPSSXEZ-UHFFFAOYSA-N Silicon Chemical compound [Si] XUIMIQQOPSSXEZ-UHFFFAOYSA-N 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 229920000642 polymer Polymers 0.000 description 2
- 229910052710 silicon Inorganic materials 0.000 description 2
- 239000010703 silicon Substances 0.000 description 2
- 239000002904 solvent Substances 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- 238000009423 ventilation Methods 0.000 description 2
- 241001136792 Alle Species 0.000 description 1
- 239000002253 acid Substances 0.000 description 1
- 150000007513 acids Chemical class 0.000 description 1
- 238000004873 anchoring Methods 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 239000003599 detergent Substances 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 229910052760 oxygen Inorganic materials 0.000 description 1
- 239000001301 oxygen Substances 0.000 description 1
- 238000007788 roughening Methods 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- -1 urine Substances 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16B—DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
- F16B13/00—Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose
- F16B13/14—Non-metallic plugs or sleeves; Use of liquid, loose solid or kneadable material therefor
- F16B13/141—Fixing plugs in holes by the use of settable material
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16B—DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
- F16B43/00—Washers or equivalent devices; Other devices for supporting bolt-heads or nuts
Abstract
Kraftschlüssige Ertüchtigung einer Stahlplatte/Konsole und der Dübel/Anker über Harzinjektage zu Flächentragwerk/Aussenbewehrung dadurch gekennzeichnet, dass durch die speziell aufgesetzte Injektagescheibe oder Zylinder, Harz in alle Hohlräume der Bohrlöcher und Befestigungsmittel eingebracht werden kann. Über die Injektage-Unterlegscheibe kann entlüftet werden, um Hohlstellen von Luft im Klebeverbund auszuschließen (Kraftschluss Dübel-Bohrloch).Non-positive strengthening of a steel plate / bracket and the dowels / anchors via resin injection to form the surface structure / external reinforcement, characterized in that resin can be introduced into all cavities of the drill holes and fasteners through the specially attached injection disc or cylinder. The injection washer can be used for venting in order to exclude air voids in the adhesive bond (force-fit dowel hole)
Description
Verbindungsmittel wie z. B. Anker sind in der Regel zylindrisch, sitzen in einem Bohrloch und haben im Falle des Dübels zusätzlich eine meist zentrisch angeordnete Gewindestange oder Schraube.Connecting means such. B. anchors are generally cylindrical, sitting in a borehole and have in the case of the anchor in addition to a usually centrally arranged threaded rod or screw.
Die Dübel/Anker befestigen eine Stahlplatte, Konsole oder Aussenbewehrung.The dowels / anchors attach a steel plate, console or external reinforcement.
PROBLEM:PROBLEM:
Befestigungsmittel, wie Durchsteckanker und Vorsteckanker haben das Problem, das die Qualität des Einbaus, bzw. der Sitz des Dübels meist gar nicht oder nur unzulänglich kontrollierbar ist.Fasteners, such as push-through anchors and Vorsteckanker have the problem that the quality of the installation, or the seat of the anchor usually not at all or only inadequately controlled.
Somit ist es oft der Fall, das Bedenken zu Einbausituationen geäußert werden und ein Tausch des Dübels unökonomisch, bzw. technisch unmöglich ist, z. B. aus Platzgründen.Thus, it is often the case that concerns are expressed on installation situations and replacement of the anchor is uneconomical, or technically impossible, z. B. for reasons of space.
Die Montage von Aussenbewehrung ist sehr kompliziert, benötigt viel Personaleinsatz und es ist nahezu unmöglich zu gewährleisten, das keine statisch unzulässigen Lufteinschlüsse im Bereich der Grenzflächen Untergrundoberfläche zu Stahlplatte verbleiben.The installation of external reinforcement is very complicated, requires a lot of personnel and it is almost impossible to ensure that no static impermissible air pockets remain in the area of the boundary surfaces surface to steel plate.
Wenn Risse im Untergrund sind, müssen diese vorab mit Harz ertüchtigt werden. Das sind mehrere Arbeitsgänge und ein erheblicher Zeitaufwand.If there are cracks in the ground, they must first be hardened with resin. These are several operations and a considerable amount of time.
