DE202004015984U1 - Lattice mat especially for fixing of pipes in prefabricated floor ceiling has at least some wires formed with pipe retaining clips which protrude from plane formed by wires - Google Patents
Lattice mat especially for fixing of pipes in prefabricated floor ceiling has at least some wires formed with pipe retaining clips which protrude from plane formed by wires Download PDFInfo
- Publication number
- DE202004015984U1 DE202004015984U1 DE202004015984U DE202004015984U DE202004015984U1 DE 202004015984 U1 DE202004015984 U1 DE 202004015984U1 DE 202004015984 U DE202004015984 U DE 202004015984U DE 202004015984 U DE202004015984 U DE 202004015984U DE 202004015984 U1 DE202004015984 U1 DE 202004015984U1
- Authority
- DE
- Germany
- Prior art keywords
- wires
- grid mat
- ceiling
- pipe
- pipe support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/48—Special adaptations of floors for incorporating ducts, e.g. for heating or ventilating
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/01—Reinforcing elements of metal, e.g. with non-structural coatings
- E04C5/02—Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance
- E04C5/04—Mats
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/18—Spacers of metal or substantially of metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Steam Or Hot-Water Central Heating Systems (AREA)
Abstract
Description
Die Erfindung betrifft eine Gittermatte, insbesondere zur Fixierung von Rohrleitungen in einer Fertigelementdecke, aus mehreren zumindest im Wesentlichen in einer Ebene in wenigstens zwei Richtungen verlaufenden und miteinander verbundenen Drähten. Weiter betrifft die Erfindung eine Fertigelementdecke aus Beton mit einer derartigen Gittermatte.The The invention relates to a grid mat, in particular for fixing of pipelines in a prefabricated ceiling, of several at least essentially in a plane extending in at least two directions and interconnected wires. Furthermore, the invention relates to a prefabricated concrete ceiling with such a grid mat.
Im Wohnhausbau und insbesondere im Büro- oder Gewerbebau werden häufig Fertigelementdecken für die Herstellung von Geschossdecken eingesetzt. Diese Fertigelementdecken lassen sich als Fertigbauteile in Betonwerken oder dergleichen in Serienproduktion kostengünstig herstellen. Auf der Baustelle werden auf diese Fertigelementdecken zusätzliche Bewehrungen sowie Ortbeton aufgebracht, um eine Geschossdecke herzustellen.in the Residential construction and especially in office or commercial construction often Prefabricated element ceilings for used the production of floor slabs. These finished element ceilings can be used as prefabricated components in concrete plants or the like in series production economical produce. On the construction site are on these prefabricated ceiling elements additional Reinforcements and in-situ concrete applied to produce a floor slab.
Als Bauteilaktivierung können auf der Baustelle vor dem Auftragen des Ortbeton Kühl- und/oder Heizkreisläufe eingebracht werden. Die hierzu erforderlichen Arbeiten auf der Baustelle sind jedoch zeit- und kostenintensiv und es besteht die Gefahr, dass durch Verzögerungen in einem einzelnen Gewerk der gesamte Baufortschritt negativ beeinflusst wird.When Component activation can placed on the site before applying the in-situ concrete cooling and / or heating circuits become. The necessary work on the site are However, time consuming and costly and there is a risk that through delays In a single trade, the entire construction progress is adversely affected becomes.
Es
wurde daher in der
Aufgabe der vorliegenden Erfindung ist es demgegenüber, die Bauteilaktivierung von Fertigelementdecken weiter zu vereinfachen, wobei insbesondere die Befestigung von Rohrleitungen erleichtert werden soll.task By contrast, it is the component activation of the present invention of prefabricated element ceilings to further simplify, in particular the attachment of pipes should be facilitated.
