DE202008009513U1 - Device in the form of a fixed-bed body - Google Patents

Device in the form of a fixed-bed body Download PDF

Info

Publication number
DE202008009513U1
DE202008009513U1 DE200820009513 DE202008009513U DE202008009513U1 DE 202008009513 U1 DE202008009513 U1 DE 202008009513U1 DE 200820009513 DE200820009513 DE 200820009513 DE 202008009513 U DE202008009513 U DE 202008009513U DE 202008009513 U1 DE202008009513 U1 DE 202008009513U1
Authority
DE
Germany
Prior art keywords
fixed bed
water
reactor
valve
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE200820009513
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE200820009513 priority Critical patent/DE202008009513U1/en
Publication of DE202008009513U1 publication Critical patent/DE202008009513U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/006Regulation methods for biological treatment
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/02Aerobic processes
    • C02F3/10Packings; Fillings; Grids
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/02Aerobic processes
    • C02F3/12Activated sludge processes
    • C02F3/1236Particular type of activated sludge installations
    • C02F3/1242Small compact installations for use in homes, apartment blocks, hotels or the like
    • C02F3/1247Small compact installations for use in homes, apartment blocks, hotels or the like comprising circular tanks with elements, e.g. decanters, aeration basins, in the form of segments, crowns or sectors
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/02Aerobic processes
    • C02F3/12Activated sludge processes
    • C02F3/1236Particular type of activated sludge installations
    • C02F3/1263Sequencing batch reactors [SBR]
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/38Gas flow rate
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/42Liquid level
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/44Time
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/20Controlling water pollution; Waste water treatment
    • Y02A20/208Off-grid powered water treatment
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Abstract

Festbettkörper zur Abwasserreinigung bei biologischen Kläranlagen umfassend bewegliche Folien und ein zentrales Haltesubstrat, wobei die Folien senkrecht zum Haltesubstrat stehend um dieses einseitig strahlen- und fächerförmig angeordnet und auf diesem aufwickelbar sind.Fixed-bed body for wastewater treatment in biological sewage treatment plants comprising movable foils and a central holding substrate, the foils being vertical to the holding substrate standing around this one-sided radiant and fan-shaped arranged and can be wound up on this.

Figure 00000001
Figure 00000001

Description

Die Erfindung betrifft einen Festbettkörper in einer Anordnung zur Abwasserreinigung bei biologischen Kläranlagen gemäß der Gattung der Patentansprüche.The The invention relates to a fixed-bed body in an arrangement for wastewater treatment in biological wastewater treatment plants according to Genus of the claims.

Die Erfindung ist anwendbar auf biologische Kläranlagen verschiedenster Dimensionierung.The Invention is applicable to biological treatment plants of various kinds Dimensioning.

Bei den bekannten biologischen Kläranlagen, welche nach dem Belebungsverfahren arbeiten, werden immer im Reaktorraum die Bakterien belüftet.at the known biological treatment plants, which after the Activation processes are always in the reactor room, the bacteria ventilated.

Bei Festbett-, Schwebebett-, oder dem klassischen Belebungsverfahren sind die Vorklärung, der Reaktor und die Nachklärung über Wandöffnungen oder Rohre miteinander verbunden.at Fixed bed, suspended bed, or the classical activation process are the primary treatment, the reactor and the secondary clarification over Wall openings or pipes connected to each other.

Das eingeleitete Abwasser fließt zuerst in die Vorklärung, wo sich die Feststoffe absetzen, und organische Schmutzstoffe zum Teil anerob abgebaut werden.The Initiated wastewater first flows into the primary treatment, where the solids settle, and organic contaminants to Part of anerobically mined.

Über eine Wandöffnung oder über ein Überlaufrohr gelangt das Abwasser in den Reaktor, wo durch Zuführung von feinblasiger Luft der aerobe Abbau von organischem Abwasser mit Hilfe von Bakterien geschieht. In der Nachklärung setzen sich mitgerissene Bakterien am Boden ab, so dass das gesäuberte Abwasser an der Wasseroberfläche abließen kann.about a wall opening or via an overflow pipe the wastewater enters the reactor, where by feeding of fine-bubble air the aerobic removal of organic sewage happens with the help of bacteria. Put in the final clarification entrained bacteria on the ground, so that the cleaned Wastewater on the water surface can drain.

Bei der biologischen Abwasserreinigung müssen Bakterien, welche sich im Klärwasser befinden, so belüftet werden, dass diese atmen können und ihre Lebensfähigkeit durch den Abbau des Klärmediums begünstigt und erhalten bleibt bzw. eine Vermehrung der Bakterien auftritt. Dieser Vorgang geschieht im so genannten Reaktorraum.at The biological wastewater treatment must have bacteria, which are in the sewage water, so be ventilated, that they can breathe and their viability favored by the degradation of the treatment medium and preserves or an increase of the bacteria occurs. This Process happens in the so-called reactor space.

In diesem Reaktorraum befinden sich frei schwimmende Bakterien oder auf Aufwuchskörpern fest sitzende Bakterien.In This reactor room contains free floating bacteria or on growth bodies firmly seated bacteria.

Diese Aufwuchskörper bestehen meist aus gitterförmigen Röhren, welche in Blockform zusammengeschweißt sind und werden als Festbettkörper bezeichnet.These Growth bodies usually consist of lattice-shaped Tubes, which are welded together in block form are and are referred to as fixed bed body.

Mit diesem Festbett ist unterhalb des Wasserspiegels der gesamte Reaktorraum, bis auf einen schmalen Freiraum am Beckendoden, ausgefüllt.With this fixed bed is below the water level, the entire reactor space, except for a narrow space at the pool bottom, filled.

In diesem Freiraum befinden sich meistens fest montierte Membranrohrbelüfter oder Membrantellerbelüfter, welche mit Hilfe von Rohren und Schläuchen, über extern aufgestellte Luftverdichter, mit Luft versorgt werden.In In this free space are usually permanently mounted Membranrohrbelüfter or membrane fan with the help of pipes and hoses, via externally mounted air compressors, with Be supplied with air.

Die an den Lüftern ausströmende vertikale Luftströmung soll gleichmäßig den Reaktorraum umwälzen und durchmischen.The vertical airflow exiting the fans should evenly circulate the reactor space and mix.

Das darüber liegende Festbett wird somit aufgrund der aufsteigenden Luftperlen und dem mitgerissenen Klärwasser vertikal durchströmt und bietet den Bakterien somit Luft und Nahrung.The overlying fixed bed is thus due to the ascending Air bubbles and the entrained sewage flowed through vertically and thus provides the bacteria with air and food.

Über eine Wandöffnung oder ein Überlaufrohr gelangt das so gereinigte Abwasser in die Nachklärung.about a wall opening or an overflow pipe passes The cleaned wastewater in the secondary clarification.

Die dorthin mit abgetriebenen alten Bakterienkulturen, als Überschussschlamm bezeichnet, sinken hier wegen der relativen ruhigen Wasserbewegung zu Boden und werden von dort mehrmals am Tag kurzzeitig mit Hilfe einer druckluftbetriebenen Hebeanlage oder mit einer Unterwasserpumpe zurück in die Vorklärung gefördert.The there with aborted old bacterial cultures, as surplus sludge referred to sink here because of the relative calm water movement to the ground and from there several times a day for a short time with the help an air-powered lifting system or with an underwater pump promoted back to the primary treatment.

Bei einer Einleitung von Klärwasser in die Vorklärung wird durch die Volumenerhöhung ein hydraulischer Abwasserstoß erzeugt, welcher erst über den Reaktorraum und dann über die Nachklärung fließt und von dort, meist über ein getauchtes Ablaufrohr, die biologische Kläranlage verlässt.at an introduction of sewage water into the primary treatment If the volume increase causes a hydraulic sewage impact, which first over the reactor space and then over the post-clarification flows and from there, mostly over a submerged drainpipe leaving biological treatment plant.

Der Vorteil solcher Festbettanlage besteht darin, dass sich diese Anlagen besonders gut zur Nachrüstung bestehender Dreikammerausfaulgruben eignen, ohne große Umbauarbeiten an der vorhandenen Grube bzw. an den drei Behältersystemen vornehmen zu müssen.Of the Advantage of such fixed bed plant is that these facilities especially good for retrofitting existing three-chamber septic tanks suitable, without major alterations to the existing pit or to make the three container systems.

Der größte verfahrenstechnische Vorteil besteht jedoch darin, dass der auf der Festbettstruktur sitzende Bakterienstamm einen so genannten Biologischen Rasen bildet, welcher unabhängig von einfließenden schwankenden Schmutzfrachten fast immer die gleiche Stärke und damit die gleiche Bakterienkonzentration aufweist.Of the However, the greatest procedural advantage exists in that the bacterial strain sitting on the fixed bed structure forming a so-called biological lawn, which is independent of inflowing swaying dirt freights almost always the same strength and therefore the same bacterial concentration having.

Diese so genannten sessilen Bakterien kommen also auch im Unterlastbetrieb der Kläranlage lange ohne Nahrung aus.These So-called sessile bacteria also come in under-load operation the sewage treatment plant for a long time without food.

Dieser Vorteil besteht hauptsächlich gegenüber den SBR-Verfahren, wo frei schwimmende Bakterien im Reaktorwasser bei fehlender Nahrung sich stark verringern und bei einer wieder einsetzende Abwassereinleitung diese nicht oder nur teilweise reinigen können.This Advantage exists mainly over the SBR method, where free-floating bacteria in the reactor water in the absence of food decrease greatly and in case of re-entering wastewater discharge they can not or only partially clean.

Ein wesentlicher Vorteil der Festbettanlage besteht in der einfachen Steuerung der Anlage, indem nur zwei Luftzuleitungen für die Belüftung in der Reaktorzone und für die Überschussschlammhebeanlage ins Nachklärbecken intervallmäßig mit Druckluft versorgt werden müssen. Bei dem SBR-Verfahren gibt es nur die Vorklärung und den Reaktor. Beide sind voneinander durch eine wasserundurchlässige Wand getrennt. Die Vorklärung dient dabei als Pufferbecken für Abwasserstöße, die dort aufgestaut werden.A significant advantage of the fixed bed system is the simple control of the system by only two air supply lines for ventilation in the reactor zone and for the excess sludge lifting system in the secondary clarifier must be supplied at intervals with compressed air. In the SBR procedure There are only the pre-treatment and the reactor. Both are separated from each other by a water-impermeable wall. The primary treatment serves as a buffer for wastewater jams, which are dammed there.

Nach einem Zeitintervall von mehreren Stunden wird dieses Wasser in einer vorgegebenen Menge in den Reaktor gefördert. Dieses Aufstauprinzip mit der nachfolgenden Beschickung des Reaktors nennt man SBR-Verfahren.To a time interval of several hours, this water is in one conveyed predetermined amount in the reactor. This Aufstauprinzip with the subsequent feed of the reactor is called SBR process.

Das Vorklärwasser muss in dosierter Menge in den Reaktor gefördert werden, um nach dem dortigen Reinigungsvorgang, wie schon beschrieben, als Klarwasser in das Ablaufrohr gepumpt zu werden. Die Belüftung erfolgt wie beschrieben, entweder über einen externen Luftverdichter oder über Tauchpumpenbelüfter.The Pre-treatment water must be delivered in metered quantity to the reactor be after the local cleaning process, as already described, as Clear water to be pumped into the drain pipe. The ventilation as described, either via an external air compressor or via submersible pump aerator.

Bei den bekannten SBR-Anlagen, welche mit extern aufgestellten Luftverdichtern arbeiten, wird über Schaltventile abwechselnd Luft in die an den Schaltventilen angeschlossenen Luftschläuche geleitet. Je ein Luftschlauch ist am Beschickungsheber, am Klarwasserheber, am Überschussschlammheber und am Belüftungselement angeschlossen.at the well-known SBR systems, which with externally installed air compressors work, is switched over switching valves alternately into the air Passed to the switching valves connected air hoses. One air hose is on the feed lifter, on the clear water lifter, on the excess sludge lifter and on the ventilation element connected.

