DE19734076B4 - Laying device for press packages of sheet-shaped slip material and a support plate - Google Patents

Laying device for press packages of sheet-shaped slip material and a support plate Download PDF

Info

Publication number
DE19734076B4
DE19734076B4 DE1997134076 DE19734076A DE19734076B4 DE 19734076 B4 DE19734076 B4 DE 19734076B4 DE 1997134076 DE1997134076 DE 1997134076 DE 19734076 A DE19734076 A DE 19734076A DE 19734076 B4 DE19734076 B4 DE 19734076B4
Authority
DE
Germany
Prior art keywords
laying
loading
support plate
materials
press
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE1997134076
Other languages
German (de)
Other versions
DE19734076A1 (en
Inventor
Friedrich B. Bielfeldt
Peter Rapp
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dieffenbacher GmbH Maschinen und Anlagenbau
Original Assignee
Dieffenbacher GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dieffenbacher GmbH and Co KG filed Critical Dieffenbacher GmbH and Co KG
Priority to DE1997134076 priority Critical patent/DE19734076B4/en
Publication of DE19734076A1 publication Critical patent/DE19734076A1/en
Application granted granted Critical
Publication of DE19734076B4 publication Critical patent/DE19734076B4/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H39/00Associating, collating, or gathering articles or webs
    • B65H39/02Associating,collating or gathering articles from several sources
    • B65H39/04Associating,collating or gathering articles from several sources from piles
    • B65H39/043Associating,collating or gathering articles from several sources from piles the piles being disposed in juxtaposed carriers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H3/00Separating articles from piles
    • B65H3/08Separating articles from piles using pneumatic force
    • B65H3/0808Suction grippers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H39/00Associating, collating, or gathering articles or webs
    • B65H39/02Associating,collating or gathering articles from several sources
    • B65H39/06Associating,collating or gathering articles from several sources from delivery streams

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Auxiliary Devices For And Details Of Packaging Control (AREA)
  • Veneer Processing And Manufacture Of Plywood (AREA)

Abstract

Legevorrichtung zur Bildung von Presspaketen (1, 2, 3) bei der Herstellung von Dekorplatten oder bei der Oberflächenvergütung von Tragplatten (11) (z. B. Span-, Faser- oder Sperrholzplatten) in Pressen,
– wobei in der Legevorrichtung fahrbare sowie heb- und senkbare Einrichtungen zur Aufnahme und zum Transport der einzelnen Belegmaterialien (5–10) und der Tragplatten (11) sowie ein bewegbares Beschick- und Legeband zur Zusammenstellung zu einem Preßpaket (1, 2, 3) angeordnet sind,
– wobei die Preßpakete (1, 2, 3) aus je mindestens einer oberen und unteren Schicht von blattförmigen Belegmaterialien (5–10) (z. B. Folien, Papiere, Edelfurniere, Kunststoffolien) und einer zwischen oberem (5, 6, 7) und unterem (8, 9, 10) Belegmaterial liegenden Tragplatte (11) bestehen,
– wobei für die Förderung der oberen (5, 6, 7) bzw. der unteren (8, 9, 10) Belegmaterialien zwei übereinander angeordnete, in Beschickrichtung (BR) zur Presse angetriebene Beschick- und Legebänder (13, 14) vorgesehen sind,
– wobei die...
Laying device for forming press packages (1, 2, 3) in the production of decorative panels or in the surface treatment of support plates (11) (eg chip, fiber or plywood panels) in presses,
- In the laying device mobile and lifting and lowering devices for receiving and transporting the individual document materials (5-10) and the support plates (11) and a movable loading and laying belt to put together to a Preßpaket (1, 2, 3) are arranged
- wherein the Preßpakete (1, 2, 3) of at least one upper and lower layer of sheet-shaped slip materials (5-10) (eg., Films, papers, veneers, plastic films) and one between upper (5, 6, 7 ) and lower (8, 9, 10) document material lying support plate (11),
- wherein for the promotion of the upper (5, 6, 7) and the lower (8, 9, 10) document materials two superimposed, in the loading direction (BR) driven to the press loading and laying belts (13, 14) are provided,
- where the ...

