DE19824453A1 - Container for backfilling underground workings - Google Patents

Container for backfilling underground workings

Info

Publication number
DE19824453A1
DE19824453A1 DE1998124453 DE19824453A DE19824453A1 DE 19824453 A1 DE19824453 A1 DE 19824453A1 DE 1998124453 DE1998124453 DE 1998124453 DE 19824453 A DE19824453 A DE 19824453A DE 19824453 A1 DE19824453 A1 DE 19824453A1
Authority
DE
Germany
Prior art keywords
container
dam
container according
material container
support rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE1998124453
Other languages
German (de)
Inventor
Klaus Schulte
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE1998124453 priority Critical patent/DE19824453A1/en
Publication of DE19824453A1 publication Critical patent/DE19824453A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/48Chocks or the like
    • E21D15/483Chocks or the like made of flexible containers, e.g. inflatable, with or without reinforcement, e.g. filled with water, backfilling material or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials

Abstract

A container for backfilling underground workings comprises a flexible rectangular bag which is fitted over an adjustable support frame and filled with water borne backfill. The water drains out of the container leaving the backfill to set and support the strata. The containers are secured to the frames by their upper edges and are height adjustable to fill the space between the floor and ceiling of the underground working. One side of the container wall can be secured to the roadway support frames (16) for securing side faces.

Description

Die Erfindung betrifft einen Dammaterialbehälter für Streckenbegleitdämme, die dem Abstand zwischen Liegendem und Hangendem angepasst jeweils einen Ab­ schnitt vorgebend entlang der Strecken im untertägigen Bergbau angeordnet und mit einem pumpfähigen und im Behälter aushärtenden Baustoff gefüllt sind, wobei der aus wasserdurchlässigem Material gefertigte quaderartige Behälter eine rundum geschlosse­ ne Wandung mit einem Einfüllstutzen aufweist.The invention relates to a dam material container for line accompanying dams, the one adjusted to the distance between lying and hanging cut and arranged along the lines in underground mining a pumpable and in the container curing building material are filled, the from cuboid-like containers made of water-permeable material form an all-round closed ne wall with a filler neck.

Im untertägigen Bergbau, insbesondere im untertägigen Steinkohlenbergbau werden im Flöz Strecken ausgefahren, um dann den Strebbereich zwischen den beiden Strecken auszukohlen. Dabei wird zunächst auf einer Seite und dann auf der anderen Seite die Kohle bis an den Streckenausbau heran abgebaut, so dass dieser durch das zu Bruch gehende Hangende stark belastet wird. Um die Belastung vom Streckenausbau möglichst weitgehend abzuhalten, werden seit vielen Jahren sogenannte Streckenbegleit­ dämme aufgefahren, d. h. der Abstand zwischen Hangendem und Liegendem wird nach Herausnahme der Kohle und nach Entfernen des Streckenausbaus mit pumpfähigem Baustoff ausgefüllt, der nach dem Aushärten die notwendigen Stutzkräfte zumindest weitestgehend aufbringt. Da das pumpfähige Baustoffmaterial natürlich mit dem Verlas­ sen des Pumprohres dazu neigt, sich gleichmäßig zu verteilen, sind zunächst beidseitig Verschläge aufgebaut worden, die den Aufbau des Baustoffs zu einem Damm erzwin­ gen. Bekannt ist es auch, den Baustoff in vorher hergestellte sackähnliche Tuchbehälter einzufüllen, die mit der zunehmenden Verfüllung vom Liegenden her zum Hangenden wachsen und aufgrund der Wasserdurchlässigkeit dafür sorgen, dass der Baustoff relativ schnell entwässert wird und dann aushärtet. Aufgrund des dünnwandigen Wandungs­ materials ist es schwierig, einigermaßen senkrecht Seitenbegrenzungen für den Damm vorzugeben. Es ist hierzu bereits versucht worden, diese Behälter wiederum in Ver­ schlägen anzuordnen, um so dem Ausbeulen der Wandung weitgehend entgegenzuwir­ ken. Besonders nachteilig bei den bekannten Behältern ist aber, dass sie quasi von un­ ten nach oben, d. h. vom Liegendem zum Hangenden wachsen, so dass das Befüllen auch schwierig ist. Von daher sind auch Behälter bekannt, die mit einem innen oder außen liegenden Stützgerüst versehen sind, wobei das außenbefindliche Stützgerüst nach dem Aushärten des Baustoffes entfernt wird. Diese Behälter weisen aber in der Regel einen kreisrunden Querschnitt auf und können nur bis zu einem relativ geringen Durch­ messer wirksam gesetzt werden, so dass aufgrund der Vielzahl der benötigten einzelnen Behälter der Aufwand verhältnismäßig groß ist. Bekannt ist es schließlich auch schon, diese im Durchmesser kreisrunden Behälter mit geeigneten Mitteln am Hangenden festzusetzen, ggf. durch Hydraulikstempel oder ähnliche Abstützteile, um dann vom Hangenden her, zumindestens aber vom oberen Teil des Behälters her diesen mit Bau­ stoff zu befüllen. Dies hat den Vorteil, dass die Behälter nicht nach oben wachsen müs­ sen, sondern vielmehr von oben nach unten befüllt werden können und sich damit bes­ ser füllen lassen. Auch bei diesen Behältern ist aber nachteilig, dass mit gesonderten Stützen gearbeitet werden muss, so dass der Aufstellungsaufwand nach wie vor verhält­ nismäßig groß ist. In der Regel handelt es sich dabei nämlich um Hydraulikstempel, wobei selbst bei den im Durchmesser relativ kleinen kreisrunden Behältern zumindest zwei derartiger Hydraulikstempel benötigt werden.In underground mining, especially in underground coal mining are extended in the seam, then around the longwall area between the two Carbonize stretches. It starts on one side and then on the other Side the coal mined up to the line extension, so that this through Breaking slope is heavily loaded. To reduce the burden of line expansion Holding back as far as possible has been so-called route accompaniment for many years dams raised, d. H. the distance between hanging and lying down becomes Take out the coal and after removing the line extension with pumpable Building material filled out, at least the necessary supporting forces after curing as far as possible. Since the pumpable building material naturally with the Verlas The pump tube tends to spread evenly on both sides Crates have been built that force the building of the building material into a dam It is also known to place the building material in previously made sack-like cloth containers to fill in, with the increasing backfill from lying down to hanging grow and due to the water permeability ensure that the building material is relative is drained quickly and then hardens. Because of the thin-walled wall materials it is difficult to make somewhat vertical side boundaries for the perineum to specify. Attempts have already been made to turn these containers into Ver Arrange blows to largely counter the bulging of the wall ken. A particularly disadvantage of the known containers, however, is that they are practically un ten up, d. H. grow from lying down to hanging so that filling is also difficult. Therefore, containers are known that have an inside or  external support structure are provided, the external support structure according to the curing of the building material is removed. However, these containers usually have a circular cross-section and can only up to a relatively small through knives can be set effectively, so that due to the large number of required individual Container the effort is relatively large. After all, it is already known these containers are circular in diameter with suitable means on the slope to fix, if necessary by hydraulic stamps or similar support parts, in order then from Hanging here, but at least from the upper part of the container with construction fill fabric. This has the advantage that the containers do not have to grow upwards sen, but rather can be filled from top to bottom and thus let it fill. It is also disadvantageous with these containers that with separate Columns must be worked so that the installation effort remains the same is reasonably large. As a rule, these are hydraulic stamps, at least even with the relatively small circular containers two such hydraulic stamps are required.

