DE202005000483U1 - Conductor rail supporting arrangement for tram tracks comprises rail anchors arranged in holes in a concrete plate and penetrating an adapter plate lying on the concrete plate - Google Patents
Conductor rail supporting arrangement for tram tracks comprises rail anchors arranged in holes in a concrete plate and penetrating an adapter plate lying on the concrete plate Download PDFInfo
- Publication number
- DE202005000483U1 DE202005000483U1 DE200520000483 DE202005000483U DE202005000483U1 DE 202005000483 U1 DE202005000483 U1 DE 202005000483U1 DE 200520000483 DE200520000483 DE 200520000483 DE 202005000483 U DE202005000483 U DE 202005000483U DE 202005000483 U1 DE202005000483 U1 DE 202005000483U1
- Authority
- DE
- Germany
- Prior art keywords
- adapter plate
- plate
- concrete slab
- busbar support
- busbar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60M—POWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
- B60M1/00—Power supply lines for contact with collector on vehicle
- B60M1/30—Power rails
- B60M1/307—Supports
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Building Environments (AREA)
Abstract
Description
Die Erfindung betrifft eine Stromschienenträgerstützanordnung wie sie insbesondere bei der Berliner S-Bahn in Abschnitten mit lastverteilender Betonplatte bei fester Fahrbahn genutzt wird. Die Stromschiene befindet sich hier neben und oberhalb des Gleises, wobei die Abnehmer von unten auf die Stromschiene Zugriff haben.The The invention relates to a busbar support support arrangement as in particular at the Berlin S-Bahn in sections with load-distributing concrete slab is used on a solid lane. The busbar is located here next to and above the track, taking the takers from below to have access to the power rail.
Die Anordnung der Stromschienenträger erfolgt bei diesen Abschnitten mit lastverteilender Betonplatte auf zwischen den Gleisschwellen angeordneten und mit der Betonplatte verbundenen Fundamentwürfeln oder -quadern aus Beton.The Arrangement of busbar supports takes place at these sections with load-distributing concrete slab placed between the sleepers and with the concrete slab connected foundation cubes or blocks of concrete.
Es hat sich nun gezeigt, dass diese Fundamentwürfel oder -quader infolge der Belastung und bedingt durch andere Umwelteinflüsse ihre Festigkeit verlieren, indem sie zur Rissbildung neigen und verwittern. Der ordnungsgemäße Fahrbetrieb ist so gefährdet.It has now been shown that these foundation cubes or cuboids due to the Stress and due to other environmental factors lose their strength, by prone to cracking and weathering. The proper driving is so endangered.
Es ist Aufgabe der Erfindung, eine Stromschienenträgerstützanordnung vorzuschlagen, die eine Sanierung des Istzustandes ermöglicht und eine lange Lebensdauer garantiert.It The object of the invention is to propose a conductor rail support support arrangement, which allows a renovation of the current state and a long life guaranteed.
Beachtet werden muss dabei, dass die Sanierungsarbeiten unter den Bedingungen des laufenden Fahrbetriebes erfolgen sollen.respected It must be there that the renovation works under the conditions of the current driving should take place.
Die erfindungsgemäße Stromschienenträgerstützanordnung bestehend aus einem Stromschienenträger, der zwischen den Gleisschwellen oder nahe den Gleisschwellen mit der lastverteilenden Betonplatte der festen Fahrbahn verbunden ist, sieht vor, dass in die lastverteilende Betonplatte Railanker fest in Bohrlöchern angeordnet sind, die eine Adapterplatte, die auf der Betonplatte aufliegt, durchdringen und mittels derer unter Einsatz von Muttern ein Verspannen der Adapterplatte gegen die Betonplatte erfolgt. Auf der Adapterplatte sind oben senkrechte Gewindestäbe angeordnet, über die variable Ausgleichsplatten mit Bohrungen geschoben sind, beginnend direkt aufliegend auf der Adapterplatte oder auf einer vorher angeordneten Zwischenplatte und endend im Bereich der Anschlusshöhe für den Stromschienenträger, der ebenfalls über die Gewindestäbe geschoben wird. Das Verspannen des Stromschienenträgers sowie der Ausgleichsplatten, Zwischenplatte und der Adapterplatte erfolgt mittels mit den Gewindestäben verschraubten Muttern.The Busbar support assembly according to the invention consisting of a busbar support between the sleepers or near the sleepers with the load-distributing concrete slab fixed roadway, provides that in the load-distributing Concrete slab rail anchors are fixedly arranged in drilled holes an adapter plate, which rests on the concrete slab penetrate and by means of which using nuts tightening the adapter plate takes place against the concrete slab. On the adapter plate are vertical above threaded rods arranged over the variable balancing plates are pushed with holes, starting directly resting on the adapter plate or on a previously arranged Intermediate plate and ending in the area of the connection height for the busbar support, the also over the threaded rods is pushed. The bracing of the busbar support as well the balancing plates, intermediate plate and the adapter plate takes place by means of the threaded rods bolted nuts.