Figure 00000001
Figure 00000001

Description

Die Erfindung betrifft eine Legevorrichtung zur Bildung von Preßpaketen bei der Herstellung von Dekorplatten oder bei der Oberflächenvergütung von Tragplatten (z. B. Span-, Faser- oder Sperrholzplatten) in Pressen.The The invention relates to a laying device for forming Preßpaketen in the production of decorative panels or in the surface treatment of support plates (eg chip, fiber or plywood boards) in presses.

Bei einer Vorrichtung nach DE 23 29 267 A1 , von der die Erfindung ausgeht, werden die Belegmaterialien der unteren und oberen Decklagen sowie die Tragplatte aus je einer Belegstrasse, die quer und an einer Seite des Beschickund Legebandes angeordnet sind, von Sammelpaletten bzw. Saugwagen auf dem absatzweise bewegbaren Beschick- und Legeband zu einem Preßpaket zusammengetragen und aufeinandergelegt.In a device according to DE 23 29 267 A1 , From which the invention proceeds, the document materials of the lower and upper cover layers and the support plate from each a slip road, which are arranged transversely and on one side of the loading and laying belt of collecting pallets or suction on the batch movable feed and laying belt to a Press pack collected and stacked.

Mit einer derartigen Legevorrichtung lassen sich Preßpakete mit einer Mittellage und jeweils unten und oben drei Decklagen in circa 30 Sekunden zusammenlegen. Diese Zeit zum Zusammenlegen eines Preßpaketes genügten bis heute, da die Beschick- und Preßzeiten einer Kurz-Takt-Preßanlage (KT-Preßanlage) nicht kürzer zu bewältigen waren. Mit einem neuen, noch nicht veröffentlichten Beschick- und Entleersystem (gemäß späterer DE 196 06 132 A1 ) sind aufgrund eines nummerisch gesteuerten Teleskoparm- und -tragsystems für die Preßpakete kürzere Beschick- und Entleer- bzw. Preßzeiten um circa 1/3, das heißt von circa 30 auf etwa 20 Sekunden und kleiner möglich. Diese kürzeren Zykluszeiten einer Beschichtungsanlage erfordern vor und hinter der KT-Presse entsprechend schnellere Bewegungsabläufe im Durchtransport des Preßpaketes durch die Anlage. Bei circa 20 Sekunden Beschick-, Preß- und Entleerzeit ist die Vorbereitung des Preßpaketes in sandwichmäßigem Aufbau vor dem Preßvorgang in der Kurztaktpresse extrem zeitkritisch, das heißt nach dem Stand der Technik ist ein Belegen der Tragplatten, zum Beispiel Spanplatten, mit zwei und mehr Folien pro Seite innerhalb einer Taktzeit von 20 Sekunden mit den Genauigkeitsanforderungen hinsichtlich Kantenparallelität und Überstandsgenauigkeit der Folienpakete zur Tragplatte nicht möglich.With such a laying device, press packets can be combined with a central layer and each top and bottom three cover layers in about 30 seconds. This time to merge a Preßpaketes satisfied until today, since the loading and pressing times of a short-stroke pressing system (KT pressing system) were not shorter to deal with. With a new, yet unpublished loading and unloading system (according to later DE 196 06 132 A1 ) are due to a numerically controlled Teleskoparm- and -tragsystems for the Preßpakete shorter loading and unloading or pressing times by about 1/3, that is from about 30 to about 20 seconds and smaller possible. These shorter cycle times of a coating system require before and after the KT press correspondingly faster movement sequences in the transport of the Preßpaketes through the system. At about 20 seconds loading, pressing and emptying the preparation of Preßpaketes in sandwichmaßem structure before pressing in the short-cycle press is extremely time-critical, that is, according to the prior art is a covering of the support plates, for example chipboard, with two or more films per page within a cycle time of 20 seconds with the accuracy requirements in terms of edge parallelism and supernatant accuracy of the film packages to the support plate not possible.

Aufgrund erhöhter Anforderungen an die Oberflächenqualität und Belastbarkeit beschichteter Holzwerkstoffplatten kommen heute in der industriellen Praxis aber mehr und mehr Folienschichtaufbauten von zwei, drei oder mehr Folien pro Seite zur Anwendung.by virtue of increased Requirements for surface quality and load capacity Coated wood-based panels today come in industrial Practice but more and more film layer structures of two, three or more slides per page for use.