Diese Aufgabe wird erfindungsgemäß im Wesentlichen dadurch gelöst, dass bei einer Gittermatte der eingangs genannten Art wenigstens einige der Drähte mit Rohrhaltebügeln versehen sind, die aus der durch die Drähte gebildeten Ebene herausragen, wobei die Rohrhaltebügel derart ausgebildet sind, dass zwischen den Rohrhaltebügeln und den Drähten Aufnahmen zum Einlegen und/oder Einrasten von Rohren oder dergleichen gebildet werden. Die Gittermatte ermöglicht es dabei, Rohrleitungen mit genau definiertem Verlegeabstand innerhalb einer Fertigelementdecke zu positionieren. Das Einlegen bzw. Einrasten der Rohre in die durch die Rohrhaltebügel gebildeten Aufnahmen ist dabei besonders einfach, so dass die Rohrleitungen schnell und auch von ungelernten Kräften fixiert werden können.These Task is according to the invention essentially solved by that in a grid mat of the type mentioned at least some of the wires with pipe clamps are provided which protrude from the plane formed by the wires, the pipe retaining bracket are formed such that between the pipe support brackets and the wires Recordings for insertion and / or engagement of pipes or the like be formed. The grid mat makes it possible to use pipelines precisely defined laying distance within a prefabricated ceiling to position. The insertion or locking of the tubes in the through the pipe support bracket formed recordings is particularly simple, so that the pipes can be fixed quickly and by unskilled workers.
Vorzugsweise verlaufen die Drähte in einem insbesondere regelmäßigen Raster in einer ersten Richtung und einer hierzu zumindest näherungsweise senkrechten zweiten Richtung, wobei die Rohrhaltebügel nur an in einer Richtung verlaufenden Drähten vorgesehen sind. Die erfindungsgemäße Gittermatte kann somit im Wesentlichen als eine herkömmliche Gittermatte aus einzelnen miteinander verschweißten Drähten gefertigt werden, wobei nur einzelne Drähte mit den Rohrhaltebügeln versehen sind. Hierdurch können die Produktionskosten der Gittermatte niedrig gehalten werden. Zudem ist es durch die Anordnung der Drähte in einem regelmäßigen Raster möglich, auch nach Einbau einer Fertigelementdecke mit einer erfindungsgemäßen Gittermatte die Position von Rohrleitungen in einer Decke exakt zu bestimmen.Preferably the wires run in a particular regular grid in a first direction and one at least approximately vertical second direction, the pipe support bracket only are provided in unidirectional wires. The grid mat according to the invention can thus essentially as a conventional grid mat of individual welded together wires be manufactured, with only individual wires provided with the pipe support brackets are. This allows the production costs of the grid mat are kept low. moreover It is due to the arrangement of the wires in a regular grid possible, even after installation of a finished element ceiling with a grid mat according to the invention the Determine position of piping in a ceiling exactly.
Wenn die Rohrhaltebügel derart angeordnet sind, dass die Aufnahmen zweier in der ersten und/oder der zweiten Richtung zueinander benachbarter Rohrhalte bügel in zumindest näherungsweise entgegengesetzte Richtungen weisen, kann ein Rohr besonders schnell und einfach an der Gittermatte fixiert werden. Die Rohrhaltebügel verhindern dabei wechselseitig, dass sich das Rohr von der Gittermatte löst. Sobald das Rohr in etwa 3 oder 4 Rohrhaltebügeln fixiert ist, behält es seine Lage sicher, ohne dass hierzu weitere Befestigungsmaßnahmen erforderlich sind. Durch die abwechselnde Stellung der Aufnahmen der Rohrhaltebügel liegt das Rohr besonders gerade auf der Gittermatte und ein eventuell im Rohr vorhandener Drall wird durch diese starre Halterung aufgehoben.If the pipe support bracket are arranged such that the recordings of two in the first and / or the second direction of mutually adjacent pipe support bracket in at least approximately opposite Directions, a pipe can be particularly quick and easy the grid mat are fixed. The pipe brackets prevent each other, that the tube separates from the grid mat. Once the tube is about 3 or 4 pipe clamps is fixed, keeps it safely its location without requiring further attachment required are. Due to the alternating position of the pictures the pipe bracket The tube is particularly straight on the grid mat and possibly in Pipe existing swirl is lifted by this rigid bracket.