Diese Heber sind Luftdruckpumpen, auch Mammutpumpen genannt, und pumpen beim Freischalten die durch die Schläuche strömende Druckluft, das vorhandene Wasser in eine höhere Position, so dass Wasser in einem anderen Behälter oder den Kläranlagenablauf gelangen kann. Es wird also zum Beginn einer jeden Reinigungsphase mit dem Beschickungsheber Abwasser aus der Vorklärung in den Reaktor gepumpt, bis der dort befindliche Schwimmerschalter in Stellung „EIN" geht und den Vorgang stoppt. Das entsprechende Ventil wird ausgeschaltet.These Lifts are air pressure pumps, also called mammoth pumps, and pumps when unlocking the flowing through the hoses Compressed air, the existing water in a higher position, so that water in another container or the sewage treatment plant drain can get. It is therefore the beginning of each cleaning phase with the feed elevator wastewater from the primary treatment in the Pumped reactor until the float switch located there in the "ON" position goes and stops the process. The corresponding valve is switched off.

In der Denitrifikationsphase wird dann kurzzeitig durch Einschalten des Belüftungselementes das Reaktorwasser umgerührt. In der folgenden Belüftungsphase wird in vorgegebenen Zeitintervallen das Reaktorwasser belüftet. Belüftungselemente sind hierbei meist Membranrohrbelüfter oder Membrantellerbelüfter. Nach einer Absetzphase wird dann das entstandene Klarwasser mit dem Klarwasserheber in den Abfluss gepumpt, entweder gleichzeitig mit dem Vorgang oder danach wird der Überschussbakterienschlamm kurzzeitig in die Vorklärung gepumpt.In The denitrification phase is then briefly switched on the aeration element stirred the reactor water. In the following aeration phase is at predetermined time intervals the Aerated reactor water. Ventilation elements are mostly membrane tube aerators or membrane cell ventilators. After a settling phase then the resulting clear water is The clear water pump is pumped into the drain, either simultaneously with the process or thereafter, the excess bacterial sludge becomes briefly pumped into the primary treatment.

SBR-Anlagen mit Tauchpumpenbelüfter funktionieren folgendermaßen:
Die in der Praxis eingesetzten Tauchpumpenbelüfter sind Unterwasserpumpen. Diese haben eine Art Schiffsschraube mit einem segmentierten Hohlwellenantrieb, mit welcher trichterförmig das Oberflächenwasser und die über die Hohlwelle angesaugte Luft, nach unten verwirbelt wird, so dass das Reaktorwasser von oben mit Luft versorgt wird.
SBR systems with submersible pump aerators work as follows:
The immersion pump aerators used in practice are underwater pumps. These have a kind of propeller with a segmented hollow shaft drive, with which funnel-shaped, the surface water and sucked over the hollow shaft air is swirled down, so that the reactor water is supplied from above with air.

Eine weitere einfache und wirkungsvolle Abwasserbelüftung wird nach dem Venturi-Injektorprinzip realisiert, indem von einer Pumpe Wasser mit möglichst hohen Wasserdruck erzeugt wird, welches hinter der Venturidüse eine Erhöhung der Fliesgeschwindigkeit zur Folge hat.A more simple and effective wastewater aeration is realized by the Venturi injector principle, by a pump Water is generated with the highest possible water pressure, which is behind the Venturi nozzle an increase in the flow rate entails.

Nach der Gebrauchsmusterschrift DE 202007011718 U1 wird ein solcher Wasserstrahlbelüfter beschrieben, welcher verstopfungsfrei arbeitet und auch in Kleinkläranlagen eingesetzt werden kann.After the utility model DE 202007011718 U1 Such a water jet aerator is described which works constipation-free and can also be used in small sewage treatment plants.

Bei den bekannten klassischen SBR-Anlagen, welche mit Unterwasserpumpen arbeiten, wird der Pumpvorgang für die einzelnen Funktionen direkt durch diese Pumpen und über die daran angeschlossenen Rohren oder Schläuchen realisiert.at the well-known classic SBR systems, which with underwater pumps work, the pumping process for each function directly through these pumps and over the connected ones Realized pipes or hoses.

Eine Rohr- oder Schlauchverbindung zwischen dem Vorklärbecken und dem Reaktorraum ist notwendig, um die intervallmäßige Befüllung des Reaktors zu realisieren und in umgedrehter Fliesrichtung den so genannten Überschussschlamm vom Reaktor in die Vorklärung zurück zu befördern. Als Überschussschlamm bezeichnen man die Bakterien im Reaktorwasser, welche ein gewisses festgelegtes Volumen überschritten haben und störend wirken.A Pipe or hose connection between the primary clarifier and the reactor space is necessary to the intermittent Filling the reactor to realize and vice versa Fliesrichtung the so-called excess sludge from the reactor to transport back to the primary treatment. As excess sludge one calls the bacteria in the reactor water, which exceeded a certain fixed volume have and interfere.

Mit der Überschussschlammfunktion pumpt eine Wasserpumpe kurzzeitig Reaktorwasser in die Vorklärung.With The excess sludge function pumps a water pump for a short time Reactor water in the primary treatment.

Bei einem angenommenen höheren Wasserstand in der Vorklärung, fließt dann nach dem Ausschalten dieser Pumpe durch diese Leitung nach dem Prinzip der frei kommunizierenden Röhre das Vorklärwasser in den Reaktorraum, bis sich der Wasserstand der Vorklärung mit dem Wasserstand des Reaktors sich ausgeglichen hat, oder die kommunizierende Röhre durch Luftblasen des Abwasserbelüfters mit Luft gefüllt wurde und der Vorgang so gestoppt wurde.at an assumed higher water level in the primary treatment, then flows through this pump after switching off this pump Line according to the principle of freely communicating tube the pre-treatment water in the reactor room until the water level the primary treatment is balanced with the water level of the reactor has, or the communicating tube through bubbles of the Wastewater aerator was filled with air and the Process was stopped.

Es wird also für die Überschussschlammfunktion und die Befüllungsfunktion nur eine Pumpe benötigt.It So is for the excess sludge function and the filling function requires only one pump.

Weiterhin benötigt man eine Unterwasserpumpe, welche als Injektorpumpe ausgebildet ist, um mit Hilfe einer vertikalen Wasserströmung so Luft anzusaugen, dass diese sich mit dem Wasser vermischt, um im Wasser des Reaktorraumes den Sauerstoffanteil zu erhöhen.Farther you need an underwater pump, which as an injector pump is designed to with the help of a vertical water flow suck in air so that it mixes with the water to in the water of the reactor room to increase the oxygen content.

Des Weiteren wird eine Klarwasserpumpe benötigt, welche das von den Bakterien gereinigte Wasser aus dem Reaktorraum in den Abfluss zu pumpen.Furthermore, a clear water pump is needed, which purified the bacteria Pump water from the reactor room into the drain.

Mit dem kurzzeitigen ein und ausschalten des Belüfters wird das Reaktorwasser mit einem gewissen Luftanteil umgerührt.With the momentary on and off of the aerator becomes the reactor water stirred with a certain proportion of air.

Der Nachteil der Festbettanlage gegenüber der SBR-Anlage besteht hauptsächlich in den kostenintensiveren längeren Belüftungszeiten und dem relativ teuren Festbettmaterial.Of the Disadvantage of the fixed bed plant opposite the SBR plant consists mainly in the more expensive longer ones Ventilation times and the relatively expensive fixed bed material.

Diese etwas längeren Belüftungsphasen sind aber notwendig, um die Wahrscheinlichkeit zu verringern, dass nicht gerade während einer Belüftungspause ein Abwasserstoß aus der Vorklärung unvermischt mit dem Reaktorwasser bis in die Nachklärung bzw. bis in das dortige Ablaufrohr gelangt.These but slightly longer ventilation phases are necessary to reduce the likelihood that not just during a ventilation break a wastewater from the Pre-treatment unmixed with the reactor water to the Final clarification or until it reaches the drainage pipe.

Um eine gute Vermischung und der damit guten Verdünnung zwischen dem einströmenden Wasser aus der Vorklärung und dem gereinigten Reaktorwasser zu erzielen, sind die Volumen der Kammern oder Behälter auch etwas größer als bei vergleichbaren SBR-Anlagen mit gleichen Einwohnerwerten.Around a good mixing and thus good dilution between the inflowing water from the primary treatment and To achieve the purified reactor water, the volume of Chambers or containers also slightly larger than for comparable SBR plants with the same population equivalents.

Ein weiterer Nachteil liegt in der Intensität der hohen Reaktorbelüftung, bei der gleichmäßig mehr Luft unter dem Festbett über die Lüfter verteilt eingeblasen wird, als die Bakterien zum Atmen benötigen und das nur zum Zweck, um alte Bakterien vom biologischen Rasen abzureißen und dadurch eine gleichmäßige selbst regulierende Bakterienschichtdicke zu erzeugen, die nicht den Reaktor zuwachsen lässt oder gar verstopft.One Another disadvantage lies in the intensity of the high reactor aeration, in the evenly more air under the fixed bed over the fan is blown distributed, as the bacteria need to breathe and that only for the purpose of getting old bacteria to tear off the biological lawn and thereby a uniform to create self-regulating bacterial layer thickness that not Grow the reactor or even clogged.

Diese Bauform der bisher bekannten Festbettkörper ist von Nachteil, weil die Besiedlungsflächen der Bakterien überall den gleichen Abstand zueinander haben und starr sind.These Design of the previously known fixed bed body is disadvantageous because the colonization areas of bacteria everywhere have the same distance from each other and are rigid.

Aus diesem Grund müssen gemäß dem Stand der Technik unterhalb des Festbettkörpers mehrere Membranrohrbelüfter oder Tellerlüfter zum Zweck der gleichen Luftverteilung installiert werden, was wiederum zur Folge hat, dass der Luftverdichter eine große Leistung haben muss.Out For this reason, according to the state of Technique below the fixed bed body several Membranrohrbelüfter or plate fans for the purpose of the same air distribution be installed, which in turn means that the air compressor a must have great performance.

Hinzu kommt, dass diese Festbettkörper bei der Montage von unten nach oben schichtenweise aufgebaut werden, muss der Monteur auf diesen stehen können.in addition comes that these fixed bed body when mounting from the bottom To be built up layer by layer, the installer has to can stand this.

Diese dafür benötigte Festigkeit ist natürlich preisintensiv und verschlechtert die Vermarktung.These this required strength is of course expensive and worsens the marketing.

Weiterhin nachteilig bei den bisher bekannten Festbettanlagen ist, dass die Membranrohr- oder Tellerlüfter zwecks Reparaturen und Wartungen auf Grund des einmal installierten Fettbettes, das über ihnen liegt, meist aus dem kompakt gebauten Reaktor nicht mehr herausnehmbar sind.Farther A disadvantage of the previously known fixed bed systems that the Membrane tube or plate fans for repairs and maintenance due to the once installed fat bed, over them lies, mostly from the compact built reactor no longer removable are.

Folgende Aufgaben müssen zur Verbesserung der verschiedenen Kläranlagen und- verfahren realisiert werden:
Im Behältersystem von Festbettanlagen, Wirbelbett- und Schwebebettanlagen sowie bei den klassischen Belebtschlammverfahren soll es keine Verbindungsöffnungen zwischen der Vorklärzone und dem Reaktorraum mehr geben. Hydraulische Stoßbelastungen von Schmutzwasser werden damit verhindert und in der Vorklärungszone aufgefangen, um dann in kleineren Mengen in Zeitintervallen in den Reaktorraum gefördert zu werden. Resultierend daraus können die Belüftungszeiten wegen der minimierten Stoßbelastung wesentlich verringert werden. Die gleichmäßigen Wasserstände im Reaktorraum und in der Nachklärung, wie es für Festbettanlagen verfahrensbedingt typisch ist, sollten erhalten bleiben. Verfahrensbedingt soll der Wasserspiegel in der Vorklärung durch die diskontinuierliche Beschickung abgesenkt werden und als Puffer für hydraulische Abwasserstöße dienen.
The following tasks have to be realized to improve the different treatment plants and processes:
In the container system of fixed bed plants, fluidized bed and floating bed plants as well as in the classical activated sludge process there should be no more connecting openings between the pre-clearing zone and the reactor chamber. Hydraulic shock loads of dirty water are thus prevented and collected in the Vorklärungszone, to then be promoted in smaller quantities at time intervals in the reactor space. As a result, the ventilation times can be significantly reduced because of the minimized impact load. The uniform water levels in the reactor chamber and in the secondary clarification, as is typical for fixed bed plants due to the process, should be maintained. Due to the process, the water level in the primary treatment is to be lowered by the discontinuous feed and serve as a buffer for hydraulic wastewater jettings.