Nach dem Stand der Technik kommt das Belegen der Tragplatten in einer Querfolienzieheinrichtung zur Anwendung, indem auf einer Ebene quer zum Preßpakettransport nacheinander erst die Unterfolien (zwei bis drei Folien quer gezogen) auf dem Beschick- und Legeband übereinander aufgelegt werden. Danach wird die Tragplatte bzw. die Mittellage auf die zwei bis drei Folien mit einem Saugwagen aufgelegt und anschließend werden dann auf die Oberseite dieses Schichtpaketes die Oberfolien zwei oder dreifach gelegt. Da der gesamte Ablauf nacheinander erfolgt und Folienfalten bzw. -überlappungen vermieden werden müssen, addieren sich entsprechend für jedes Preßpaket diese Legezeiten.To the prior art is the covering of the support plates in one Transverse film pulling device for use by on a plane transverse to Preßpakettransport one after the other, first the lower foils (two to three foils pulled transversely) on the loading and laying belt one above the other be hung up. Thereafter, the support plate or the middle layer be placed on the two to three slides with a vacuum car and then be then on the top of this layer package the top two or two films laid in triplicate. Since the entire sequence takes place one after the other and Foil folds or overlaps avoided Need to become, add up accordingly every package these laying times.

Der Erfindung liegt die Aufgabe zugrunde, eine Vorrichtung zu schaffen, mit der das Zusammenlegen eines Preßpaketes mit einer Mittellage und jeweils oben und unten zwei bis drei Folien bzw. Belegmaterialien in kürzerer Zeit als es mit den bisher bekannten Legevorrichtungen möglich ist, das heißt konkret, das Zusammenlegen eines Preßpaketes des genannten Aufbaues in 20 Sekunden oder weniger zu ermöglichen.Of the Invention has for its object to provide a device with the merging of a Preßpaketes with a middle layer and at the top and bottom two to three slides or slip materials in shorter Time when it is possible with the previously known laying devices, that means concretely, the collapsing of a Preßpaketes the to allow said structure in 20 seconds or less.

Die Lösung dieser Aufgabe ist im Patentanspruch 1 angegeben.The solution This object is specified in claim 1.

Mit den Vorrichtungen gemäß der Erfindung wird die Aufgabe insbesondere dadurch gelöst, daß für den Aufbau des Preßpaketes die hierfür erforderlichen Einzelbelegungszeiten nicht hintereinander, sondern zum Teil parallel ablaufen, so daß sich dadurch in der Addition der Einzelzeiten die aufgabengemäß geforderte Zeit für das Zusammenlegen eines Preßpaketes von ≤ 20 Sekunden erreicht wird. Von Vorteil ist dabei auch, daß die Querbelegung nicht in einer Ebene und auf einem Beschick- und Legeband sondern in zwei bzw. drei Ebenen und auf zwei bzw. drei Beschick- und Legebändern durch Querbelegung darauf erfolgt. Dadurch werden die erforderlichen Zeiten für den Mehrschichtaufbau des Preßpaketes halbiert.With the devices according to the invention the problem is solved in particular by the fact that for the construction of the Preßpaketes the one for this required single occupancy times not consecutively, but run partly parallel, so that thereby in the addition the individual times the task required time for the collapsing of a press pack from ≤ 20 Seconds is reached. It is also advantageous that the transverse assignment not in a plane and on a load and tape but in two or three levels and on two or three loading and laying tapes Cross-assignment takes place on it. This will set the required times for the Multi-layer structure of the press pack halved.

Anhand der Zeichnung wird die Erfindung und weitere zweckmäßige Ausgestaltungen mit zwei Ausführungsbeispielen näher beschrieben.Based the drawing of the invention and other useful embodiments with two embodiments described in more detail.