Hier liegt der Ansatz für unsere Idee.Here is the approach to our idea.
LÖSUNG/ERFINDUNG:SOLUTION / Invention
Dieses Vorhaben wird durch die im Schutzanspruch 1–42 beschrieben Materialien und deren Zusammenspiel gelöst.This project is solved by the protection in the claims 1-42 described materials and their interaction.
Die im Schutzanspruch 1–42 beschriebene Ertüchtigung von Befstigungsmitteln (Dübeln/Ankern) und Stahlplatten, soll die Möglichkeit bieten, die Befestigungsmittel und die Stahlplatten im montierten Zustand bei Montage oder nachträglich durch das Einbringen von geeigneten Injektionsharzen zu ertüchtigen.The described in the protection claim 1-42 strengthening of fasteners (anchors / anchors) and steel plates, to provide the opportunity to the fasteners and the steel plates in the assembled state during assembly or later by the introduction of suitable injection resins tougher.
Ertüchtigung heißt zwischen Verbindungsmittel und Bohrloch vorhandene Hohlräume und die Hohlräume im Bereich der Glrenzfläche Stahlplatte zu Untergrund mit Injektionsharz vollständig zu verfüllen, das Lochspiel des Befestigungsmittels im Bohrloch zu minimieren oder sogar auszuschließen, den Beton um das Bohrloch des Befestigungsmittels und unter der Stahlplatte mit Injektionsharz zu vergüten, bzw. zu verbessern und in Korrosion im Dübelbereich, ggf. auch angebohrter Bewehrung und auch der Rückseite von Konsolen/Stahlplatten zu unterbinden.Effort means to completely fill existing cavities and cavities in the area of the boundary surface steel plate to substrate with injection resin to minimize the hole play of the fastener in the borehole or even exclude the concrete around the hole of the fastener and under the steel plate with injection resin Compensate or improve and to prevent corrosion in the anchor area, possibly also drilled reinforcement and the back of consoles / steel plates.
Zwischen dem Dübel/Anker und dem Beton oder Mauerwerk des Bohrloches befindet sich in Folge unserer Bearbeitung das Injektionsharz, welches zum Befestigungsmittel, z. B. Dübel einen Klebeverbund und zur Bohrlochwandung einen Haftverbund herstellt.Between the dowel / anchor and the concrete or masonry of the borehole is located as a result of our processing, the injection resin, which is the fastener, z. B. dowels an adhesive bond and the borehole wall produces an adhesive bond.
Zwischen Untergrund und Stahlplatte/Konsole befindet sich in Folge unserer Bearbeitung das Injektionsharz, welches zur Stahlplatte/Konsole einen Klebeverbund und zum Unterdrund, z. B. Stahlbeton, Metall, Mauerwerk oder Holz einen Haftverbund herstellt.Between substrate and steel plate / console is due to our processing, the injection resin, which to the steel plate / console an adhesive bond and the Unterdrund, z. As reinforced concrete, metal, masonry or wood produces an adhesive bond.
Auch im Bereich des Dübelkopfes wird das Harz eingebracht.The resin is also introduced in the area of the dowel head.
Die Ertüchtigung der Gesamtkonstruktion aus gedübelter bzw. verankerter Stahlplatte oder Konsole, bedeutet einen Kraftverbund zwischen dieser und dem tragenden Untergrund herzustellen.The upgrading of the overall construction of dowelled or anchored steel plate or console, means to establish a power connection between this and the supporting substrate.
Dieses erfolgt bei Dübeln und Ankern, die im Beton gesetzt sind, bis zur Erreichung der Qualität, das die Dübel nicht gezogen werden können. (Materialversagen)This is done with anchors and anchors, which are set in the concrete, to the achievement of the quality that the dowels can not be pulled. (Material failure)
Das Entfernen der ertüchtigten Stahlplatte/Konsole ist ebenfalls nicht möglich, ohne Rückbau der Untergrundes.The removal of the upgraded steel plate / console is also not possible without dismantling the substrate.