In Weiterbildung des Erfindungsgedankens ist es vorgesehen, dass an wenigstens einigen der Rohrhaltebügel und/oder an wenigstens einigen der Drähte Abstandhalter derart vorgesehen sind, dass die Abstandhalter in einer zu den Rohrhaltebügeln zumindest näherungsweise entgegengesetzten Richtung, insbesondere um etwa 10 mm bis etwa 25 mm, aus der durch die Drähte gebildeten Ebene herausragen. Bei bekannten streifenförmigen Abstandhaltern, die beispielsweise aus Kunststoff bestehen, können die Rohre in Nuten der Abstandshalter eingeklippst werden. Diese Fixierung der Rohre ist jedoch unzureichend, so dass in einigen Anwendungsfällen die Rohre vor dem Eingießen in den Beton aus ihrer Halterung herausgefallen sind, so dass später ihre exakte Position innerhalb der Fertigelementdecke nicht mehr bestimmbar ist. Zudem weisen die bekannten Abstandhalter den Nachteil auf, dass diese nur schlecht in Beton eingießbar sind. Dagegen sind die beispielsweise ebenfalls bügelförmigen Abstandhalter der erfindungsgemäßen Gittermatte fest mit dieser und damit mit den Rohrleitungen verbunden. Zudem ist das Eingießen dieser an der Gittermatte befestigten Abstandhalter problemlos möglich. Die Abstandhalter können somit gewährleisten, dass die Gittermatte und damit die mit dieser verbindbaren Rohre in einem exakt definierten Abstand von vorzugsweise etwa 1,6 cm zu der in Einbaulage unteren Oberfläche der Fertigelementdecke positioniert sind.In a further development of the inventive idea, it is provided that spacers are provided on at least some of the tube holding brackets and / or on at least some of the wires in such a way that the spacers are at least approximately opposite in direction to the tube holding brackets, in particular by approximately 10 mm to approximately 25 mm, protrude from the plane formed by the wires. In known strip-shaped spacers, which consist for example of plastic, the tubes can be clipped into grooves of the spacers. However, this fixation of the tubes is insufficient, so that in some applications, the tubes have fallen out before pouring into the concrete from its holder, so that later their exact position within the finished element ceiling is no longer determinable. In addition, the known spacers have the disadvantage that they are poorly pourable in concrete. In contrast, the example also bow-shaped spacers of the grid mat according to the invention are firmly connected to this and thus to the pipes. In addition, the pouring of these on the grid mat fixed spacers easily possible. The spacers can thus ensure that the grid mat and thus the pipes connectable with this are positioned at a precisely defined distance of preferably about 1.6 cm to the lower surface of the finished element ceiling in the installation position.
Wenn die Rohrhaltebügel und/oder die Abstandhalter als Schlaufen in wenigstens einigen Drähten ausgebildet sind, können diese automatisiert auf einer Drahtbiegemaschine hergestellt und in den Fertigungsprozess der Gittermatte integriert werden.If the pipe support bracket and / or the spacers are formed as loops in at least some wires are, can these are automated and manufactured on a wire bending machine be integrated into the manufacturing process of the grid mat.
Alternativ hierzu ist es jedoch auch möglich, die Rohrhaltebügel und/oder die Abstandhalter an wenigstens einigen Drähten zu befestigen. Insbesondere hat es sich als vorteilhaft erwiesen, die Rohrhaltebügel und die Abstandhalter an den Drähten einer Gittermatte festzuschweißen. Eine besonders wirtschaftliche Herstellung der erfindungsgemäßen Gittermatte kann dadurch erreicht werden, dass die Abstandhalter und die Rohrhaltebügel einstückig sind, so dass diese nicht separat an Drähten einer Gittermatte fixiert werden müssen.alternative However, it is also possible, the Pipe bracket and / or the spacers on at least some wires Fasten. In particular, it has proved to be advantageous, the Pipe bracket and the spacers on the wires to weld a grid mat. A particularly economical production of the grid mat according to the invention can be achieved by the fact that the spacers and pipe brackets are integral, so that these are not separate on wires a grid mat must be fixed.
