DE202010011673U1 - Force-fitting "synthesis anchor" between mechanical anchor and injection resin filling when installed and when installed - Google Patents

Force-fitting "synthesis anchor" between mechanical anchor and injection resin filling when installed and when installed Download PDF

Info

Publication number
DE202010011673U1
DE202010011673U1 DE202010011673U DE202010011673U DE202010011673U1 DE 202010011673 U1 DE202010011673 U1 DE 202010011673U1 DE 202010011673 U DE202010011673 U DE 202010011673U DE 202010011673 U DE202010011673 U DE 202010011673U DE 202010011673 U1 DE202010011673 U1 DE 202010011673U1
Authority
DE
Germany
Prior art keywords
anchor
washer
mechan
cylinder
injection resin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE202010011673U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE202010011673U priority Critical patent/DE202010011673U1/en
Publication of DE202010011673U1 publication Critical patent/DE202010011673U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B13/00Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose
    • F16B13/14Non-metallic plugs or sleeves; Use of liquid, loose solid or kneadable material therefor
    • F16B13/141Fixing plugs in holes by the use of settable material

Abstract

Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker. Die Bohrlochwandung mit Injektageharzverfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, dadurch gekennzeichnet, dass durch die speziell aufgesetzte Injektagescheibe oder Zylinder, Harz in alle Hohlräume der Bohrlöcher und Befestigungsmittel eingebracht werden kann. Über die Injektage-Unterlegscheibe kann entlüftet werden, um Hohlstellen von Luft im Klebeverbund auszuschließen (Kraftschluss Dübel-Bohrloch).Non-positive "synthesis anchor" between mechan. Anchor and composite anchor. The borehole wall with injection resin filling in the installed state and during installation and / or including any steel plates or brackets that may be in front, with or without an injection washer or cylinder, characterized in that resin is poured into all cavities of the boreholes and through the specially placed injection washer or cylinder Fastening means can be introduced. The injection washer can be used for venting in order to exclude air voids in the adhesive bond (force-fit dowel hole)

Description

Verbindungsmittel wie z. B. Anker sind in der Regel zylindrisch, sitzen in einem Bohrloch und haben im Falle des Dübels zusätzlich eine meist zentrisch angeordnete Gewindestange oder Schraube.Connecting means such. B. anchors are generally cylindrical, sitting in a borehole and have in the case of the anchor in addition to a usually centrally arranged threaded rod or screw.

Der mechanische Anker ist kraftkontrolliert. Er verfügt über eine Hülse und einen Konus der beim Anspannen durch Verschiebung gegenüber der Spreizhülse die nötige Spreizkraft erzeugt.The mechanical anchor is force-controlled. He has a sleeve and a cone which generates the necessary spreading force when tightening by displacement relative to the expansion sleeve.

PROBLEM:PROBLEM:

Befestigungsmittel, wie Durchsteckanker und Vorsteckanker haben das Problem, das die Qualität des Einbaus, bzw. der Sitz des Dübels meist gar nicht oder nur unzulänglich kontrollierbar ist.Fasteners, such as push-through anchors and Vorsteckanker have the problem that the quality of the installation, or the seat of the anchor usually not at all or only inadequately controlled.

Somit ist es oft der Fall, das Bedenken zu Einbausituationen geäußert werden und ein Tausch des Dübels unökonomisch, bzw. technisch unmöglich ist, z. B. aus Platzgründen.Thus, it is often the case that concerns are expressed on installation situations and replacement of the anchor is uneconomical, or technically impossible, z. B. for reasons of space.

Hier liegt der Ansatz für unsere Idee.Here is the approach to our idea.

LÖSUNG/ERFINDUNG:SOLUTION / Invention

Dieses Vorhaben wird durch die im Schutzanspruch 1–33 beschrieben Materialien und deren Zusammenspiel gelöst.This project is solved by the protection in the claims 1-33 described materials and their interaction.

Die im Schutzanspruch 1–33 beschriebene Ertüchtigung von mechanischen Ankern, soll die Möglichkeit bieten, die Befestigungsmittel im oder vor dem montierten Zustand und ohne Entfernung der mit dem Dübel befestigten Objekte wie Stahlplatten, Konsolen usw., bei Montage oder nachträglich durch das Einbringen von geeigneten Injektionsharzen zu ertüchtigen. Ertüchtigung heißt zwischen Verbindungsmittel und Bohrloch vorhandene Hohlräume mit Injektionsharz vollständig zu verfüllen, das Lochspiel des Befestigungsmittels im Bohrloch zu minimieren oder sogar auszuschließen, den Beton um das Bohrloch des Befestigungsmittels mittels Injektionsharz zu vergüten, bzw. zu verbessern und in Korrosion im Dübelbereich, ggf. angebohrter Bewehrung und auch der Rückseite von Konsolen zu unterbinden.The described in the protection claim 1-33 of mechanical anchors, to offer the possibility, the fasteners in or before the assembled state and without removing the attached objects with the dowel such as steel plates, brackets, etc., during assembly or subsequently by the introduction of suitable To make up for injection resins. Effort means to completely fill existing cavities between injection means and borehole with injection resin to minimize or even exclude the hole play of the fastener in the borehole, to compensate for the hole of the fastener by means of injection resin, or to improve and corrosion in the dowel area, if necessary drilled reinforcement and also to suppress the back of consoles.

Zwischen dem mechanischen Anker und dem Beton oder Mauerwerk des Bohrloches befindet sich in Folge unserer Bearbeitung das Injektionsharz, welches zum Befestigungsmittel, z. B. Dübel einen Klebeverbund und zur Bohrlochwandung einen Haftverbund herstellt.Between the mechanical anchor and the concrete or masonry of the borehole is located as a result of our processing, the injection resin, which is the attachment means, for. B. dowels an adhesive bond and the borehole wall produces an adhesive bond.