Da das Harz den Dübeln oder Anker, bzw. das Befestigungsmittel und die Platten-/Konsolenrückseite überzieht ist keine Korrosion mehr möglich (Unterbindung Sauerstoffkorrosion)Since the resin covers the dowels or anchors, or the fastener and the plate / console back no corrosion is possible (suppression of oxygen corrosion)
Da sich das Harz als Isolator zwischen Metalle legt, wie z. B. Bewehrung und Dübel/Anker legt ist korrosives Verhalten der Metalle durch elektrolytische Spannungreihen mittels dieses Isolators, unterbunden.Since the resin lays as an insulator between metals, such as. B. reinforcement and anchor / anchor sets is corrosive behavior of the metals by electrolytic voltage series means of this insulator, prevented.
Es sind alle Größen und Längen der Dübel möglich, es ist möglich die Gewindestange und auch die Hülse in jeder Länge zu wählen und am Standardanker, der z. B. bauaufsichtlich zugelassen ist, zu ersetzen.There are all sizes and lengths of the dowels possible, it is possible to choose the threaded rod and the sleeve in each length and the standard anchor, the z. B. is approved by building inspectorate to replace.
Es ist kein Eintritt von Fremdstoffen oder Fremdflüssigkeiten unter die Platte/Konsole möglich wie z. B. Reinigungsmittel, Urin, Säuren.There is no entry of foreign matter or foreign liquids under the plate / console possible such. As detergents, urine, acids.
Das System kann komplett in Befestigungsmittel und der verfüllten Grenzfläche zwischen Stahlpatte/Konsole und Untergrund hohe dynamische Lasten aufnehmen.The system can accommodate high dynamic loads completely in fasteners and the filled interface between steel plate / console and ground.
Das Zusammenspiel aller Komponenten wird am Beispiel einer Injektage von Stahlplatte/Konsole und Dübeln/Ankern über die Injektage-Unterlegscheibe beschrieben und sieht wie folgt aus:
- – Es werden fachgerechte Vorarbeiten wie, Untergrundüberprüfung, Zugversuch, Ermittlung der Lage der Bewehrung und Untergrundvorbereitung durchgeführt.
- – Dann wird die Lage der Dübel/Anker festgelegt und mittels Schablone angezeichnet.
- – Die Bohrlöcher werden fachgerecht, gemäß Zulassung hergestellt.
- – Es werden alternativ zu normalen Ankern, wenn erforderlich Standardgewindestange und Ankerhülse ersetzt durch eine
- – Gewindestange und Hülse in notwendiger Länge, ggf. durch den Statiker bestimmt.
- – Die Stahlplatte hat, wenn es die örtlichen Gegebenheiten zulassen, vor Montage Entlüftungsöffnungen und auf der Unterseite umlaufende Sikken zur Abdichtungszwecken. In die Sikken wird vor Montage eine Abdichtungsmasse eingebracht werden. Alternativ ist auch eine Abdichtung am Rand (Unterseite der Platte) mit einer auf die Fläche am Rand aufgeklebten oder in Sikke eingelegten/verklebten Pressdichtung möglich.
- – Die Platte/Konsole wird mittels Befestigungsmitteln auf dem Untergrund montiert.
- – Die auf dem Anker/Dübel normalerweise sitzende Unterlegscheibe werden durch eine Injektageunterlegscheibe bei Montage ersetzt.
- – Die spezielle Injektage-Unterlegscheibe wird aufgesetzt und fachgerecht, gemäß Zulassung befestigt.
- – Der Übergang zwischen Scheibe und Untergrund (Platte/Konsole) werden mit Dichtmittel z. B. mit Silikon oder einer geeigneten Dichtung verschlossen.
- – Auf die Gewindestange wird ein in Länge und Durchmesser geeigneter zylindrischer Deckel z. B. aus Kunststoff oder Gummi aufgeschraubt und unterbindet das Austreten von Injektagematerial. In Ausnahmefällen kann dieser Anschluss auch verdämmt werden mit z. B. Silicon oder anderen schnell härtenden Dichtungsmaterialien.