Es muss ein neuer Festbettkörper entwickelt werden, bei welchem die Vorteile der bekannten Festbettanlage erhalten bleiben und die beschriebenen Nachteile dieser Anlagen beseitigt werden.It a new fixed bed body has to be developed in which the advantages of the known fixed bed plant are preserved and the described disadvantages of these systems are eliminated.

Der Festbettkörper mit den Aufwuchsflächen muss dabei so ausgebildet sein sein, dass diese sich leicht und flexibel durch jede Behälteröffnung einführen lassen, leicht montierbar sind und das die Aufwuchsflächenabstände, zwecks Einsatz von Tellerbelüftern, in ihrem Zentrum der stärksten Belüftung eng sind und sich dann so verbreitern, dass ein Zuwachsen der Aufwuchsflächen nicht möglich ist oder die Funktionsweise nicht stört.Of the Fixed bed body with the growth surfaces must be there be designed so that they are light and flexible insert each container opening, are easy to assemble and that the nursery surface distances, for the use of plate fans, in their center of strongest ventilation are tight and then so widen that growth of the nursery areas does not is possible or does not interfere with the operation.

Darüber hinaus müssen die Belüftungsvorrichtungen (Tellerbelüfter oder ein Injektorbelüfter) bei Wartungsarbeiten aus dem Reaktor herausnehmbar sein, ohne dass das Festbett hinderlich dabei ist.About that In addition, the ventilation devices (disc ventilator or an injector fan) during maintenance from the Reactor be removable, without the fixed bed hindering it is.

Im weiteren besteht die Aufgabe, die Luftdruckheber, also den Beschickungsheber, den Überschussschlammheber und den Klarwasserheber, wasserstandsabhängig zu steuern, so dass die dafür jetzt benötigten elektromagnetischen Schaltventile entfallen oder teilweise entfallen können.in the Another task is the air pressure lifter, ie the feed lifter, the excess sludge lift and the clear water heater, water level dependent to control, so that needed for it now electromagnetic switching valves omitted or partially eliminated can.

Diese dafür notwendige Schalteinheit soll die Wasserstände direkt schalten können.These necessary switching unit should the water levels can switch directly.

Aufgabe der vorliegenden Erfindung ist es, ein Festbettkörper und ein Verfahren zum Betreiben eines solchen in einer Anordnung zur Abwasserreinigung bei biologischen Kläranlagen anzugeben, welche die zuvor stehend genannten Nachteile des Standes der Technik vermeiden.Object of the present invention is to provide a fixed bed body and a method for operating such in an arrangement for wastewater treatment in biological treatment plants, which overcome the above-mentioned disadvantages of Avoid prior art.

Erfindungsgemäß wird diese Aufgabe durch die kennzeichnenden Merkmale des 1. Schutzanspruchs gelöst. Weitere günstige Ausgestaltungsmöglichkeiten der Erfindung sind in den nachgeordneten Schutzansprüchen angegeben.According to the invention This object by the characterizing features of the first protection claim solved. Further favorable design possibilities The invention are in the subordinate claims specified.

Das Wesen der Erfindung besteht darin, dass ein industriell fertigbarer Festbettkörper bereitgestellt wird, bei dem Folien, bspw. Kunststofffolien, senkrecht stehend um einen zentralen Haltepunkt einseitig strahlen -und fächerförmig angebracht sind.The Essence of the invention is that an industrially manufacturable Fixed bed body is provided, in the films, eg. Plastic films, standing vertically around a central breakpoint on one side Radiant and fan-shaped are attached.

Vorteilhaft als zentraler Haltepunkt der einzelnen Folienblätter ist ein Rohr, um dessen Kreisumfang verteilt die Folienflächen strahlenförmig angebracht sind. Eine senkrechte Abkantung am Strahlenende der Folienfläche dient dabei erfindungsgemäß als Abstandshalter der Folien zueinander. Die zentral gefassten Folienflächen sind zueinander beweglich und führen im Abwasser stehend, während der Belüftung von unten, eine Eigenbewegung durch.Advantageous as a central breakpoint of the individual foil sheets a tube around the circumference of which distributes the film surfaces are mounted radially. A vertical fold at the end of the film surface of the film serves according to the invention as Spacer of the films to each other. The central film surfaces are movable to each other and lead in the sewage, during the ventilation from below, a proper movement by.

Das zentrale Halterohr dient als Befestigungssubstrat dieses Folienfestbettes.The central holding tube serves as a mounting substrate of this film fixed bed.

Bei einer stehenden Variante können unterhalb des Folienfestbettes an dem Halterohr Standfüße befestigt sein.at a standing variant can below the fixed film bed be attached to the holding tube feet.

Bei einer schwimmenden Variante des Folienfestbettes kann oberhalb am Halterohr ein Schwimmer befestigt werden, welcher dann auf dem Reaktorwasser schwimmt und das unterhalb der Wasseroberfläche hängenden Folienfestbettkörper hält.at a floating variant of the film fixed bed can above the Holding tube to be attached to a float, which then on the reactor water Floats and hanging below the water surface Foil fixed bed body holds.

Bei der Montage oder Demontage des Folienfestbettkörpers wird das zentrale Rohr gedreht, damit sich die Folien um dessen Achse aufwickeln und durch diesen verringerten Umfang passt der Folienfestbettkörper auch durch die Öffnungen von Kleinkläranlagen.at the assembly or disassembly of the film fixed bed body is the central tube is rotated to allow the slides around its axis wind up and by this reduced extent fits the foil fixed bed body also through the openings of small wastewater treatment plants.

Nach dieser kurzzeitigen Verformung gehen dann die Folienflächen wegen Ihrer Steifigkeit und wegen der erwähnten Abstandsabkantung in ihre geometrische Ursprungsform zurück.To this short-term deformation then go the foil surfaces because of their stiffness and because of the mentioned Abstandsabkantung back to their geometric original form.

Wenn unterhalb des erfindungsgemäßen Folienfestbettes ein Tellerbelüfter oder ein Injektorbelüfter in Funktion tritt, wird die Aufwuchsfläche des biologischen Rasens, welche im Zentrum des Folienfestbettes eng zueinander liegt, am besten belüftet und mit zunehmenden Abstand vom Folienfestbettzentrum lässt die Belüftung nach. Es wird also nur dort intensiv belüftet, wo die Bakterienkonzentration am höchsten ist und auch nur dort verhindern die aufsteigenden Luftblasen, mit der daraus resultierenden Wasserströmung, das Zuwachsen der eng zueinander liegenden Aufwuchsflächen.If below the film fixed bed according to the invention a disc ventilator or an injector fan in Function occurs, the growth area of the biological Lawn, which is close to each other in the center of the film fixed bed, best ventilated and with increasing distance from the film fixed bed center lets off the ventilation. So it will only be there intensively ventilated where the bacterial concentration is highest is and only there prevent the rising air bubbles, with the resulting water flow, the growth the closely spaced growth areas.

Im äußeren Radiusbereich der zueinander immer größer werdenden Abstände der Aufwuchsflächen reichen die entstehenden Strömungen der Strömungswalzen aus, um die dort angesiedelten Bakterien mit Nahrung und Luft zu versorgen. In diesem Bereich ist ein Zuwachsen der Aufwuchsflächen auch wegen der größer werdenden Eigenbewegung nicht möglich.In the outer Radius range of each other ever increasing Distances of the growth surfaces are sufficient for the resulting Currents of the flow rolls out to those there provide food and air to settled bacteria. In this area is a growth of the nursery areas also because of the larger becoming own movement not possible.

Abgestorbenen Bakterienkulturen können bei dem erfindungsgemäßen Folienfestbett ungehindert nach unten abfallen und führen zu keinen sonst üblichen Verstopfungen.dead Bacterial cultures can in the inventive Slide down the fixed bed without hindrance and guide it downwards to no usual blockages.

Durch den erfindungsgemäßen Einsatz von Folien als Aufwuchsflächen nach der beschriebenen Realisierungsvariante werden die Materialkosten gegenüber herkömmlicher Festbettanlagen wesentlich gesenkt und eine universelle Einsetzbarkeit erreicht.By the inventive use of films as nursery surfaces After the implementation variant described, the material costs significantly reduced compared to conventional fixed bed systems and achieved a universal applicability.

Die erfindungsgemäßen kostengünstigen Festbettfolien können auch im Reaktor von herkömmlichen SBR-Anlagen eingebaut werden und beseitigen das Unterlastproblem dieser Anlagen, wenn nur wenige oder nur ein Einwohnerwert diese Anlagen speisen.The inexpensive fixed-bed films according to the invention can also be used in the reactor of conventional SBR plants be installed and eliminate the underload problem of these systems, if only a few or only a population value feed these plants.

Darüber hinaus liegt auch im Rahmen der Erfindung, dass beim Einsatz des erfindungsgemäßen Folienfestbettkörper ein elektrisch betätigter Schwimmerschalter, welcher in der Kläranlage montiert ist und den maximalen und minimalen Wasserstand der Anlagensteuerung signalisiert, gleichzeitig als Umschalter für die zwei Wasserströme bei SBR-Pumpenanlagen und als Umschalter für die zwei Luftströme bei Festbettanlagen und SBR-Druckluftanlagen, arbeitet.About that It is also within the scope of the invention that when using the Inventive film fixed bed body an electrically operated float switch, which in the sewage treatment plant is mounted and the maximum and minimum Water level of the system control signals, simultaneously as Switch for the two water flows in SBR pumping systems and as a changeover switch for the two air streams Fixed bed plants and SBR compressed air systems, works.

Dadurch können bei SBR-Drucklufthebeanlagen wenigstens zwei Schaltventile und zwei Druckluftschläuche entfallen und der Klarwasserheber wird nicht zeit- sondern bedarfsgerecht gesteuert.Thereby With SBR compressed air lifting systems, at least two switching valves can be used and two compressed air hoses omitted and the clear water jacks is not time-controlled but needs-based.

Bei SBR-Pumpenanlagen kann eine der drei Pumpen wegfallen, da der Schwimmerschalter betrieben von nur einer Pumpe, den Klarwasserstrom und den Beschickungs-, Überschussschlammwasserstrom, je nach Wasserstandshöhe automatisch umschalten kann.at SBR pumping equipment can eliminate one of the three pumps because the float switch operated by just one pump, the clear water stream and the feed, excess sludge water stream, can switch automatically depending on the water level.