Der Erfindung liegt nun die Aufgabe zugrunde, einen Dammaterialbehälter zu schaffen, der ohne großen Aufwand im leeren Zustand so montierbar ist, dass er sich durch das Befüllen zwischen Hangendem und Liegendem genau positioniert verspannt und dabei einen relativ großen Durchmesser aufweist bzw. im Durchmesser den jewei­ ligen Gegebenheiten anpassbar ist.The invention is based on the object of a dam material container create that can be assembled without much effort when empty so that it can precisely positioned by filling between hanging and lying and has a relatively large diameter or the diameter of each current circumstances is customizable.

Die Aufgabe wird gemäß der Erfindung dadurch gelöst, dass der obere Rand des Behälters ganz oder teilweise umgeschlagen und eine Stangenhalterung bildend geformt ist und dass parallel zur Streckenlängsachse Tragstangen eingezogen sind, die am Streckenausbau und/oder am bereits gesetzten Begleitdammabschnitt abstützbar ausgebildet sind.The object is achieved according to the invention in that the upper edge of the container completely or partially turned over and forming a rod holder is shaped and that parallel to the longitudinal axis of the support rods are retracted can be supported on the track extension and / or on the accompanying dam section already set are trained.

Mit einem derart ausgebildeten Dammaterialbehälter ist es zunächst einmal möglich, ohne zusätzliche Hilfsmittel diesen im Bereich des Hangenden so festzulegen und abzustützen, dass er dann bequem quasi schon aufgestellt mit dem Dammbaumate­ rial bzw. dem Baustoff befüllt werden kann. Dementsprechend ist der an sich bekannte Einfüllstutzen im Bereich des Hangenden angeordnet. Diese Ausbildung hat darüber hinaus den Vorteil, dass es problemlos möglich ist, einen in der Höhe größeren Behäl­ ter einzusetzen, als es an sich für die jeweilige Strebverhältnisse notwendig ist. Damit ist eine größere Anpassbarkeit an Schwankungen möglich, ohne dass die Stützkraft o. Ä. derartiger Behälter dadurch beeinträchtigt würde. Es kommt einfach dazu, dass ein gewisser Teil der Wandung zusammen gelegt auf dem Liegenden verbleibt und eben nicht ganz mit dem Baustoff ausgefüllt wird. Da Boden und Deckel des Behälters mit der Wandung eine Einheit bilden, kann es auf keinen Fall dazu kommen, dass Baustoff unbeabsichtigt austritt. Die Form derartiger Behälter ist annähernd optimal, d. h. die Seitenwände sind annähernd senkrecht, so dass zum gewünschten Abstützen des Hangen­ den die notwendigen Abstützkräfte erzeugt werden, andererseits aber unnötige Mengen an Dammbaumaterial bzw. Baustoff nicht benötigt werden. Die die Wand des Behälters bzw. des Streckenbegleitdamms vorgebenden Wandungen bzw. Seitenwände des Behäl­ ters wirken dabei vorteilhaft gleichzeitig als Sanierung, weil sie das Wasser durchlas­ sen, den Baustoff aber zurückhalten, so dass sie im nachhinein in den Baustoff inte­ griert sind und diesen vorteilhaft stabilisieren. Die notwendige "Befestigung" am Gebir­ ge bzw. am Hangendem erfolgt durch die Tragstangen, die einerseits auf dem Strecken­ ausbau abgestützt werden, der in diesem Bereich freigelegt worden ist und andererseits dadurch, dass die entsprechende Tragstange sich am vorhandenen Begleitdammabschnitt abstützt. Die beiden Tragstangen reichen in aller Regel aus, um dem entsprechenden Behälter die gewünschte Form zu geben. Denkbar ist es aber auch, wie weiter hinten noch ausgeführt, zu den Tragstangen auch noch Querstangen vorzusehen. Da diese Tragstangen eigentlich kein Gewicht zu tragen brauchen, können sie relativ dünn di­ mensioniert werden, sind leicht zu transportieren und gut zu handhaben.With such a dam material container, it is first of all possible to set this in the area of the hanging without additional aids and to support it so that it can be conveniently set up with the dam construction material rial or the building material can be filled. Accordingly, the well-known  Filler neck arranged in the area of the hanging. This training has about that also the advantage that it is easily possible to have a larger container more than what is necessary for the respective striving conditions. In order to a greater adaptability to fluctuations is possible without the supporting force or the like. such containers would be affected. It just happens that a certain part of the wall folded together remains on the lying and even is not completely filled with the building material. Because bottom and lid of the container with of the wall form a unit, there can be no way that building material unintentionally emerges. The shape of such containers is approximately optimal, i. H. the Side walls are approximately vertical, so that the desired support of the slope the necessary support forces are generated, but on the other hand unnecessary quantities of dam building material or building material are not required. The the wall of the container or the walls or side walls of the container which define the route dam ters also have a beneficial effect as renovation because they let the water through but hold back the building material so that it can be integrated into the building material afterwards are grated and stabilize this advantageous. The necessary "attachment" to the mountain ge or on the hanging is carried out by the support rods, on the one hand on the stretch supported expansion that has been exposed in this area and on the other in that the corresponding support rod is located on the existing accompanying dam section supports. The two support rods are usually sufficient to the corresponding To give containers the desired shape. But it is also conceivable, as further below still executed to provide cross bars to the support rods. This one Support rods actually do not need to carry any weight, they can be relatively thin dimensioned, are easy to transport and easy to use.