Auch im Bereich des Dübelkopfes (Durchgangsbohrung im angeschlossenem Bauteil) wird das Harz eingebracht. Die Verfüllung des Lochspiels in der vorhandenen Grundplatte setzt den Wert einer Verschiebung der Grundplatte unter Normallasten auf Null mm.Also in the area of the dowel head (through hole in the connected component), the resin is introduced. The filling of the hole play in the existing base plate sets the value of a displacement of the base plate under normal loads to zero mm.

Die Ertüchtigung des mechanischen Ankers, bedeutet einen zusätzlichen Verbund zwischen diesem und dem tragenden Untergrund herzustellen. Zusätzlich zur Lastabtragung über Reibung des vorhandenen Ankers kommt hier eine Anhaftung des injizierten Harzes an den Dübelkörper und eine Mirkroverzahnung an der Untergrundoberfläche zustande.The improvement of the mechanical anchor means to create an additional bond between it and the supporting ground. In addition to the load transfer via friction of the existing anchor comes here an adhesion of the injected resin to the dowel body and a Mirkroverzahnung on the substrate surface.

Dieses erfolgt bei Dübeln, die im Beton gesetzt sind, bis zur Erreichung der Qualität, das die Dübel nicht aus dem Untergrund herausgezogen werden können.This is done with anchors, which are set in the concrete, to the achievement of the quality that the dowels can not be pulled out of the ground.

Da das Harz den Dübeln oder Anker, bzw. das Befestigungsmittel überzieht ist keine Korrosion mehr möglich (Sauerstoffkorrosion)Since the resin covers the dowels or anchor, or the fastener corrosion is no longer possible (oxygen corrosion)

Da sich das Harz als Isolator zwischen Metalle legt, wie z. B. Bewehrung und Dübel/Anker legt ist korrosives Verhalten der Metalle durch elektrolytische Spannungreihen mittels dieses Isolators, unterbunden.Since the resin lays as an insulator between metals, such as. B. reinforcement and anchor / anchor sets is corrosive behavior of the metals by electrolytic voltage series means of this insulator, prevented.

Es sind alle Größen und Längen der Dübel möglich, es ist möglich die Gewindestange und auch die Hülse in jeder Länge zu wählen und am Standardhülsenanker zu ersetzenThere are all sizes and lengths of the dowels possible, it is possible to choose the threaded rod and the sleeve in each length and replace the standard sleeve anchor

Das Zusammenspiel aller Komponenten wird am Beispiel einer Injektage eines Vorsteckankers beschrieben sieht wie folgt aus:

  • – Die auf dem mechan. Anker normalerweise sitzende Unterlegscheibe werden durch eine Injektageunterlegscheibe bei Montage ersetzt.
  • – Es werden Standardgewindestange und Ankerhülse ersetzt durch eine Gewindestange und Hülse in notwendiger Länge, ggf. durch den Statiker bestimmt.
  • – Das Bohrloch wird fachgerecht und sachkundegerecht hergestellt.
  • – Die spezielle Injektage-Unterlegscheibe wird aufgesetzt und fachgerecht befestigt. Das spezifische Drehmoment wird nach Vorgabe des Statikers (Vorspannung) aufgebracht.
  • – Wenn nötig wird eine zylindrische Pressdichtung vorher gesetzt, um das unkontrollierte Austreten von Harz, in mittels Befestigungsmitteln fixierte Bauteile, zu verhindern.
  • – Der Übergang zwischen Scheibe und Untergrund werden mit Dichtmittel z. B. mit Silikon oder einer geeigneten Dichtung verschlossen.
  • – Auf die Gewindestange wird ein in Länge und Durchmesser geeigneter zylindrischer Deckel z. B. aus Kunststoff oder Gummi aufgeschraubt und unterbindet das Austreten von Injektagematerial. In Ausnahmefällen kann dieser Anschluss auch verdämmt werden mit z. B. Silicon oder anderen schnell härtenden Dichtungsmaterialien.
  • – Auch eine Verdämmung mit Dichtband des Gewindes ist möglich
  • – (Es ist statt der Injektagescheibe auch ein Injektagezylinder möglich.)
  • – Es werden in eines oder beide Injektage-/Lüftungsöffnungen Klemmstifte gesetzt, mittels Setzgerät.
  • – Durch den Anschluss Klemmstift-Injektageöffnung oder direkt in die Injektageöffnung der Injektage-Unterlegscheibe wird Harz injiziert, durch die Entlüftungsöffnung wird entlüftet. Es wird mittels OPTI-Schlauch der Anschluss der Entlüftungsöffnung verlängert und der Austritt des Harzes kanalisiert und kontrolliert.
  • – Nach dem Abbinden des Harzes ist der Dübel oder des Befestigungsmittel ertüchtigt, das bedeutet die Kraftübertragung in den Untergrund ist hergestellt.
  • – Ein Rückbau der Verdämmungen und Klemmstifte erfolgt.
The interaction of all components is described using the example of an injection of a Vorsteckankers looks as follows:
  • - The on the mechan. Anchor normally seated washer will be replaced by a washer washer when mounting.
  • - Standard threaded rod and anchor sleeve are replaced by a threaded rod and sleeve of the required length, if necessary determined by the structural engineer.
  • - The borehole is manufactured professionally and in accordance with the relevant expertise.
  • - The special injection washer is put on and fixed properly. The specific torque is applied according to the specifications of the structural engineer (preload).
  • If necessary, a cylindrical press seal is pre-set to prevent the uncontrolled escape of resin into fastener-fixed components.
  • - The transition between the disc and the substrate with z. B. closed with silicone or a suitable seal.
  • - On the threaded rod is suitable in length and diameter cylindrical cover z. B. screwed plastic or rubber and prevents the escape of injection material. In exceptional cases, this connection can also be dammed with z. As silicone or other fast-curing sealing materials.
  • - Also a damming with sealing tape of the thread is possible
  • - (It is also possible to use a syringe cylinder instead of the injecting disc.)
  • - Clamping pins are placed in one or both injection / ventilation openings by means of a setting device.
  • - Resin is injected through the terminal pin injector port or directly into the injection port of the injector washer and vented through the vent port. It is extended by means of OPTI hose connection of the vent and the outlet of the resin channeled and controlled.
  • - After the setting of the resin of the dowel or the fastener is upgraded, that is, the power transmission to the ground is made.
  • - A deconstruction of the Verdämmungen and clamping pins takes place.