Zwischen der oberen Ausgleichsplatte und dem Stromschienenträger kann eine Zwischenplatte angeordnet sein, ebenso zwischen der Adapterplatte und der Betonplatte. Bei den Zwischenplatten handelt es sich vorzugsweise um PE-Platten.Between the upper balance plate and the busbar support can be arranged between an intermediate plate, as well as between the adapter plate and the concrete slab. The intermediate plates are preferably around PE plates.
Die Erfindung soll anhand der Zeichnungen dargestellt werden. Es zeigen:The The invention will be illustrated with reference to the drawings. Show it:
In
In
bzw. auf der Betonplatte
Der
Stromschienenträger
Die
Adapterplatte
Die
Verschraubung und damit die Verspannung der Adapterplatte
Zum
Flächenausgleich
und auch um der Anordnung eine gewisse Elastizität zu verleihen, ist vorgesehen,
dass Zwischenplatten
Die
Adapterplatte
Eine
Adapterplatte
Weiter
weist die Adapterplatte
Bei den Sanierungsarbeiten wird zweckmäßigerweise wie folgt vorgegangen:
- 1 Montage, eines Notträgers,
- 2 Abtragen des zerstörten
Fundamentes des Stromschienenträgers
4 , - 3 Sanierung der Oberfläche
der Betonplatte
1 , - 4 Fräsen
der Verankerungslöcher,
vorzugsweise
4 an der Zahl, - 5 Planfräsen
der Oberfläche
der Betonplatte
1 , - 6 Aufbringen einer Zwischenplatte
12 aus PE, - 7 Auflegen der Adapterplatte
7 , - 8 Einkleben der HILT – Anker
6 mit Standardmörtel, HIT-C 11/HIT RE 500, - 9 Verschrauben der Adapterplatte
7 mit der Betonplatte1 , - 11 Auflegen einer Zwischenplatte
12 , - 12 Anordnung des Fußes
des Stromschienenträgers
4 , - 13 Verschrauben des Stromschienenträgers
4 , der Zwischenplatte12 , der Ausgleichsplatten10 und de Adapterplatte7 und - 14 Demontage des Notträgers.
- 1 assembly, of an emergency carrier,
- 2 Removal of the destroyed foundation of the busbar support
4 . - 3 Renovation of the surface of the concrete slab
1 . - 4 Milling the anchoring holes, preferably
4 in number, - 5 Face milling of the surface of the concrete slab
1 . - 6 Applying an intermediate plate
12 made of PE, - 7 Placing the adapter plate
7 . - 8 Gluing in the HILT anchor
6 with standard mortar, HIT-C 11 / HIT RE 500, - 9 Screwing the adapter plate
7 with the concrete slab1 . - 11 Placing an intermediate plate
12 . - 12 Arrangement of the foot of the busbar support
4 . - 13 Screwing the busbar support
4 , the intermediate plate12 , the compensating plates10 and the adapter plate7 and - 14 Disassembly of the emergency vehicle.
Derartige Sanierungsarbeiten lassen sich über drei Betriebsruhen realisieren, ohne dass der Fahrbetrieb beeinträchtigt wird.such Renovation work can be over to realize three company rest periods without impairing the driving operation.