Es zeigen:It demonstrate:

1 in drei Beispielen jeweils den Mehrschichtaufbau eines Preßpaketes in Seitenansicht, 1 in three examples in each case the multilayer structure of a Preßpaketes in side view,

2 die Legevorrichtung gemäß der Erfindung in schematischer Darstellung in Draufsicht, 2 the laying device according to the invention in a schematic representation in plan view,

3 in einem Schnitt a-a und Seitenansicht die Legevorrichtung nach 2, 3 in a section aa and side view of the laying device according to 2 .

4 in einem Schnitt b-b und Seitenansicht die Legevorrichtung nach 2, 4 in a cut bb and side view the laying device after 2 .

5 die Legevorrichtung nach 2 und Schnitt c-c in Seitenansicht mit Zusammenführung des Preßpaketes in einer Ionisierungsvorrichtung, 5 the laying device after 2 and Section cc in side view with merging of the Preßpaketes in an ionization device,

6 die Legevorrichtung des ersten Ausführungsbeispiels in perspektivischer Darstellung, 6 the laying device of the first embodiment in a perspective view,

7 die Legevorrichtung gemäß der Erfindung in einem zweiten Ausführungsbeispiel und Seitenansicht und 7 the laying device according to the invention in a second embodiment and side view and

8 die Legevorrichtung nach 7 in Draufsicht. 8th the laying device after 7 in plan view.

Die Legevorrichtung gemäß dem ersten Ausführungsbeispiel zeigen die 2 bis 6, während die Legevorrichtung des zweiten Ausführungsbeispiels in den 7 und 8 dargestellt ist. Die 1a, b und c zeigen den möglichen Mehrschichtaufbau dieser Preßpakete 1, 2 oder 3 mit einer Tragplatte 11 und den Folien bzw. Belegmaterialien 5, 6 und 7 des oberen Folienpaketes I und den Folien bzw. Belegmaterialien 8, 9 und 10 des unteren Folienpaketes II. Die Erfindung wird für beide Ausführungsbeispiele anhand eines Preßpaketes 3 nachstehend beschrieben.The laying device according to the first embodiment show the 2 to 6 while the laying device of the second embodiment in the 7 and 8th is shown. The 1a , b and c show the possible multilayer structure of these press packages 1 . 2 or 3 with a support plate 11 and the slides or slip materials 5 . 6 and 7 of the upper film package I and the films or document materials 8th . 9 and 10 of the lower film package II. The invention is based on a Preßpaketes for both embodiments 3 described below.

2 zeigt in Draufsicht die Gesamtanlage des ersten Ausführungsbeispieles mit den Beschick- und Legebändern 13 oben und 14 unten sowie dem Beschickband 12 für die Tragplatten 11 mit dem Vorratstisch 23. Für ein Preßpaket 3 mit je drei Folien 5, 6, 7 oben und drei Folien 8, 9 und 10 unten auf der Tragplatte 11, ziehen die sechs Saugeinrichtungen 17 und 18 gleichzeitig die Folien von den Stapeltischen 15 und 16 ab und legen sie nach der Querfahrt auf den Beschick- und Legebänder 13 und 14 die nach 3 im Zweietagengestell 21 übereinander angeordnet sind, ab. Nach dem Zurückziehen der Saugeinrichtungen 17 und 18 legt der Saugwagen 19 die Tragplatte 11 auf die oberste Folie 8 ab. Die Beschick- und Legebänder 13 und 14 werden dabei taktweise von den ersten Stapeltischen 15 und 16 zu den zweiten und dritten weiterbewegt und in der Ionisierungsvorrichtung 20 zusammengeführt, wobei vorher das obere Folienpaket II auf der Tragplatte 11 abgelegt wird. Wie die 2 shows a plan view of the entire system of the first embodiment with the loading and laying belts 13 above and 14 below as well as the loading belt 12 for the support plates 11 with the storage table 23 , For a press pack 3 with three slides each 5 . 6 . 7 above and three slides 8th . 9 and 10 down on the support plate 11 , pull the six suction devices 17 and 18 at the same time the films from the stacking tables 15 and 16 and lay them on the loading and laying belts after the crossing 13 and 14 the after 3 in a two-tiered frame 21 are arranged one above the other from. After retraction of the suction devices 17 and 18 puts the suction car 19 the support plate 11 on the top sheet 8th from. The loading and laying belts 13 and 14 are doing intermittently from the first stacking tables 15 and 16 moved to the second and third and in the ionization device 20 merged, with previously the upper foil package II on the support plate 11 is filed. As the