Nach einer besonders bevorzugten Ausführungsform der Erfindung sind die Rohrhaltebügel, insbesondere paarweise, an einem Drahtabschnitt befestigt, der in die Drähte der Gittermatte einhängbar und auf diesen einrastbar ist. Die Rohrhaltebügel lassen sich so in der gewünschten Position auf der Gittermatte durch eine Klippsverbindung befestigen, bevor die derart vorgefertigten Gittermatten dann der weiteren Verarbeitung zugeführt werden. Bei dieser Gestaltung der Gittermatte kann der Verlauf der Rohre leichter an die individuellen Anforderungen an eine Fertigelementdecke angepasst werden, da sich die Drahtabschnitte mit den Rohrhaltebügeln bei Bedarf auch manuell versetzen lassen.To a particularly preferred embodiment of the invention are the pipe retaining bracket, in particular in pairs, attached to a wire section, which can be suspended in the wires of the grid mat and on this is latched. The pipe brackets can be so in the desired Secure the position on the grid mat by a clip connection before the thus prepared grid mesh then the further processing supplied become. In this design of the grid mat, the course of the Pipes easier to the individual requirements of a prefabricated ceiling be adapted as the wire sections with the pipe support brackets at Need to be moved manually.
Um die Rohre auch während des Umgießens mit Beton sicher zu fixieren, bestehen die Drähte, die Rohrhaltebügel und/oder die Abstandhalter vorzugsweise aus einem insbesondere hochfesten und feuerverzinkten Stahl mit einem Durchmesser von etwa 0,5 mm bis etwa 5 mm, insbesondere etwa 2 mm. Die Oberfläche der Drähte, Rohrhaltebügel und/oder Abstandhalter ist beispielsweise durch die Feuerverzinkung korrosionsgeschützt. Die Gittermatte kann daher direkt auf die Schalung aufgelegt werden und durch die Rundheit der Drähte vom Beton eingeschwemmt werden. Die Gittermatte und ihre Komponenten sind somit innerhalb der Fertigelementdecke von außen nicht sichtbar. Eine Betonüberdeckung ist jedoch nicht erforderlich.Around the pipes also during of infusing with Concrete secure fix, consist of wires, pipe brackets and / or the spacers preferably made of a particular high-strength and hot dip galvanized steel with a diameter of about 0.5 mm to about 5 mm, in particular about 2 mm. The surface of the wires Pipe bracket and / or spacers, for example, by the hot dip galvanizing protected against corrosion. The grid mat can therefore be placed directly on the formwork and by the roundness of the wires from the Concrete are flooded. The grid mat and its components are thus not within the finished element ceiling from the outside visible, noticeable. A concrete cover is not required.
Die erfindungsgemäße Gittermatte eignet sich insbesondere dazu, dass in die Rohrhaltebügel bifilar oder mäanderförmig verlegte Rohre eingelegt und/oder eingerastet sind. Rohrsysteme können jedoch auch durch ein spiralförmig, gitterförmig oder registerartig angeordnetes Rohr gebildet werden.The Grid mat according to the invention is particularly suitable to bifilar in the pipe support bracket or meandered Tubes are inserted and / or engaged. However, pipe systems can also by a spiral, a grid or arranged like a register tube.
Vorzugsweise bestehen die mit der Gittermatte verbindbaren Rohre aus einem Kunststoff, beispielsweise aus PE-RT. Um eine ausreichende Kühl- oder Heizleistung zu erreichen, sollte das Rohr eine Länge von weniger als etwa 150 m aufweisen. Bei den üblicherweise eingesetzten Rohrdurchmessern von etwa 10 mm bis etwa 22 mm sollte die Länge des Rohres etwa 125 m nicht überschreiten. Ein für die vorliegende Erfindung bevorzugter Rohrdurchmesser liegt bei etwa 12 mm.Preferably are the connectable to the grid mat pipes made of a plastic, for example, PE-RT. In order to achieve a sufficient cooling or heating power, the pipe should be a length less than about 150 m. For the commonly used pipe diameters of about 10 mm to about 22 mm, the length of the tube should not exceed about 125 m. One for the present invention preferred tube diameter is included about 12 mm.
