DE1997883U - FEED INSERT FOR SMOKE AND EXHAUST CHIMNEYS - Google Patents
FEED INSERT FOR SMOKE AND EXHAUST CHIMNEYSInfo
- Publication number
- DE1997883U DE1997883U DE19681997883 DE1997883U DE1997883U DE 1997883 U DE1997883 U DE 1997883U DE 19681997883 DE19681997883 DE 19681997883 DE 1997883 U DE1997883 U DE 1997883U DE 1997883 U DE1997883 U DE 1997883U
- Authority
- DE
- Germany
- Prior art keywords
- smoke
- shrink film
- chimneys
- shaped
- structural units
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
P.A.506 373*27.8.68P.A. 506 373 * 8/27/68
PAT E N TAN WÄLT EPAT E N TAN ELECTS E.
VOLKER BUSSE DIETRICH BUSSEVOLKER BUSSE DIETRICH BUSSE
45 OSNABRDCK, den 26. Aug. 190845 OSNABRDCK, Aug. 26, 1908
DB/4DB / 4
Schiefertonwerke Buer
Inn. Karl Hennann Hensiek 3
4523 Buer Slate works Buer Inn. Karl Hennann Hensiek 3
4523 Buer
Futtereinsatz für Rauch- und AbgaskamineLining insert for smoke and exhaust chimneys
Die Neuerung bezieht sich auf einen Puttereinsatz für Rauch- und Abgaskamine bzw. -schornsteine, bestehend aus Formsteinen aus feuerfestem Material, die an ihren aneinandergrenzenden Stoßkanten nut- und federartig ineinandergreifen.The innovation relates to a putter insert for smoke and exhaust chimneys or chimneys, consisting of shaped stones made of fireproof material, which interlock at their abutting edges like a tongue and groove.
Die bisher bekannten Futtereinsätze werden an Ort und Stelle eines zu errichtenden Gebäudes oder Bauwerks aus den einzelnen Formsteinen aufgemauert. Dies erfordert einen erheblichen Arbeitsaufwand, nimmt beträchtliche Zeit in Anspruch und setzt den Einsatz von Fachkräften voraus. Das Aufmauern eines vollständigen Futtereinsatzes setzt für einen unverzögerten Arbeitsablauf eine Vorberechnung und Bestellung der Formsteine in Anzahl und Typ voraus, wobei die Möglichkeit des Auftretens von Transportbrüchen zu berücksichtigen ist, was entsprechende Kosten verursacht. Zum Aufmauern von Futtereinsätzen finden ferner in der Regel Spezialmörtel Verwendung, deren mengengerechte Beschaffung und vermauerungsfertige Bereitung Umstände bedingt, welche ihrerseits die Erstellung ir.it entsprechenden Kosten belastet.The previously known lining inserts are made on the spot of a building or structure to be erected from the individual Bricked up molded bricks. This requires a significant amount of work, takes a considerable amount of time, and sets the use of skilled workers. The walling up of a complete lining insert sets a precalculation and ordering of the shaped stones in for an immediate workflow Number and type ahead, taking into account the possibility of transport breaks occurring, which is appropriate Causes costs. In addition, special mortars are usually used to build up lining inserts, the quantities of which are appropriate Procurement and ready-to-wall preparation circumstances conditional, which in turn charges the creation ir.it corresponding costs.
Die Neuerung schafft hier Abhilfe und ist dadurch gekennzeichnet, daß die Formsteine zu einen verbaufertigen Längenabschnitt des Futtereinsatzes bildenden, vorgefertigten Baueinheiten vereinigt und die Baueinheiten jeweils von einer eine Transportklammer bildenden Schrumpffolie am Umfang umgeben sind. Vorzugsweise sind die Formsteine an der Innenseite mit einem Säuremörtel und an der Außenseite mit einem Kunststoffkleber zur Baueinheit aufgemauert. Die Schrumpffolie erstreckt sich zweckmäßig ein Stück um die obere und untere Abschlußkante der Baueinheit herum.The innovation provides a remedy here and is characterized in that the shaped stones form a length section that is ready for installation of the lining insert forming, prefabricated structural units combined and the structural units each from one a shrink film forming a transport clamp are surrounded on the circumference. The shaped stones are preferably on the inside bricked up with an acid mortar and on the outside with a plastic adhesive to form the unit. The shrink film expediently extends a piece around the upper and lower end edge of the structural unit.
Die Neuerung ermöglicht es, Futtereinsätze aus den vorgefertigten Baueinheiten in kürzester Frist bis zur vollen Kaminhöhe herzustellen, ohne hierzu Fachpersonal zu benötigen. Durch den Fortfall von Aurmauerungsarbeiten an der Baustelle samt zugehörigen Nebenarbeiten verringern sich die Gestehungskosten der Futtereinsätze, während die Zeitverkürzung äs? Gestehungszeit an der Baustelle mit Kosteneinsparungen durch Beschleunigung des Baufortschritts einhergeht. Die Vorfertigung der Futtereinsätze zu Baueinheiten an einer Produktionsstätte läßt eine Vereinfachung und Verbilligung der Herstellung eintreten, die durch Rationalisierung und Mechanisierung bedingt ist. Die neuerungsgemäßen Baueinheiten bilden dabei ohne Veränderung des Verbandes der Formsteine transportierbare Gegenstände, die beispielsweise mit Hilfe von Palletten einfach gehandhabt werden können. Beim Einbau an der BaustelleThe innovation makes it possible to manufacture lining inserts from the prefabricated structural units up to the full chimney height in the shortest possible time, without the need for specialist staff. The elimination of masonry work on the construction site, including the associated ancillary work, reduces the production costs of the lining use, while the time is reduced . Production time at the construction site goes hand in hand with cost savings by accelerating construction progress. The prefabrication of the chuck inserts into structural units at a production facility allows the production to be simplified and made cheaper, which is due to rationalization and mechanization. The structural units according to the innovation form objects which can be transported without changing the association of shaped stones and which can be easily handled, for example, with the aid of pallets. When installing on the construction site
genügt es, die die Einheit umklammernde Schrumpffolie zu entfernen, deren Herumgreifen um die obere und untere Abschlußkante der Baueinheit deren Verband in axialer Richtung sichern hilft. Hierbei wirkt auch die Verwendung des Kunststoffklebers mit, so daß sich ohne weiteres Baueinheiten von mehreren Metern Länge einwandfrei vorfertigen und verbauen lassen.it is sufficient to remove the shrink film that is clasping the unit, and to reach it around the upper and lower end edges the assembly helps secure the association in the axial direction. The use of the Plastic adhesive with, so that easily prefabricated units of several meters in length and can be built.
Zwei Ausführungsbeispiele des Gegenstands der Neuerung sind in der Zeichnung schematisch veranschaulicht, es zeigen:Two embodiments of the subject of the innovation are illustrated schematically in the drawing, they show:
Fig. 1 eine Futtereinsatz-Baueinheit nach der Neuerung und 21 shows a chuck insert assembly according to the innovation and 2
in schematiseher Seitenansicht bzw. Draufsicht,in schematic side view or top view,
Fig. 3 Ansichten ähnlich Fig. 1 und 2 einer anderen Ein- und k Fig. 3 views similar to FIGS. 1 and 2 of a different Ein and k
satzausführung.set execution.
Die in öer Zeichnung «argesteilten verbaufertigen Baueinheiten bestehen aus Formsteinen 1,2 bzw. 3, die aus säurefestem und feuerfestem Material, z.B. Schamotte, hergestellt sind. An ihren Stoßkanten sind die Formsteine 1,2 und 3 mit Nut und Feder versehenj über die sie formschlüssig ineinandergreifen. Die eine Feder bildenden, vorspringenden Leisten an Stoßkanten der Formsteine sind mit H bezeichnet. Unter Verwendung von Säuremörtel an der Innenseite und Kunststoffkleber an der Außenseite sind die Formsteine 1,2 bzw. 3 zu BaueinheitenThe ready-to-install units shown in the drawing consist of shaped bricks 1, 2 and 3, which are made of acid-proof and fire-proof material, for example chamotte. At their abutting edges, the shaped stones 1, 2 and 3 are provided with tongue and groove via which they interlock in a form-fitting manner. The protruding strips forming a spring on the abutting edges of the molded blocks are denoted by H. With the use of acid mortar on the inside and plastic adhesive on the outside, the molded blocks 1, 2 and 3 are made into structural units
aufgemauert, deren Höhe beispielsweise einen Meter, zwei Meter oder ein Geschoßhöhenmaß betragen kann. Je nach Einzelhöhe der Formsteine 1,2 bzw, 3 umfaßt daher jede Baueinheit mehrere ubereinanderliegende Reihen von Formsteinen.bricked up, the height of which, for example, one meter, two Meters or a storey height measure. Depending on the individual height of the shaped blocks 1, 2 or 3, each structural unit therefore comprises several superimposed rows of shaped stones.
Bei der Ausführung nach Fig. 1 verkörpert die Baueinheit einen Längenabschnitt eines Futtereinsatzes mit rechtwinkligem Querschnitt. In diesem Falle finden Ecksteine 1 und Zwischenverbindungssteine 2 in beispielsweise der dargestellten Ausführung Verwendung. Bei der Ausführung nach Fig. 3 und 1I hat der Futtereinsatz einen kreisförmigen Querschnitt, in weichem Falle kreisbogensegmentförmige Formsteine gleicher Ausbildung Verwendung finden können.In the embodiment according to FIG. 1, the structural unit embodies a length section of a chuck insert with a rectangular cross section. In this case, corner stones 1 and intermediate connecting stones 2 are used in the embodiment shown, for example. In the embodiment of FIGS. 3 and 1 I of feed use has a circular cross-section, can be found the same in the case of soft circular-arc-segment-shaped conglomerates training use.
Das Aufmauern der Brueinheiten erfolgt an der Produktionsstätte. Um den Verband der Formsteine innerhalb einer Baueinheit auf dem Weg zwischen der Proäuktionsötätte und einer Einbaustelle zu sichern und gleichzeitig die Baueinheiten nach außen hin zu schützen, ist jede Baueinheit von einer lediglich schematisch veranschaulichten Schrumpffolie 5 am Umfang umgeben, welche als strichpunktierte Linie veranschaulicht ist. Diese Schrumpffolie 5 wird in Fortnteines Schlauches angepaßter Grundabmessung locker über eine Baueinheit gestülpt, wonach die Baueinheit samt Folie erhitzt wird. Infolge der Erhitzung zieht sich die Schrumpffolie fest und unter Spannung um die Baueinheit, wobei vorzugsweise sich die Folie ein Stück um die obere und untere Abschlußkante der Baueinheit heruiaerstreckt. Die Schrumpffolie übt schon bei verhältnismäßigThe bricking up of the Bru units takes place at the production site. To the association of the shaped bricks within a structural unit on the way between the production facility and an installation site to secure and at the same time to protect the structural units from the outside, each structural unit is only one schematically illustrated shrink film 5 surrounded on the circumference, which is illustrated as a dash-dotted line. This shrink film 5 is adapted in the form of a tube The basic dimensions are loosely placed over a structural unit, after which the structural unit and the foil are heated. As a result of heating The shrink film pulls itself tightly and under tension around the structural unit, the film preferably wrapping around a piece the upper and lower end edges of the structural unit extend outwards. The shrink film is already practicing at relative
geringen Wandstärken, beispielsweise bei Wandstärken von 0,150 bis 0,175 mm eine kräftige, ausreichende Spannung auf die Baueinheit aus, welche auf diese Weise von einer einfachen und billigen Transportklämmer umgeben ist.small wall thicknesses, for example with wall thicknesses of 0.150 to 0.175 mm, a strong, sufficient tension on the structural unit, which is surrounded in this way by a simple and cheap transport clamp.
Es versteht sich, daß anstelle dertiargestellten Formsteine je nach den gewünschten Höhen- und Querschnittsabmessungen Pormsteine anderer, zweckentsprechender Gestaltung Verwendung finden können.It goes without saying that instead of the shaped stones Depending on the desired height and cross-sectional dimensions, Pormsteine other, appropriate design use can find.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19681997883 DE1997883U (en) | 1968-08-27 | 1968-08-27 | FEED INSERT FOR SMOKE AND EXHAUST CHIMNEYS |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19681997883 DE1997883U (en) | 1968-08-27 | 1968-08-27 | FEED INSERT FOR SMOKE AND EXHAUST CHIMNEYS |
Publications (1)
Publication Number | Publication Date |
---|---|
DE1997883U true DE1997883U (en) | 1968-12-05 |
Family
ID=5758518
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19681997883 Expired DE1997883U (en) | 1968-08-27 | 1968-08-27 | FEED INSERT FOR SMOKE AND EXHAUST CHIMNEYS |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE1997883U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19700411A1 (en) * | 1997-01-09 | 1998-07-23 | Wolfshoeher Tonwerke Gmbh | Refractory material panel for construction of heated structures |
-
1968
- 1968-08-27 DE DE19681997883 patent/DE1997883U/en not_active Expired
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19700411A1 (en) * | 1997-01-09 | 1998-07-23 | Wolfshoeher Tonwerke Gmbh | Refractory material panel for construction of heated structures |
DE19700411C2 (en) * | 1997-01-09 | 1999-06-10 | Wolfshoeher Tonwerke Gmbh | Rectangular plate made of refractory material for building flue gas flues, heating chambers or the like. |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2438890A1 (en) | PREFABRICATED ELEMENTS FOR PARTITION WALLS AND MASONRY AND WALLS AND WALLS BUILT WITH SUCH ELEMENTS | |
DE1997883U (en) | FEED INSERT FOR SMOKE AND EXHAUST CHIMNEYS | |
DE2608848C3 (en) | Wall element made of sand-lime bricks | |
DE905060C (en) | Process for erecting buildings made of straw clay and the like like | |
DE7526883U (en) | BRACKET FOR IN PARTICULAR DOUBLE-WALLED WITH ARMORING MADE OF INDIVIDUAL COMPONENTS OR FORMWORK TO BE BUILT. WALLS | |
DE823500C (en) | Floor ceiling for buildings in metal construction | |
DE814045C (en) | Ceiling hollow stone | |
DE2416948B2 (en) | PROCEDURE FOR CONSTRUCTION AND REPAIR OF COOK CHAMBER WALL | |
DE1684715C3 (en) | ||
AT334055B (en) | FASTENING ELEMENT FOR MOUNTING FLOOR GAS CONCRETE PREFABRICATED WALL ELEMENTS ON PILLARS, IN PARTICULAR CONCRETE PILLARS | |
AT235549B (en) | Artificial stone stair step | |
DE450301C (en) | Method of making reinforced concrete dome shells | |
AT216732B (en) | Divisible hollow block | |
DE325256C (en) | Cavity wall made of concrete supports and plates engaging in their grooves | |
DE872838C (en) | Building ceiling | |
DE1806812A1 (en) | Prefabricated beams made of shaped bricks for the formation of steel stone ceilings or other ceilings made of ceiling bricks | |
DE2614186A1 (en) | Prefabricated concrete ring beam formwork - has interfacing steel rods in sidepieces connectable to provide spacers | |
DE804033C (en) | Method and device for producing a building ceiling | |
DE589856C (en) | Silo with cross ventilation | |
AT252088B (en) | Process for the production of prefabricated components | |
DE707337C (en) | Wall made of hollow bricks with a concrete filling in the cavities, especially for feed silos | |
DE1945506C (en) | Ceiling element | |
DE7810413U1 (en) | SHELLBODY | |
CH190925A (en) | Wooden construction element. | |
AT84616B (en) | Cell wall made of stacked bars for grain or similar silos. |