3 und 4 zeigen sind die sechs Stapeltische 15 und 16 ebenfalls in einem Zweietagengestell 24 heb- und senkbar untergebracht. Eine übersichtliche Darstellung der Legevorrichtung beim Zusammenlegen des Preßpaketes 3 und dem Weiterführen zur KT-Presse mit dem Beschickband 22 zeigt in perspektivischer Darstellung die 6. 3 and 4 show are the six stacking tables 15 and 16 also in a two-day frame 24 housed raised and lowered. A clear view of the laying device when folding the Preßpaketes 3 and continuing to the KT press with the feed belt 22 shows in perspective the 6 ,

Die Legevorrichtung gemäß der Erfindung für das zweite Ausführungsbeispiel geht aus den 7 und 8 hervor. Soweit die gleichen Bauteile Verwendung finden können, sind sie mit denselben Bezugszeichen gekennzeichnet. Wie im ersten Ausführungsbeispiel nach den 1 bis 6 erfolgt das Zusammenlegen der Folienpakete I und II oben und unten zeitlich parallel. Durch die dritte Etage, ausgebildet als Beschickband 4 für die zuführenden Tragplatten 11, in der Mitte zwischen den oberen und unteren Beschick- und Legebändern 13 und 14 erfolgt das Zuführen der Tragplatten 11 gleichfalls parallel zu den Bewegungsabläufen des Folienzusammenlegens gemäß dem ersten Ausführungsbeispiel, im Vergleich dazu mit noch größerem Zeitvorteil. Das gesamte Preßpaket 3 aus den drei Etagen der Beschick- und Legebänder 4, 13 und 14 wird in der Ionisierungsvorrichtung 20 in Synchrongeschwindigkeit zusammengefügt. Hierfür werden das obere Folienpaket I mit den Folien 5, 6 und 7 schräg von oben und das untere Folienpaket II mit den Folien 8, 9 und 10 schräg von unten, der in der mittleren Etage auf dem Beschickband 4 einlaufenden Tragplatte 11 zugeführt. Das so zusammengefügte Preßpaket 3 wird unmittelbar danach zur Haftung des Schichtpaketaufbaues durch die Ionisierungsvorrichtung 20 gefahren und dem Beschickband 22 zur KT-Presse übergeben.The laying device according to the invention for the second embodiment is from the 7 and 8th out. As far as the same components can be used, they are marked with the same reference numerals. As in the first embodiment of the 1 to 6 the collapsing of the film packets I and II takes place at the top and bottom at the same time. Through the third floor, designed as Beschickband 4 for the feeding support plates 11 , in the middle between the upper and lower loading and laying belts 13 and 14 the feeding of the support plates takes place 11 also parallel to the movement sequences of the film collapsing according to the first embodiment, in comparison with even greater time advantage. The entire press pack 3 from the three floors of the loading and laying belts 4 . 13 and 14 is in the ionization device 20 assembled in synchronous speed. For this purpose, the upper foil package I with the slides 5 . 6 and 7 diagonally from above and the lower foil package II with the films 8th . 9 and 10 sloping from below, the middle floor on the loading conveyor 4 incoming support plate 11 fed. The pressed package thus assembled 3 Immediately thereafter, the adhesion of the layer packet structure by the ionization device 20 drove and the feed belt 22 handed over to the KT press.

Es besteht natürlich auch die Möglichkeit, die Tragplatten 11 mit einer unterschiedlichen Anzahl an Folien je Seite zu belegen.Of course, there is also the possibility of the support plates 11 with a different number of slides per page.