Eine erfindungsgemäße Fertigelementdecke besteht aus Beton, wobei eine Gittermatte der oben genannten Art in den Beton integriert, insbesondere eingegossen ist. Die Gittermatte ist dabei vorzugsweise an oder in der Nähe der im Einbauzustand unteren Seite der Fertigelementdecke positioniert. Dies ermöglicht einen guten Wärmeübergang zwischen den Heiz- und/oder Kühlrohren innerhalb der Fertigelementdecke und den darunter gelegenen zu temperierenden Räumen.A Prefabricated ceiling according to the invention exists made of concrete, wherein a grid mat of the type mentioned above in the Concrete integrated, in particular cast. The grid mat is preferably at or in the vicinity of the lower in the installed state Positioned side of prefabricated ceiling. This allows one good heat transfer between the heating and / or cooling pipes within the prefabricated ceiling and the below to be tempered Rooms.
Um die bei Fertigelementdecken üblicherweise geforderten mechanischen Eigenschaften zu erreichen, kann beispielsweise auf den Rohrhaltebügeln der Gittermatte eine weitere Gittermatte als Unterbewehrung und/oder schlaufenartige Gitterträger aufgelegt und/oder befestigt werden. Die Unterbewehrung kann zudem das Aufschwimmen des Rohrsystems während des Umgießens mit Beton verhindern. Die gegebenenfalls vorgesehenen schlaufenartigen Gitterträger dienen dabei der Verbindung mit einer Quer- und/oder Oberbewehrung, die in den Ortbeton eingegossen werden.Around usually in prefabricated ceilings For example, to achieve required mechanical properties on the pipe clamps the grid mat another grid mat as a sub-reinforcement and / or loop-like lattice girders are applied and / or attached. The sub-reinforcement can also swim up of the pipe system during of transfusion prevent with concrete. The optionally provided loop-like girder serve the connection with a transverse and / or upper reinforcement, which are poured into the in-situ concrete.
Zur Positionierung der Gittermatte mit Rohrleitungen innerhalb einer Fertigelementdecke können erfindungsgemäß alternativ auch die bisher zur Positionierung der Bewehrung eingesetzten separaten Abstandhalter verwendet werden. Hierzu werden zunächst die Gittermatten auf bspw. X-förmige Abstandhalter aus Kunststoff aufgelegt und dann die Bewehrung auf die Rohre der Gittermatte aufgelegt. Das Gewicht der Gittermatte und der Bewehrung verhindert wirkungsvoll ein Aufschwimmen der Rohre während des Eingießens der Gittermatten in Beton. Bei dieser Ausführungsform sind die Rohre folglich zwischen der Gittermatte und der Bewehrung in der Fertigelementdecke angeordnet.to Positioning the grid mat with piping inside one Prefabricated ceiling can according to the invention alternatively Also, the previously used to position the reinforcement separate Spacers are used. For this purpose, first the Grid mats on eg. X-shaped Plastic spacer placed and then the reinforcement on placed the tubes of the grid mat. The weight of the grid mat and the reinforcement effectively prevents the pipes from floating during the process pouring the grid mats in concrete. In this embodiment, therefore, the tubes are between the grid mat and the reinforcement arranged in the prefabricated ceiling.
Es wird bevorzugt, wenn die Fertigelementdecke eine Betonstärke von mindestens etwa 4 cm bei der Betonqualität B25 aufweist. In der Praxis hat es sich bewährt, wenn die Fertigelementdecke eine Dicke von etwa 5 cm oder etwa 6 cm aufweist. Fertigelementdecken mit dieser Stärke entsprechen den handelsüblichen Fertigelementdecken und lassen sich daher mit den bekannten Systemen transportieren und heben. Die Herstellung und der Transport der erfindungsgemäßen Fertigelementdecke unterscheidet sich daher nur dadurch von den herkömmlichen Fertigelementdecken, dass vor dem Umgießen der Bewehrung eine zusätzliche Gittermatte mit dem darauf befestigten Rohrsystem in den Gießtisch eingelegt wird. Eine größere Materialstärke, die zu Problemen insbesondere beim Transport führen kann, ist dabei nicht notwendig.It is preferred if the finished element ceiling has a concrete thickness of at least about 4 cm in the quality of concrete B25. In practice, it has proven useful if the finished element ceiling has a thickness of about 5 cm or about 6 cm. Prefabricated floor coverings with this thickness correspond to the commercial finished element ceilings and leave therefore transport and lift with the known systems. Therefore, the manufacture and transport of the prefabricated element ceiling according to the invention differs from conventional prefabricated element ceilings in that an additional mesh mat with the pipe system fastened thereon is inserted into the casting table before the reinforcement is overmolded. A larger material thickness, which can lead to problems especially during transport, is not necessary.