Das Zusammenspiel aller Komponenten wird am Beispiel einer Ertüchtigung mehrerer Vor- oder Durchsteckanker, durch diese z. B. eine Stahlplatte auf einer Betonoberflächebefestigt ist, beschrieben und sieht wie folgt aus:

  • – Die Stahlplatte wird im Bereich des Anschlusses an den Untergrund, außen herum abgedichtet, an einer der oberen Ecken wird ein Entlüftungsschlauch montiert, der mittels Klemmstift und Befestigungsmittel ENLÜ montiert wird.
  • – (Alternativ kann die Stahlplatte vor Montage Entlüftungsöffnungen und auf der Unterseite umlaufende Sikken zur Abdichrungszwecken haben.)
  • – Sicherungsmaßnahmen werden getroffen/Laststützen eingebaut
  • – Eine oder alle auf der Stahlplatte sitzenden Ankermuttern werden mit Injektage-Unterlegscheibe eingebaut.
  • – Die Mutter wird fest, gemäß statischen Vorgaben, verschraubt.
  • – Spalte zwischen Scheibe und Platte werden verdämmt, z. B. mit Silikon oder mit einem Dichtring verschlossen, je nach Anwendungsfall.
  • – Auf die Gewindestange wird ein in Länge und Durchmesser geeigneter zylindrischer Deckel z. B. aus Kunststoff oder Gummi aufgeschraubt und unterbindet das Austreten von Injektagematerial. In Ausnahmefällen kann dieser Anschluss auch verdämmt werden mit z. B. Silicon oder anderen schnell härtenden Dichtungsmaterialien.
  • – Es werden in eines oder beide Injektage-/Lüftungsöffnungen Klemmstifte gesetzt, mittels Setzgerät.
  • – Durch das Injektageloch mit Klemmstift oder direkt in das Injektageloch der Injektage-Unterlegscheibe wird Harz injiziert, durch die Entlüftungsöffnung wird nur kurz Luft und Harz abgeführt, dann wird es verschlossen (Stopfen).
  • – Weiteres Harz tritt hinter die Stahlplatte ein und die Luft entweicht über die Entlüftungsöffnung am Plattenrand bis auch dort Harz kontrolliert und kanalisiert austritt. kraftschlüssig verbunden. Dieses ist bis zu einem Hohlraum von bis zu maximal 6 mm Tiefe möglich.
  • – Der Eingebrachte Harz unterbindet die Korrosion und elektrolytische Spannungsreihen zwischen den Metallen, Dübeln und ggf. angebohrter Bewehrung.
  • – Je nach Erfordernis, Plattengröße, Randbedingungen und Komponenten wie Harzviskosität, zugesetze Lösungsmittel usw. werden ein oder mehrere Dübel mit Spezialscheiben der Injektage-Unterlegscheiben versehen, über welche Harz injiziert und zumindestens temporär entlüftet wird. Das Verfahren und seine Abfolge wird den Gegebenheiten optimal angepasst.
The interaction of all components is the example of an upgrade of several pre- or push-through, by this z. As a steel plate is mounted on a concrete surface, described and looks like this:
  • - The steel plate is sealed in the area of the connection to the underground, around the outside, on one of the upper corners a ventilation hose is mounted, which is mounted by means of clamping pin and fastening means ENLÜ.
  • - (Alternatively, the steel plate may have vents prior to mounting and sumps on the bottom for sealing purposes.)
  • - Safety measures are taken / load supports installed
  • - One or all of the anchor nuts on the steel plate are fitted with an injector washer.
  • - The nut is screwed tight, according to static specifications.
  • - Column between disc and plate are dammed, z. B. closed with silicone or with a sealing ring, depending on the application.
  • - On the threaded rod is suitable in length and diameter cylindrical cover z. B. screwed plastic or rubber and prevents the escape of injection material. In exceptional cases, this connection can also be dammed with z. As silicone or other fast-curing sealing materials.
  • - Clamping pins are placed in one or both injection / ventilation openings by means of a setting device.
  • - Through the injection hole with pin or directly into the injection hole of the injection washer, resin is injected, through the vent only briefly air and resin is discharged, then it is closed (stopper).
  • - Another resin enters behind the steel plate and the air escapes through the vent at the edge of the plate until there also resin controlled and channeled exit. positively connected. This is possible up to a cavity of up to a maximum depth of 6 mm.
  • - The resin introduced prevents the corrosion and electrolytic voltage series between the metals, dowels and possibly drilled reinforcement.
  • Depending on requirements, plate size, boundary conditions and components such as resin viscosity, added solvents, etc., one or more dowels are provided with special washers of the injection washers, through which resin is injected and at least temporarily vented. The procedure and its sequence are optimally adapted to the circumstances.

Zusammenfassend wird mit unserem Einbringungssystem aus rein mechanischen Ankern ein mechanisch wirkender, Last über Reibung und Mikroformschluss abtragender Verbundanker erzeugt und das Bohrloch zur Konservierung des Befestigungsmittels verschlossen.In summary, with our introduction system of purely mechanical anchors, a mechanically acting, load-bearing friction and microform connection-removing composite anchor is produced and the borehole is closed for the preservation of the fastener.

Fremdstoffen können nicht mehr in das Bohrloch eindringen.Foreign substances can no longer penetrate into the borehole.