Nach einer zweckmäßigen Ausführung der Erfindung ist vorgesehen, dass der obere Rand als durchgehende, rohrförmige Stangenhalterung ausgebildet ist. Hierdurch ist die Möglichkeit gegeben, die einzelnen Stangen in die entsprechende Stangenhalte­ rung einzuschieben, um so den Behälter unter Tage vorzubereiten und dann zwischen Hangendem und Liegendem festzusetzen. Denkbar ist es aber auch, die Tragstangen gleich bei Fertigung der Stangenhalterung mitzufixieren und dann auch mitzutranspor­ tieren. Dies ist problemlos deshalb möglich, weil sie ein geringes Gewicht aufweisen und weil sie mit dem notwendigen Tuch für die Wandung eingeschlagen werden kön­ nen, ohne ein solches Paket in nennenswertem Umfang zu stören. Es ist bereits darauf hingewiesen worden, dass die Tragstangen in der Stangenhalterung sicher gelagert werden, wobei sie beim Hin- und Herschieben auch gleichzeitig vorteilhaft geführt sind, weil die den oberen Rand bildende Stangenhalterung die eingeschobene Trag­ stange eng umhüllend und führend ausgebildet ist. Da die Tragstangen auch bei der Herstellung der Stangenhalterung gleich mit eingelegt sein können und mit eingebunden werden, ist der Begriff "eingeschobene Tragstange" entsprechend nicht ganz umfas­ send.According to an expedient embodiment of the invention it is provided that the upper edge is designed as a continuous, tubular rod holder. Hereby it is possible to hold the individual rods in the corresponding rod holders insert to prepare the container underground and then between To fix hanging and lying. But it is also conceivable to use the support rods to be fixed in the manufacture of the rod holder and then also to be transported animals. This is easily possible because they are light in weight  and because they can be wrapped with the necessary cloth for the wall without disturbing such a package to any significant extent. It is already on it have been advised that the support rods are securely stored in the rod holder are, whereby they are also performed at the same time advantageous when moving back and forth are because the rod holder forming the upper edge is the inserted support rod is tightly enveloping and designed to be a leader. Since the support rods also in the Manufacture of the rod holder can be inserted with and included are, the term "inserted support rod" is not entirely included send.

Die entsprechenden Tragstangen reichen in aller Regel aus, um den Behälter vor allem mit dem vorhandenen Streckenausbau bzw. dem bereits gesetzten Begleitdamm zu verbinden. Soweit beim Verbinden mit dem Streckenausbau Probleme bestehen, kann es zweckmäßig sein, wenn die Stangenhalterungen mit Anschlagmitteln für den Streckenausbau ausgerüstet sind. Hierbei kann es sich um Schlaufen oder Bänder aber auch Rödeldraht. Mit Hilfe dieser Anschlagmittel kann der Behälter bzw. können die Tragstangen an den Bolzen, den Abstandshaltern oder auch am Verzug des Strecken­ ausbaus festgelegt werden, was den Vorteil hat, dass es damit möglich ist, sie bis dicht unter das Hangende zu bringen und dort festzulegen, um dann den Baustoff besonders einfach und sicher einbringen zu können.The corresponding support rods are usually sufficient to hold the container in front all with the existing route expansion or the already installed accompanying dam connect to. As far as there are problems with the connection with the line expansion, it may be appropriate if the rod holders with slings for Line expansion are equipped. This can be loops or ribbons, however also solder wire. With the help of these slings, the container or can Support rods on the bolts, the spacers or even the warpage of the stretch expansion can be determined, which has the advantage that it is possible to close them up to bring it underneath the slope and fix it there, and then the building material in particular easy and safe to insert.

Die zum Einsatz kommenden in Längsrichtung der Strecke verlaufenden Trag­ stangen können auch durch weitere Stangen ergänzt werden. Hierzu sieht die Erfindung vor, dass zumindest die den bereits gesetzten Begleitdammabschnitt abgewandte Seite des Behälters eine Aufnahme bzw. Stangenhalterung für eine rechtwinklig zu den Läng­ stragstangen verlaufende Quertragstange aufweist. Diese Quertragstange führt letztlich dann dazu, dass ein entsprechendes Quadrat oder Rechteck vorgegeben ist, das den Deckel des Behälters bildet und das eine optimale Einbringung der Stützkräfte vom Hangenden über den Begleitdamm aufs Liegende oder umgekehrt vorzugeben und si­ cherzustellen. Die Form, die so für den Behälter vorgegeben ist, ist annähernd ideal und darüber hinaus haben diese Quertragstangen auch den Vorteil, dass beim nachfol­ genden Ansetzen des nächsten Behälters ein optimales Widerlager vorhanden ist, auf das die Längstragstangen der nächsten Behälter aufgelegt oder aufgeschoben werden können.The support used in the longitudinal direction of the line Poles can also be supplemented with other poles. The invention provides for this before that at least the side facing away from the accompanying dam section of the container a holder or rod holder for a perpendicular to the length has supporting cross-bar. This cross support rod ultimately leads then to the fact that a corresponding square or rectangle is given that the Lid of the container forms and the optimal introduction of the support forces from To specify hanging on the accompanying dam on the lying or vice versa and si to create. The shape that is given for the container is almost ideal and in addition, these cross bars also have the advantage that an optimal abutment is available on the next container  that the longitudinal support rods of the next container are placed or pushed on can.

Um das Einsetzen oder Verbinden der Längstragstangen mit dem bereits gesetz­ ten Begleitdamm zu erleichtern, ist vorgesehen, dass die Längstragstangen, zumindest die streckenabgewandte Längstragstange ein in Richtung bereits gesetzter Begleitdamm weisendes angeschärftes Ende aufweist. Durch dieses angeschärfte Ende ist entweder möglich, die entsprechende Längstragstange einfacher auf die Quertragstange aufzule­ gen oder aber auch richtig in das Material des Begleitdamms, d. h. also beispielsweise in den Anhydrit hineinzutreiben. Damit hat dann die Längstragstange ein optimales Widerlager, so dass sie entsprechende Kräfte übernehmen kann und den zu setzenden Behälter so verspannt, dass er vom Hangenden her leicht mit dem Baustoff verfüllt werden kann.To insert or connect the longitudinal support rods with the already law To facilitate th accompanying dam, it is provided that the longitudinal support rods, at least the longitudinal support rod facing away from the track is an accompanying dam already set pointing sharpened end. Through this sharpened end is either possible to easily attach the corresponding longitudinal support rod to the cross support rod or correctly in the material of the accompanying dam, d. H. for example to drive into the anhydrite. The longitudinal support rod then has an optimal one Abutment, so that it can take over appropriate forces and the one to be set Container clamped so that it easily fills with the building material from the hanging can be.