- – Auch eine Verdämmung mit Dichtband des Gewindes erfolgt.
- – (Es ist statt der Injektagescheibe auch ein Injektagezylinder möglich.)
- – Es werden in die Injektage-/Lüftungsöffnungen Klemmstifte gesetzt, mittels Setzgerät, sowohl in Platte als auch in Unterlegscheibe.
- – Durch den Anschluss Klemmstift-Injektageöffnung oder direkt in die Injektageöffnung der Injektage-Unterlegscheibe, oder direkt in ein Loch der Stahlplatte/Konsole, wird Harz injiziert, durch die Entlüftungsöffnung wird entlüftet. Es wird mittels OPTI-Schlauch der Anschluss der Entlüftungsöffnung verlängert und der Austritt des Harzes kanalisiert und kontrolliert, insbesondere die Entlüftung.
- – Wenn es erforderlich ist, werden Luft bzw. Luftblasen hinter der Platte/Konsolen mittels temporär aufgebrachter Unruhe oder Ultraschall, bei Einbringung des Harzes, ausgetrieben.
- – Nach dem Abbinden des Harzes ist der Dübel oder des Befestigungsmittel und die Stahlplatte/Konsole ertüchtigt, das bedeutet die Kraftübertragung des Gesamtsystems in den Untergrund ist hergestellt.
- – Ein Rückbau der Verdämmungen und Klemmstifte erfolgt.
- – Je nach Erfordernis, Plattengröße, Randbedingungen und Komponenten wie Harzviskosität, zugesetze Lösungsmittel usw. werden ein oder mehrere Dübel mit Spezialscheiben der Injektage-Unterlegscheiben versehen, erhalten die Stahlplatten/Konsolen Entlüftungsöffnungen, über welche Harz injiziert und zumindestens temporär entlüftet wird. Das Verfahren und seine Abfolge wird den Gegebenheiten optimal angepasst.
- - Proper preparatory work such as subsoil examination, tensile test, determination of the position of the reinforcement and substrate preparation are carried out.
- - Then the position of the dowel / anchor is determined and marked by means of a template.
- - The drill holes are made professionally, according to approval.
- - As an alternative to normal anchors, if necessary standard threaded rod and anchor sleeve replaced by a
- - Threaded rod and sleeve in necessary length, if necessary determined by the structural engineer.
- - The steel plate has, depending on local conditions, before mounting vents and on the bottom circumferential Sikken for sealing purposes. In the Sikken a sealing compound is introduced before mounting. Alternatively, a seal on the edge (underside of the plate) with a glued on the surface at the edge or in Sikke inserted / glued press seal is possible.
- - The plate / console is mounted by means of fasteners on the ground.
- - The washer normally located on the anchor / dowel will be replaced by a washer during installation.
- - The special injection washer is placed and properly fastened according to approval.
- - The transition between the disc and substrate (plate / console) are sealed with sealant z. B. closed with silicone or a suitable seal.
- - On the threaded rod is suitable in length and diameter cylindrical cover z. B. screwed plastic or rubber and prevents the escape of injection material. In exceptional cases, this connection can also be dammed with z. As silicone or other fast-curing sealing materials.
- - Also a damming done with sealing tape of the thread.
- - (It is also possible to use a syringe cylinder instead of the injecting disc.)
- - There are set in the injection / ventilation holes clamping pins, by means of setting tool, both in plate and in washer.
- - By connecting pin injector port or directly into the injection port of the injector washer, or directly into a hole of the steel plate / console, resin is injected, through the vent port is vented. It is extended by means of OPTI hose connection of the vent and the outlet of the resin channeled and controlled, in particular the vent.
- - If necessary, air or air bubbles are expelled behind the plate / console by means of temporarily applied restlessness or ultrasound when the resin is introduced.
- - After the setting of the resin of the dowel or the fastener and the steel plate / console is ertüchtigt, that means the power transmission of the entire system in the ground is made.
- - A deconstruction of the Verdämmungen and clamping pins takes place.