Erfindungsgemäß werden die unterschiedlichen Wasserstände im SBR-Reaktor mit Folienfestkörper oder in der Nachklärung ausgenutzt, um einen in einer beweglichen Röhre befindlichen Gummiventilball mit Eisenkernfüllung, in zwei Endlagen je nach Wasserstand rollen zu lassen, um in diesen beiden Endlagen je ein Ventilsitz verschließen zu können (Schwimmschaltventil). Da sich an dieser beweglichen Röhre eine flexible Zuleitung und an den beiden Kugelventilsitzen ebenfalls flexible Ableitungsschläuche installiert sind, kann nach Fixierung eines mechanischen Drehpunktes und wegen einem zusätzlich angebrachten Schwimmkörpers, diese Ventilröhre auf dem Reaktorwasser schwimmen. Bei hohem Reaktorwasserstand rollt die Ventilkugel auf den niedrigeren Ventilkugelsitz, bei niedrigem Wasserstand geschieht das Gleiche in umgedrehter Richtung. Damit eine Anlagensteuerung die Wasserstände regulieren kann, ist außerhalb der Röhre an einem Ventilkugelsitz ein elektrischer Magnetsensor angebracht, welcher der Steuerung die Position des Gummiventilballs mit Eisenkernfüllung, berührungslos signalisiert. Der Drehpunkt dieser so konstruktiv ausgestatteten druckfesten Röhre, die als Schwimmerumschaltventil bezeichnet wird, kann außerhalb aber auch innerhalb des Ventilkörpers, je nach der gewünschter Schalthysterese liegen.According to the invention, the different water levels are exploited in the SBR reactor with film solids or in secondary clarification to roll in a movable tube rubber valve ball with iron core filling, in two end positions depending on the water level to close each valve seat in these two end positions can (Floating switching valve). Since a flexible supply line and flexible discharge hoses are also installed on this movable tube, after fixation of a mechanical fulcrum and because of an additionally attached floating body, this valve tube can float on the reactor water. At high reactor water level, the valve ball rolls on the lower valve ball seat, at low water level, the same happens in the opposite direction. So that a system control can regulate the water levels, an electrical magnetic sensor is mounted outside of the tube on a valve ball seat, which signals the control of the position of the rubber valve with iron core filling, non-contact. The fulcrum of this structurally equipped pressure-resistant tube, which is referred to as a float switching valve, can be outside but also within the valve body, depending on the desired switching hysteresis.

Durch diese erfindungsgemäße Lösung in Form eines Schwimmerumschaltventils werden die Eigenschaften eines Schwimmerschalters und eines Umschaltventils zu vereinigt.By this solution according to the invention in the form a float switching valve will have the characteristics of a float switch and a switching valve combined.

Für druckluftbetriebene SBR-Anlagen bedeutet dies, dass mit nur einem am Schwimmerumschaltventil angeschlossenen Druckluftschlauch, bspw. bei niedrigem Wasserstand im Reaktor, der Beschickungsheber so lange betätigt wird, bis der maximale Wasserstand erreicht ist und der Ventilball in die andere Endlage rollt und diese Luftzufuhr des Beschickungshebers unterbricht und der Magnetsensor die Ventilballendlage erkennt und somit den Drucklufterzeuger abschaltet. Wenn nach der Belüftungsphase der zum Umschaltschwimmerventil führende Druckluftschlauch wieder eingeschalten wird, fließt sofort durch den offen gewordenen Ventilkugelsitz die Luft zum Klarwasserheber und pumpt solange Klarwasser in den Kläranlagenabfluss, bis im umgedrehten Sinn der Ventilball seinen eingenommenen Ventilsitz, wegen des niedrig werdenden Wasserspiegels verlässt. Der Magnetsensor signalisiert dies der Steuerung und ein neuer Zyklus mit dem Beschickungsheber setzt ein. Außer das mehrere Schaltventile und Druckluftschläuche eingespart werden, vereinfacht sich die Anlagensteuerung durch das direkte Schalten des Beschickungshebers und des Klarwasserhebers mit Hilfe der Doppelfunktion des Schwimmerumschaltventils. Der Klarwasserheber wird direkt geschaltet und die energieaufwendige zeitgesteuerte Klarwasserabpumpzeitphase entfällt. Wegen der nun kürzer gewordenen Klarwasserabpumpzeit kann auch der Überschussschlammheber parallel zum Klarwasserheber betrieben werden. Durch kleinere Rohrdurchmesser des Überschussschlammhebers wird bei gleicher Pumpzeit, wie der Klarwasserheber, wenig Überschussschlammwasser in die Vorklärung zurück gepumpt.For Air-powered SBR systems mean that with just one connected to the float switching valve compressed air hose, eg. at low water level in the reactor, the feed lifter for so long is pressed until the maximum water level is reached and the valve ball rolls into the other end position and this air supply of the feeder jack interrupts and the magnetic sensor interrupts the valve ball end position detects and thus shuts off the compressed air generator. If after the Ventilation phase leading to the Umschaltschwimmerventil Compressed air hose is switched on again, flows immediately through the open valve ball seat, the air to the clear water jack and pumped clear water into the wastewater treatment system, until in the reverse sense the valve ball its assumed valve seat, because of the low water level leaves. Of the Magnetic sensor signals this to the controller and a new cycle with the feed elevator sets. Except the multiple switching valves and compressed air hoses can be saved, simplified the system control by the direct switching of the feeder jack and the clear water jack with the help of the double function of the float switching valve. The clear water lifter is switched directly and the energy-consuming timed Klarwasserabpumpzeitphase deleted. Because of the now shorter become Klarwasserabpumpzeit also the excess sludge lift in parallel operated to clear water. Due to smaller pipe diameter the excess sludge lifter is at the same pumping time, like the clear water lifter, little excess sludge water in the pre-treatment pumped back.

Dadurch können beide parallel über den flexiblen Schlauch am offenen Kugelventilsitz des Schwimmerschaltventils mit Duckluft versorgt werden. Dies bedeutet erfindungsgemäß, dass das notwendige Schaltventil und der Druckluftschlauch zum Überschussschlammheber ebenfalls entfallen können.Thereby Both can be parallel over the flexible hose at the open ball valve seat of the float switching valve with Duckluft be supplied. This means according to the invention, that the necessary switching valve and the compressed air hose to excess sludge lift can also be omitted.

Gemäß der Erfindung hat die gesamte druckluftbetriebene SBR-Anlage, die mit dem Folienfestkörper versehen ist, nur ein Schaltventil und nur einen Druckluftschlauch, welcher am Schwimmerumschaltventil angeschlossen ist.According to the Invention has the entire compressed air operated SBR plant, with the film solid is provided, only one switching valve and only one compressed air hose, which at the float switch valve connected.

Erfindungsgemäß werden alle drei Druckluftheber und die damit verbundenen Wasserpumpmengen, wie beschrieben, nur vom erfindungsgemäßen Schwimmerumschaltventil gesteuert.According to the invention all three compressed air lifts and the associated water pumping volumes, as described, only from the invention Schwimmerumschaltventil controlled.

Bei SBR-Anlagen, welche mit Unterwasserpumpen betrieben werden, kann entsprechend dieser erfindungsgemäßen Lösung eine Unterwasserpumpe eingespart werden. Es verbleibt also die Belüfterpumpe und die Klarwasser-Beschickungspumpe, welche das beschriebene Schwimmerumschaltventil so mit Wasser versorgt, dass beim maximalen Wasserstand im Reaktor Klarwasser über den offenen Kugelventilsitz in den Ablauf gepumpt wird und nach dieser Klarwasserfunktion, bei niedrigem Wasserstand im Reaktor, der Beschickungsstoß über den anderen offenen Kugelventilsitz erfolgen kann.at SBR systems, which are operated with underwater pumps, can according to this solution according to the invention an underwater pump can be saved. This leaves the aerator pump and the clear water feed pump containing the described float switch valve so supplied with water that at the maximum water level in the reactor Clear water through the open ball valve seat into the drain is pumped and after this clear water function, at low water level in the reactor, the feed over the other open ball valve seat can be done.

Bei der Befüllung des Reaktors über die schon beschriebene korrespondierende Röhre, steigt der Wasserstand so lange an, bis die Gummikugel mit Eisenkernfüllung diesen Kugelventilsitz verschließt. Erfindungsgemäß schaltet das Schwimmerumschaltventil je nach Wasserstand ein Wasserstrom automatisch um und signalisiert die Schaltzustände über den berührungslosen magnetischen Schaltsensor der Anlagensteuerung.at the filling of the reactor over the already described Corresponding tube, the water level rises so long until the rubber ball with iron core filling this ball valve seat closes. Switches according to the invention the float switching valve, depending on the water level, a water flow automatically and signals the switching states via the non-contact magnetic switch sensor of the system control.

Durch diese Maßnahmen wird in Verbindung mit dem Einsatz der erfindungsgemäßen Festbettfolien der Kostenaufwand für SBR-Anlagen deutlich gesenkt.By These measures will be combined with the use of Fixed bed films of the invention cost significantly reduced for SBR systems.

Die Erfindung wird nachstehend an Hand der schematischen Zeichnungen und der Ausführungsbeispiele näher erläutert. Es zeigt:The The invention will be described below with reference to the schematic drawings and the embodiments explained in more detail. It shows:

1: eine schematische Darstellung einer Festbettanlage in einer Dreikammergrube mit einer in eine Kammer eingeführten Ausführungsform des erfindungsgemäßen Folienfestbettes in der Draufsicht, 1 : a schematic representation of a fixed bed installation in a three-chamber pit with an introduced into a chamber embodiment of the film fixed bed according to the invention in plan view,

2: eine schematische Darstellung einer zweiten Ausführungsform des erfindungsgemäßen Folienfestbettes, 2 FIG. 2: a schematic representation of a second embodiment of the film fixed bed according to the invention, FIG.

3: eine schematische Darstellung einer dritten Ausführungsform des erfindungsgemäßen Folienfestbettes, 3 FIG. 2: a schematic representation of a third embodiment of the film fixed bed according to the invention, FIG.

4: eine schematische Darstellung einer vierten Ausführungsform des erfindungsgemäßen Folienfestbettes in einer Folienfächerfestbettanlage, 4 FIG. 2: a schematic representation of a fourth embodiment of the film fixed bed according to the invention in a film fan fixed bed installation, FIG.

5: eine schematische Darstellung einer vierten Ausführungsform des erfindungsgemäßen Folienfestbettes in einer Folienfächerfestbettanlage mit Schwimmerumschaltventil, 5 FIG. 2: a schematic representation of a fourth embodiment of the film fixed bed according to the invention in a film fan fixed bed system with float changeover valve, FIG.

6: eine schematische Darstellung einer fünften Ausführungsform des erfindungsgemäßen Folienfestbettes in einer SBR-Anlage und 6 a schematic representation of a fifth embodiment of the film fixed bed according to the invention in a SBR plant and

7: eine schematische Darstellung einer sechsten Ausführungsform des erfindungsgemäßen Folienfestbettes in einer weitern SBR-Anlage. 7 : A schematic representation of a sixth embodiment of the film fixed bed according to the invention in a further SBR plant.

In den 1 bis 7 sind die Einbaumöglichkeiten und mögliche Einbauvarianten einer Ausführungsform der erfindungsgemäßen Festbettfolien in verschiedenen Kläranlagen (von der einfachsten, preiswertesten, bis zur energiesparsamsten Bauform) dargestellt.In the 1 to 7 are the installation options and possible installation variants of an embodiment of the fixed-bed films according to the invention in various wastewater treatment plants (from the simplest, cheapest, to the most energy-efficient design) shown.

1 zeigt den schematischen Aufbau einer beschriebenen Festbettanlage in einer Dreikammergrube in der Draufsicht. In dieser Festbettanlage ist der Festbettkörper in Form eines sternförmig gefächerten Folienfestbettes (22), welches von einem Halterohr (38) in der ersten Viertelkammer gehalten wird, im Festbettreaktor (17) getaucht montiert und wird von unten mit einem Tellerbelüfter (21) oder mit einem Injektorbelüfter (29) belüftet. 1 shows the schematic structure of a described fixed bed plant in a three-chamber pit in plan view. In this fixed bed system, the fixed-bed body is in the form of a star-shaped film fixed bed ( 22 ), which is supported by a holding tube ( 38 ) in the first quarter chamber, in the fixed bed reactor ( 17 ) and is mounted from below with a plate ventilator ( 21 ) or with an injector fan ( 29 ) ventilated.

Das Vorklärwasser aus der Vorklärung (16) fließt in diesem Fall durch den getauchten Übergang in den Festbettreaktor (17), wird dort durch die auf den fächerförmigen Aufwuchsflächen sitzenden Bakterien gereinigt, gelangen dann über einen getauchten Übergang in die Nachklärung (18) und fließen danach gereinigt in den Kläranlagenabfluss.The pre-treatment water from primary treatment ( 16 ) flows in this case through the submerged transition into the fixed bed reactor ( 17 ), where it is cleaned by the bacteria sitting on the fan-shaped growth surfaces, then pass through a submerged transition into the secondary clarification ( 18 ) and then flow purified into the wastewater treatment plant effluent.