11
Preßpaket mit einer Folie/SeitePress package with a slide / page
22
Preßpaket mit zwei Folien/SeitePress package with two slides / side
33
Preßpaket mit drei Folien/SeitePress package with three slides / page
44
BeschickbandFeeding conveyor
55
erste Folie obenfirst Foil above
66
zweite Folie obensecond Foil above
77
dritte Folie obenthird Foil above
88th
erste Folie untenfirst Slide down
99
zweite Folie untensecond Slide down
1010
dritte Folie untenthird Slide down
1111
Tragplattesupport plate
1212
BeschickbahnBeschickbahn
1313
Beschick- und Legebandfacility Loading and band
1414
Beschick- und Legebandfacility Loading and band
1515
Stapeltische für Folien 8, 9, 10 Stacking tables for foils 8th . 9 . 10
1616
Stapeltische für Folien 5, 6, 7 Stacking tables for foils 5 . 6 . 7
1717
Saugvorrichtungen fürsuction devices For
Folien 5, 6, 7 films 5 . 6 . 7
1818
Saugvorrichtungen fürsuction devices For
Folien 8, 9, 10 films 8th . 9 . 10
1919
SaugwagenVacuum Truck
2020
Ionisierungsvorrichtungionization
2121
ZweietagengestellTwo tier
2222
BeschickbandFeeding conveyor
2323
Vorratstischsupply table
2424
ZweietagengestellTwo tier
II
Folienpaket aus 5, 6, 7 Foil package 5 . 6 . 7
IIII
Folienpaket aus 8, 9, 10 Foil package 8th . 9 . 10

Claims (3)

