DE202007010645U1 - Device for foundation, attachment and / or securing - Google Patents

Device for foundation, attachment and / or securing Download PDF

Info

Publication number
DE202007010645U1
DE202007010645U1 DE200720010645 DE202007010645U DE202007010645U1 DE 202007010645 U1 DE202007010645 U1 DE 202007010645U1 DE 200720010645 DE200720010645 DE 200720010645 DE 202007010645 U DE202007010645 U DE 202007010645U DE 202007010645 U1 DE202007010645 U1 DE 202007010645U1
Authority
DE
Germany
Prior art keywords
foundations
gravel
concrete
concrete sleepers
consist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE200720010645
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GRASER UWE
Graser Uwe Dipl-Ing
Original Assignee
GRASER UWE
Graser Uwe Dipl-Ing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GRASER UWE, Graser Uwe Dipl-Ing filed Critical GRASER UWE
Priority to DE200720010645 priority Critical patent/DE202007010645U1/en
Publication of DE202007010645U1 publication Critical patent/DE202007010645U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F8/00Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
    • E01F8/0005Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic used in a wall type arrangement
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/72Counterweights or supports for balancing lifting couples
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/205Securing of slopes or inclines with modular blocks, e.g. pre-fabricated
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/025Retaining or protecting walls made up of similar modular elements stacked without mortar
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Railway Tracks (AREA)
  • Foundations (AREA)

Abstract

Fundamente/Verankerungen, dadurch gekennzeichnet, dass sie aus neuen und/oder gebrauchten Stahl- oder Spannbeton-Schwellen (1), zum Beispiel aus zurück gebauten Bahngleisen, und/oder einer Kombination aus beiden bestehen, die als einzelne Plattenfundamente auf ebenem Unterbau (2), der aus Sand, Kies, Splitt oder Schotter hergestellt wird bzw. befestigte Beton- oder Asphaltflächen etc. besteht, aufgestellt werden (Bild 1 und Bild 2).Foundations / anchors, characterized in that they are made of new and / or used Steel or prestressed concrete sleepers (1), for example made from rebuilt ones Train tracks, and / or a combination of both, the as a single plate foundations on a flat substructure (2), the Sand, gravel, grit or gravel is produced or fortified Concrete or asphalt surfaces etc. are set up (Figure 1 and Figure 2).

Figure 00000001
Figure 00000001

Description

Definitiondefinition

Die Erfindung betrifft die Verwendung neuer und/oder gebrauchter Beton-Schwellen (1), zum Beispiel aus zurück gebauten Bahngleisen, und/oder einer Kombination aus beiden als:

  • • Fundamente für technische Anlagen und Bauwerke
  • • Stationäre und nachgeführte Solaranlagen (Photovoltaik oder Solarthermie) auf Freiflächen oder Flachdächern etc.
  • • Böschungssicherung
  • • Lärmschutzwände (gestapelt, verfüllt und bepflanzt)
  • • Ballast für Krane etc.
The invention relates to the use of new and / or used concrete sleepers ( 1 ), for example from reconstructed railway tracks, and / or a combination of both as:
  • • Foundations for technical installations and structures
  • • Stationary and tracked solar systems (photovoltaic or solar thermal) on open spaces or flat roofs etc.
  • • Slope protection
  • • Noise barriers (stacked, backfilled and planted)
  • • Ballast for cranes etc.

Einleitungintroduction

Zweck der Erfindung ist die kostengünstige Herstellung von Fundamenten, Verankerungen, Befestigungen oder Sicherungen von technischen Anlagen und Bauwerken.purpose The invention is the cost-effective production of foundations, moorings, fixings or fuses of technical installations and structures.

Die durch die ständig durchgeführten Rückbaumaßnahmen von Bahngleisen (Personen- und Güterverkehrsstrecken, Werks- und Kranbahnen) anfallenden Betonschwellen (1) können in der Regel nicht wieder für Gleisbauten zum Einsatz kommen und müssen daher mit hohem Kostenaufwand recycelt werden. Dies kann aber durch die im Folgenden beschriebenen Einsatzmöglichkeiten vermieden werden, da die Beton-Gleisschwellen (1) in anderen Bereichen noch Jahrzehnte lang sinnvoll genutzt werden können.Concrete sleepers resulting from the permanent dismantling of railway tracks (passenger and freight lines, factory and crane runways) ( 1 ) can not usually be used again for track construction and must therefore be recycled at a high cost. However, this can be avoided by the uses described below, since the concrete sleepers ( 1 ) can be used meaningfully in other areas for decades to come.