Die in Längsrichtung der Strecke am Streckenausbau festgelegte Längstragstange benötigt keine weitere Abstützung, während man für die strebseitige Längstragstange bzw. die entsprechende Quertragstange an dem Verbindungspunkt zwischen beiden zweckmäßigerweise eine Abstützung noch errichten kann und zwar mit Hilfe eines Hydraulikstempels oder ähnlichem Abstützelementes. Zwar ist dieses Abstützelement nicht unbedingt nötig, doch in der Regel von Vorteil, weshalb gemäß der Erfindung vorgesehen ist, dass die Quertragstange endseitig zumindest am der streckenabgewand­ ten Längstragstange zugewandten Ende eine Abplattung für die Kopfplatte eines Hy­ draulikstempels aufweist. Zwar ist eine solche Abplattung wiederum nicht unbedingt notwendig, doch ist damit für den Bergmann das Setzen des Abstützelementes leichter zu bewerkstelligen. Vor allem weiß er genau, wo er das Abstützelement anzubringen hat, um dann anschließend den Behälter schnell und vollständig mit Baustoff zu verfül­ len.The longitudinal support rod defined in the longitudinal direction of the line when the line is being extended No further support is required while you are using the strut-side longitudinal support rod or the corresponding crossbar at the connection point between the two expediently can still build a support with the help of a Hydraulic stamp or similar support element. This is a support element not absolutely necessary, but usually advantageous, which is why according to the invention it is provided that the cross support rod at the end at least on the track away end facing the longitudinal support rod a flattening for the head plate of a Hy has draulic stamp. Such flattening is again not absolutely necessary necessary, but this makes it easier for the miner to place the support element to accomplish. Above all, he knows exactly where to attach the support element in order to then quickly and completely fill the container with building material len.

Weiter vorne ist bereits darauf hingewiesen worden, dass die Wandung des Behälters aus einem Material besteht, das Wasser durchlässt. Damit ist es natürlich auch möglich, dass die beim Einpumpen des Baustoffes entweichende Luft gleichzeitig durch die Wandung hindurchdringt, ohne dass es zu nachteiligen Rückstaus im Behälter kommt. Die entweichende Luft wird dabei gleichzeitig gefiltert, so dass nicht einmal mitgerissene Baustoffteile in die Umwelt entweichen können. Da der Einfüllstutzen nicht unmittelbar unter dem Hangenden angeordnet werden kann, sondern in gewissem Abstand dazu, ist das Auslaufen von Baustoff wirksam dadurch verhindert, dass der Einfüllstutzen als Rückschlagventil oder ein solches aufweisend ausgebildet ist. Der Baustoff kann damit wirksam eingepumpt werden, bis sich der Behälter insgesamt so­ weit aufgebläht und ausgeweitet hat, dass er den Hohlraum zwischen Hangendem und Liegendem wirksam verfüllt.It was pointed out earlier that the wall of the Container is made of a material that allows water to pass through. So that's natural it is also possible that the air escaping when the building material is pumped in at the same time penetrates through the wall without causing adverse backlogs in the container  is coming. The escaping air is filtered at the same time, so that not even entrained building material parts can escape into the environment. Because the filler neck can not be arranged directly under the hanging, but in a certain Distance to it, the leakage of building material is effectively prevented by the Filler neck is designed as a check valve or having such. Of the Building material can thus be pumped in effectively until the container as a whole has blown up and expanded to the point that it hangs between the hanging and Effectively backfilled.

Das dichte Anliegen des Behälters am Hangenden erreicht man insbesondere auch dadurch, dass das den Deckel des Behälters bildende Oberteil in Richtung Han­ gendes ausbeulbar ausgebildet ist. Wird aufgrund des eingesetzten Rückschlagventils entsprechend der Rest des Baustoffes unter Druck eingepumpt, kann sich der Deckel nach oben hin bis zum Hangenden Ausbeulen, um so die optimale Verbindung mit dem gesamten Hangenden zu erreichen.The tight fit of the container on the slope is achieved in particular also in that the upper part forming the lid of the container in the direction of Han is designed to be dentable. Is due to the check valve used According to the rest of the building material pumped in under pressure, the lid can become upwards to the hanging bulge in order to achieve the optimal connection with the to reach the entire slope.

Bei schon sehr hart gewordenem Baustoff kann es ggf. Probleme machen, die Längstragstange richtig und wirksam am bereits aufgestellten Streckenbegleitdamm bzw. am entsprechenden Behälter zu erreichen. Um hier Hilfsmittel miteinsetzen zu können, sieht die Erfindung vor, dass die Längstragstange auf der dem angeschärften oder eine Spitze aufweisenden Ende gegenüberliegenden Endstück eine Aufnahme für eine Bohrmaschine oder einen Schlaghammer aufweist. Damit kann diese Längstrag­ stange bei Bedarf sogar motorisch so beaufschlagt werden, dass sie ein optimiertes Widerlager im Bereich des bereits aufgestellten Behälters findet. Besonders zweckmä­ ßig hat sich dabei herausgestellt, die Tragstangen als Metallstangen auszubilden, weil diese ggf. auch das Eintreiben mit Hilfsmitteln ermöglichen und weil sie aufgrund ihrer Eigensteifigkeit auch dann noch für eine vorteilhafte "Aufhängung" des Behälters sor­ gen, wenn sie das entsprechende Widerlager am bereits vorhandenen Behälter finden.If the building material has already become very hard, it may cause problems that Longitudinal support rod correctly and effectively on the line accompanying dam already set up or at the appropriate container. To use tools here can, the invention provides that the longitudinal support rod on the sharpened or a tip having an end opposite end piece a receptacle for has a drill or a hammer. This allows this longitudinal beam If necessary, the rod can even be motorized in such a way that it is optimized Abutment takes place in the area of the container already set up. Particularly useful ßig has turned out to design the support rods as metal rods because if necessary, they can also be driven in with tools and because of their Intrinsic rigidity even then for an advantageous "suspension" of the container sor if you find the corresponding abutment on the existing container.