Legevorrichtung zur Bildung von Presspaketen (1, 2, 3) bei der Herstellung von Dekorplatten oder bei der Oberflächenvergütung von Tragplatten (11) (z. B. Span-, Faser- oder Sperrholzplatten) in Pressen, – wobei in der Legevorrichtung fahrbare sowie heb- und senkbare Einrichtungen zur Aufnahme und zum Transport der einzelnen Belegmaterialien (510) und der Tragplatten (11) sowie ein bewegbares Beschick- und Legeband zur Zusammenstellung zu einem Preßpaket (1, 2, 3) angeordnet sind, – wobei die Preßpakete (1, 2, 3) aus je mindestens einer oberen und unteren Schicht von blattförmigen Belegmaterialien (510) (z. B. Folien, Papiere, Edelfurniere, Kunststoffolien) und einer zwischen oberem (5, 6, 7) und unterem (8, 9, 10) Belegmaterial liegenden Tragplatte (11) bestehen, – wobei für die Förderung der oberen (5, 6, 7) bzw. der unteren (8, 9, 10) Belegmaterialien zwei übereinander angeordnete, in Beschickrichtung (BR) zur Presse angetriebene Beschick- und Legebänder (13, 14) vorgesehen sind, – wobei die oberen Belegmaterialien (5, 6, 7) auf mehreren heb- und senkbaren oberen Stapeltischen (16) und die unteren Belegmaterialien (5, 6, 7) auf mehreren heb- und senkbaren unteren Stapeltischen (15) in einem Zweietagengestell (21) seitlich neben den Beschick- und Legebändern (13, 14) angeordnet sind, – wobei zum Abheben der Belegmaterialien (510) von den Stapeltischen (15, 16) und zum Ablegen auf die Beschick- und Legebänder (13, 14) Saugeinrichtungen (17, 18) quer zur Beschickrichtung (BR) verfahrbar angeordnet sind, – wobei zur Bildung eines Presspaketes (1, 2, 3) aus mindestens einem oberen Belegmaterial (5, 6, 7), der Tragplatte (11) und aus mindestens einem unteren Belegmaterial (8, 9, 10) die Beschick- und Legebänder (13, 14) in Beschickrichtung (BR) zur Presse zusammengeführt angeordnet sind, und – wobei entweder zur Ablage der Tragplatte (11) auf den unteren Belegmaterialien (8, 9, 10) ein Saugwagen (19) von einem Vorratstisch (23) quer zur Beschickrichtung (BR) verfahrbar angeordnet ist oder zur Einführung der Tragplatte (11) zwischen die oberen (5, 6, 7) und die unteren (8, 9, 10) Belegmaterialien ein Beschickband (4) zwischen den Beschick- und Legebändern (13, 14) angeordnet ist.Laying device for forming press packages ( 1 . 2 . 3 ) in the production of decorative panels or in the surface treatment of support plates ( 11 ) (eg chipboard, fibreboard or plywood boards) in presses, in which in the laying device mobile as well as raised and lowered devices for receiving and transporting the individual document materials ( 5 - 10 ) and the support plates ( 11 ) and a movable loading and laying belt for putting together to a Preßpaket ( 1 . 2 . 3 ) are arranged, - whereby the Preßpakete ( 1 . 2 . 3 ) each comprising at least one upper and lower layer of sheet-shaped slip materials ( 5 - 10 ) (eg foils, papers, veneers, plastic foils) and one between upper ( 5 . 6 . 7 ) and lower ( 8th . 9 . 10 ) Document material lying support plate ( 11 ), whereby - for the promotion of the upper ( 5 . 6 . 7 ) or the lower ( 8th . 9 . 10 ) Document materials two superimposed, in the loading direction (BR) to the press driven load and slide belts ( 13 . 14 ), the upper document materials ( 5 . 6 . 7 ) on a plurality of raised and lowered upper stacking tables ( 16 ) and the lower document materials ( 5 . 6 . 7 ) on a plurality of raised and lowered lower stacking tables ( 15 ) in a two-day rack ( 21 ) at the side next to the loading and laying belts ( 13 . 14 ) are arranged, - wherein for lifting the document materials ( 5 - 10 ) from the stacking tables ( 15 . 16 ) and for storing on the loading and laying tapes ( 13 . 14 ) Suction devices ( 17 . 18 ) are arranged movable transversely to the loading direction (BR), - wherein to form a press pack ( 1 . 2 . 3 ) from at least one upper documentary material ( 5 . 6 . 7 ), the support plate ( 11 ) and at least one lower documentary material ( 8th . 9 . 10 ) the loading and laying belts ( 13 . 14 ) are arranged in the loading direction (BR) brought together to the press, and - wherein either for storage of the support plate ( 11 ) on the lower slip materials ( 8th . 9 . 10 ) a suction truck ( 19 ) from a storage table ( 23 ) is arranged movable transversely to the loading direction (BR) or for the introduction of the support plate ( 11 ) between the upper ( 5 . 6 . 7 ) and the lower ( 8th . 9 . 10 ) Document materials a feed belt ( 4 ) between the loading and laying belts ( 13 . 14 ) is arranged. Legevorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass zur Versorgung des Vorratstisches (23) mit Tragplatten (11) eine Transportbahn (12) neben dem unteren Beschick- und Legeband (14) angeordnet ist.Laying device according to claim 1, characterized in that for supplying the supply table ( 23 ) with support plates ( 11 ) a transport path ( 12 ) next to the lower loading and laying belt ( 14 ) is arranged. Legevorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass an der Zuführung der Tragplatten (11) durch das Beschickband (4) zu den übereinander liegenden Beschick- und Legebändern (13, 14) eine Ionisierungsvorrichtung (20) angeordnet ist.Laying device according to claim 1, characterized in that at the feed of the support plates ( 11 ) through the feed belt ( 4 ) to the superimposed loading and laying belts ( 13 . 14 ) an ionization device ( 20 ) is arranged.
DE1997134076 1997-08-06 1997-08-06 Laying device for press packages of sheet-shaped slip material and a support plate Expired - Fee Related DE19734076B4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1997134076 DE19734076B4 (en) 1997-08-06 1997-08-06 Laying device for press packages of sheet-shaped slip material and a support plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1997134076 DE19734076B4 (en) 1997-08-06 1997-08-06 Laying device for press packages of sheet-shaped slip material and a support plate

Publications (2)

Publication Number Publication Date
DE19734076A1 DE19734076A1 (en) 1999-02-11
DE19734076B4 true DE19734076B4 (en) 2006-03-23

Family

ID=7838179

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1997134076 Expired - Fee Related DE19734076B4 (en) 1997-08-06 1997-08-06 Laying device for press packages of sheet-shaped slip material and a support plate

Country Status (1)

Country Link
DE (1) DE19734076B4 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19924697B4 (en) * 1999-05-28 2011-04-21 Otto Künnecke GmbH Device and method for the assembly of printing units from laterally non-perforated signatures
EP1582486A1 (en) * 2004-03-31 2005-10-05 Mercandia Industries A/S A suction head device for lifting an upper sheet of veneer from a stack of veneer sheets, and a veneered boards lamination apparatus