Da sich diese Betonschwellen (1) durch eine lange Lebensdauer, hohe Stabilität und relativ hohe Masse auszeichnen, sind sie zum Einsatz als Fundamente, Ballast oder Schutz- und Sicherungselemente hervorragend geeignet.Because these concrete sleepers ( 1 ) are characterized by a long life, high stability and relatively high mass, they are ideal for use as foundations, ballast or protection and security elements.

Erfindungsgemäße AufgabeTask according to the invention

Die Aufgabe der Erfindung besteht darin, eine einfache und sehr preiswerte Variante von Fundamenten, Verankerungen, Befestigungen oder Sicherungen von technischen Anlagen und Bauwerken herzustellen und zwar unter Verwendung von Stahlbeton-Bahnschwellen (1), die normalerweise entsorgt oder mit relativ hohem Kostenaufwand recycelt werden.The object of the invention is to produce a simple and very inexpensive variant of foundations, anchors, fixings or fuses of technical installations and structures using reinforced concrete sleepers ( 1 ), which are normally disposed of or recycled at relatively high cost.

Stand der TechnikState of technology

Bekannt sind Beton- und Stahlbetonfundamente in Form von Platten, Blöcken, Hülsen, Pfählen usw. (je nach Einsatzzweck und geologischen Gegebenheiten), die vorgefertigt werden oder als Ortbeton in Schalungen eingebracht werden bzw. Erdanker, die vor Ort eingerammt oder eingeschraubt werden.Known are concrete and reinforced concrete foundations in the form of plates, blocks, shells, piles, etc. (depending on the purpose and geological conditions), the prefabricated be introduced or as in-situ concrete in formwork or ground anchor, the be rammed or screwed in place.

Die Bahnschwellen (1) werden nach dem Rückbau der Gleise mit großen Schreddern zerkleinert, was durch den eingebauten Bewehrungsstahl sehr hohen Aufwand verursacht, anstatt sie ohne großen finanziellen Aufwand für Jahrzehnte zu dem vorbenannten Zweck weiterzunutzen.The railway sleepers ( 1 ) are shredded after the dismantling of the tracks with large shredders, which caused by the built-in reinforcing steel very high cost, instead of using them for a long time without great financial expense for the aforementioned purpose.

Nachteile des Standes der Technikdisadvantage of the prior art

Die bekannten Einrichtungen zur Herstellung von Fundamenten/Verankerungen sind ohne Ausnahme teurer als die erfindungsgemäße Lösung.The known facilities for the production of foundations / anchorages are without exception more expensive than the solution according to the invention.

Durch die notwendige Aushärtungszeit des Betons, von in der Regel 4 Wochen, sind Stillstandszeiten im Bauablauf zu berücksichtigen.By the necessary curing time of the concrete, from usually 4 weeks, are downtime in the Construction process to consider.

Das Recyceln der vorhandenen Bahnschwellen (1) kostet Geld und wertvolle Energie.The recycling of existing railway sleepers ( 1 ) costs money and valuable energy.