Im Gegensatz zu den bisher bekannten Festbettanlagen, welche unterhalb des Festbettkörpers eine in der Fläche gleichmäßige Belüftung erfordern, ist gemäß der vorliegenden Erfindung eine in einem kleinen Radius wirkende Belüftung in den Zonen der höchsten Bakterienkonzentration im inneren Radius der Folienfächer ausreichend und effektiv für den Stoffwechsel der Bakterien.in the Contrary to the previously known fixed bed plants, which below of the fixed bed body uniform in area Ventilation is required according to the present Invention a ventilation acting in a small radius in the zones of the highest concentration of bacteria in the interior Radius of the slide trays sufficient and effective for the metabolism of the bacteria.

2 zeigt schematisch dargestellt das sternförmige, gefächerte Folienfestbett (22) als Einbaubeispiel in Halbkreisform in der ersten Viertelkammer im Festbettreaktor (17). 2 schematically shows the star-shaped, fan-shaped film fixed bed ( 22 ) as an installation example in semicircular form in the first quarter chamber in the fixed bed reactor ( 17 ).

3 zeigt das sternförmige, gefächerte Folienfächerfestbett (22) in Viertelkreisform im Festbettreaktor (17). 3 shows the star-shaped, fanned foil fan fixed bed ( 22 ) in quadrilateral form in the fixed bed reactor ( 17 ).

Die am sternförmigen Strahlende bestehenden senkrecht verlaufenden Abkantungen geben der Aufwuchsfläche Stabilität und dienen als Abstandshalter (37) für die Eigenbewegungen der einzelnen Folienflächen des Folienfächerfestbettes (22) zueinander.The star-shaped radiating edge existing perpendicular edges give the growth surface stability and serve as a spacer ( 37 ) for the proper movements of the individual film surfaces of the film fan fixed bed ( 22 ) to each other.

Die Foliennoppen (36) im Innenbereich können ebenfalls als Abstandshalter der beweglichen Folienflächen zueinander dienen. Es kann auch an sich bekannte Noppenfolie als Aufwuchsfläche des sternförmig gefächerten Folienfächerfestbettes (22) in der zuvor beschriebenen Weise genutzt werden.The foil nubs ( 36 ) in the interior can also serve as spacers of the movable film surfaces to each other. It can also be known per se Noppenfolie as growth area of the star-shaped fan-shaped film fan bed ( 22 ) can be used in the manner described above.

In 4 ist ein Beispiel zum Betrieb der Folienfächerfestbettanlage (22) mit der einfachsten Steuervariante, dem Schwimmerumschaltventil (19) mit Vorklärung (16), Festbettreaktor (17) und Nachklärung (18) schematisch dargestellt.In 4 is an example of the operation of the film fan fixed bed system ( 22 ) with the simplest control variant, the float switch valve ( 19 ) with primary treatment ( 16 ), Fixed bed reactor ( 17 ) and final clarification ( 18 ) shown schematically.

Im Gegensatz zur klassischen in der Praxis eingesetzten Festbettanlage hat die Vorklärung (16) gemäß der vorliegenden Erfindung keine Verbindungsöffnung zum Reaktor (17) und die beschriebenen nachteiligen hydraulischen Wasserstöße können nicht in den Ablauf der Kläranlage gelangen. Der Wasserspiegel (12) in der Vorklärung (16) ist abgesenkt und dient genau wie bei den SBR-Anlagen als Vorklärungspufferspeicher für zulaufendes Abwasser.In contrast to the classical fixed bed plant used in practice, the primary treatment ( 16 ) according to the present invention, no connection opening to the reactor ( 17 ) and the described adverse hydraulic water surges can not get into the drain of the sewage treatment plant. The water level ( 12 ) in the primary treatment ( 16 ) is lowered and, just like the SBR plants, serves as pre-clearing buffer for incoming waste water.

Ebenfalls ist im Reaktor (17) durch die mit diesem hydraulisch in Verbindung stehende Nachklärung (18) der Wasserstand (12) abgesenkt.Also in the reactor ( 17 ) by the secondary clarification ( 18 ) the water level ( 12 ) lowered.

Diese erfindungsgemäße Festbettanlage arbeitet ähnlich wie eine SBR-Anlage, hat aber nur einen Verdichter (20), keine elektromagnetischen Schaltventile, nur einen Zuleitungsluftschlauch (2) und das erfindungsgemäße Schwimmerumschaltventil (19). Schwimmerumschaltventil (19) schaltet (wie die Schaltung bei den bekannten Festbettanlagen) über einen voreingestellten Zeitablauf den Verdichter (20), eine gewisse Zeit „EIN" und „AUS".This fixed bed installation according to the invention works in a similar way to an SBR installation, but has only one compressor ( 20 ), no electromagnetic switching valves, only one supply air hose ( 2 ) and the Schwimmerumschaltventil invention ( 19 ). Float switch valve ( 19 ) switches (as the circuit in the known fixed bed systems) over a preset time the compressor ( 20 ), a certain time "ON" and "OFF".

Beim Einschalten des Verdichters (20) wird Luft in die Zuleitung (2) des Schwimmerumschaltventils (19) gefördert und gelangt über die nicht verschlossene Ableitung (11) einmal zum Tellerlüfter (21), welcher somit das Folienfächerfestbett (22) von unten belüftet, so das die Scherwirkung der aufsteigenden Luftblasen im Zentrum des Folienfächerfestbettes (22) am größten ist und radial nach außen abnimmt und zum anderen wird die Luft durch einen Abzweig in der Ableitung (11) auch zum Beschickungsheber (24) in die Vorklärung (16) geleitet.When switching on the compressor ( 20 ), air is introduced into the supply line ( 2 ) of the float switching valve ( 19 ) and passes through the unsealed derivative ( 11 ) once to the plate fan ( 21 ), which thus the film fan fixed bed ( 22 ) ventilated from below, so that the shearing effect of the rising air bubbles in the center of the film fan fixed bed ( 22 ) is the largest and decreases radially outwards and on the other hand, the air through a branch in the derivative ( 11 ) also to the feeder ( 24 ) in the primary treatment ( 16 ).

Der Beschickungsheber (24) fördert also immer eine gewisse Abwassermenge Vorklärwasser pro Belüftungszeiteinheit in den Reaktor (17).The feeder lifter ( 24 ) thus always conveys a certain amount of wastewater pre-treatment water per aeration time unit in the reactor ( 17 ).

Der Beschickungsheber (24) ist so gestaltet, dass während dieser Zeiteinheit nur soviel Abwasser in den Reaktor (17) gepumpt wird, wie notwendig ist, um bei allen summierten Zeiteinheiten eines Tages die maximal anfallende Abwassermenge in den Reaktor (17) pumpen zu können.The feeder lifter ( 24 ) is designed so that during this time unit only so much wastewater in the reactor ( 17 ) is pumped, as necessary, for all summed time units one day, the maximum amount of wastewater in the reactor ( 17 ) to be able to pump.

Wenn genügend Vorklärwasser vorhanden ist, steigt demnach langsam der Wasserspiegel (12) im Reaktor (17) und in der Nachklärung (18) an. Beim Erreichen des maximalen gewünschten Wasserstandes (12) öffnet die Ventilkugel (7) die Ableitung (10) und verschließt die Ableitung (11) so, dass der Beschickungsheber (24) und der Tellerbelüfter (21) nicht mehr arbeiten.If enough pre-treatment water is available, the water level slowly increases ( 12 ) in the reactor ( 17 ) and in the final clarification ( 18 ) at. When reaching the maximum desired water level ( 12 ) opens the valve ball ( 7 ) the derivative ( 10 ) and closes the derivative ( 11 ) so that the loader ( 24 ) and the plate ventilator ( 21 ) not work any more.

Über die Ableitung (10), wird Luft in den Klarwasserheber gefördert, welcher dann im Klarwasserbereich, das Klarwasser in das Abflussrohr fördert. Durch einen Abzweig an der Ableitung (10) gelangt ein Teil der Druckluft auch in den Überschussschlammheber (23), welcher abgesetzte Bakterien am Boden der Nachklärung (18) in die Vorklärung (16) fördert. Wegen des geringeren Rohrdurchmessers wird aber nur wenig Überschussschlamm mit dem Überschussschlammheber (23) abgepumpt.About the derivation ( 10 ), air is conveyed into the clear water jack, which then conveys clear water into the drainage pipe in the clear water area. By a branching at the derivation ( 10 ) some of the compressed air also enters the excess sludge 23 ), which settled bacteria at the bottom of the secondary clarification ( 18 ) in the primary treatment ( 16 ) promotes. Because of the smaller pipe diameter but only a little excess sludge with the excess sludge ( 23 ) pumped.

Durch das Abpumpen des Klarwasserhebers (25), senkt sich der Wasserspiegel (12) wieder auf den gewünschten Minimalwert und die Ventilkugel (7) verschließt die Ableitung (10) und öffnet die Ableitung (11), so dass der gleiche Vorgang von Neuen beginnen kann.By pumping the clear water lifter ( 25 ), the water level lowers ( 12 ) back to the desired minimum value and the valve ball ( 7 ) closes the derivative ( 10 ) and opens the derivation ( 11 ) so that the same process can start from new.

In 5 ist ein weiteres Beispiel zum Betrieb einer Folienfächerfestbettanlage mit dem Schwimmerumschaltventil (19) (ähnlich wie in 4) schematisch dargestellt, wobei diese genau so optimal wie eine SBR-Anlage arbeitet und optimal die Vorteile einer Festbettanlage und einer SBR-Anlage vereint. Bei der erfinderischen Lösung gemäß 5 ist gegenüber der Lösung gemäß 4 zusätzlich ein elektrisches Magnetventil (26) eingebaut, welches die Luftzufuhr zum Schwimmerumschaltventil (19) ein oder ausschaltet. Wie bei SBR-Anlagen dient die Vorklärung (16) als Pufferspeicher für zufließendes Abwasser.In 5 is another example of the operation of a film fan fixed bed system with the float switch valve ( 19 ) (similar to in 4 ), which works just as optimally as an SBR plant and optimally combines the advantages of a fixed bed plant and an SBR plant. In the inventive solution according to 5 is opposite to the solution according to 4 additionally an electric solenoid valve ( 26 ), which controls the air supply to the float switch valve ( 19 ) turns on or off. As with SBR plants, the primary treatment ( 16 ) as a buffer for incoming wastewater.