- - Depending on the requirements, plate size, boundary conditions and components such as resin viscosity, added solvents, etc. If one or more dowels are provided with special washers of the washers, the steel plates / consoles receive vents over which resin is injected and at least temporarily vented. The procedure and its sequence are optimally adapted to the circumstances.
Das Zusammenspiel aller Komponenten wird am Beispiel einer Ertüchtigung mehrerer Vor- oder Durchsteckanker, durch diese z. B. eine Stahlplatte auf einer Betonoberflächebefestigt ist, beschrieben und sieht wie folgt aus:
- – Es werden fachgerechte Vorarbeiten wie, Untergrundüberprüfung, Zugversuch, Ermittlung der Lage der Bewehrung und Untergrundvorbereitung durchgeführt.
- – Dann wird die Lage der Dübel/Anker festgelegt und mittels Schablone angezeichnet.
- – Die Bohrlöcher werden fachgerecht, gemäß Zulassung hergestellt.
- – Es werden alternativ zu normalen Ankern, wenn erforderlich Standardgewindestange und Ankerhülse ersetzt durch eine
- – Gewindestange und Hülse in notwendiger Länge, ggf. durch den Statiker bestimmt.
- – Die Stahlplatte wird im Bereich des Anschlusses an den Untergrund, außen herum verdämmt, an einer der oberen Ecken wird im Dämmbereich ein Entlüftungsschlauch (oder mehrere) montiert, der mittels Klemmstift und Befestigungsmittel ENLÜ montiert wird.
- – Eine oder alle auf der Stahlplatte sitzenden Ankermuttern werden mit Injektage-Unterlegscheibe eingebaut. Zusätzlich hat die Platte/Konsole Injektageöffnungen.
- – (Alternativ ist die Einbringung des Harzes auch über Klemmstifte möglich, die im Bereich der umlaufenden Plattenverdämmung montiert werden.
- – Die Mutter wird fest, gemäß statischen Vorgaben, verschraubt.
- – Spalte zwischen Scheibe und Platte werden verdämmt, z. B. mit Silikon oder mit einem Dichtring verschlossen, je nach Anwendungsfall.
- – Auf die Gewindestange wird ein in Länge und Durchmesser geeigneter zylindrischer Deckel z. B. aus Kunststoff oder Gummi aufgeschraubt und unterbindet das Austreten von Injektagematerial. In Ausnahmefällen kann dieser Anschluss auch verdämmt werden mit z. B. Silicon oder anderen schnell härtenden Dichtungsmaterialien.
- – Es werden in die Injektage-/Lüftungsöffnungen Klemmstifte gesetzt, mittels Setzgerät.
- – Auf die Klemmstifte werden Injektageschläuche gesetzt.
- – Durch das Injektageloch/den Schlauch mit Klemmstift oder direkt in das Injektageloch der Injektage-Unterlegscheibe wird Harz injiziert, durch die Entlüftungsöffnung wird nur kurz Luft und Harz abgeführt, dann wird es verschlossen (Stopfen).
- – Weiteres Harz tritt hinter die Stahlplatte ein und die Luft entweicht über die Entlüftungsöffnung am Plattenrand bis auch dort Harz kontrolliert und kanalisiert austritt.
- – Es wird von unten nach oben gearbeitet.
- – Wenn es erforderlich ist, werden Luft bzw. Luftblasen hinter der Platte/Konsolen mittels temporär aufgebrachter Unruhe oder Ultraschall, bei Einbringung des Harzes, ausgetrieben.
- – Nach dem Abbinden des Harzes sind die Dübel ertüchtigt, das bedeutet die Kraftübertragung in den Untergrund ist hergestellt. Zusätzlich ist die Stahlplatte mit dem tragenden Untergrund kraftschlüssig verbunden. Dieses ist derzeit bis zu einem Hohlraum von bis zu maximal 6 mm Tiefe möglich. (bei über 6 mm verwenden wir bewehrte Harze)
- – Der Eingebrachte Harz unterbindet die Korrosion und elektrolytische Spannungsreihen zwischen den Metallen, Dübeln und ggf. angebohrter Bewehrung.