Erfindungsgemäße LösungInventive solution

Die erfindungsgemäße Aufgabe ist dadurch gelöst, dass Bahnschwellen (1), die in genormten Größen und Gewichten vorhanden sind, als Gründung und Verankerungen für technische Anlagen und Bauwerke als Einzelstücke oder Gruppen bzw. Stapel in definierten Abständen auf einen ebenen Untergrund aus Kies, Schotter, Asphalt oder Beton aufgestellt oder ins Erdreich eingegraben werden. (Bilder 1 bis 3). Da diese mit genau definierten Befestigungspunkten hergestellt werden, wird die genormte Befestigung der technischen Anlagen und Bauwerke möglich sowie deren Planung vereinfacht. Man kann auch komplette Gleisabschnitte als Fundamente verlegen (Bild 5) und die Konstruktion an den Schienen befestigen.The object of the invention is achieved in that railway sleepers ( 1 ), which are available in standardized sizes and weights, are set up as foundations and anchors for technical facilities and structures as individual pieces or groups or stacks at defined intervals on a flat surface of gravel, gravel, asphalt or concrete or buried in the ground. (Pictures 1 to 3). Since these are manufactured with precisely defined attachment points, the standardized attachment of technical equipment and structures is possible and their planning simplified. You can also lay complete track sections as foundations (Figure 5) and fasten the structure to the rails.

Da man die Fundamente nicht zwingend eingraben muss, ist der Einsatz auch auf stillgelegten Deponien möglich, bei denen die schützende Deckschicht, die aus Erdreich besteht, in der Regel nur minimal geschwächt werden darf.There you do not necessarily have to dig the foundations is the use also possible on closed landfills where the protective top layer, which consists of soil, usually only minimally weakened may.

Zusätzlich können die Fundamente bei entsprechender Notwendigkeit natürlich auch mit Erdankern gesichert werden (Bild 4).In addition, the If necessary, foundations secured with ground anchors become (picture 4).

Als Stapel können die Schwellen (1) als Lärmschutzwände (Bild 6) eingesetzt werden oder können zur Sicherung von Böschungen (Bild 7) Verwendung finden. Möglich ist auch die Herstellung von Ballast für Kräne etc. daraus.As a stack, the thresholds ( 1 ) can be used as noise protection walls (Fig. 6) or can be used to secure slopes (Fig. 7). It is also possible to produce ballast for cranes etc. from it.

Verbesserungen des Standes der Technikimprovements of the prior art

Gegenüber den bekannten Einrichtungen ermöglicht die Erfindung eine starke Einsparung von Kosten sowie den universellen Einsatz von vorhandenen Bauteilen, die normalerweise entsorgt werden.Compared to the known facilities he the invention allows a great saving of costs as well as the universal use of existing components, which are normally disposed of.

Begriffsdefinitiondefinition of Terms

Zur besseren Erfassung der Beschreibungsinhalte werden nachfolgend die verwendeten Fachbegriffe definiert:
Bahnschwellen, auch Betonschwellen, Stahlbeton-Bahnschwellen oder Beton-Gleisschwellen genannt (1):
Bauteile aus Stahlbeton, die normalerweise als Aufnahme für Bahnschienen im Personen- und Güterverkehr oder bei Werks- oder Kranbahnen eingesetzt werden Fundamente:
Bauteile aus Bauteile aus Beton- oder Stahlbeton, Mauerwerk, Naturstein oder Stahl, die der Verankerung von Bauwerken und technischen Anlagen sowie der Ableitung der Bauwerkslasten in den Untergrund dienen.
To better capture the description contents, the technical terms used are defined below:
Railway sleepers, also called concrete sleepers, reinforced concrete railway sleepers or concrete sleepers ( 1 ):
Reinforced concrete components which are normally used as a support for railway tracks in passenger and freight transport or in factory or crane runways. Foundations:
Structural components made of concrete or reinforced concrete, masonry, natural stone or steel, used for anchoring structures and technical installations, as well as for discharging structural burdens underground.

Erdanker (3):
Zusätzliche Verankerung von Plattenfundamenten durch Spieße oder Schrauben.
Ground anchor ( 3 ):
Additional anchoring of slab foundations by skewers or screws.