- 11
- Betonplattenconcrete slabs
- 22
- Schwellenswell
- 33
- Fahrschienerunning rail
- 44
- StromschienenträgerRail support
- 55
- Stromschieneconductor rail
- 66
- RailankerRail anchor
- 77
- Adapterplatteadapter plate
- 88th
- Mutternnuts
- 99
- Gewindestäbethreaded rods
- 1010
- variable Ausgleichsplattenvariable shims
- 1111
- Mutternnuts
- 1212
- Zwischenplatteintermediate plate
- 1313
- Spiralfederspiral spring
- 1414
- Scheibedisc
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200520000483 DE202005000483U1 (en) | 2005-01-10 | 2005-01-10 | Conductor rail supporting arrangement for tram tracks comprises rail anchors arranged in holes in a concrete plate and penetrating an adapter plate lying on the concrete plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200520000483 DE202005000483U1 (en) | 2005-01-10 | 2005-01-10 | Conductor rail supporting arrangement for tram tracks comprises rail anchors arranged in holes in a concrete plate and penetrating an adapter plate lying on the concrete plate |
Publications (1)
Publication Number | Publication Date |
---|---|
DE202005000483U1 true DE202005000483U1 (en) | 2005-05-25 |
Family
ID=34625977
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE200520000483 Expired - Lifetime DE202005000483U1 (en) | 2005-01-10 | 2005-01-10 | Conductor rail supporting arrangement for tram tracks comprises rail anchors arranged in holes in a concrete plate and penetrating an adapter plate lying on the concrete plate |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE202005000483U1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006001442B3 (en) * | 2006-01-10 | 2007-07-05 | Db Bahnbau Gmbh | Pantograph contact rail connection device for local passenger train has contact rail connected with insulator foot where rail console is composed of base plate, platform connected at right angle and two seal plates |
WO2013127802A3 (en) * | 2012-02-28 | 2013-10-31 | SPL Powerlines Austria GmbH & Co. KG | Insulated mount for a power rail for electrically driven rail vehicles |
CN109177818A (en) * | 2018-06-22 | 2019-01-11 | 苏州大成电子科技有限公司 | A kind of height-adjustable conductor rail bracket |
CN109177819A (en) * | 2018-06-22 | 2019-01-11 | 苏州大成电子科技有限公司 | Adjustable conductor rail bracket |
-
2005
- 2005-01-10 DE DE200520000483 patent/DE202005000483U1/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006001442B3 (en) * | 2006-01-10 | 2007-07-05 | Db Bahnbau Gmbh | Pantograph contact rail connection device for local passenger train has contact rail connected with insulator foot where rail console is composed of base plate, platform connected at right angle and two seal plates |
WO2013127802A3 (en) * | 2012-02-28 | 2013-10-31 | SPL Powerlines Austria GmbH & Co. KG | Insulated mount for a power rail for electrically driven rail vehicles |
CN109177818A (en) * | 2018-06-22 | 2019-01-11 | 苏州大成电子科技有限公司 | A kind of height-adjustable conductor rail bracket |
CN109177819A (en) * | 2018-06-22 | 2019-01-11 | 苏州大成电子科技有限公司 | Adjustable conductor rail bracket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AT391499B (en) | RAILWAY CONSTRUCTION, ESPECIALLY FOR RAILWAY VEHICLES WITH VERY HIGH TRAVELING SPEEDS | |
EP3460125A1 (en) | Railway track construction | |
DE202005000483U1 (en) | Conductor rail supporting arrangement for tram tracks comprises rail anchors arranged in holes in a concrete plate and penetrating an adapter plate lying on the concrete plate | |
DE102008039965A1 (en) | Arrangement for fixing posts for protective walls | |
DE4415363C1 (en) | A permanent way superstructure for railways, especially for bridges and processes for its manufacture | |
AT8456U1 (en) | RAILWAY TRANSFER | |
EP0894897A1 (en) | Process for making a track structure | |
EP0546380B1 (en) | Railway track structure | |
DE202011001106U1 (en) | System for horizontal alignment of a track rail of a fixed rail track | |
EP0620316B1 (en) | Elastic rail pads for open or closed superstructure | |
EP1045069A2 (en) | Ballastless track superstructure with prefabricated concrete slabs and process for their replacement | |
DE102017122770A1 (en) | Covering for railway tracks | |
DE19643533A1 (en) | Sound absorbing load-bearing gratings for railway track | |
DE19849266A1 (en) | Permanent way for streetcars at the road surface has an intermediate layer between the rail foot and the concrete sleepers with elasticity and vibration damping qualities | |
DE3027086C2 (en) | Prestressed concrete turnout sleeper | |
DE202011000572U1 (en) | Elastic rail fastening with inline abutment for mass transit systems | |
EP0456147B1 (en) | Railwaytrack structure | |
EP2016226B1 (en) | Hollow sleeper | |
EP1891271B1 (en) | Lifting and directing tie | |
CH715209B1 (en) | Track transition unit between a ballast track section and a ballastless track section. | |
EP1253245A1 (en) | Method of alternative use of railway tracks | |
EP2800833B1 (en) | Slab track | |
DE4239383C2 (en) | Web body | |
DE3008006C2 (en) | Floor construction from prefabricated components | |
EP0794288B1 (en) | Fastening of a Y-shaped sleeper to a ballastless substructure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R207 | Utility model specification |
Effective date: 20050630 |
|
R150 | Term of protection extended to 6 years |
Effective date: 20080222 |
|
R151 | Term of protection extended to 8 years |
Effective date: 20110208 |
|
R158 | Lapse of ip right after 8 years |
Effective date: 20130801 |