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2329267A1 (en) * 1973-06-08 1975-01-02 Dieffenbacher Gmbh Maschf METHOD AND DEVICE FOR FITTING FILMS AND CARRIER PLATES TO A PRESS UNIT
DE19606132A1 (en) * 1996-02-20 1997-08-21 Dieffenbacher Gmbh Maschf Feeding and emptying of a short cycle press

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2329267A1 (en) * 1973-06-08 1975-01-02 Dieffenbacher Gmbh Maschf METHOD AND DEVICE FOR FITTING FILMS AND CARRIER PLATES TO A PRESS UNIT
DE19606132A1 (en) * 1996-02-20 1997-08-21 Dieffenbacher Gmbh Maschf Feeding and emptying of a short cycle press

Also Published As

Publication number Publication date
DE19734076A1 (en) 1999-02-11

Similar Documents

Publication Publication Date Title
EP1399380B1 (en) Device and method for plaiting a web of flexible material
DE2825206C2 (en) Device for introducing, pressing and discharging a layer package into a hot press or from a hot press
DE2605141A1 (en) PLANT FOR THE PRODUCTION OF LAMINATE AND DECORATIVE PANELS
DE2701464A1 (en) METHOD AND DEVICE FOR FORMATION OF PACKAGES FOR A VARIABLE NUMBER OF STACKABLE TWO-DIMENSIONAL ELEMENTS
DE19734076B4 (en) Laying device for press packages of sheet-shaped slip material and a support plate
DE2614558A1 (en) Palletless package assembly process - with standard size layers stacked and formed with lift fork access slots before covering
DE19847345B4 (en) Method and plant for the production of endless veneer layer boards
AT395302B (en) DEVICE FOR DISTRIBUTING A SHEATH CURRENT FROM EACH OVERHEAD BENEFIT
DE4010307C2 (en) Process for the production of solid wood panels
DE1275468B (en) Device for loading pallets with bags
CH677896A5 (en)
DE2852456C2 (en) Device for on and off panels in the manufacture of laminated panels
DE2928231A1 (en) Laminated material press system - lifts finished article by members inserted from sides and sets down on transporters
DE4001835A1 (en) Mfg. sandwiched components with core and cover layers - deposits glued flexible web in loops with core material on reciprocating base
DE19835933A1 (en) Equipment for producing endless veneer plates and involves multi-layered run with gluing and pressing in continuously working press together with advance pre-press and pre-heating device
DE1453258A1 (en) Method and device for producing layered material
EP0141177B1 (en) Apparatus for compressing fibrous-cement slabs
DE4106818C2 (en)
DE2252804A1 (en) PROCESS AND DEVICE FOR ASSEMBLING AND ARRANGING COMPONENTS IN A CERTAIN ORDER, IN PARTICULAR COMPONENTS FOR ACCUMULATORS
DE19914357C2 (en) Foil laying system for at least covering the top of carrier plates with foils
DE19731133C2 (en) Process for the production of laminates, in particular industrial laminates
DE1504913C (en) System for folding laminated panels made up of foils
DE3216348C1 (en) Device for the continuous production of prefabricated wall parts
WO2016142497A1 (en) Plant for manufacturing panels from stacked veneers
DE3517049A1 (en) DEVICE FOR PALLETIZING

Legal Events

Date Code Title Description
8127 New person/name/address of the applicant

Owner name: DIEFFENBACHER GMBH + CO. KG, 75031 EPPINGEN, DE

8110 Request for examination paragraph 44
8364 No opposition during term of opposition
R082 Change of representative

Representative=s name: ANTON HARTDEGEN, DE

R081 Change of applicant/patentee

Owner name: DIEFFENBACHER GMBH MASCHINEN- UND ANLAGENBAU, DE

Free format text: FORMER OWNER: DIEFFENBACHER GMBH + CO. KG, 75031 EPPINGEN, DE

Effective date: 20121116

R082 Change of representative

Representative=s name: HARTDEGEN, ANTON, DIPL.-ING.(FH), DE

Effective date: 20121116

R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee