Between towering, load-bearing building suspended building Download PDFInfo
- Publication number
- DE202004014897U1 DE202004014897U1 DE202004014897U DE202004014897U DE202004014897U1 DE 202004014897 U1 DE202004014897 U1 DE 202004014897U1 DE 202004014897 U DE202004014897 U DE 202004014897U DE 202004014897 U DE202004014897 U DE 202004014897U DE 202004014897 U1 DE202004014897 U1 DE 202004014897U1
- Authority
- DE
- Germany
- Prior art keywords
- building
- building according
- bottom plate
- towering
- attached
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/34—Extraordinary structures, e.g. with suspended or cantilever parts supported by masts or tower-like structures enclosing elevators or stairs; Features relating to the elastic stability
- E04B1/3408—Extraordinarily-supported small buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Tents Or Canopies (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Gebäude (1, 1a bis 1h), das zwischen aufragenden, 'auf Druck beanspruchten' länglichen Bauteilen aufgehängt ist, dadurch gekennzeichnet, daß das Gebäude eine größere Länge als Breite aufweist, und daß die beiden Kopfseiten des Gebäudes über Zugglieder (3) jeweils an einem Mast aufgehängt sind, so daß das Gebäude zwischen beiden Masten (8) in einem Abstand zum Boden und/oder zur Wasseroberfläche schwebt.Building (1, 1a to 1h) interposed between towering 'stressed' elongated Suspended components is, characterized in that the building a longer length than Has width, and that the two Head sides of the building over tension members (3) each hung on a mast are so that that Building between two masts (8) at a distance to the ground and / or floating to the water surface.
Description
Anwendungsgebietfield of use
Die Erfindung betrifft eine Konstruktion entsprechend dem Oberbegriff des Anspruchs 1. Zur Definition des Begriffes 'Gebäude': Gebäude sind selbständig benutzbare, überdachte bauliche Anlagen, die von Menschen betreten werden können und geeignet oder bestimmt sind, dem Schutz von Menschen, Tieren oder Sachen zu dienen. Hierzu gehören zum Beispiel nicht Brücken, Straßen und Staudämme.The The invention relates to a construction according to the preamble of the claim 1. To the definition of the term 'building': buildings are independently usable, roofed Structural facilities that can be entered by people and suitable or intended, the protection of humans, animals or things to serve. These include for example not bridges, streets and dams.
Stand der TechnikState of the art
Als Stand der Technik kann das bereits realisierte Projekt „SU-SI" des österreichischen Architekten Johannes Kaufmann angeführt werden. Es handelt sich dabei um eine mobile Gebäudeeinheit in Holzbauweise, die aufgeständert werden kann (http//www.ikarch.at/system.php?section=3&item=1) – das Tragwerk dieser Gebäudeeinheit ist 'auf Druck beansprucht'.When State of the art, the already realized project "SU-SI" of the Austrian Architects Johannes Kaufmann can be cited. It is about a mobile building unit in timber construction, the raised can be (http // www.ikarch.at / system.php? section = 3 & item = 1) - the structure this building unit is 'on pressure'.
Ausführungen von maßgeblich 'auf Zug beanspruchten' Gebäudeaufhängungen sind derzeit nicht bekannt. Es liegen Entwurfsunterlagen in Ideenform vor, die jedoch nicht für eine Realisierung ausgearbeitet worden sind (http://www.treehousesofhawaii.com/competition/finalists/index.htm) und daher nicht die erforderliche Detaillierung aufweisen.versions of significantly 'train loaded' building suspensions are currently unknown. There are draft documents in idea form but not for a realization has been worked out (http://www.treehousesofhawaii.com/competition/finalists/index.htm) and therefore do not have the required detailing.
Im Brückenbau sind zudem ähnliche Konstruktionsprinzipien bekannt.in the bridge building are also similar Design principles known.
Weitere Quellen zum Stand der Technik können aus den nachstehenden Druckschriften entnommen werden:
- D E 15 34 737 B
-
DE 102 04 898 A1 - DE 16 09 500 A
- CH 4 20 579
- FR 13 62 650
- sGB 11 04 068
- DE 15 34 737 B
-
DE 102 04 898 A1 - DE 16 09 500 A
- CH 4 20 579
- FR 13 62 650
- sGB 11 04 068
Nachteile des Standes der Technikdisadvantage of the prior art
Folgende Nachteile können angeführt werden:
- – Der Raum unterhalb solcher Gebäude ist durch die Stützen nur beschränkt nutzbar. Gebäude dieser Art sind in hohem Maße setzungsempfindlich. Die Standsicherheit in Erdbebengebieten ist dadurch beeinträchtigt.
- – Tragwerk und Boden müssen aufeinander abgestimmt werden. Bauen im Hang erfordert genaue Kenntnis der Örtlichkeit.
- – Auf Druck beanspruchte Bauteile erfordern konstruktionsbedingt eine größere Dimensionierung als auf Zug beanspruchte Bauteile.
- – Die Gebäude nach dem Stand der Technik weisen nur eingeschränkte Fähigkeit für schnellen Auf- und Abbaus auf.
- – Durch fehlende Elementierung und Skalierbarkeit können die Herstellungskosten einer Serienfertigung entgegenstehen.
- – Die nach dem Stand der Technik bekannten Gebäude können zumeist nicht ohne größeren Aufwand individuell an den jeweiligen Einsatzzweck angepasst werden – dies betrifft beispielsweise die gewünschte Höhe des Gebäudes, die Beachtung der Gegebenheiten des Untergrundes.
- - The space below such buildings is limited by the supports available. Buildings of this type are highly sensitive to settlement. The stability in seismic areas is thereby impaired.
- - The structure and floor must be coordinated. Building in the hill requires exact knowledge of the location.
- - Components subject to pressure require design-related greater dimensioning than tensile stressed components.
- The prior art buildings have limited ability for rapid assembly and disassembly.
- - Missing elementation and scalability, the manufacturing costs of a series production can be opposed.
- - The well-known in the prior art buildings can usually not be adapted individually to the particular application without much effort - this concerns, for example, the desired height of the building, observance of the conditions of the substrate.
Aufgabe der ErfindungTask of invention
Aufgabe der Erfindung ist es, ein Gebäude so aufzuhängen, daß alle auftretenden Kräfte (Eigenlasten, Nutzlasten, Windlasten, Schneelasten) über'auf Zug beanspruchte Verbindungen' in aufragende, tragende Bauteile eingeleitet werden.task The invention is a building like this hang, that all occurring forces (Dead loads, payloads, wind loads, snow loads) über'auf train claimed Connections' in towering, load-bearing components are introduced.
Dabei soll ein möglichst schwebender bzw. Iosgelöster Eindruck des Gebäudes entstehen. Zudem soll die Konstruktion eine minimale Berührungsfläche zum Boden aufweisen.there should one possible floating or Iosgelöster Impression of the building arise. In addition, the design should have a minimal contact surface for Floor.
Die Erfindung kann insbesondere dort eingesetzt werden, wo ein besonderer optischer Effekt durch eine anspruchvolle architektonische Konstruktion erzielt werden soll. Solche Einsatzzwecke sind beispielsweise zu sehen bei sportlichen Events (Ski- und Snowboard-Events bzw. Motorsport-Events), da hier auch der Raum unter dem Gebäude für den eigentlichen Veranstaltungszweck weiter genutzt werden kann.The Invention can be used in particular where a special optical effect through a sophisticated architectural design should be achieved. Such uses are for example too see at sporting events (ski and snowboard events or motorsport events), because here also the space under the building for the actual event purpose can be used further.