- – Ein Rückbau der Verdämmungen und Klemmstifte erfolgt.
- – Je nach Erfordernis, Plattengröße, Randbedingungen und Komponenten wie Harzviskosität, zugesetze Lösungsmittel usw. werden ein oder mehrere Dübel mit Spezialscheiben der Injektage-Unterlegscheiben versehen, erhalten die Stahlplatten/Konsolen Entlüftungsöffnungen, über welche Harz injiziert und zumindestens temporär entlüftet wird. Das Verfahren und seine Abfolge wird den Gegebenheiten optimal angepasst.
- - Proper preparatory work such as subsoil examination, tensile test, determination of the position of the reinforcement and substrate preparation are carried out.
- - Then the position of the dowel / anchor is determined and marked by means of a template.
- - The drill holes are made professionally, according to approval.
- - As an alternative to normal anchors, if necessary standard threaded rod and anchor sleeve replaced by a
- - Threaded rod and sleeve in necessary length, if necessary determined by the structural engineer.
- - The steel plate is dammed in the vicinity of the connection to the ground, around the outside, at the upper corners in the Dämmbereich a breather hose (or more) is mounted, which is mounted by means of clamping pin and fastener ENLÜ.
- - One or all of the anchor nuts on the steel plate are fitted with an injector washer. In addition, the plate / console has injection ports.
- - (Alternatively, the introduction of the resin via terminal pins is possible, which are mounted in the area of the circulating Plattenverdämmung.
- - The nut is screwed tight, according to static specifications.
- - Column between disc and plate are dammed, z. B. closed with silicone or with a sealing ring, depending on the application.
- - On the threaded rod is suitable in length and diameter cylindrical cover z. B. screwed plastic or rubber and prevents the escape of injection material. In exceptional cases, this connection can also be dammed with z. As silicone or other fast-curing sealing materials.
- - There are set in the Injektage- / ventilation holes clamping pins, by means of setting device.
- - Injection hoses are placed on the clamping pins.
- - The injection hole / hose with pin or directly into the injection hole of the injector washer resin is injected, through the vent only briefly air and resin is discharged, then it is closed (plug).
- - Another resin enters behind the steel plate and the air escapes through the vent at the edge of the plate until there also resin controlled and channeled exit.
- - It works from the bottom up.
- - If necessary, air or air bubbles are expelled behind the plate / console by means of temporarily applied restlessness or ultrasound when the resin is introduced.
- - After the setting of the resin, the dowels are upgraded, that means the transmission of power into the ground is made. In addition, the steel plate is frictionally connected to the supporting surface. This is currently possible up to a cavity of up to a maximum depth of 6 mm. (at over 6 mm we use reinforced resins)
- - The resin introduced prevents corrosion and electrolytic tension between the metals, dowels and possibly drilled reinforcement.
- - A deconstruction of the Verdämmungen and clamping pins takes place.
- - Depending on the requirements, plate size, boundary conditions and components such as resin viscosity, added solvents, etc. If one or more dowels are provided with special washers of the washers, the steel plates / consoles receive vents over which resin is injected and at least temporarily vented. The procedure and its sequence are optimally adapted to the circumstances.
Zusammenfassend wird mit unserem Einbringungssystem aus mechanischen Ankern ein Verbundanker erzeugt und das Bohrloch zur Konservierung des Befestigungsmittels verschlossen.In summary, our anchoring system uses mechanical anchors to create a composite anchor and seal the well to conserve the fastener.
Zwischen Untergrund und Stahlplatte/Konsole befindet sich in Folge unserer Bearbeitung das Injektionsharz, welches zur Stahlplatte/Konsole einen Klebeverbund und zum Unterdrund, z. B. Stahlbeton, Metall, Mauerwerk oder Holz einen Haftverbund erstellt hat. Auch der Bereich hinter der Platte ist konservierend verschlossen.Between substrate and steel plate / console is due to our processing, the injection resin, which to the steel plate / console an adhesive bond and the Unterdrund, z. As reinforced concrete, metal, masonry or wood has created a bond. The area behind the plate is also closed conservatively.