Zeichnungsbeschreibungendrawing descriptions

Bild 1 bis 7, Ziff. 1 zeigt eine Stahlbeton-Bahnschwelle nach Stand der TechnikFigures 1 to 7, para. 1 shows a reinforced concrete railway sleeper according to the prior art

Bild 1 und 5, Ziff. 2 zeigt eine BahnschieneFigures 1 and 5, para. 2 shows a railway track

Bild 1 bis 5, Ziff. 3 zeigt eine technische Anlage (z.B. Solaranlage)Figures 1 to 5, para. 3 shows a technical system (eg solar system)

Bild 1 bis 7, Ziff. 4 zeigt den ebenen Unterbau aus Kies oder Schotter bzw. Asphalt oder BetonFigures 1 to 7, para. 4 shows the flat substructure made of gravel or gravel or asphalt or concrete

Bild 4, Ziff. 5 zeigt einen ErdankerPicture 4, point 5 shows a ground anchor

Bild 5, Ziff. 6 zeigt eine Befestigung auf den SchienenFig. 5, para. 6 shows a fixture on the rails

Claims (8)

Fundamente/Verankerungen, dadurch gekennzeichnet, dass sie aus neuen und/oder gebrauchten Stahl- oder Spannbeton-Schwellen (1), zum Beispiel aus zurück gebauten Bahngleisen, und/oder einer Kombination aus beiden bestehen, die als einzelne Plattenfundamente auf ebenem Unterbau (2), der aus Sand, Kies, Splitt oder Schotter hergestellt wird bzw. befestigte Beton- oder Asphaltflächen etc. besteht, aufgestellt werden (Bild 1 und Bild 2).Foundations / anchorages, characterized in that they consist of new and / or used steel or prestressed concrete sleepers ( 1 ), for example of reconstructed railway tracks, and / or a combination of both, which are designed as individual slab foundations on a level substructure ( 2 ), which is made of sand, gravel, chippings or gravel or paved concrete or asphalt surfaces, etc., are placed (Figure 1 and Figure 2). Fundamente nach Anspruch 1, dadurch gekennzeichnet, dass die Fundamente als Gruppen aus mehreren, miteinander verbundenen Schwellen hergestellt werden (Bild 3).Foundations according to claim 1, characterized that the foundations as groups of several, interconnected Thresholds are produced (Figure 3). Fundamente nach Anspruch 1, dadurch gekennzeichnet, dass diese Fundamente aus kompletten Gleisabschnitten bestehen, die durch die beiden parallelen Schienen (4) miteinander verbunden sind (Bild 5).Foundations according to claim 1, characterized in that these foundations consist of complete track sections, which pass through the two parallel rails ( 4 ) are interconnected (Fig. 5). Fundamente nach Anspruch 1, Anspruch 2 oder 3, dadurch gekennzeichnet, dass diese Fundamente zusätzlich mit Erdankern (5) im Untergrund befestigt werden (Bild 4).Foundations according to claim 1, claim 2 or 3, characterized in that these foundations in addition to ground anchors ( 5 ) are fixed in the underground (Fig. 4). Fundamente nach Anspruch 3, dadurch gekennzeichnet, dass das Bauwerk bzw. die technische Anlage (3) mit geeigneter Konstruktion (6) direkt auf dem Bahngleis (4) befestigt wird (Bild 5).Foundations according to claim 3, characterized in that the building or the technical system ( 3 ) with suitable construction ( 6 ) directly on the railway track ( 4 ) is attached (Figure 5). Lärmschutzwände, dadurch gekennzeichnet, dass sie aus mehreren, übereinander gestapelten Betonschwellen (1) bestehen, die mit Schotter, Kies oder mit Erdreich verfüllt und auch bepflanzt werden können (Bild 6).Noise barriers, characterized in that they consist of several, stacked concrete sleepers ( 1 ), which can be filled with gravel, gravel or soil and can also be planted (Fig. 6). Betonschwellenstapel (1) gemäß Anspruch 4, dadurch gekennzeichnet, dass er zur Böschungssicherung von Abhängen oder Erdaufschüttungen verwendet wird (Bild 7).Concrete sleepers stack ( 1 ) according to claim 4, characterized in that it is used for slope protection of slopes or earth embankments (Figure 7). Verwendung von neuen und/oder gebrauchten Beton-Bahnschwellen (1) als Ballast für Krane und Arbeitsmaschinen.Use of new and / or used concrete sleepers ( 1 ) as ballast for cranes and work machines.
DE200720010645 2007-07-29 2007-07-29 Device for foundation, attachment and / or securing Expired - Lifetime DE202007010645U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE200720010645 DE202007010645U1 (en) 2007-07-29 2007-07-29 Device for foundation, attachment and / or securing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE200720010645 DE202007010645U1 (en) 2007-07-29 2007-07-29 Device for foundation, attachment and / or securing