Weiterhin kann das Gebäude auch im Messe- und im Eventbereich zum Einsatz kommen und dabei als exklusiver Empfangs- oder Aufenthaltsbereich fungieren und dabei gleichzeitig auch mit Gastronomie-Einrichtungen ausgestattet werden. Es kann zudem als Ferienhaus am Strand oder Hang für exklusive Nutzung eingesetzt werden. Je nach Verwendungszweck und Einsatzort dabei können einzelne Einheiten auch als Schulungsräume oder Ausstellungsräume ausgestattet werden.Farther can the building also in the exhibition and in the event area are used and thereby act as an exclusive reception or lounge area while doing so at the same time also be equipped with catering facilities. It can also be used as a holiday home on the beach or slope for exclusive Use to be used. Depending on the purpose and location can do it individual units also equipped as classrooms or showrooms become.
Lösung der AufgabeSolution of task
Diese Aufgabe wird durch eine Konstruktion mit den Merkmalen des Anspruchs 1 gelöst. Hierbei ist zu beachten, daß unter einem Mast auch eine Säule, ein Pfeiler oder eine Stütze verstanden werden kann.These The object is achieved by a construction having the features of the claim 1 solved. It should be noted that under a mast also a pillar, a pillar or a pillar can be understood.
Vorteile der ErfindungAdvantages of invention
Folgende Vorteile bietet die Erfindung:
- – Der Raum unterhalb des Gebäudes ist stützenfrei und damit uneingeschränkt nutzbar. Die Landschaft unterhalb des Gebäudes kann unberührt bleiben – so ist eine Weg- oder Wasserführung unter dem Gebäude denkbar. Es eignet sich somit besonders zur Errichtung auf Grundstücken, an die hohe Ansprüche hinsichtlich der'Einbindung in die Landschaft' gestellt werden.
- – Die Konstruktion ist setzungsunempfindlich und daher erdbebensicher.
- – Durch die geringere Dimensionierung der auf Zug beanspruchten Bauteile entsteht ein Iosgelöster Eindruck. Diese außergewöhnliche Bauweise eignet sich daher besonders für Projekte, bei denen das Gebäude eine besondere optische Wirkung erzielen soll.
- - The space below the building is column-free and thus fully usable. The landscape below the building can be left untouched - so a way or water guide under the building is conceivable. It is thus particularly suitable for construction on land, to which high demands are made with regard to the 'integration into the landscape'.
- - The construction is insensitive to settlement and therefore earthquake-proof.
- - Due to the smaller dimensions of the claimed components to train a Iosgelöster impression. This unusual design is therefore particularly suitable for projects in which the building should achieve a special visual effect.
Darstellung und Erklärungpresentation and explanation
Die
Das
Gebäude
(
Die
textile Membrane überspannt
ein Tragwerk aus freigeformten Brettschichtholzrahmen. Diese sind
mittels Schlitzblechen biegesteif miteinander verbunden. Die Rahmen
(
Die Grundstruktur des Gebäudes kann durch nichttragende Wände, Fenster und Türelemente ergänzt werden. Auch andere Dachkonstruktionen sind vorstellbar.The Basic structure of the building can through non-loadbearing walls, Windows and door elements added become. Other roof structures are conceivable.
Es bestehen zahlreiche konventionelle Erschließungsmöglichkeiten, die von Wendeltreppen über einläufige bis zweiläufige gerade Treppen reichen.There are numerous conventional development options ranging from spiral staircases to single-storey to double-flight straight staircases.
Montageablaufinstallation procedure
Fundamentefoundations
Die
Fundamentierung der Konstruktion ist von örtlichen Faktoren abhängig und
kann nach unterschiedlichen konventionellen Bauarten ausgeführt werden.
Bei normalen Bodenverhältnissen
empfehlen sich Einzelfundamente (
Richten der MasteStraightening the masts
Die
Maste (
Am
Ort der Montage werden die Spiralseile (
Anheben
des Masts mit Hilfsseil am oberen Aufhängepunkt (
Jetzt
werden die Gabelspannschlösser
der am Mast herunterhängenden
Spiralseile (
Gebäude (
Die
beiden Stahlträger
(
Die
Stahlträger
(
Die
Balken (
Es
folgt das Verlegen und Befestigen der Brettstapelelemente (
Jetzt,
nachdem die Grundstruktur aufgebaut ist, können die Trennwände (
Es
folgt die etwaige Montage von Fenstern, Türen, Brüstungen, Sanitärobjekten,
sowie leichten Trennwänden.