Fremdstoffen können nicht mehr in das Bohrloch oder hinter die Platte/Konsole eindringen.Foreign substances can no longer penetrate into the drill hole or behind the plate / console.
Damit ertüchtigen wir nicht nur Anker/Dübel statisch, sondern stoppen Korrosion an Dübeln, Ankern und ggf. angebohrter Bewehrung des Betons. Auch elektrolytische Vorgänge, bzw. elektrolytische Spannungsreihen zwischen den Metallen, unterbrechen wir mit unserem Einbringungssystem.Not only do we anchor anchors / anchors statically, but we also stop corrosion on anchors, anchors and, if necessary, the reinforced concrete reinforcement. Also, electrolytic processes, or electrolytic voltage series between the metals, we interrupt with our introduction system.
Eine Ertüchtigung/Einbringung des Harzes im laufenden Betrieb ist auch nachträglich möglich.An upgrade / introduction of the resin during operation is also possible later.
Die Oberfläche einer neuen Platte ist auf der Rückseite ist durch Rillen oder Aufrauhung vergrößert.The surface of a new plate is on the back is enlarged by grooves or roughening.
Bei allen und auch großen Querschnitten und Längen und Dimensionen können nach kürzester Zeit das System belastet werden, 5 Minuten bis 48 Stunden je nach Injektageharz.For all and also large cross-sections and lengths and dimensions, the system can be loaded after a very short time, 5 minutes to 48 hours depending on the injection resin.
Wenn Injektageunterlegscheibe und Injektagezylinder, sowie Bohrungen in der Platte/Konsole und die Einbringung/Entlüftung über Klemmstifte am Rand der Platte z. B. aus Platzgründen oder statischen Gründen nicht möglich ist, kann eine Injektage in den Anker/hinter die Platte/Konsole auch über eine Hohlbohrung (mittiges Loch ca. 4 mm) in der/den Gewindestangen der Dübel/Anker erfolgen.If the washer and injector cylinder, as well as holes in the plate / console and the insertion / venting via clamping pins on the edge of the plate z. B. for reasons of space or static reasons is not possible, an injection into the anchor / behind the plate / console via a hollow bore (central hole about 4 mm) in the / the threaded rods of the anchor / anchor done.
Da bei unserem System die komplette Verfüllung, ohne Luftblasen, sowohl des Dübels/Ankers, als auch hinter der Stahlplatte/Konsole gewährleistet werden kann, ist eine Aufnahme von sehr hohen statischen und dynamischen Lasten gewährleistet. Bei schwierigen Einbausituationen wird die Freiheit von Lufteinschlüssen zusätzlich über bei Harzeinbringung angewendeten Nutzen von Unruhen und Ultraschall.As the complete backfilling, without air bubbles, of both the anchor / anchor and behind the steel plate / console can be ensured with our system, it is possible to absorb extremely high static and dynamic loads. In difficult installation situations, the freedom of air pockets is further enhanced by the benefits of riot and ultrasound applied to resin application.
Mit normalen Harzen wird von uns ein Spalt bis 6 mm überbrückt. Bei größeren Spalten/Lunken im Übergang Platte zu Untergrund wird das System bewehrt, heißt es werden Mikropartikel/Microfasern eingebracht, vor- und/oder bei der Injektage. Auch das Einbringen von Faserstrümpfen und Matten ist möglich.With normal resins we bridge a gap of up to 6 mm. For larger gaps / Lunken in the transition from plate to substrate, the system is reinforced, it means microparticles / microfibers are introduced, before and / or during the injection. The introduction of fiber stockings and mats is possible.
Risse im Untergrund der Oberfläche, jedes Materials, werden automatisch bei unserer Harzeinbringung in einem Arbeitsgang mit verschlossen.Cracks in the surface of the surface, of any material, are automatically sealed during our resin application in one operation.