Um eine Beschädigung des Rohrsystems beispielsweise bei nachträglichem Einbringen von Bohrlöchern in die Fertigelementdecke zu vermeiden, können in diese Elektroanschlussdosen, Deckenbefestigungen, Befestigungsschienen und/oder Aussparungen oder Öffnungen vorgesehen sein. Hierdurch ist es möglich, die Positionen von derartigen Dosen oder Öffnungen individuell für jede Fertigelementdecke einzuplanen und bei Bedarf den Verlauf der Rohrleitungen entsprechend anzupassen.Around a damage of the pipe system, for example, when subsequently introducing boreholes in To avoid the finished element ceiling, in these electrical outlets, Ceiling fixtures, mounting rails and / or recesses or openings be provided. This makes it possible, the positions of such Cans or openings individually for to plan each finished element ceiling and, if necessary, the course of Adjust pipelines accordingly.
Das aus dem wenigstens einem Rohr gebildete Rohrsystem lässt sich besonders einfach an einen üblicherweise zentral angeordneten Verteiler anschließen, wenn die Enden wenigstens eines an der Gittermatte befestigten Rohres aus der Fertigelementdecke insbesondere um etwa 6 m bis etwa 10 m herausragen. Zu lange Rohrenden können auf der Baustelle auf das erforderliche Maß gekürzt werden. Zum Transport der Fertigelementdecke lassen sich die Rohrenden in Ringe binden und beispielsweise zwischen den aus der Fertigelementdecke herausragenden schlaufenartigen Gitterträgern anordnen. Wenn im Bereich des Austritts des wenigstens einen Rohres aus der Fertigelementdecke ein dieses umgreifendes, beispielsweise geripptes Schutzrohr vorgesehen ist, kann das Rohrsystem vor Knicken, Setzrissen und/oder Dehnfugen geschützt werden. Dabei kann das Schutzrohr etwa 10 cm in die Fertigelementdecke geschoben und dort einbetoniert sein.The from the at least one tube formed pipe system can be especially easy on one usually connect centrally located manifold when the ends at least a fixed to the grid mat pipe from the prefabricated ceiling in particular protrude by about 6 m to about 10 m. Too long pipe ends can be shortened to the required level on the construction site. To transport the Prefabricated ceiling can be the pipe ends tie in rings and for example, between the protruding from the finished ceiling element loop-type lattice girders Arrange. If in the region of the outlet of the at least one tube from the finished element ceiling this encompassing, for example ribbed protection tube is provided, the pipe system can prevent buckling, Rising cracks and / or expansion joints are protected. It can do that Protective tube pushed about 10 cm into the prefabricated ceiling and there to be set in concrete.
In Weiterbildung des Erfindungsgedankens ist es vorgesehen, dass in der Fertigelementdecke mehrere, insbesondere zwei Rohrsysteme vorgesehen sind. Diese können entweder dazu genutzt werden, Räume bei Bedarf zu erwärmen oder abzukühlen, es ist jedoch auch möglich, die Rohrsysteme zur Zufuhr beliebiger anderer Medien oder als Versorgungskanäle zu nutzen. Weiter ist es auch möglich ein Rohrsystem an eine Wärmepumpe anzuschließen wobei in dem Rohrsystem ein Kühl- oder Heizmittel, wie Wasser oder dergleichen, zirkuliert. Dabei ist es von Vorteil, dass das Rohrsystem in vergleichsweise geringem Abstand von der Oberfläche der Fertigelementdecke angeordnet ist, so dass die Reaktionszeit zur Kühlung bzw. Erwärmung nur sehr gering ist.In Further development of the concept of the invention, it is envisaged that in the finished element ceiling several, especially two pipe systems provided are. these can be used either, rooms to heat if necessary or to cool but it is also possible to use the piping systems to supply any other media or as supply channels. Next it is also possible Pipe system to a heat pump to join wherein in the pipe system a cooling or heating means such as water or the like is circulated. It is it is advantageous that the pipe system in comparatively low Distance from the surface the prefabricated element ceiling is arranged, so that the reaction time for cooling or warming only very small.
Weiterbildungen, Vorteile und Anwendungsmöglichkeiten der Erfindung ergeben sich auch aus der nachfolgenden Beschreibung von Ausführungsbeispielen und der Zeichnung. Dabei bilden alle beschriebenen und/oder bildlich dargestellten Merkmale für sich oder in beliebiger Kombination den Gegenstand der Erfindung, unabhängig von ihrer Zusammenfassung in den Ansprüchen oder deren Rückbeziehung.Further developments, Advantages and applications The invention will become apparent from the following description of exemplary embodiments and the drawing. All are described and / or illustrated illustrated features for itself or in any combination the subject matter of the invention, independently from their summary in the claims or their dependency.
Es zeigen:It demonstrate:
Die
in den Figuren dargestellte Gittermatte
Die
Rohrhaltebügel
sind derart angeordnet, dass die Aufnahmen
Zusätzlich zu
den Rohrhaltebügeln
Das
Rastermaß der
Gittermatte
In
Auf
der Baustelle werden die beispielsweise schlaufenartigen Gitterträger
Abweichend
von der dargestellten Ausführungsform
ist es auch möglich,
die Rohrhaltebügel und
Abstandhalter einzeln oder gemeinsam an Drähten
Neben
der gezeigten Verwendung der Gittermatte
Da die Systemgittermatte in Fertigteilwerken wie eine herkömmliche Bewehrungsmatte behandelt werden kann, ist diese leicht in den Fertigungsablauf in einem Werk zu integrieren. Zudem kann durch die Nutzung der erfindungsgemäßen Systemgittermatter gegebenenfalls auf die sonst üblichen Abstandshalter verzichtet werden.There the system grid mat in precast plants like a conventional one Reinforcement mat can be treated, this is easy in the production process in to integrate a work. In addition, by using the Systemgittermatter invention may optionally to the usual Spacers are dispensed with.
Bei
der in
Die
in
Die
Rohre
- 11
- Gittermattegrid mat
- 22
- Drahtwire
- 33
- RohrhaltebügelPipe bracket
- 44
- Aufnahmeadmission
- 55
- Rohrpipe
- 66
- Abstandshalterspacer
- 77
- FertigelementdeckePrefabricated element ceiling
- 88th
- Betonconcrete
- 99
- Unterbewehrungunder armor
- 1010
- Gitterträgergirder
- 1111
- Querbewehrungtransverse reinforcement
- 1212
- Oberbewehrungupper reinforcement
- 1313
- Ortbetonsitu concrete
- 1414
- Befestigungsschlaufeattachment loop
Claims (19)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202004015984U DE202004015984U1 (en) | 2004-10-14 | 2004-10-14 | Lattice mat especially for fixing of pipes in prefabricated floor ceiling has at least some wires formed with pipe retaining clips which protrude from plane formed by wires |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202004015984U DE202004015984U1 (en) | 2004-10-14 | 2004-10-14 | Lattice mat especially for fixing of pipes in prefabricated floor ceiling has at least some wires formed with pipe retaining clips which protrude from plane formed by wires |
Publications (1)
Publication Number | Publication Date |
---|---|
DE202004015984U1 true DE202004015984U1 (en) | 2005-02-17 |
Family
ID=34202710
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE202004015984U Expired - Lifetime DE202004015984U1 (en) | 2004-10-14 | 2004-10-14 | Lattice mat especially for fixing of pipes in prefabricated floor ceiling has at least some wires formed with pipe retaining clips which protrude from plane formed by wires |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE202004015984U1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006052558A1 (en) * | 2006-11-06 | 2008-05-08 | Rehau Ag + Co | Ceiling unit for heating/cooling ceiling for cooling space, has insulating layer divided into insulating filling sections, over which ceiling unit is connectable with space ceiling-sided carrier structure |
EP2725160A1 (en) * | 2012-10-29 | 2014-04-30 | REHAU AG + Co | Concrete core tempering element and concrete core tempering system, comprising such a concrete core tempering element |
EP2818606A1 (en) * | 2013-06-27 | 2014-12-31 | Vbi Ontwikkeling B.V. | A concrete floor slab and a method of manufacturing a concrete slab |
-
2004
- 2004-10-14 DE DE202004015984U patent/DE202004015984U1/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006052558A1 (en) * | 2006-11-06 | 2008-05-08 | Rehau Ag + Co | Ceiling unit for heating/cooling ceiling for cooling space, has insulating layer divided into insulating filling sections, over which ceiling unit is connectable with space ceiling-sided carrier structure |