Die Erfindung zeichnet sich insbesondere dadurch aus, dass ein Dammaterial­ behälter geschaffen ist, der leicht zu montieren und dann mit Baustoff zu verfüllen ist und der sich insbesondere den Gegebenheiten, d. h. insbesondere den Höhenschwan­ kungen anpassen lässt, ohne dass Sonderbauarten benötigt werden. Vorteilhaft ist wei­ ter, dass zum vorteilhaften Befüllen des Behälters vom Hangenden aus lediglich verhält­ nismäßig einfache Tragstangen benötigt werden, die auf vorhandenen bzw. einfach zu schaffenden Widerlagern abgestützt werden, um so den Behälter im leeren Zustand möglichst dicht am Hangenden zu positionieren und dann mit Baustoff zu verfüllen. Die Behälter können im leeren Zustand leicht transportiert und eben, wie erwähnt, montiert werden, wobei praktisch die Möglichkeit gegeben ist, quadratische oder rechteckige Behälter vorzugeben, um so den Hohlraum zwischen Hangendem und Liegendem mög­ lichst optimal zu verfüllen. Natürlich können auch davon abweichende Formen erreicht werden, wobei in aller Regel lediglich zwei Tragstangen benötigt werden, die parallel zur Längsachse der Strecke abgestützt werden und zwar unter gleichzeitiger Aufhän­ gung des Behälters.The invention is characterized in particular by the fact that a dam material container is created, which is easy to assemble and then fill with building material and which in particular the circumstances, d. H. especially the swan  can be adjusted without the need for special designs. White is advantageous ter that only behaves to the advantageous filling of the container from the hanging In principle, simple support rods are required, which are available or simply too creating abutments are supported so that the container is empty to be positioned as close as possible to the slope and then to be filled with building material. The Containers can be easily transported when empty and, as mentioned, even assembled be, with the practical possibility of being square or rectangular Specify containers so that the space between hanging and lying is possible optimally to fill. Of course, deviating forms can also be achieved are, whereby usually only two supporting rods are required, the parallel are supported to the longitudinal axis of the route, with simultaneous suspension supply of the container.

Weitere Einzelheiten und Vorteile des Erfindungsgegenstandes ergeben sich aus der nachfolgenden Beschreibung der zugehörigen Zeichnung, in der ein bevorzugtes Ausführungsbeispiel mit den dazu notwendigen Einzelheiten und Einzelteilen dargestellt ist. Es zeigen:Further details and advantages of the subject matter of the invention result from the following description of the accompanying drawing, in which a preferred Embodiment with the necessary details and items shown is. Show it:

Fig. 1 eine Strecke im Querschnitt mit bereits gesetztem Damm­ materialbehälter, Fig. 1 is a route in cross section with already set, dam material tank,

Fig. 2 einen Schnitt durch den oberen Rand eines Behälters mit eingelegter Tragstange, Fig. 2 shows a section through the upper rim of a container with inserted supporting rod,

Fig. 3 eine perspektivische Darstellung einer Strecke mit einzel­ nen Abschnitten, die den Streckenbegleitdamm bilden, Fig. 3 is a perspective view of a track with single-NEN sections forming the route accompanying dam

Fig. 4 mehrere eingebaute und im Einbau befindliche Behälter vom Streb her gesehen und Fig. 4 seen several built-in and built-in container from the strut and

Fig. 5 einen entsprechenden Behälter in Draufsicht. Fig. 5 shows a corresponding container in plan view.

Fig. 1 zeigt eine Strecke 4, die im Flöz aufgefahren ist. Dabei ist auf einer Seite der Strecke bereits das Flöz abgebaut und ein Dammaterialbehälter 1 gesetzt. Dieser ist zwischen Hangendem 2 und Liegendem 3 verspannt, so dass er die Hangendschichten wirksam abstützt und dabei den Streckenausbau 16 entlastet. Fig. 1 shows a route 4 , which is excavated in the seam. The seam has already been mined on one side of the route and a dam material container 1 has been set. This is braced between the hanging 2 and the lying 3 , so that it effectively supports the hanging layers and thereby relieves the track extension 16 .

Die Dammaterialbehälter 1 bzw. die Behälter 1 bilden in Streckenlängsrich­ tung 12 gesehen einen durchgehenden Streckenbegleitdamm 5, wobei dieser aus eng aneinander angefügten Abschnitten 6 besteht. Diese Abschnitte 6 werden von den ein­ zelnen Behältern 1, 1', 1'', 1''' gemäß Fig. 3 gebildet.The dam material container 1 or the container 1 form seen in line longitudinal direction 12 a continuous line accompanying dam 5 , which consists of closely attached sections 6 . These sections 6 are formed by the individual containers 1 , 1 ', 1 '', 1 ''' according to FIG. 3.

Die Wandung 7 des Behälters 1 besteht aus einem wasserdurchlässigen Material, während der eingefüllte Baustoff zurückgehalten wird. Dadurch kann der Baustoff im Behälter 1 relativ schnell Aushärten, um dann seine Stützaufgaben zu übernehmen.The wall 7 of the container 1 consists of a water-permeable material, while the filled building material is retained. As a result, the building material in container 1 can harden relatively quickly in order to then take on its supporting functions.

Die einzelnen Behälter 1, 1', 1'', 1''' werden über den Einfüllstutzen 8 mit Baustoff gefüllt, der relativ dicht in der Nähe des Hangenden 2 angeordnet bzw. in die Wandung 7 des Behälters 1 eingebracht ist.The individual containers 1 , 1 ', 1 '', 1 ''' are filled via the filler neck 8 with building material, which is arranged relatively close to the hanging area 2 or is introduced into the wall 7 of the container 1 .

Die Strecke 4 dient zum Abtransport der Kohle. Hierzu werden Förderbänder eingesetzt, die hier nicht dargestellt sind. Dargestellt ist aber ein Transportbehälter 9, mit dessen Hilfe die sonst benötigten Materialien und Werkzeuge herangebracht wer­ den. Derartige Transportbehälter 9 können auch zum Antransport des Baustoffes be­ nutzt werden, wobei der Baustoff dann im Bereich des Strebes mit Wasser vermischt wird.The route 4 is used to remove the coal. Conveyor belts are used for this purpose, which are not shown here. However, a transport container 9 is shown , with the aid of which the materials and tools otherwise required are brought in. Such transport container 9 can also be used to transport the building material, the building material then being mixed with water in the area of the strut.