Nach Abschluß des
Innenausbaus wird die textile Membrane von einem fachkundigen Montageteam
an den Rahmen (
Aufhängung des Gebäudes (
Zuvor
sollten sperrige Einrichtungsgegenstände aufgestellt und vor Bewegung
gesichert werden. Das Gebäude
wird an vier Punkten mit einem Lastenkran angehoben. Gleichzeitig
ziehen im Gebäude
befindliche Monteure die zur Verlängerung der Spiralseile (
Das
Gebäude
(
Es folgt die Überprüfung sämtlicher Befestigungspunkte sowie eventueller Belastungstests, bevor die Hebevorrichtung des Lastenkrans entfernt wird.It follows the review of all Attachment points and any stress tests before the Lifting device of the crane is removed.
AbbildungserklärungFigure declaration
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202004014897U DE202004014897U1 (en) | 2003-12-05 | 2004-09-24 | Between towering, load-bearing building suspended building |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2003156975 DE10356975A1 (en) | 2003-12-05 | 2003-12-05 | Between towering, load-bearing building suspended building |
DE10356975.8 | 2003-12-05 | ||
DE202004014897U DE202004014897U1 (en) | 2003-12-05 | 2004-09-24 | Between towering, load-bearing building suspended building |
Publications (1)
Publication Number | Publication Date |
---|---|
DE202004014897U1 true DE202004014897U1 (en) | 2005-01-05 |
Family
ID=34042301
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE2003156975 Withdrawn DE10356975A1 (en) | 2003-12-05 | 2003-12-05 | Between towering, load-bearing building suspended building |
DE202004014897U Expired - Lifetime DE202004014897U1 (en) | 2003-12-05 | 2004-09-24 | Between towering, load-bearing building suspended building |
DE112004002732T Expired - Fee Related DE112004002732D2 (en) | 2003-12-05 | 2004-12-01 | Between towering, load-bearing building suspended building |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE2003156975 Withdrawn DE10356975A1 (en) | 2003-12-05 | 2003-12-05 | Between towering, load-bearing building suspended building |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE112004002732T Expired - Fee Related DE112004002732D2 (en) | 2003-12-05 | 2004-12-01 | Between towering, load-bearing building suspended building |
Country Status (2)
Country | Link |
---|---|
DE (3) | DE10356975A1 (en) |
WO (1) | WO2005056944A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106812216A (en) * | 2017-03-20 | 2017-06-09 | 金环建设集团有限公司 | A kind of mast Cable forces system integral installation method |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3179870B1 (en) | 2014-08-13 | 2023-10-04 | Akeso Biomedical Inc. | Antimicrobial compounds and compositions, and uses thereof |
DE102015219228A1 (en) * | 2015-10-06 | 2017-04-06 | Bauhaus Universität Weimar | Kit for a dismountable, walkable structure |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB970822A (en) | 1961-04-15 | 1964-09-23 | Draiswerke Gmbh | Improvements relating to machines for the preparation of plasticized synthetic plastic material |
FR1362650A (en) * | 1963-04-25 | 1964-06-05 | Air-conditioned city | |
DE1609500A1 (en) * | 1964-06-12 | 1970-09-10 | Henkel Dr Phil G | Hanging house and process for its manufacture |
FR1402752A (en) * | 1964-08-05 | 1965-06-11 | Housing construction | |
BE671348A (en) * | 1965-01-05 | |||
FR2736671B1 (en) * | 1995-07-11 | 1997-10-03 | Sari Soc | VIBRATION DAMPING SYSTEM, ANTI-SEISMIC DEVICE FOR INDIVIDUAL CONSTRUCTIONS |
AT410237B (en) * | 2001-06-20 | 2003-03-25 | Klasz Walter | Dismountable platform |