Die in 5 dargestellt Folienfächerfestbettanlage (22) funktioniert wie folgt:
Der Verdichter (20) wird eingeschaltet und das Ventil (26) öffnet, so dass Luft über die Zuleitung (2) durch das Schwimmerumschaltventil (19) in die Ableitung (11) fließen kann und den Beschickungsheber (24) betätigt. Dieser pumpt Vorklärwasser aus der Vorklärung (16) in den Reaktor (17). Der Wasserstand (12) steigt im Reaktor (17) und in der Nachklärung (18) an. Wenn der maximale gewünschte Wasserstand erreicht ist, öffnet die Ventilkugel (7) die Ableitung (10) und verschließt die Ableitung (11), so dass kein Vorklärwasser mehr in den Reaktor gefördert wird. Gleichzeitig signalisiert der Magnetsensor (8), dass der maximale Wasserstand erreicht ist und das Schaltventil (26) schließt. Intervallmäßig wird immer bei eingeschalteten Verdichter (20) und bei geschlossenen Ventil (26) das Folienfächerfestbett (22) durch den Tellerbelüfter (21) längere Zeit belüftet. Nach Beendigung dieses Reinigungsvorganges wird der Luftverdichter (20) abgeschaltet. Nach einer Absetz- bzw. einer Sedimentationsphase wird der Verdichter (20) eingeschalten, das Ventil (26) wird elektromechanisch geöffnet, die Druckluft des Verdichters (20) fließt über die Zuleitung (2) in die offene Ableitung (10) in den Klarwasserheber (25), welcher das entstandene Klarwasser solange in das Abflussrohr pumpt, bis wieder der minimale Wasserstand erreicht ist und die Ventilkugel (7) die Ableitung (10) verschließt. Wie auch zu 3 beschrieben, wird während des Klarwasserpumpvorganges eine geringe Wassermenge Überschussschlamm mit dem Überschussschlammheber (23) in die Vorklärung (16) weggepumpt.
In the 5 illustrated film fan fixed bed system ( 22 ) works as follows:
The compressor ( 20 ) is turned on and the valve ( 26 ) opens, so that air over the supply line ( 2 ) by the float switch valve ( 19 ) into the derivative ( 11 ) and the feeder ( 24 ). This pumps primary water from the primary treatment ( 16 ) in the reactor ( 17 ). The water level ( 12 ) rises in the reactor ( 17 ) and in the final clarification ( 18 ) at. When the maximum desired water level is reached, the valve ball ( 7 ) the derivative ( 10 ) and closes the derivative ( 11 ), so that no pre-treatment water is fed into the reactor. At the same time the magnetic sensor ( 8th ) that the maximum water level is reached and the switching valve ( 26 ) closes. Intermittent is always when the compressor ( 20 ) and with closed valve ( 26 ) the film fan fixed bed ( 22 ) through the plate ventilator ( 21 ) ventilated for a long time. After completion of this cleaning process, the air compressor ( 20 ) shut off. After a settling or sedimentation phase, the compressor ( 20 ), the valve ( 26 ) is opened electromechanically, the compressed air of the compressor ( 20 ) flows via the supply line ( 2 ) into the open derivative ( 10 ) in the clear water 25 ), which pumps the resulting clear water into the drainage pipe until the minimum water level is reached again and the valve ball ( 7 ) the derivative ( 10 ) closes. As well too 3 described during the clear water pumping process, a small amount of water excess sludge with the excess sludge 23 ) in the primary treatment ( 16 ) pumped away.

Sollte während des davor beschriebenen Beschickungsvorganges nicht genügend Wasser in der Vorklärung (16) vorhanden sein, so wird nach einem Zeitablauf dieser automatisch über das Ventil (26) abgeschaltet. Sollte nach mehreren Beschickungsvorgängen das Schwimmerumschaltventil (19) nicht betätigt werden und die Ventilkugel (7) nicht den Sensor (8) betätigen, dann schaltet die Schwimmerumschaltventil (19) um auf Schwachlastbetrieb und die Belüftungszyklen können automatisch verkürzt werden.Should not enough water in the pre-treatment during the loading process described above ( 16 ), then after a passage of time, this is automatically switched off via the valve ( 26 ) shut off. If, after several feed operations, the float switch valve ( 19 ) and the valve ball ( 7 ) not the sensor ( 8th ), then the float switch valve ( 19 ) for low load operation and the ventilation cycles can be automatically shortened.

Wenn nach der Klarwasserabpumpphase die Ventilkugel (7) die Ableitung (10) verschließt, wird durch diese Signalgebung am Sensor (8) das Ventil (26) geschlossen.If, after the clear water pumping phase, the valve ball ( 7 ) the derivative ( 10 ) is detected by this signaling on the sensor ( 8th ) the valve ( 26 ) closed.

Sollte danach in einer begrenzten Zeiteinheit dennoch das Schwimmerumschaltventil angehoben werden und die Ventilkugel (7) am Sensor (8) ein Signal erzeugen, dann kann in die Kläranlage Fremdwasser eingedrungen sein und die Steuerung (19) meldet Hochwasseralarm oder eine ähnliche Meldung.If, after that, the float switching valve is raised in a limited time unit and the valve ball ( 7 ) on the sensor ( 8th ) generate a signal, then foreign water may have entered the sewage treatment plant and the control ( 19 ) reports flood alert or similar message.

In 6 ist schematisch eine SBR-Anlage dargestellt, umfassend Vorklärung (16) und Reaktor (17) sowie ein erfindungsgemäßes Folienfächerfestbett (22), welches über dem Tellerbelüfter (21) eingebaut ist.In 6 schematically an SBR plant is shown, comprising primary treatment ( 16 ) and reactor ( 17 ) as well as a film fan fixed bed according to the invention ( 22 ), which above the disc ventilator ( 21 ) is installed.

Somit erfolgt gemäß der Erfindung die Kombination einer an sich bekannten SBR-Anlage mit dem erfindungsgemäßen Folienfächerfestbett (22). Bei den bisher bekannten SBR-Anlagen mit Drucklufterzeugern werden die Druckluftzuleitungen zum Tellerbelüfter (21), zum Beschickungsheber (24), zum Überschussschlammheber (23) und zum Klarwasserheber (25) mit Schaltventilen geschalten. Die Wasserstandshöhen werden dabei mit Schwimmerschaltern, mit Druckluftsensortechnik oder durch Zeitsteuerung geschalten. Gemäß der vorliegenden Erfindung hingegen findet ein Schwimmerschaltventil (26) Einsatz, um diese Funktionen zu steuern.Thus, according to the invention, the combination of a per se known SBR plant with the film fan fixed bed according to the invention ( 22 ). In the previously known SBR systems with compressed air generators, the compressed air supply lines to the plate ventilator ( 21 ), to the feeder ( 24 ), to the surplus sludge 23 ) and the clear water ( 25 ) switched with switching valves. The water level heights are switched with float switches, with compressed air sensor technology or with time control. In contrast, according to the present invention, a float switching valve ( 26 ) Use to control these functions.

Gemäß dieser erfinderischen Lösung gibt es nur noch zwei Druckluftzuleitungen zur Kläranlage, da das neue Schwimmerumschaltventil (26) alle gewünschten minimalen und maximalen Wasserstände (12) erfasst und direkt reguliert. Alle bei dieser druckluftbetriebenen SBR-Kläranlage notwendigen Vorgänge, werden also nur durch das Ein- und Ausschalten des Luftdruckverdichters (20), durch einen Magnetsensor (8) und durch das Schwimmerumschaltventil (26) gesteuert. Die Wasserstandshöhe (12) wird über die Ventilkugel (7) und den berührungslos schaltenden Magnetsensor (8) der Steuerung (19) signalisiert. Der Tellerbelüfter (21) wird immer betrieben, wenn der Luftverdichter (20) eingeschalten ist und das Ventil (26) geschlossen ist. Wenn das Ventil (26) öffnet, dann gibt der Tellerbelüfter keine Luftblasen an das Wasser ab, weil der Luftgegendruck der Belüftungsmembran größer ist, als der Luftdruck am Ventil (26), welcher indirekt die nach oben offenen Luftdruckheber (23), (24) und (25) mit Luft versorgt.According to this inventive solution, there are only two compressed air supply lines to the treatment plant, as the new float switch valve ( 26 ) all desired minimum and maximum water levels ( 12 ) and directly regulated. All processes required in this SBR wastewater treatment plant are only activated by switching the air compressor on and off ( 20 ), by a magnetic sensor ( 8th ) and by the float switch valve ( 26 ) controlled. The water level ( 12 ) is via the valve ball ( 7 ) and the non-contact switching magnetic sensor ( 8th ) of the controller ( 19 ) signals. The plate ventilator ( 21 ) is always operated when the air compressor ( 20 ) is turned on and the valve ( 26 ) closed is. When the valve ( 26 ), then the disk ventilator does not deliver any air bubbles to the water, because the air back pressure of the venting membrane is greater than the air pressure at the valve ( 26 ), which indirectly the upwardly open air pressure ( 23 ) 24 ) and ( 25 ) supplied with air.

Die Vorklärung (16) dient als Pufferspeicher des frei zufließenden Abwassers.The primary treatment ( 16 ) serves as a buffer of the free-flowing wastewater.

Die wichtigsten Vorgänge der in der 6 dargestellten Anlagen sind folgende:
Der Wasserspiegel (12) befindet sich nach dem Klarwasserabpumpvorgang auf dem gewünschten Minimum, die Ventilkugel (7) hat die Ableitung (10) zum Klarwasserheber (25) geschlossen. Der Magnetsensor (8) signalisiert der Steuerung (19), dass keine Ventilkugel (7) sich in dessen Erfassungsbereich befindet und damit der minimale Wasserstand erreicht ist. Bei eingeschalteten Verdichter (20) und offenem Ventil (26) wird die erzeugte Druckluft durch die Zuleitung (2) in das Schwimmerumschaltventil (26) und von dort aus, in die offene Ableitung (11) zu dem Überschussschlammheber (23) und zum Beschickungsheber (24) gepumpt. Da im Reaktor (17) noch eine ruhige Wasserphase vorhanden ist, sind die Bakterien in Richtung Reaktorboden abgesunken und haben sich dort abgesetzt. Alle unerwünschten Bakterien, welche sich oberhalb der Ansaugöffnungshöhe (33) des Überschussschlammhebers (23) befinden, werden nun dort angesaugt und in die Vorklärung (16) befördert. Ebenso und zur gleichen Zeit fördert der Beschickungsheber (24), alle Flüssigkeiten oberhalb seiner Ansaugöffnung in den Reaktor (17).
The most important events in the 6 The systems shown are as follows:
The water level ( 12 ) is after the clear water pumping at the desired minimum, the valve ball ( 7 ) has the derivative ( 10 ) to the clear water lifter ( 25 ) closed. The magnetic sensor ( 8th ) signals the controller ( 19 ) that no valve ball ( 7 ) is in its detection range and thus the minimum water level is reached. When the compressor is switched on ( 20 ) and open valve ( 26 ), the compressed air generated by the supply line ( 2 ) into the float switching valve ( 26 ) and from there into the open derivative ( 11 ) to the excess sludge lift ( 23 ) and to the feeder ( 24 ) pumped. Because in the reactor ( 17 ) is still a quiet water phase, the bacteria have dropped in the direction of the reactor bottom and have settled there. All unwanted bacteria that are above the suction opening height ( 33 ) of the excess sludge lift ( 23 ) are now sucked in there and in the primary treatment ( 16 ). Likewise, and at the same time, the feeder ( 24 ), all liquids above its intake into the reactor ( 17 ).

Das in den Reaktor (17) gepumpte Wasser fließt über einen geeigneten beruhigten Zulauf (35) in das Reaktorwasser, ohne dort die ruhige Wasserphase zu stören und ohne das die dort abgesetzten Bakterien aufgewühlt werden. Der konstruktive Aufbau des Überschussschlammhebers (23) ist so gestaltet, dass im Vergleich zum Beschickungsheber (24) nur wenig Wasser in der gleichen Zeiteinheit gefördert wird.The into the reactor ( 17 ) pumped water flows through a suitable calmed inlet ( 35 ) into the reactor water without disturbing the calm water phase and without disturbing the bacteria deposited there. The construction of the excess sludge lifter ( 23 ) is designed so that compared to the feeder ( 24 ) only a little water in the same time unit is promoted.

Wenn genügend Wasser in der Vorklärung (16) vorhanden ist, steigt der Wasserspiegel (12) im Reaktor (17) an und hebt das um seinen Drehpunkt (5) gelagerte Schwimmerumschaltventil (19) so lange an, bis die Ventilkugel (7), den Ventilsitz (3) verlässt und in den Ventilsitz (4) rollt, die Ableitung (11) verschließt und der Sensor (8) der Steuerung (9) signalisiert, dass der maximal gewünschte Wasserstand erreicht ist. Mit diesem Signal wird das Ventil (26) geschlossen und über die Zuleitung zum Tellerbelüfter (21) wird dieser, wie es für SBR-Kläranlagen üblich ist, intervallmäßig durch Ein- und Ausschalten des Luftverdichters (20) betätigt. Mit dieser intervallmäßigen Belüftung wird die eigentliche Abwasserreinigung ausgelöst und als bekannt vorausgesetzt und nicht weiter beschrieben.If enough water in the primary treatment ( 16 ), the water level rises ( 12 ) in the reactor ( 17 ) and raises that around its fulcrum ( 5 ) mounted float switching valve ( 19 ) until the valve ball ( 7 ), the valve seat ( 3 ) leaves and into the valve seat ( 4 ) rolls the derivative ( 11 ) and the sensor ( 8th ) of the controller ( 9 ) signals that the maximum desired water level has been reached. With this signal the valve ( 26 ) and via the supply line to the plate ventilator ( 21 ), this is, as is customary for SBR treatment plants, at intervals by turning on and off the air compressor ( 20 ). With this interval ventilation, the actual wastewater treatment is triggered and assumed to be known and not described further.