Claims (42)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202010011672U DE202010011672U1 (en) | 2010-08-21 | 2010-08-21 | Force-fitting upgrade of a steel plate / console and the dowel / anchor via Harzinjektage to tensile structure / Aussentragwerk |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202010011672U DE202010011672U1 (en) | 2010-08-21 | 2010-08-21 | Force-fitting upgrade of a steel plate / console and the dowel / anchor via Harzinjektage to tensile structure / Aussentragwerk |
Publications (1)
Publication Number | Publication Date |
---|---|
DE202010011672U1 true DE202010011672U1 (en) | 2011-09-02 |
Family
ID=44751804
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE202010011672U Expired - Lifetime DE202010011672U1 (en) | 2010-08-21 | 2010-08-21 | Force-fitting upgrade of a steel plate / console and the dowel / anchor via Harzinjektage to tensile structure / Aussentragwerk |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE202010011672U1 (en) |
-
2010
- 2010-08-21 DE DE202010011672U patent/DE202010011672U1/en not_active Expired - Lifetime
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102004017006B4 (en) | Method of erecting a tower | |
EP2550431B1 (en) | Method for the retroactive strengthening of a fastening means, and injection washer suitable for this purpose | |
DE102004017008A1 (en) | Method of erecting a tower | |
EP2978911B1 (en) | Device, assembly and method for fixing a scaffold to a façade and method for manufacturing the device | |
EP2715013B1 (en) | Connecting arrangement and method for producing a punching shear reinforcement, a subsequent lateral-force reinforcement and/or a reinforcement connection | |
DE202010011672U1 (en) | Force-fitting upgrade of a steel plate / console and the dowel / anchor via Harzinjektage to tensile structure / Aussentragwerk | |
DE102012017704A1 (en) | Arrangement for the high-strength anchoring of a tensioning rod having a tension member in a component and method for producing such an anchorage | |
DE202010011673U1 (en) | Force-fitting "synthesis anchor" between mechanical anchor and injection resin filling when installed and when installed | |
EP3388597A1 (en) | Reinforcing element for reinforcing concreted panels | |
DE102010004466A1 (en) | Mounting system for mounting floor construction to concrete floor, has anchorage element anchored in concrete base and comprising threaded hole in which ends of threaded rods are screwed, where anchorage element has base body | |
DE202010011675U1 (en) | Conclusion Dowel to drill hole in the installed state and when installing dowels, screws, through and Vorsteckankern, and other fasteners, incl. Possibly superior consoles with injection resin | |
DE102016012297A1 (en) | Reinforced concrete structure | |
DE202010011674U1 (en) | Corrosion protection in the installed state and in the installation of dowels, screws, through and Vorsteckankern, and other fasteners, incl. Possibly superior consoles with injectable resin | |
DE102014214473A1 (en) | Reinforcement arrangement for a building and method for reinforcing a structure with such a reinforcement arrangement | |
DE4341329A1 (en) | Concrete component cast=in dowel with shaft | |
DE102009051912A1 (en) | Method for strengthening foundation e.g. surface foundation, of wind turbine, involves partially hardening in-situ concrete extension, and pre-tensioning anchorage elements in underground, where elements held by extension | |
EP3191655A1 (en) | Assembly comprising a component | |
DE202007017679U1 (en) | Mounting arrangement for constructions projecting from building structures | |
EP2042657A1 (en) | Device for anchoring caps to the superstructure of buildings | |
EP1567733A1 (en) | Device and method for fastening fa ade plates | |
DE102018217276A1 (en) | Arrangement for fastening components to a cast metal component | |
DE19524170A1 (en) | Weathered dam wall repair - by wall hole drilling to take heavy-load anchors and protective plate support anchors all concreted into place after plate welding in-situ | |
AT519862B1 (en) | Method for fixing an anchoring element in a wall or ceiling | |
DE2911226C2 (en) | Method for producing a threaded tie rod anchorage | |
DE202010003943U1 (en) | Subsequent upgrading of dowels, screws, through and Vorsteckankern and otherwise. Verb.- and fasteners and / or incl. Supposed steel plates |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R207 | Utility model specification |
Effective date: 20111027 |
|
R150 | Term of protection extended to 6 years | ||
R150 | Term of protection extended to 6 years |
Effective date: 20130906 |
|
R157 | Lapse of ip right after 6 years |