DE10204898A1 (en) * | 2002-02-06 | 2003-08-07 | Eduard Kolbrink | Support system for building, especially industrial shed, has uprights joined in pairs by length supports and having anchor cables extending over their top ends |
-
2003
- 2003-12-05 DE DE2003156975 patent/DE10356975A1/en not_active Withdrawn
-
2004
- 2004-09-24 DE DE202004014897U patent/DE202004014897U1/en not_active Expired - Lifetime
- 2004-12-01 WO PCT/DE2004/002643 patent/WO2005056944A1/en active Application Filing
- 2004-12-01 DE DE112004002732T patent/DE112004002732D2/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106812216A (en) * | 2017-03-20 | 2017-06-09 | 金环建设集团有限公司 | A kind of mast Cable forces system integral installation method |
CN106812216B (en) * | 2017-03-20 | 2019-04-12 | 金环建设集团有限公司 | A kind of mast-Cable forces system integral installation method |
Also Published As
Publication number | Publication date |
---|---|
DE112004002732D2 (en) | 2006-11-16 |
WO2005056944A1 (en) | 2005-06-23 |
DE10356975A1 (en) | 2005-07-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE1807716A1 (en) | Prefabricated, transportable room element for the production of buildings | |
DE3824387C2 (en) | ||
DE2608872A1 (en) | Wall hung prefabricated metal and plastics verandah - has skeleton frame and floor panels, hung via cables from draw hooks | |
WO2014053070A1 (en) | Construction kit for forming a support structure | |
DE102013006380A1 (en) | Decking for scaffolding | |
DE2539806A1 (en) | COMPONENT | |
DE202004014897U1 (en) | Between towering, load-bearing building suspended building | |
DE2310312A1 (en) | BUILDING MANUFACTURED USING PREFABRICATED LARGE-FORMAT COMPONENTS | |
DE202019107206U1 (en) | Kit for retrofitting a balcony or a winter garden to a house wall | |
DE3933198A1 (en) | Grid of solid or tubular sectional poles - has poles anchored in base pieces, and incorporates connecting uprights with plugs and sockets | |
DE7027429U (en) | PREFABRICATED ROOM ELEMENT FOR ERECTING BUILDINGS. | |
DE4239057C2 (en) | Process and prefabricated module for the production of structures and buildings | |
DE2728474B2 (en) | Rigid frame body | |
DE803435C (en) | Skeleton construction from prefabricated parts for multi-storey buildings and halls | |
WO2017060143A1 (en) | Construction kit for a dismantleable walk-on load-bearing structure | |
DE1684213B2 (en) | Buildings with frames made from individual parts | |
DE1119499B (en) | Building with one or more vertical tubes and floor ceilings suspended at their upper ends | |
DE102016112316A1 (en) | Stanchion head for a transportable structure and transportable structure | |
DE2750931C2 (en) | ||
DE10205205A1 (en) | Wall unit, for construction, has a concrete shell with integrated reinforcements to carry projecting bonding structures at a gap from an insulation shell, for concrete to be poured between them | |
DE19732256C2 (en) | Process for producing an outer basement wall | |
LU101699A1 (en) | Wood / concrete composite component | |
DE2250505A1 (en) | SPACE CELL FOR APARTMENT ASSEMBLIES OR HOUSES | |
DE2320917A1 (en) | STEEL CONSTRUCTION WITH ROOM CELLS | |
DE20318088U1 (en) | Suspended balcony system for multi-story buildings has balcony platforms supported on one side by tensioning elements of protruding cantilevers, with lengths of tensioning elements corresponding to story height |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R086 | Non-binding declaration of licensing interest | ||
R207 | Utility model specification |
Effective date: 20050210 |
|
R150 | Utility model maintained after payment of first maintenance fee after three years |
Effective date: 20070822 |
|
R157 | Lapse of ip right after 6 years |