Nach der mehrstündigen Belüftungsphase schaltet die Steuerung (19) den Luftverdichter (20) aus, damit in dieser Sedimentationsphase wie schon erwähnt, die Bakterien sich in Richtung Beckenboden absetzen können und sich im oberen Wasserbereich des Reaktors 17 sich eine Klarwasserzone bilden kann.After several hours of ventilation, the controller switches ( 19 ) the air compressor ( 20 ), so that in this sedimentation phase, as already mentioned, the bacteria can settle in the direction of the pelvic floor and in the upper water of the reactor 17 can form a clear water zone.

Nach dieser vorgegebenen Zeit wird zuerst das Schaltventil (26) geöffnet und dann der Luftverdichter (20) eingeschaltet. Die Druckluft fliest dann durch das Schaltventil (26), durch die Zuleitung (2) über die Ableitung (10) in den Klarwasserheber (25) und pumpt über dessen Ansaugöffnung das Klarwasser in das Abflussrohr, bis wieder der minimale Wasserstand erreicht ist, die Ventilkugel die Ableitung (10) wieder verschließt und der Magnetsensor (8) das der Steuerung (19) signalisiert. Ab diesem Zeitpunkt kann der neue Zyklus beginnen. Wenn nicht genügend Vorklärwasser in der Vorklärung (16) vorhanden ist, wird der schon beschriebene Beschickungsvorgang in vorgegebenen Zeitabschnitten wiederholt. Wenn der Beschickungsheber (24) also kein oder nur wenig Wasser in den Reaktor (17) fördert, wird die Ventilkugel nicht betätigt und der Magnetsensor (8) signalisiert der Steuerung (9), dass ein Schwachlastbetrieb vorliegt und die Belüftungsintervalle am Tellerbelüfter (21) verkürzt werden können.After this predetermined time, first the switching valve ( 26 ) and then the air compressor ( 20 ) switched on. The compressed air then flows through the switching valve ( 26 ), through the supply line ( 2 ) over the derivative ( 10 ) in the clear water 25 ) and pumps the clear water into the drain pipe via its suction port until the minimum water level is reached again, the valve ball discharges ( 10 ) and the magnetic sensor ( 8th ) that of the controller ( 19 ) signals. From this point on, the new cycle can begin. If not enough pre-treatment water in the primary treatment ( 16 ) is present, the already described loading process is repeated in predetermined periods. When the feeder jack ( 24 ) so little or no water in the reactor ( 17 ), the valve ball is not actuated and the magnetic sensor ( 8th ) signals the controller ( 9 ), that there is a low-load operation and the ventilation intervals at the disk ventilator ( 21 ) can be shortened.

Die wesentlichen Vorteile SBR-Kläranlage gemäß 6 liegen darin, dass durch den Einsatz des Schwimmerumschaltventils (19) die sonst benötigten kostenintensiven, elektromagnetisch betriebenen Schaltventile mit den daran befindlichen Ableitungsleitungen eingespart und durch den kostengünstigen Einsatz des Folienfächerfestbettes die Nachteile von unterlastig betriebenen SBR-Anlagen beseitigt werden.The main advantages SBR treatment plant according to 6 lie in the fact that by using the float switch valve ( 19 ) the otherwise costly, electromagnetically operated plants NEN switching valves saved with the discharge lines located thereon and the disadvantages of under-powered SBR systems can be eliminated by the cost-effective use of the film fan fixed bed.

In 7 ist eine SBR-Kläranlage mit Folienfächerfestbett (22) im Reaktor (17) mit Pumpenbelüftung schematisch dargestellt, in welcher das Schwimmerumschaltventil (26) die von der Pumpe (27) wasserstandsabhängig einmal das Klarwasser in das Ablaufrohr pumpt und zum anderen die Doppelfunktion als Überschussschlammpumpe erfüllt und den Beschickungsstoß ausführt, damit durch die kommunizierende Röhre (32) Abwasser durch den höheren Wasserstand in der Vorklärung (16) aus der Vorklärung (16) in den Reaktor (17) fließt. Durch das Schwimmerumschaltventil (19) wird gegenüber bekannten Anlagen eine Pumpe eingespart bzw. werden gegenüber Herstellern, welche auch nur zwei Pumpen einsetzen, die für die Funktion notwendigen eingesetzten Zusatzteile wie Ventile, Mehrwegventile oder Ausgleichsbehälter eingespart.In 7 is an SBR treatment plant with a film fan fixed bed ( 22 ) in the reactor ( 17 ) with pump ventilation, in which the float switch valve ( 26 ) from the pump ( 27 ) Depending on the water level, the clear water is pumped into the drainpipe and, on the other hand, it performs the dual function as an excess sludge pump and carries out the charging stroke, so that it can pass through the communicating tube ( 32 ) Wastewater due to the higher water level in the primary treatment ( 16 ) from the primary treatment ( 16 ) in the reactor ( 17 ) flows. Through the float switch valve ( 19 ) saves a pump compared to known systems or be compared to manufacturers who also use only two pumps, the necessary for the function necessary additional parts such as valves, multi-way valves or reservoirs saved.

Die Pumpe (28) wird zur Erzeugung des Treibwassers für den Wasserstrahlbelüfter (29) eingesetzt. Dieser arbeitet nach dem Venturiprinzip, saugt Luft an und strahlt dieses Luft-Wassergemisch über ein Strahlrohr in den Reaktor (17) und belüftet somit das Folienfächerfestbett (22) für den Reinigungsprozess.The pump ( 28 ) is used to generate the motive water for the water jet aerator ( 29 ) used. This works on the Venturi principle, sucks in air and radiates this air-water mixture via a jet pipe in the reactor ( 17 ) and thus ventilates the film fan fixed bed ( 22 ) for the cleaning process.

Die dargestellte Anlage funktioniert im Wesentlichen wie folgt:
Bei SBR-Kläranlagen, welche mit Unterwasserpumpen ausgestattet sind, erfolgt eine Befüllung des Reaktors (17) nur dann, wenn der Wasserstand in der Vorklärung (16) höher ist, als im Reaktor (17).
The illustrated system works essentially as follows:
In SBR treatment plants equipped with underwater pumps, the reactor is filled ( 17 ) only if the water level in the primary treatment ( 16 ) is higher than in the reactor ( 17 ).

Gemäß der erfindungsgemäßen Lösung, welche in 7 dargestellt ist, ist dies auch so und der Wasserstand (12) im Reaktor ist am minimalsten Punkt. (Das Reaktorwasser wurde also schon abgepumpt.)According to the solution according to the invention, which in 7 this is also the case and the water level ( 12 ) in the reactor is at the minimum point. (So the reactor water was already pumped out.)

Die Steuerung (19) schaltet die Pumpe (27) kurz ein und aus.The control ( 19 ) switches the pump ( 27 ) briefly on and off.

Während dieser kurzen Einschaltphase saugt die Pumpe (27) Klarwasser aus der ruhigen Wasserphase an und pumpt dieses durch die Zuleitung (2) in das Schwimmerumschaltventil (19) über die offene Ableitung (11) durch die Venturidüse (30) in die korrespondierende Röhre (32). Durch den hinter den Venturidüseneingang (30) entstehenden Unterdruck wird durch das Ansaugrohr (31) überschüssiger Belebtschlamm an dessen unteren Öffnung angesaugt und ebenfalls, durch die kommunizierende Röhre (32), in den Reaktor (17) befördert. Alle sich schlecht absetzenden Belebtschlammbakterien, welche sich oberhalb des Abstandes (33) befinden, werden so als Überschussschlamm in die Vorklärung befördert.During this short switch-on phase, the pump sucks ( 27 ) Clear water from the calm water phase and pumps it through the supply line ( 2 ) into the float switching valve ( 19 ) over the open derivative ( 11 ) through the Venturi nozzle ( 30 ) into the corresponding tube ( 32 ). Through the rear of the venturi nozzle ( 30 ) resulting negative pressure is through the intake pipe ( 31 ) sucked in excess activated sludge at the lower opening and also, through the communicating tube ( 32 ), into the reactor ( 17 ). All poorly settling activated sludge bacteria, which are above the distance ( 33 ) are transported as surplus sludge in the primary treatment.

Schaltet die Pumpe (27) ab, dann fließt nach dem Prinzip der frei kommunizierenden Röhre (32) Vorklärwasser aus der Vorklärung (16) in entgegen gesetzter Richtung hauptsächlich durch das Ansaugrohr (31) in den Reaktor (17).Switches the pump ( 27 ), then flows according to the principle of freely communicating tube ( 32 ) Pre-treatment water from primary treatment ( 16 ) in the opposite direction mainly through the intake pipe ( 31 ) in the reactor ( 17 ).

Der Wasserspiegel (12) im Reaktor steigt so lange an, bis die Ventilkugel (7) in ihre andere Endlage rollt, dort die Ableitung (11) verschließt, der Magnetsensor (8) dies erkennt und der Steuerung (9) diesen maximalen Wasserstand (12) signalisiert.The water level ( 12 ) in the reactor increases until the valve ball ( 7 ) rolls into its other end position, there the derivative ( 11 ), the magnetic sensor ( 8th ) recognizes this and the controller ( 9 ) this maximum water level ( 12 ) signals.

Dieser Befüllungsvorgang des Reaktors (17) wird gestoppt, indem die Pumpe (28) eingeschalten wird und der Wasserstrahlinjektor über sein Strahlrohr (29) Luftblasen in den Reaktor (17) einstrahlt. Einige dieser Luftblasen werden von der Fangschale des Ansaugrohres (31) aufgefangen und steigen in der korrespondierenden Röhre (32) nach oben und unterbrechen wegen der dort größer werdenden Luftblase diesen Befüllungsvorgang.This filling process of the reactor ( 17 ) is stopped by the pump ( 28 ) and the water jet injector via its jet pipe ( 29 ) Bubbles in the reactor ( 17 ). Some of these air bubbles are absorbed by the intake pan of the intake pipe ( 31 ) and rise in the corresponding tube ( 32 ) and interrupt because of the increasing air bubble this filling process.

Nach diesem Befüllungsvorgang bleibt die Pumpe (27) ausgeschalten und die Pumpe (28) belüftet, über den daran angeschlossenen Wasserstrahlinjektor (29), das Folienfächerfestbett (22) im Reaktor (17) in den vorgegebenen Belüftungsintervallen, die hier nicht näher beschrieben werden.After this filling process, the pump ( 27 ) and the pump ( 28 ), via the attached water jet injector ( 29 ), the film fan fixed bed ( 22 ) in the reactor ( 17 ) in the specified ventilation intervals, which are not described here.

Nach dieser Reinigungsphase wird ebenfalls die Pumpe (28) abgeschaltet und die Bakterien setzen sich in Richtung Reaktorbeckenboden ab. Nach Ablauf dieser Sedimentationsphase bilden sich in der oberen Wasserschicht des Reaktors (17) Klarwasser, welches beim Einschalten der Pumpe (27) angesaugt wird und durch die Zuleitung (2), durch das Schwimmerumschaltventil (19), in die offene Ableitung (10) durch das Abflussrohr der Kläranlage gepumpt wird. Bei diesem Abpumpprozess fällt der Wasserspiegel (12) im Reaktor (17) solange, bis die Ventilkugel (7) den Kugelsitz der Ableitung (11) verlässt und den Kugelsitz der Ableitung (10) verschließt. Der Magnetsensor (8) signalisiert der Steuerung (9), dass der minimale Wasserstand (12) erreicht ist und die schon beschriebene Überschussschlammfunktion mit der Befüllungsfunktion und der nachfolgenden Belüftungsphase von der Steuerung (9) erneut eingeleitet werden kann.After this cleaning phase, the pump ( 28 ) and the bacteria settle in the direction of the reactor basin floor. At the end of this sedimentation phase, in the upper water layer of the reactor ( 17 ) Clear water, which when switching on the pump ( 27 ) is sucked in and through the supply line ( 2 ), by the float switch valve ( 19 ), into the open derivative ( 10 ) is pumped through the drainage pipe of the treatment plant. In this Abpumpprozess the water level falls ( 12 ) in the reactor ( 17 ) until the valve ball ( 7 ) the ball seat of the derivative ( 11 ) leaves and the ball seat of the derivative ( 10 ) closes. The magnetic sensor ( 8th ) signals the controller ( 9 ) that the minimum water level ( 12 ) and the already described excess sludge function with the filling function and the subsequent aeration phase of the controller ( 9 ) can be restarted.