EP2725160A1 (en) * | 2012-10-29 | 2014-04-30 | REHAU AG + Co | Concrete core tempering element and concrete core tempering system, comprising such a concrete core tempering element |
EP2818606A1 (en) * | 2013-06-27 | 2014-12-31 | Vbi Ontwikkeling B.V. | A concrete floor slab and a method of manufacturing a concrete slab |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102007055134A1 (en) | Reinforced concrete floor element e.g. hollow plate, for producing floor of multi-storey building, has pipe connectors feeding and discharging fluid, where either or both of connectors is present at floor bottom side in integrated condition | |
EP1669681A2 (en) | Prefabricated heating/cooling module for use in a building element, especiallly a ceiling or a wall element, and method for making a building element | |
EP1619005B1 (en) | Manufacturing process for a prefabricated slab or wall with reinforcing steel bars and support rail adapted to such process | |
DE10001839C2 (en) | Structural steel construction, concrete slab element with integrated heating or cooling function and manufacturing process | |
EP2466028B1 (en) | Construction element with tubes and method for manufacturing same | |
EP1207354A2 (en) | Mounting strip, heating or cooling register also a flat building part from hardenable material | |
DE202009018538U1 (en) | Reinforced concrete component with reinforcement made of L-shaped sheet metal parts | |
EP1610064B1 (en) | Concrete core tempering module and manufacturing process of a concrete core tempering module | |
DE202004015984U1 (en) | Lattice mat especially for fixing of pipes in prefabricated floor ceiling has at least some wires formed with pipe retaining clips which protrude from plane formed by wires | |
DE10114340C1 (en) | Process for producing a concrete element and concrete element part | |
DE10259961B4 (en) | Prefabricated component, in particular ceiling or wall component made of a cured material | |
EP0992637A1 (en) | Prefabricated building element | |
DE102014110843A1 (en) | Surface tempering element and from several surface temperature control elements existing surface tempering | |
DE4434499A1 (en) | Building solid floor panel | |
DE102004034707A1 (en) | Core heating and hardening module for concrete slab is laid on top of reinforcement bars held on spacers in standard production pallet and consists of pipe in meandering arrangement | |
DE202008000239U1 (en) | Heat exchanger system for a building | |
DE20315885U1 (en) | Concrete plate used for ceilings, consists of a metal or plastic mesh or mat reinforcement, and a pipe system | |
EP1006318A1 (en) | Installation for heating and/or cooling of spaces | |
EP2574852A2 (en) | Method for producing large-scale floor heating systems and floor heating systems produced according to this method | |
AT2323U1 (en) | COMPONENT | |
DE20022421U1 (en) | Structural steel construction, concrete slab element and concrete ceiling or concrete floor with integrated heating or cooling function | |
EP2725160B1 (en) | Concrete core tempering element and concrete core tempering system, comprising such a concrete core tempering element | |
AT15573U1 (en) | mounting rod | |
DE102004011902B3 (en) | Reinforcement structure for ceiling/floor multi-storey building is pre-prepared off-site | |
DE20304644U1 (en) | Height positioning device for reinforcing layers and pipe holders during concrete casting, comprises spacer block with cross bar between its legs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R207 | Utility model specification |
Effective date: 20050324 |
|
R163 | Identified publications notified |
Effective date: 20050705 |
|
R150 | Utility model maintained after payment of first maintenance fee after three years |
Effective date: 20080117 |
|
R151 | Utility model maintained after payment of second maintenance fee after six years |
Effective date: 20110107 |
|
R152 | Utility model maintained after payment of third maintenance fee after eight years |
Effective date: 20130110 |
|
R071 | Expiry of right | ||
R071 | Expiry of right |