Die einzelnen Behälter 1 weisen am oberen Rand 10 eine durchgehende Stangen­ halterung 11 auf, in der Tragstangen 13, 14 und wie weiter hinten erläutert wird auch noch 15 gelagert sind. Fig. 2 verdeutlicht, dass diese Tragstangen 13, 14, 15 in einer schlaufenartigen Stangenhalterung gelagert sind, die durch Anlegen einer Naht 30 er­ reicht wird. Während man Fig. 2 entnehmen kann, dass ein relativ großer Abstand zwischen der Tragstange 13, 14, 15 und der Stangenhalterung 11 besteht, liegt die Stangenhalterung in der Regel dicht an den Tragstangen 13, 14, 15 an, so dass diese entsprechend eingehüllt gelagert sind und auch geführt werden, wenn aus irgendwel­ chen Gründen die Tragstangen 13, 14, 15 in Längsrichtung der Stangenhalterung 11 verschoben werden müssen.The individual container 1 have a continuous rod holder 11 at the upper edge 10 , in the support rods 13 , 14 and as explained further below, 15 are also stored. Fig. 2 illustrates that these support rods 13 , 14 , 15 are mounted in a loop-like rod holder, which is sufficient by applying a seam 30 . While FIG. 2 shows that there is a relatively large distance between the support rods 13 , 14 , 15 and the rod holder 11 , the rod holder is generally in close contact with the support rods 13 , 14 , 15 , so that they are appropriately encased are and are also performed if the support rods 13 , 14 , 15 must be moved in the longitudinal direction of the rod holder 11 for any reason.

Fig. 1 und Fig. 3 zeigen, dass im Bereich des oberen Randes 10 bzw. der Stan­ genhalterung 11 die Abstützung bzw. die Fixierung des Behälters 1 dadurch erreicht wird, dass die eingebundenen Tragstangen 13, 14, 15 auf den Bolzen 17 des Strecken­ ausbaus 16 abgestützt werden oder damit verbunden werden und zwar mit den An­ schlagmitteln 18, 18'. Darüber hinaus ist aber auch eine weitere Abstützung möglich, die insbesondere Fig. 4 und Fig. 5 entnommen werden kann. Fig. 1 and Fig. 3 show that in the area of the upper edge 10 and the Stan gene holder 11, the support or fixation of the container 1 is achieved in that the integrated support rods 13 , 14 , 15 on the bolt 17 of the route Extension 16 are supported or connected to it with the impact means 18 , 18 '. Furthermore, however, further support is possible, which can be seen in particular Fig. 4 and Fig. 5.

Bei Fig. 1 ist eine Sicht aus dem Streb heraus in die Strecke 4 verdeutlicht, wobei die beiden Behälter 1 und 1' bereits gesetzt sind, während der dritte Behälter 1'' gerade gesetzt werden soll. Er weist daher noch eine etwas größere Höhe als die beiden bereits gesetzten Behälter auf. Wobei ebenfalls angedeutet ist, dass die Tragstange 13 des bereits gesetzten Behälters 1 sich am Behälter 1' abstützt, während die Tragstange 13' erst noch quasi in den Behälter 1 hineingetrieben werden muss, um dann eine vor­ teilhafte Lagerung zu erreichen. Die andere hier nicht sichtbare Tragstange 14 wird, wie in den Fig. 1 und 3 angedeutet, am Streckenausbau 16 festgelegt. Bei der aus Fig. 4 ersichtlichen Ausführung befindet sich der Einfüllstutzen 8 im Bereich Streb- /Streckenübergang, so dass er gut erreichbar und der Behälter 1 gut zu verfüllen ist. Bei er Ausführung nach Fig. 5 ist der Einfüllstutzen 8 streckenseitig angeordnet, was den Vorteil hat, dass die Arbeiten im Streb-/Streckenübergang durch das Setzen der Behäl­ ter wenig beeinträchtigt werden.In Fig. 1 a view from the longwall into the section 4 is illustrated, the two containers 1 and 1 'having already been set, while the third container 1 ''is to be set. It therefore has a slightly larger height than the two containers already placed. It is also indicated that the support rod 13 of the already placed container 1 is supported on the container 1 ', while the support rod 13 ' has to be practically driven into the container 1 in order to then achieve a partial storage. The other support rod 14 , which is not visible here, is, as indicated in FIGS. 1 and 3, fixed to the track extension 16 . In the embodiment shown in FIG. 4, the filler neck 8 is located in the face / crossover area, so that it is easily accessible and the container 1 is easy to fill. In he embodiment of Fig. 5 of the filler pipe 8 is arranged trackside, which has the advantage that the work in Streb- / track transition will be little affected by the setting of ter Behäl.

Die Draufsicht nach Fig. 5 soll verdeutlichen, dass nicht nur zwei in Strecken­ längsrichtung 12 verlaufende Tragstangen 13, 14 vorgesehen sind, sondern dass auch zumindest eine rechtwinklig dazu angeordnete Quertragstange 15 für einen möglichst stabilen oberen Rand 10 sorgt. Diese Quertragstange 15 ist genau so angeordnet und im Behälter 1 festgelegt, wie die beiden anderen Längstragstangen 13 und 14. Dies wird durch die Wellenlinien parallel zu den Tragstangen 13, 14, 15 angedeutet. Die Quer­ tragstange 15 bildet somit die abgewandte Seite 19, d. h. die abgewandte Seite 19 zum bereits gesetzten Streckenbegleitdamm bzw. -abschnitt 6.The top view according to FIG. 5 is intended to clarify that not only two support rods 13 , 14 running in the longitudinal direction 12 are provided, but also that at least one cross support rod 15 arranged at right angles to it ensures that the upper edge 10 is as stable as possible. This cross support rod 15 is arranged exactly and fixed in the container 1 , like the other two longitudinal support rods 13 and 14 . This is indicated by the wavy lines parallel to the support rods 13 , 14 , 15 . The transverse support bar 15 thus forms the side facing away from 19 the side facing away from 19 ie to the already set route accompanying dam or section. 6

Während die Ecke 32 abgestützt ist, weil die Längstragstange 14 sich am Strec­ kenausbau 16 abstützen kann, wird die Ecke 33 nur durch Eintreiben der Längstrag­ stange 13 in den bereits gesetzten Abschnitt 6 abgestützt. Die Abstützung kann dabei optimiert werden, indem nach dem Eintreiben des angeschärften Endes 20 das andere Ende bzw. das Ende 21 der Quertragstange 15 über die Kopfplatte 23 eines Hydraulik­ stempels 24 erfasst und gegen das Hangende gedrückt wird. Zweckmäßigerweise ist das Ende 21 der Quertragstange 15 oder auch das Ende der Längstragstange 13 mit einer Abplattung 22 versehen, die in Fig. 5 nur angedeutet ist. Wie schon erwähnt kann auch das dem angeschärften Ende 20 gegenüberliegende Endstück 25 mit einer solchen Ab­ plattung versehen werden.While the corner 32 is supported because the longitudinal support rod 14 can be supported on the track extension 16 , the corner 33 is only supported by driving the longitudinal support rod 13 into the section 6 already set. The support can be optimized by capturing the other end or the end 21 of the cross support rod 15 via the head plate 23 of a hydraulic stamp 24 after driving the sharpened end 20 and pressing it against the slope. The end 21 of the cross support rod 15 or the end of the longitudinal support rod 13 is expediently provided with a flattening 22 , which is only indicated in FIG. 5. As already mentioned, the sharpened end 20 opposite end piece 25 can be provided with such a plating.

Bei einer derartigen Abstützung auf der Ecke 33 ist es möglich, den gesamten Deckel 26 des Behälters 1 bis dicht unter das Hangende zu bringen, um dann durch Einfüllen des Baustoffes über den Einfüllstutzen 8 den gesamten Behälter möglichst schnell mit Baustoff zu verfüllen. Dieser wächst dann an den Seitenwandungen 27 vom Boden 28 aus hoch, bis er den Deckel 26 entsprechend ausbeult und an das Hangende 2 anliegt, wie dies beispielsweise in Fig. 1 verdeutlicht ist. Besonders vorteilhaft ist dabei, dass sich die Längstragstange 13 am bereits gesetzten Abschnitt 6 bzw. dessen Quer­ tragstange, die in Fig. 5 nicht dargestellt ist, abstützen kann. Damit ist das Ende 29 der Längstragstange 13 und auch das gegenüberliegende Ende 25 bzw. die Ecke 33 so stabilisiert, dass ein vollständiges Ausfüllen des Behälters 1 auf jeden Fall sichergestellt ist.With such a support on the corner 33 , it is possible to bring the entire lid 26 of the container 1 to just below the slope, in order then to fill the entire container with building material as quickly as possible by filling the building material via the filler neck 8 . This then grows up on the side walls 27 from the bottom 28 until it bulges the cover 26 accordingly and lies against the hanging end 2 , as is illustrated, for example, in FIG. 1. It is particularly advantageous that the longitudinal support rod 13 can be supported on the already set section 6 or its cross support rod, which is not shown in FIG. 5. The end 29 of the longitudinal support rod 13 and also the opposite end 25 or the corner 33 are thus stabilized such that complete filling of the container 1 is ensured in any case.

Wird die Strecke nicht wie in den Fig. 4 und 5 von links nach rechts einge­ bracht, sondern in der umgekehrten Richtung, sind die Tragstangen 13 und 15 praktisch umgekehrt einzubringen, d. h. die Tragstange 13 mit dem angeschärften Ende genau in die andere Richtung weisend, während die Quertragstange 15 auf der jetzt gegenüber­ liegenden Seite angeordnet ist.If the route is not brought in from the left to the right as in FIGS . 4 and 5, but in the opposite direction, the support rods 13 and 15 are to be inserted practically the other way round, ie the support rod 13 with the sharpened end pointing exactly in the other direction while the cross bar 15 is arranged on the opposite side now.

Alle genannten Merkmale, auch die den Zeichnungen allein zu entnehmenden, werden allein und in Kombination als erfindungswesentlich angesehen.All of the above-mentioned features, including those that can only be taken from the drawings, alone and in combination are regarded as essential to the invention.

Claims (11)

1. Dammaterialbehälter für Streckenbegleitdämme (5), die dem Ab­ stand zwischen Liegendem (3) und Hangendem (2) angepasst jeweils einen Abschnitt (6) vorgebend entlang der Strecken (4) im untertägigen Bergbau angeordnet und mit einem pumpfähigen und im Behälter (1) aushärtenden Baustoff gefüllt sind, wobei der aus wasserdurchlässigem Material gefertigte quaderartige Behälter (1) eine rundum geschlossene Wandung (7) mit einem Einfüllstutzen (8) aufweist, dadurch gekennzeichnet, dass der obere Rand (10) des Behälters (1) ganz oder teilweise umgeschlagen und eine Stangenhalterung (11) bildend geformt ist und dass parallel zur Streckenlängsachse (12) Tragstangen (13, 14, 15) eingezogen sind, die am Streckenausbau (16) und/oder am bereits gesetzten Begleitdammabschnitt (6) abstützbar ausgebildet sind.1.Damm material container for line accompanying dams ( 5 ), which was adapted to the position between lying ( 3 ) and hanging line ( 2 ), each section ( 6 ) predetermined along the lines ( 4 ) in underground mining and with a pumpable and in the container ( 1 ) curing building material, the cuboid-like container ( 1 ) made of water-permeable material having an all-round closed wall ( 7 ) with a filler neck ( 8 ), characterized in that the upper edge ( 10 ) of the container ( 1 ) is wholly or partially folded over and a rod holder ( 11 ) is formed and that parallel to the longitudinal axis ( 12 ) support rods ( 13 , 14 , 15 ) are retracted, which are designed to be supported on the line extension ( 16 ) and / or on the accompanying dam section ( 6 ). 2. Dammaterialbehälter nach Anspruch 1, dadurch gekennzeichnet, dass der obere Rand (10) als durchgehende, rohrförmige Stangenhalterung (11) ausge­ bildet ist.2. dam material container according to claim 1, characterized in that the upper edge ( 10 ) as a continuous tubular rod holder ( 11 ) is formed. 3. Dammaterialbehälter nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die den oberen Rand bildende Stangenhalterung (11) die eingeschobene Tragstange (13, 14, 15) eng umhüllend und führend ausgebildet ist.3. Dam material container according to one of the preceding claims, characterized in that the rod holder ( 11 ) forming the upper edge of the inserted support rod ( 13 , 14 , 15 ) is tightly enveloping and guiding. 4. Dammaterialbehälter nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Stangenhalterungen (11) mit Anschlagmitteln (18) für den Streckenausbau (16) ausgerüstet sind. 4. Dam material container according to one of the preceding claims, characterized in that the rod holders ( 11 ) are equipped with stop means ( 18 ) for the line extension ( 16 ). 5. Dammaterialbehälter nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass zumindest die dem bereits gesetzten Begleitdammabschnitt (6) abgewandte Seite (19) des Behälters (1) eine Aufnahme bzw. Stangenhalterung (11) für eine rechtwinklig zu den Längstragstangen (13, 14) verlaufende Quertragstange (15) aufweist.5. Dam material container according to one of the preceding claims, characterized in that at least the side ( 19 ) of the container ( 1 ) facing away from the accompanying dam section ( 6 ) that has already been set has a receptacle or rod holder ( 11 ) for a right angle to the longitudinal support rods ( 13 , 14 ) has transverse support rod ( 15 ). 6. Dammaterialbehälter nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Längstragstangen (13, 14), zumindest die streckenabgewandte Längstragstange (13) ein in Richtung bereits gesetzter Begleitdamm (5) weisendes angeschärftes Ende (20) aufweist.6. dam material container according to any one of the preceding claims, characterized in that the longitudinal support rods ( 13 , 14 ), at least the longitudinal support rod facing away from the track ( 13 ) has a sharpened end ( 20 ) pointing in the direction of the accompanying dam ( 5 ) already set. 7. Dammaterialbehälter nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Quertragstange (15) endseitig zumindest am der streckenabgewandten Läng­ stragstange (13) zugewandten Ende (21) eine Abplattung (22) für die Kopfplatte (23) eines Hydraulikstempels (24) aufweist.7. dam material container according to any one of the preceding claims, characterized in that the transverse support rod ( 15 ) at the end at least at the distance from the longitudinal support rod ( 13 ) facing end ( 21 ) has a flattening ( 22 ) for the head plate ( 23 ) of a hydraulic ram ( 24 ) . 8. Dammaterialbehälter nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der Einfüllstutzen (8) als Rückschlagventil oder ein solches aufweisend ausgebildet ist.8. dam material container according to one of the preceding claims, characterized in that the filler neck ( 8 ) is designed as a check valve or having such. 9. Dammaterialbehälter nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass das den Deckel (26) des Behälters (1) bildende Oberteil in Richtung Hangendes (2) ausbeulbar ausgebildet ist.9. dam material container according to one of the preceding claims, characterized in that the lid ( 26 ) of the container ( 1 ) forming the upper part is designed to be dentable in the direction of the slope ( 2 ). 10. Dammaterialbehälter nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Längstragstange (13) auf der dem angeschärften oder eine Spitze aufweisenden Ende (20) gegenüberliegenden Endstück (25) eine Aufnahme für eine Bohrmaschine oder einen Schlaghammer aufweist.10. dam material container according to one of the preceding claims, characterized in that the longitudinal support rod ( 13 ) on the sharpened or pointed end ( 20 ) opposite end piece ( 25 ) has a receptacle for a drill or a hammer. 11. Dammaterialbehälter nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Tragstangen (13, 14, 15) als Metallstangen ausgebildet sind.11. Dam material container according to one of the preceding claims, characterized in that the support rods ( 13 , 14 , 15 ) are designed as metal rods.
DE1998124453 1998-05-30 1998-05-30 Container for backfilling underground workings Withdrawn DE19824453A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1998124453 DE19824453A1 (en) 1998-05-30 1998-05-30 Container for backfilling underground workings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1998124453 DE19824453A1 (en) 1998-05-30 1998-05-30 Container for backfilling underground workings

Publications (1)

Publication Number Publication Date
DE19824453A1 true DE19824453A1 (en) 1999-12-02

Family

ID=7869561

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1998124453 Withdrawn DE19824453A1 (en) 1998-05-30 1998-05-30 Container for backfilling underground workings

Country Status (1)

Country Link
DE (1) DE19824453A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003069124A1 (en) * 2002-02-15 2003-08-21 Kelvin Robert Legge A method of dewatering a solid particulate material
CN111691904A (en) * 2020-06-17 2020-09-22 黄文忠 Adjustable supporting net rack capable of keeping fit with inside of tunnel for coal mining
CN112832829A (en) * 2021-02-18 2021-05-25 淮北市平远软岩支护工程技术有限公司 Supporting method and supporting device based on guided release confined water technology

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003069124A1 (en) * 2002-02-15 2003-08-21 Kelvin Robert Legge A method of dewatering a solid particulate material
CN111691904A (en) * 2020-06-17 2020-09-22 黄文忠 Adjustable supporting net rack capable of keeping fit with inside of tunnel for coal mining
CN112832829A (en) * 2021-02-18 2021-05-25 淮北市平远软岩支护工程技术有限公司 Supporting method and supporting device based on guided release confined water technology
CN112832829B (en) * 2021-02-18 2022-02-25 淮北市平远软岩支护工程技术有限公司 Supporting method and supporting device based on guided release confined water technology

Similar Documents

Publication Publication Date Title
DE19738216A1 (en) Dyke-reinforcing module
DE19824453A1 (en) Container for backfilling underground workings
DE4029632A1 (en) Support system for excavations - uses telescopic props in travelling excavations on loose materials
DE2257828C2 (en) Device for the shield-like expansion of underground mining operations
DE3045632C2 (en)
EP2683874B1 (en) Device for making piles in a soil
DE4402358A1 (en) Stacking pot pillar for mining supports
DE2609612C3 (en) Device for digging a planting hole
DE2246745C2 (en) Retractable shield extension unit
DE3409002C2 (en)
DE3408823C1 (en) Filler neck with non-return valve
DE3519225A1 (en) Method of constructing slope-supporting bodies required for hydraulic spoil heaps, and arrangement for carrying out the method
DE4122568A1 (en) Method of filling voids arising from roof falls in mining - involves propping shield and placing on it reinforcing mat and plastic bag filled with lightweight concrete
AT314587B (en) Device for carrying out a process for the underground production of in-situ concrete channels and tunnels of all kinds
DE3431733A1 (en) METHOD AND DEVICE FOR Sinking An Arrangement Comprising A Flexible Surface Material In A Trench Filled With Thixotropic Slurry
DE2063488C3 (en) Short stamp with stamp shoe for the expansion of a route in the area of its transition into a longwall
DE10044367A1 (en) Lost support for mining and tunnel construction
DE19614735C1 (en) Water trough for explosion carrier in underground mine
DE20319896U1 (en) Folding hollow prop, in particular to be used in mining, comprising support ring deformable or detachable for transport
DE4120789C1 (en) Mine roof support with floor carried base body - which is box-shaped for retaining expanding, reactive mixt. for filling hollow support
DE3535094A1 (en) Filling connection for fabric bags and fabric tubes
DE4339221A1 (en) Initial safety system for underground mine chambers - secures props of expendable supporting walling between roof and floor to form dam and encloses in lightweight or aerated concrete
DE3917170A1 (en) Roof support in mining - comprises webbed container surrounding mesh frame filled with hardening material
DE3621496A1 (en) Method for reducing compressed-air losses when driving underground, compressed-air-supported cavities and device for carrying out the method
DE2950041A1 (en) Arched mine or tunnel gallery support rock joint - has concrete type filling pressed into textile tube through hole between ends

Legal Events

Date Code Title Description
8139 Disposal/non-payment of the annual fee