Die wesentlichen Vorteile SBR-Kläranlage mit Folienfächerfestbett (22) gemäß 7 liegen darin, dass durch den Einsatz des Schwimmerumschaltventils (19), die sonst benötigten kostenintensiven, elektromagnetisch betriebenen Schaltventile mit den daran befindlichen Ableitungsleitungen, eingespart und durch den kostengünstigen Einsatz des Folienfächerfestbettes (22) die Nachteile von unterlastig betriebenen SBR-Anlagen beseitigt werden.The main advantages SBR-treatment plant with foil fan fixed bed ( 22 ) according to 7 lie in the fact that by using the float switch valve ( 19 ), which otherwise required costly, electromagnetically operated switching valves with the discharge lines located thereon, saved and by the cost-effective use of Fo lienfächerfestbettes ( 22 ) the disadvantages of under-powered SBR plants are eliminated.

Darüber hinaus ist diese Anlage durch das zuvor stehende Verfahren besonders gut reinigbar und die bereits genannten Vorteile des erfindungsgemäßen Folienfacherfestbettes (22) verbessern diese gute Reinigung noch.In addition, this plant is particularly easy to clean by the above method and the already mentioned advantages of Folienfacherfestbettes invention ( 22 ) improve this good cleaning yet.

Alle in der Beschreibung, den Ausführungsbeispielen und den nachfolgenden Ansprüchen dargestellten Merkmale können sowohl einzeln als auch in beliebiger Kombination miteinander erfindungswesentlich sein.All in the description, the embodiments and the The following claims can be illustrated both individually and in any combination with each other invention essential be.

11
druckfeste Kunststoffröhreflameproof Plastic tube
22
flexible Zuleitungflexible supply
33
Ventilkugelsitz an der flexiblen Ableitung 10 Valve ball seat on the flexible drain 10
44
Ventilkugelsitz an der flexiblen Ableitung 11 Valve ball seat on the flexible drain 11
55
Drehpunkt mechanischpivot point mechanically
66
Schwimmerswimmer
77
Ventilkugelvalve ball
88th
Magnetsensor/BrückensensorMagnetic sensor / bridge sensor
99
elektronische Steuerungelectronic control
1010
flexible Ableitungflexible derivation
1111
flexible Ableitungflexible derivation
1212
Wasseroberfläche/WasserstandshöheWater surface / water level
1313
Neigungswinkel der Ventilsitze 3 und 4 zueinanderTilt angle of the valve seats 3 and 4 to each other
1414
elektrische Leitung des Magnetsensors 8 electrical line of the magnetic sensor 8th
1515
mechanische Halterungmechanical bracket
1616
Vorklärungprimary treatment
1717
Reaktorreactor
1818
NachklärungAfter clarification
1919
SchwimmerumschaltventilSchwimmerumschaltventil
2020
Verdichter (Drucklufterzeuger)compressor (Compressed air generators)
2121
Belüfter (Tellerbelüfter)aerator (Disc diffusers)
2222
FolienfächerfestbettFoil trays fixed bed
2323
ÜberschussschlammheberExcess sludge lifter
2424
Beschickungshebercharging lifter
2525
KlarwasserheberClear water fountain
2626
elektromagnetisches Schaltventilelectromagnetic switching valve
2727
Pumpepump
2828
Belüftungspumpeaeration pump
2929
Wasserstrahlbelüfterwater jet ventilator
3030
VenturidüsenengstelleVenturidüsenengstelle
3131
Ansaugrohrintake
3232
korrespondierende Röhrecorresponding tube
3333
Höhe der Überschussschlammabsaugungheight the excess sludge extraction
3434
Verdichter nur für die Belüftungcompressor only for ventilation
3535
Beruhigter Zulauf des Beschickungshebers 24 Calmed inlet of the feeder jack 24
3636
Abstandsnoppenspacer protrusions
3737
Abstandshalterspacer
3838
HalterohrSupport tube

ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list The documents listed by the applicant have been automated generated and is solely for better information recorded by the reader. The list is not part of the German Patent or utility model application. The DPMA takes over no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • - DE 202007011718 U1 [0029] - DE 202007011718 U1 [0029]

Claims (6)

Festbettkörper zur Abwasserreinigung bei biologischen Kläranlagen umfassend bewegliche Folien und ein zentrales Haltesubstrat, wobei die Folien senkrecht zum Haltesubstrat stehend um dieses einseitig strahlen- und fächerförmig angeordnet und auf diesem aufwickelbar sind.Fixed bed body for wastewater treatment in biological treatment plants comprising movable films and a central holding substrate, wherein the films are perpendicular to the holding substrate standing around this one-sided radiant and fan-shaped arranged and can be wound up on this. Festbettkörper gemäß Anspruch 1, dadurch gekennzeichnet, dass das Haltesubstrat ein Halterohr (2) ist, um dessen Kreisumfang verteilt die Folienflächen strahlenförmig angebracht sind.Fixed bed body according to claim 1, characterized in that the holding substrate is a holding tube ( 2 ) is distributed around the circumference of the film surfaces are mounted radially. Festbettkörper gemäß Anspruch 2, dadurch gekennzeichnet, dass dadurch gekennzeichnet, dass um ein senkrecht stehendes Halterohr (38) einseitig sternförmige Folienflächen befestigt sind, welche im inneren Radius eng aneinander liegen und am äußeren Radius zueinander einen größeren Abstand aufweisen.Fixed bed body according to claim 2, characterized in that characterized by a vertical holding tube ( 38 ) are fixed on one side star-shaped foil surfaces, which are close to each other in the inner radius and at the outer radius to each other have a greater distance. Festbettkörper gemäß Anspruch 1, 2 oder 3, dadurch gekennzeichnet, dass sich am äußeren Ende jeder Folienfläche jeweils eine Abkantung (34) befindet.Fixed bed body according to claim 1, 2 or 3, characterized in that at the outer end of each foil surface in each case a fold ( 34 ) is located. Festbettkörper gemäß Anspruch 4, dadurch gekennzeichnet, dass die Folie eine Noppenfolie ist.Fixed bed body according to claim 4, characterized in that the film is a knobbed foil. Festbettkörper gemäß Anspruch 1, 2 oder 3, dadurch gekennzeichnet, dass dieser stehend, hängend oder schwebend in einem Reaktor angeordnet ist.Fixed bed body according to claim 1, 2 or 3, characterized in that this standing, hanging or floating in a reactor.
DE200820009513 2008-07-14 2008-07-14 Device in the form of a fixed-bed body Expired - Lifetime DE202008009513U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE200820009513 DE202008009513U1 (en) 2008-07-14 2008-07-14 Device in the form of a fixed-bed body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE200820009513 DE202008009513U1 (en) 2008-07-14 2008-07-14 Device in the form of a fixed-bed body

Publications (1)

Publication Number Publication Date
DE202008009513U1 true DE202008009513U1 (en) 2008-09-11

Family

ID=39744712

Family Applications (1)

Application Number Title Priority Date Filing Date
DE200820009513 Expired - Lifetime DE202008009513U1 (en) 2008-07-14 2008-07-14 Device in the form of a fixed-bed body

Country Status (1)

Country Link
DE (1) DE202008009513U1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202010009084U1 (en) * 2010-06-15 2011-11-14 Atb Umwelttechnologien Gmbh Biological clarifier
EP2284128A3 (en) * 2009-07-11 2012-03-28 Reinhard Boller Method and device for cleaning waste water and separation device for same
EP2444378A1 (en) * 2010-10-21 2012-04-25 Umwelttauchservice Tauchpartner C. Ulrich GmbH Method for measuring sludge level in sludge containers
EP2660207A1 (en) * 2012-05-04 2013-11-06 KLARO GmbH Device and method for operating SBR sewage treatment plants

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202007011718U1 (en) 2007-08-20 2007-11-15 PRÄDEL, Birgit Apparatus for aeration of liquid media in sewage treatment plants and reactors

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202007011718U1 (en) 2007-08-20 2007-11-15 PRÄDEL, Birgit Apparatus for aeration of liquid media in sewage treatment plants and reactors

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2284128A3 (en) * 2009-07-11 2012-03-28 Reinhard Boller Method and device for cleaning waste water and separation device for same
DE202010009084U1 (en) * 2010-06-15 2011-11-14 Atb Umwelttechnologien Gmbh Biological clarifier
EP2444378A1 (en) * 2010-10-21 2012-04-25 Umwelttauchservice Tauchpartner C. Ulrich GmbH Method for measuring sludge level in sludge containers
EP2660207A1 (en) * 2012-05-04 2013-11-06 KLARO GmbH Device and method for operating SBR sewage treatment plants
DE102012008928A1 (en) * 2012-05-04 2013-11-07 Klaro Gmbh Apparatus and method for operating SBR wastewater treatment plants

Similar Documents

Publication Publication Date Title
DE102011122695B4 (en) Clear water compressed air lift for biological wastewater treatment plants and process for its operation
DE102010049709B3 (en) Clear water compressed air lift for biological sewage treatment plants, process for its operation and its use
EP2641876B1 (en) Biological wastewater treatment device
DE102008033293B4 (en) Device in the form of a float switching valve and method of operating such in an arrangement for wastewater treatment in biological sewage treatment plants
DE202009014465U1 (en) Device in the form of a compressed air lift
DE102014015488B4 (en) Bi-functional air lift for biological wastewater treatment plants, method of its operation and its use
DE202008009515U1 (en) Device in the form of a float switching valve
DE102009012822B3 (en) Switching valve for wastewater purification of e.g. sequential batch reactor sewage plant, has ball sealing valve seat and drain connection, and another ball sealing another valve seat and another drain connection after actuation of valve
EP2098487B1 (en) Biological clearing device
DE202008009513U1 (en) Device in the form of a fixed-bed body
DE202015105725U1 (en) Three-functional air lift for biological wastewater treatment plants
DE2028051C3 (en) Small sewage treatment plant for one or more households
EP1582263B1 (en) Pressurized air lifting device for flowable materials
DE102014006679B4 (en) Pneumatic lifter for biological treatment plants, process for its operation and its use
EP1650169B1 (en) Biological clarification device with a submersible pump
DE102008033291B4 (en) Wastewater treatment plant for biological wastewater treatment and method for operating such
DE102009039316A1 (en) Wastewater treatment plant and process for wastewater treatment
DE102006005865A1 (en) Pumping device for pumping wastewater
DE102019100455B3 (en) Wastewater treatment plant
EP1588987B1 (en) Water treatment plant having concentric basins
DE102016117462B3 (en) Pressurized water water jacks with pollution protection
DE202010014736U1 (en) Clear water compressed air lift for biological wastewater treatment plants
AT403373B (en) BIOLOGICAL WASTEWATER PLANT AND METHOD FOR OPERATING SUCH A
DE202014003914U1 (en) Air lift for biological treatment plants
DE202012101516U1 (en) Biological clarifier

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 20081016

R150 Utility model maintained after payment of first maintenance fee after three years
R150 Utility model maintained after payment of first maintenance fee after three years

Effective date: 20111130

R151 Utility model maintained after payment of second maintenance fee after six years
R151 Utility model maintained after payment of second maintenance fee after six years

Effective date: 20140804

R158 Lapse of ip right after 8 years