Publications (1)

Publication Number Publication Date
DE202007010645U1 true DE202007010645U1 (en) 2007-10-11

Family

ID=38580535

Family Applications (1)

Application Number Title Priority Date Filing Date
DE200720010645 Expired - Lifetime DE202007010645U1 (en) 2007-07-29 2007-07-29 Device for foundation, attachment and / or securing

Country Status (1)

Country Link
DE (1) DE202007010645U1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2251485A2 (en) * 2009-05-07 2010-11-17 RAIL.ONE GmbH Reinforced concrete sleeper and method for its production
ITBO20090631A1 (en) * 2009-10-01 2011-04-02 Vicar Srl PLATFORM FOR TELECOMMUNICATIONS
CN106930315A (en) * 2017-05-10 2017-07-07 中国十九冶集团有限公司 Mobile tower crane foundation structure and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2251485A2 (en) * 2009-05-07 2010-11-17 RAIL.ONE GmbH Reinforced concrete sleeper and method for its production
EP2251485A3 (en) * 2009-05-07 2013-12-04 RAIL.ONE GmbH Reinforced concrete sleeper and method for its production
ITBO20090631A1 (en) * 2009-10-01 2011-04-02 Vicar Srl PLATFORM FOR TELECOMMUNICATIONS
CN106930315A (en) * 2017-05-10 2017-07-07 中国十九冶集团有限公司 Mobile tower crane foundation structure and construction method

Similar Documents

Publication Publication Date Title
EP3441527B1 (en) Shut-off device for preventing the passage of land vehicles
DE3736943C1 (en) Railway superstructure, especially for very high speeds
EP2698476B1 (en) Method for the construction of an offshore structure and foundation for an offshore structure
EP0663470A1 (en) Superstructure for railway tracks
DE202007010645U1 (en) Device for foundation, attachment and / or securing
DE4236766C2 (en) Method for renovating a dam construction for a roadway
AT505789A2 (en) BARRIER WITH GLUED TRIANGES
DE102006055307A1 (en) Cross-beams fixing method for railways, involves arranging anchor block that form-fits with recesses in beam sides and force-fits with underground, in recesses, where block is made by lining and sealing of hollow form with membrane
Armour et al. Repair of failing MSE railroad bridge abutment
Simenson Rammed earth: fiber-reinforced, cement-stablilized
DE60002810T2 (en) IMPROVED EDUCATION OF A COVER SUPPORT FOR PILE FOUNDATIONS
DE202019003404U1 (en) Sound and vibration absorbing foam concrete substructures
DE102007056408B4 (en) System and method for building a roadway
EP2447421B1 (en) Joining of a frame to a surface
Lim et al. Construction of the linkway underneath the existing Outram Park Station
DE69916641T2 (en) IMPROVEMENTS ON OR WITH REGARD TO RAILWAY RAILWAYS
Grossauer et al. The” Standard Tunnel Construction Method “of Rhaetian Railways: Die „Normalbauweise Tunnel” der Rhätischen Bahn
EP4276246A1 (en) Method for producing a barrage device
EP1710355A1 (en) Mixed-in-place Diaphragm wall with filigree beams
DE19710148C2 (en) Cover for accessible manholes
DE202013100857U1 (en) Platform upgrade and refurbishment system
DE632171C (en) Groyne with a vault-like upper part and a pile substructure
DE202022001983U1 (en) Buildings made from recycled bridge elements
Yeo Tunnels and Underground Structures, Zhao, Shirlaw & Krishnan (eds)© 2000Taylor&Francis, ISBN905809 171 6 Construction of the linkway underneath the existing Outram Park Station
DE102010000589B4 (en) Method and device for creating a sheet piling

Legal Events

Date Code Title Description
R086 Non-binding declaration of licensing interest
R207 Utility model specification

Effective date: 20071115

R150 Term of protection extended to 6 years

Effective date: 20101014

R157 Lapse of ip right after 6 years

Effective date: 20140201