Damit ertüchtigen wir nicht nur mechan. Anker statisch, sondern stoppen Korrosion an Dübeln, Ankern und ggf. angebohrter Bewehrung des Betons. Auch elektrolytische Vorgänge, bzw. elektrolytische Spannungsreihen zwischen den Metallen, unterbrechen wir mit unserem Einbringungssystem. Zusätzlich bringen wir das Lochspiel im Bohrloch auf Null (wie eingegossen) und sorgen dafür, das bei Mehrfachbefestigungen und Einwirkungen von Querlasten auf Grundplatten, alle Dübel gleichzeitig belastet werden, da das Lochspiel im Bereich der Durchgangsbohrung im angeschlossenem Bauteil auch auf null Millimeter gebracht worden ist.We do not just mechanize it. Anchor static, but stop corrosion at dowels, anchors and possibly drilled reinforcement of the concrete. Also, electrolytic processes, or electrolytic voltage series between the metals, we interrupt with our introduction system. In addition, we bring the hole play in the borehole to zero (as cast in) and ensure that in case of multiple attachments and effects of shear loads on base plates, all dowels are charged simultaneously because the hole clearance has been brought in the area of the through hole in the connected component to zero millimeters ,

Eine Ertüchtigung/Einbringung des Harzes im laufenden Betrieb ist möglich.An upgrade / introduction of the resin during operation is possible.

Die Oberfläche der Hülse ist durch Rillen oder Aufrauhung vergrößert.The surface of the sleeve is increased by grooves or roughening.

Bei allen und auch großen Querschnitten und Langen kann nach kürzester Zeit der Syntheseanker belastet werden, 5 Minuten bis 48 Stunden je nach Injektageharz.With all and also large cross-sections and lengths, the synthesis anchor can be loaded after a very short time, 5 minutes to 48 hours depending on the injection resin.

Wenn Injektageunterlegscheibe und Injektagezylinder z. B. aus Platzgründen nicht eingebaut werden können, kann eine Injektage in den Anker auch über eine Hohlbohrung (mittiges Loch ca. 4 mm) in der Gewindestange erfolgen.If injector washer and injection cylinder z. B. for reasons of space can not be installed, can be done in the anchor rod via a hollow bore (central hole about 4 mm) in the threaded rod.

Wenn der Abstand Anker zu Bohrlochwandung, bzw. das Lochspiel die Fähigkeiten eines Standardharzes durch zu großen Randabstand übersteigt, erfolgt eine Ertüchtigung des Harzes durch Beimengung von bewehrenden Mikrostoffen in den Spalt (lose oder über Vorinjektage oder als eine Art Strumpf) und/oder eine Bewehrung mit Mikrostoffen/Mikrofasern als Beimengung in dem eingebrachten Injektionsharz erfolgt. Dadurch kann in größere Lochspielabstände kraftschlüssig injiziert werden.If the distance between the anchor and the borehole wall or the hole play exceeds the capabilities of a standard resin due to an excessively large edge distance, the resin is reinforced by adding reinforcing micro-substances into the gap (loose or via pre-injection or as a kind of stocking) and / or a reinforcement with microfibers / microfibers as admixture in the introduced injection resin. As a result, it is possible to force fit into larger clearance distances.

Claims (34)

Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker. Die Bohrlochwandung mit Injektageharzverfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, dadurch gekennzeichnet, dass durch die speziell aufgesetzte Injektagescheibe oder Zylinder, Harz in alle Hohlräume der Bohrlöcher und Befestigungsmittel eingebracht werden kann. Über die Injektage-Unterlegscheibe kann entlüftet werden, um Hohlstellen von Luft im Klebeverbund auszuschließen (Kraftschluss Dübel-Bohrloch).Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor. The borehole wall with Injektageharzverfüllung in the installed state and installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, characterized in that through the specially patch Injektagescheibe or cylinder, resin in all cavities of the holes and Fastening means can be introduced. About the Injektage washer can be vented to exclude voids of air in the adhesive bond (traction dowel hole). Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundaner mit Injektageharzverfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, dass bei Injektage mit verdämmter Stahlplatte mehrere Dübel, die durch die Stahlplatte stoßen, gleichzeitig injiziert werden können (Kraftschluss Dübel-Bohrloch bei Zugang des Injektionsharzes von Bohrloch zu Bohrloch über die Ebene hinter der Stahlplatte).Force-fitting "synthesis anchor" between mechan. Anchor and Verbundaner with Injektageharzverfüllung in the installed state and during installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized in that when Injektamm with dammed steel plate several dowels, which can penetrate through the steel plate, can be injected simultaneously (traction plug hole with access of the injection resin from hole to hole over the plane behind the steel plate). Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, dass zwischen Befestigungsmittel und Bohrloch vorhandene Hohlräume mit dem Injektionsharz verfüllt werden und aus dem allein mechanischen Anker, welcher Lasten über Reibung in den Untergrund abträgt, nach Abbindung des Harzes ein Verbundanker entsteht, welcher zusätzlich geeignet ist, Lasten über den Verbund Dübel/Bohrlochwandung abzutragen.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor borehole wall with injection resin filling in the installed state and at installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized in that between the fastener and the hole existing cavities filled with the injection resin and from the sole mechanical anchor, which removes loads on friction in the ground, after setting of the resin, a composite anchor is formed, which is also suitable to remove loads on the composite dowel / borehole. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das durch das Einbringen des Injektionsharzes in die Hohlräume zwischen Befestigungsmittel und Bohrungswandung in Beton sowie andere Materialien und die Verfüllung der Bohröffnung und der Hohlräume im Dübel und die Verfüllung der Bohröffnung, eine Konservierung der Einbausituation entsteht.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor borehole wall with injection resin filling in the installed state and at installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized by the introduction of the injection resin in the cavities between fastener and bore wall in concrete as well as other materials and the filling of the drill hole and the cavities in the dowel and the backfilling of the drill hole, a preservation of the installation situation arises. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das durch das Einbringen des Injektionsharzes in die Hohlräume zwischen Befestigungsmittel und Bohrungswandung in Beton, sowie andere Materialien und die Verfüllung der Bohröffnung und der Hohlräume im Anker, eine Unterbindung der Korrosion an den Befestigungsmitteln erfolgt. Das Harz funktioniert als Isolator.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor Borehole wall with injection resin filling in the installed state and during installation and / or incl. The possibly superior steel plates or brackets, with or without washer washer or cylinder, according to one of the preceding claims, characterized, that is done by introducing the injection resin into the cavities between the fastener and bore wall in concrete, and other materials and the backfilling of the bore hole and the cavities in the anchor, a suppression of corrosion to the fasteners. The resin works as an insulator. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das durch das Einbringen des Injektionsharzes in die Hohlräume zwischen Befestigungsmittel und Bohrungswandung in Beton und die Verfüllung der Bohröffnung und der Hohlräume im Anker, eine Unterbindung der Korrosion an den berührten oder angebohrten Bewehrungseisen erfolgt. (Isolator Harz)Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor borehole wall with injection resin filling in the installed state and at installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized by the introduction of the injection resin in the cavities between the fastener and bore wall in concrete and the filling of the hole and the holes in the anchor, a suppression of corrosion on the touched or drilled rebar occurs. (Insulator resin) Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das durch das Einbringen des Injektionsharzes in die Hohlräume zwischen Befestigungsmittel und Bohrungswandung in Beton und die Verfüllung der Bohröffnung und der Hohlräume im Dübel, eine Unterbindung elektrolytischer Vorgänge bzw. elekrolytischer Spannungsreihen zwischen den Metallen, insbesondere wenn Bewehrung angebohrt wurde, erfolgt.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor borehole wall with injection resin filling in the installed state and during installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized by the introduction of the injection resin into the cavities between fasteners and bore wall in concrete and the filling of the hole and the holes in the dowel, a suppression of electrolytic processes or elekrolytischer voltage series between the metals, especially when reinforcement was drilled, takes place. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, dass nach Verdämmung (Abdichtung im Randbereich) zum Untergrund durch die speziell aufgesetzte Injektage-Unterlegscheibe oder Zylinder, durch Harzinjektage, ganze Stahlplatten diverser Größen einen volständigen Verbundschluss ohne Hohlstellen zum Untergrunderhalten (Vollständiger Verbund) Kein Kondensat hinter den Platten in Hohlstellen. Keine Korrosion.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor borehole wall with injection resin filling in the installed state and during installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized in that after damming (sealing in the edge region ) to the ground through the specially applied injection washer or cylinder, by Harzinjektage, whole steel plates of various sizes a continuous connection without voids to underground (complete composite) No condensate behind the plates in voids. No corrosion. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, dass zur Ertüchtigung sowohl alle Anker/Dübel, als auch der Stahlplattenrand verdämmt werden könne, z. B. mit Silicon oder anderem schnellhärtendem Dichtungsmaterial. Die Platte erhält ein oder zwei Löcher gemäß örtlichen Gegebenheiten und die Injektage erfolgt über eines der Löcher direkt oder über einen gesetzten Klemmstift. Die Entlüftung erfolgt entweder über das zweite Bohrloch in der Platte mit Klemmstift oder an einer der Plattenecken wird ein Entlüftungsschlauch montiert, der mittels Klemmstift und Befestigungsmittel ENLÜ angebracht wird.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor Borehole wall with injection resin filling in the installed state and during installation and / or incl. The possibly superior steel plates or brackets, with or without washer washer or cylinder, according to one of the preceding claims, characterized, that for reinforcement both anchor / dowels, as well as the steel plate edge can be dammed, z. As with silicone or other fast-curing sealing material. The plate receives one or two holes according to local conditions and the injection takes place via one of the holes directly or via a set clamping pin. Venting is either via the second borehole in the plate with pin or at one of the plate corners a vent hose is mounted, which is attached by means of clamp pin and fastener ENLÜ. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das durch das Einbringen des Injektionsharzes in die Hohlräume zwischen Befestigungsmittel und Bohrungswandung, eine Verfestigung (Vergütung) des unmittelbar umgebenden Betons durch Penetration des saugfähigen Untergrundes erfolgt.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor borehole wall with injection resin filling in the installed state and at installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized by the introduction of the injection resin in the cavities between the fastener and the bore wall, a solidification (remuneration) of the immediately surrounding concrete by penetration of the absorbent substrate is carried out. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das auch im Bereich der Durchgangsbohrung des befestigten Materials, das Injektageharz mittels unserem Verfahren in den Bereich des Lochspieles eingebracht wird und dieses Lochspielmaß auf Null mm setzt.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor borehole wall with injection resin filling in the installed state and at installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized in that also in the region of the through hole fastened material, the injection resin is introduced by our method in the field of hole play and this Lochspielmaß sets to zero mm. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das durch das Einbringen des Injektionsharzes in die Hohlräume zwischen Befestigungsmittel und Bohrungswandung in Beton und die Verfüllung der Hohlräume in den Befestigungsmitteln, bei gesetzten mechan. Ankern eine Ertüchtigung erfolgt, so dass bei einem Auszugsversuch höhere Lastwerte erreicht werden.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor borehole wall with injection resin filling in the installed state and at installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized by the introduction of the injection resin in the cavities between the fastener and bore wall in concrete and the filling of the cavities in the fasteners, with set mechan. Anchoring takes place, so that in an extract attempt higher load values are achieved. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das durch das Einbringen des Injektionsharzes in die Hohlräume zwischen Befestigungsmittel und Bohrungswandung in Beton und die Verfüllung der Hohlräume in dem mechan. Anker, eine derartige Ertüchtigung erfolgt, so dass bei einem „Zugversuch im erweiterten Riss” die geforderten Werte der mechan. Anker mindestens erreicht werden. (Werte der Dübelzulassungen)Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor borehole wall with injection resin filling in the installed state and at installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized by the introduction of the injection resin in the cavities between fastener and bore wall in concrete and the backfilling of the cavities in the mechan. Anchor, such an exercise is done so that in a "tensile test in the extended crack" the required values of mechan. Anchors can be reached at least. (Values of the dowel approvals) Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, dass mechan Anker in schwer zugänglichen Bereichen mit unserer Injektagemethode ertüchtigt werden können. Die Ertüchtigung erfolgt ohne Demontage des bereits vorhandenen DübelsForce-fitting "synthesis anchor" between mechan. Anchor and composite anchor borehole wall with injection resin filling in the installed state and at installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized in that mechan anchor in hard to reach areas can be upgraded with our injection method. The upgrade takes place without dismantling the existing anchor Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, dass mechan. Anker im laufenden Betrieb der Anlage, bzw. Anlagen ertüchtigt werden können.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor borehole wall with injection resin filling in the installed state and at installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized in that mechan. Anchors can be upgraded during operation of the plant or plants. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, dass durch das Einbringen des Injektionsharzes in die Hohlräume, die durch den Abbau der aufgebrachten Vorspannung des Dübels im Betons beim Anziehen der Befestigungsmittel entstanden sind, diese komplett verfüllt und der Beton verfestigt werden. Der Verformungshohlraum der im Beton entstanden ist, wird vollständig verfüllt und es entsteht ein Kopfbolzenähnlicher Zustand, so dass das Befestigungsmittel die statisch geforderten Werte gemäß Herstellerlisten, deutlich erfüllen.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor Borehole wall with injection resin filling in the installed state and during installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized characterized in that by introducing the injection resin into the cavities, which are caused by the degradation of the applied bias of the anchor in the concrete when tightening the fastener, this completely filled and the concrete are solidified. The deformation cavity created in the concrete is completely filled and a head bolt-like condition is created so that the fastener clearly meets the statically required values according to the manufacturer's lists. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche. dadurch gekennzeichnet, dass durch das Einbringen des Injektionsharzes in die Hohlräume, die durch das Setzen von Befestigungsmitteln mit Hammerbohrverfahren entstanden sind, diese Hohlräume verfüllt und der Beton verfestigt (vergütet) wird. Der Hohlraum der im Beton entstanden ist, wird gefüllt und es entsteht ein Kopfbolzen der statisch stabil ist, so dass das Befestigungsmittel mindestens die statisch geforderten Werte gemäß Herstellerlisten, erfüllt.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor Composite anchor Borehole wall with injection resin filling in the installed state and during installation and / or incl. The possibly superior steel plates or brackets, with or without washer washer or cylinder, according to one of the preceding claims. characterized in that filled by the introduction of the injection resin into the cavities, which are caused by the setting of fasteners with Hammerbohrverfahren, these cavities filled and the concrete solidified (annealed) is. The cavity created in the concrete is filled and there is a head bolt which is statically stable, so that the fastener meets at least the statically required values according to manufacturer lists. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, dass in unserem speziell entwickelten Verfahren, die von uns entwickelte Injektage-Unterlegscheibe oder der Zylinder eingesetzt wird und mit geeigneten Dichtungsringen und/oder Dichtmitteln, je nach örtlicher Vorgabe abgedichtet wird.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor Borehole wall with injection resin filling in the installed state and at installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized in that in our specially developed method, the injector washer or cylinder we use is inserted and sealed with appropriate sealing rings and / or sealants as local requirements dictate. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, dass in unserem speziell entwickelten Verfahren, die von uns entwickelte Injektage-Unterlegscheibe oder Zylinder eingesetzt wird. Diese Injektage-Unterlegscheibe/Der Zylinder enthält zusätzlich zum Mittelloch zwei Öffnungen, eine Befüll – und eine Entlüftungsöffnung. Das Injektagemittel wird über diese Injektage-Unterlegscheibe oder den Zylinder in den zu verfüllenden Bereich injiziert. Gleichzeitig wird über die zweite vorhandene Öffnung der Injektage-Unterlegscheibe, der zu injizierende Bereich entlüftet. Es wären auch mehrer Befüll-, oder Entlüftungsöffnungen möglich, wenn dieses die Größe der Befestigung erfordert.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor Borehole wall with injection resin filling in the installed state and during installation and / or incl. The possibly superior steel plates or brackets, with or without washer washer or cylinder, according to one of the preceding claims, characterized, that in our specially developed process, we use the injection washer or cylinder developed by us. This injector washer / cylinder contains two openings in addition to the center hole, a filling and a vent opening. The injecting agent is injected into the area to be filled via this injection washer or the cylinder. At the same time, the area to be injected is vented via the second existing opening of the injection washer. It would also be several filling, or vents possible if this requires the size of the attachment. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, dass in unserem speziell entwickelten Verfahren, die von uns entwickelte Injektage-Unterlegscheibe eingesetzt wird. Nach dem Einbau der Unterlegscheibe wird diese mit einem speziell entwickelten zylindrischen Deckel, der auf die Gewindestange aufgeschraubt wird, abgedichtet.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor Borehole wall with injection resin filling in the installed state and during installation and / or incl. The possibly superior steel plates or brackets, with or without washer washer or cylinder, according to one of the preceding claims, characterized, that in our specially developed procedure, we use the injector washer developed by us. After installing the washer, it is sealed with a specially developed cylindrical cover, which is screwed onto the threaded rod. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, dass zur Ertüchtigung sowohl alle Dübel, als auch der Stahlplattenrand verdämmt werden könne, z. B. mit Silicon/Polyurethan oder anderem schnell härtendem Dichtungsmaterial, welches in eine Kerbe oder Rille auf der Unterseite der Platte eingebracht wird. Die Platte erhält ein oder zwei Löcher gemäß örtlichen Gegebenheiten und die Injektage erfolgt über eines der Löcher direkt oder über einen gesetzten Klemmstift. Die Entlüftung erfolgt entweder über das zweite Bohrloch in der Platte mit Klemmstift oder an einer der Plattenecken wird ein Entlüftungsschlauch montiert, der mittels Klemmstift und Befestigungsmittel ENLÜ angebracht wird. Entlüftung und oder Befüllung kann auch über die Injektageunterlegscheiben oder Zylinder erfolgen, ohne Bohrungen in der Stahlplatte.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor Borehole wall with injection resin filling in the installed state and during installation and / or incl. The possibly superior steel plates or brackets, with or without washer washer or cylinder, according to one of the preceding claims, characterized, that for reinforcement both dowels, as well as the steel plate edge can be dammed, z. With silicone / polyurethane or other fast curing sealant material which is inserted into a notch or groove on the underside of the plate. The plate receives one or two holes according to local conditions and the injection takes place via one of the holes directly or via a set clamping pin. Venting is either via the second borehole in the plate with pin or at one of the plate corners a vent hose is mounted, which is attached by means of clamp pin and fastener ENLÜ. Venting and / or filling can also be done via the washers or cylinders, without holes in the steel plate. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das, wenn die Lage es zulässt, das Injektageharz direkt ohne Hilfsmittel wie der Injektage-Unterlegscheibe vor und/oder beim Einbringen des Ankers, je nach Zulassung, injiziert wird.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor Borehole wall with injection resin filling in the installed state and during installation and / or including the possibly superior Steel plates or brackets, with or without a washer or cylinder, according to one of the preceding claims, characterized in that, if the situation permits, the injection resin directly without aids such as the Injektage washer before and / or during insertion of the anchor, depending after approval, is injected. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das, wenn die Lage es zulässt, das Injektageharz direkt ohne Hilfsmittel vor und/oder beim Einbringen des mechan. Ankers, je nach Zulassung, injiziert wird und dadurch und durch die geringe Materialdicke in kürzester Zeit ein belastbarer Anker entsteht. Je nach Harz zwischen 5 Minuten und 48 Stunden, auch bei großen Querschnitten.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor Borehole wall with injection resin filling in the installed state and during installation and / or incl. The possibly superior steel plates or brackets, with or without washer washer or cylinder, according to one of the preceding claims, characterized, which, if the situation allows, the injection resin directly without aids before and / or when introducing the mechan. Ankers, depending on the approval, injected and thus and the small material thickness in a short time creates a strong anchor. Depending on the resin between 5 minutes and 48 hours, even with large cross sections. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das durch das Erstellen des Kopfbolzens mittels der Harzinjektage, das Nachspreizverhalten, insbesondere auch im Riss, bzw. erweiterten Riss, nicht in jedem Fall relevant ist.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor borehole wall with injection resin filling in the installed state and installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized by the creation of the head bolt means the Harzinjektage, the Nachspreizverhalten, especially in the crack, or extended crack, is not relevant in every case. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das ggf. vorhandene Risse und Fehlstellen im Material, welches das Bohrloch umgibt, mit verschlossen werden.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor Borehole wall with injection resin filling in the installed state and at installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized, the possibly existing cracks and flaws in the material surrounding the borehole to be closed with. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das unsere Maschinentechnik in Kombination mit Einringungstechnik eine Materialeinbringung ohne Lufteinschlüsse, bzw. nahezu ohne Lufteinschlüsse ermöglicht.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor Borehole wall with injection resin filling in the installed state and at installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims for protection, characterized in that our machine technology in combination with Einringungstechnik Material introduction without air pockets, or almost without air pockets allows. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das durch das lückenlose Verfüllen des Befestigungsmittels und lückenloses Unerfüttern von Grundplatten ein Eintritt von Schmutz und Fremdstoffen und Fremdflüssigkeiten wie z. B. Reiniger, Chemikalien oder Tierurin unterbunden wird und somit auch diese Ursachen der Korrosion ausgeschaltet werden.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor borehole wall with injection resin filling in the installed state and installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized by the complete filling of the fastener and complete unfeeding of base plates entry of dirt and foreign substances and foreign liquids such. As cleaner, chemicals or animal urine is prevented and thus these causes of corrosion are eliminated. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, dass in unserem speziell entwickelten Verfahren, wenn der Platz oder die Ausführung keine Injektage-Unterlegscheibe oder Zylinder zulassen, eine Gewindestange mit mittiger Hohlbohrung benutzt wird, die je nach örtlicher Vorgabe abgedichtet wird. Durch die mittig in der Gewindestange befindliche ca. mind. 4 mm breite Hohlbohrung wird dann das Harz eingebracht.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor Borehole wall with injection resin filling in the installed state and at installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized in that in our specially developed method, if the space or design does not allow an injector washer or cylinder, use a threaded rod with a central hollow bore, which will be sealed to local specifications. The resin is then introduced through the approximately 4 mm wide hollow bore in the center of the threaded rod. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das, durch die geringe Materialdicke des Injektageharzes bei Einbau in kürzester Zeit ein belastbarer Anker entsteht. Je nach Harz zwischen 5 Minuten und 48 Stunden, auch bei großen Querschnitten.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor Borehole wall with injection resin filling in the installed state and during installation and / or incl. The possibly superior steel plates or brackets, with or without washer washer or cylinder, according to one of the preceding claims, characterized, that, due to the small material thickness of the injection resin when installed in a very short time a resilient anchor arises. Depending on the resin between 5 minutes and 48 hours, even with large cross sections. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das die Standardhülse und Gewindestange durch andere in erforderlicher Länge und entsprechender Materialgüte ersetzt werden, je nach erforderlicher Bohrlochtiefe und statischer VorgabenForce-fitting "synthesis anchor" between mechan. Anchor and composite anchor borehole wall with injection resin filling in the installed state and at installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized in that the standard sleeve and threaded rod by others be replaced in the required length and appropriate material quality, depending on the required drill hole depth and static specifications Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das die Standardhülse und Gewindestange durch andere in erforderlicher Länge und entsprechender Materialgüte ersetzt werden, je nach erforderlicher Bohrlochtiefe und statischer VorgabeForce-fitting "synthesis anchor" between mechan. Anchor and composite anchor Borehole wall with injection resin filling in the installed state and during installation and / or including the possibly superior steel plates or brackets, with or without washer or washer injector, according to one of Previous protection claims, characterized in that the standard sleeve and threaded rod are replaced by other required length and corresponding material quality, depending on the required hole depth and static specification Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das die Anker-Hülse von außen eine rillenartige oder raue Oberfläche hat, so das diese eine optimale Oberfläche für den Harzverbund darstellt und eine Hohe Lastangriffsoberfläche ergibt.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor borehole wall with injection resin filling in the installed state and at installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized in that the anchor sleeve from the outside has a groove-like or rough surface so that it provides an optimum surface for the resin composite and gives a high load-bearing surface. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das in besonderen Ankeranwendungen geforderte Redundanzen überflüssig sind, da der Anker nicht entfernbar ist und somit ein Versagen des Ankers unter Normalbedingungen ausgeschlossen ist.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor Borehole wall with injection resin filling in the installed state and at installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized redundant required in special anchor applications redundancy are because the anchor is not removable and thus a failure of the anchor under normal conditions is excluded. Kraftschlüssiger „Syntheseanker” zwischen mechan. Anker und Verbundanker Bohrlochwandung mit Injektageharz verfüllung im Einbauzustand und bei Einbau und/oder incl. der evtl. vorgesetzten Stahlplatten oder Konsolen, mit oder ohne Injektage-Unterlegscheibe oder Zylinder, nach einem der vorhergehenden Schutzansprüche, dadurch gekennzeichnet, das wenn der Abstand Anker zu Bohrlochwandung, bzw. das Lochspiel die Fähigkeiten eines Standardharzes durch zu großen Randabstand übersteigt, eine Ertüchtigung des Harzes durch Beimengung von bewehrenden Mikrostoffen in den Spalt (lose oder als eine Art Strumpf) und/oder eine Bewehrung mit Mikrostoffen/Mikrofasern in dem eingebrachten Injektionsharz erfolgt. Dadurch kann in größere Lochspielabstände kraftschlüssig injiziert werden.Force-fitting "synthesis anchor" between mechan. Anchor and composite anchor borehole wall with injection resin filling in the installed state and at installation and / or incl. The possibly superior steel plates or brackets, with or without Injektage washer or cylinder, according to one of the preceding claims, characterized in that when the distance anchor to borehole wall or the hole play exceeds the capabilities of a standard resin by too large margin distance, a reinforcement of the resin by admixture of reinforcing micro-substances in the gap (loose or as a kind of stocking) and / or a reinforcement with micro-materials / microfibers in the introduced injection resin. As a result, it is possible to force fit into larger clearance distances.
DE202010011673U 2010-08-21 2010-08-21 Force-fitting "synthesis anchor" between mechanical anchor and injection resin filling when installed and when installed Expired - Lifetime DE202010011673U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE202010011673U DE202010011673U1 (en) 2010-08-21 2010-08-21 Force-fitting "synthesis anchor" between mechanical anchor and injection resin filling when installed and when installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE202010011673U DE202010011673U1 (en) 2010-08-21 2010-08-21 Force-fitting "synthesis anchor" between mechanical anchor and injection resin filling when installed and when installed

Publications (1)

Publication Number Publication Date
DE202010011673U1 true DE202010011673U1 (en) 2011-09-02

Family

ID=44751805

Family Applications (1)

Application Number Title Priority Date Filing Date
DE202010011673U Expired - Lifetime DE202010011673U1 (en) 2010-08-21 2010-08-21 Force-fitting "synthesis anchor" between mechanical anchor and injection resin filling when installed and when installed

Country Status (1)

Country Link
DE (1) DE202010011673U1 (en)

Similar Documents

Publication Publication Date Title
EP2550431B1 (en) Method for the retroactive strengthening of a fastening means, and injection washer suitable for this purpose
DE102004017006B4 (en) Method of erecting a tower
EP2278180A2 (en) Method and device for axially securing a machine element
EP2715013B1 (en) Connecting arrangement and method for producing a punching shear reinforcement, a subsequent lateral-force reinforcement and/or a reinforcement connection
DE202010011673U1 (en) Force-fitting "synthesis anchor" between mechanical anchor and injection resin filling when installed and when installed
DE102012017704A1 (en) Arrangement for the high-strength anchoring of a tensioning rod having a tension member in a component and method for producing such an anchorage
DE102012217449A1 (en) Arrangement for fastening a component inside a wind turbine
DE202010011672U1 (en) Force-fitting upgrade of a steel plate / console and the dowel / anchor via Harzinjektage to tensile structure / Aussentragwerk
DE202010011675U1 (en) Conclusion Dowel to drill hole in the installed state and when installing dowels, screws, through and Vorsteckankern, and other fasteners, incl. Possibly superior consoles with injection resin
DE202010011674U1 (en) Corrosion protection in the installed state and in the installation of dowels, screws, through and Vorsteckankern, and other fasteners, incl. Possibly superior consoles with injectable resin
DE102010004466A1 (en) Mounting system for mounting floor construction to concrete floor, has anchorage element anchored in concrete base and comprising threaded hole in which ends of threaded rods are screwed, where anchorage element has base body
EP3388597A1 (en) Reinforcing element for reinforcing concreted panels
NL2018677B1 (en) Injected bolted connection
DE202010003943U1 (en) Subsequent upgrading of dowels, screws, through and Vorsteckankern and otherwise. Verb.- and fasteners and / or incl. Supposed steel plates
EP3191655A1 (en) Assembly comprising a component
DE102009051912A1 (en) Method for strengthening foundation e.g. surface foundation, of wind turbine, involves partially hardening in-situ concrete extension, and pre-tensioning anchorage elements in underground, where elements held by extension
DE102014214473A1 (en) Reinforcement arrangement for a building and method for reinforcing a structure with such a reinforcement arrangement
DE102018217276A1 (en) Arrangement for fastening components to a cast metal component
DE102013100193B3 (en) A method of attaching a fitting to a window made of plastic hollow profile sections or door
DE102016118394A1 (en) Concrete screw for a vehicle restraint system
DE102020132066B4 (en) Method of attaching a fitting and fastener
DE10043848B4 (en) Mounting sleeve for a wall anchor
DE102021105112B4 (en) Test arrangement and method for testing fresh concrete composite systems for lateral water movements
DE102015114127A1 (en) fastening device
DE202012001307U1 (en) Apparatus for post-consolidation of a rail in a ballastless installation

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 20111027

R150 Term of protection extended to 6 years
R150 Term of protection extended to 6 years

Effective date: 20130906

R157 Lapse of ip right after 6 years