DE19600992A1 - Support frame and work platform for installation of tapered concrete roof - Google Patents

Support frame and work platform for installation of tapered concrete roof

Info

Publication number
DE19600992A1
DE19600992A1 DE19600992A DE19600992A DE19600992A1 DE 19600992 A1 DE19600992 A1 DE 19600992A1 DE 19600992 A DE19600992 A DE 19600992A DE 19600992 A DE19600992 A DE 19600992A DE 19600992 A1 DE19600992 A1 DE 19600992A1
Authority
DE
Germany
Prior art keywords
work platform
support frame
construction
platform
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19600992A
Other languages
German (de)
Inventor
Otto Heinzle
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of DE19600992A1 publication Critical patent/DE19600992A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/36Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/20Scaffolds comprising upright members and provision for supporting cross-members or platforms at different positions therealong
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/36Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes
    • E04G1/362Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes specially adapted for tanks, silos or similar vessels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Support arrangement in which the support frame (1) is held in a vertically adjustable manner on a central tower (3). A ring shaped construction (7) is rotatably arranged around the support platform.Fall prevention rails (8,9) are attached to the ring shaped construction. The work platform (2) is adjustable in inclination and is secured in the desired inclined position by braces (11) running over the prop (10).

Description

Das Einschalen und Ausschalen einer Kegelschalung, welches beim Bau von Faulbehältern oder Faultürmen meistens notwendig ist, ist eine sehr zeitaufwendige und dadurch kostspielige Arbeit. Die Arbeit muß in größeren Höhen ausgeführt werden. Ganz besonders schwierig ist die Demontage der Kegelschalung und der für diese notwendigen Abstützung.The formwork and formwork of a cone formwork, which the Construction of digesters or digesters is mostly necessary a very time-consuming and therefore expensive job. The Work must be done at higher altitudes. Most notably it is difficult to dismantle the cone formwork and that for it necessary support.

Die Erfindung stellt sich nun die Aufgabe, ein Traggerüst mit einer Arbeitsplattform zu entwickeln, welche das Einschalen und Ausschalen einer Kegelschalung vereinfacht und erleichtert und wodurch auch die Kosten für diese Arbeit wesentlich gesenkt werden können.The invention now has the task of having a supporting structure to develop a working platform that allows shuttering and Stripping a cone formwork simplified and facilitated which also significantly reduces the cost of this work can be.

Dies wird mittels eines Traggerüstes und einer Arbeitsplattform erreicht, welche die Merkmale des Patentanspruches 1 aufweisen.This is done using a support structure and a work platform achieved, which have the features of claim 1.

Im Folgenden wird nun ein Ausführungsbeispiel der Erfindung an­ hand der beiliegenden Zeichnungen eingehend beschrieben.An exemplary embodiment of the invention will now be described below hand described in detail in the accompanying drawings.

Fig. 1 zeigt den oberen Teil eines zu bauenden Faulbehälters mit dem erfindungsgemäßen Traggerüst und der Arbeitsplattform im Schnitt. Fig. 2 zeigt einen Ausschnitt von Fig. 1 in vergrößertem Maßstabe und Fig. 3 zeigt eine mögliche Rollenführung für die ringförmige Konstruktion am äußeren oberen Rande der Tragkon­ struktion. Fig. 1 shows the upper part of a digester to be built with the scaffolding according to the invention and the working platform in section. Fig. 2 shows a section of Fig. 1 on an enlarged scale and Fig. 3 shows a possible roller guide for the annular construction on the outer upper edge of the Tragkon construction.

Fig. 1 zeigt den oberen Teil eines zu bauenden Faulbehälters im Schnitt. Die Zylinderwand ist betoniert und ausgeschalt. Der Mittelturm 3 ist montiert. Am oberen Teil des Mittelturms ist das Traggerüst 1 montiert. Am oberen rechten Rande ist die Arbeits­ plattform 2 lösbar befestigt. Auf Stützen 6 ist ein ringförmiges Profil 5 angeordnet, worauf der obere Teil der Tragprofile 4 aufgelagert ist. Diese Profile 4 sind am unteren Ende auf der Zylinderwand aufgelagert und mit gleicher Neigung in regelmäßigen Abständen strahlenförmig rundum angeordnet. Auf diesen Pro­ filen wird die Schalhaut für die Kegelschalung aufgelegt. Der Übersichtlichkeit halber sind nur rechts und links je ein Profil 4 eingezeichnet. Fig. 1 shows the upper part of a digester to be built in section. The cylinder wall is concreted and stripped. The middle tower 3 is assembled. The supporting structure 1 is mounted on the upper part of the center tower. At the upper right edge, the platform 2 is releasably attached. An annular profile 5 is arranged on supports 6 , on which the upper part of the support profiles 4 is supported. These profiles 4 are supported at the lower end on the cylinder wall and arranged at the same inclination at regular intervals all around. The formlining for the cone formwork is placed on these profiles. For the sake of clarity, only one profile 4 is shown on the right and one on the left.

Fig. 2 zeigt einen Ausschnitt von Fig. 1 in vergrößertem Maß­ stabe. Vom Mittelturm 3 ist nur mehr der obere Teil zu sehen. Fig. 2 shows a section of Fig. 1 on an enlarged scale. From the middle tower 3 only the upper part can be seen.

Nachdem das Traggerüst 1 einen wesentlichen Teil des Gewichtes der Kegelschalung und auch des Betons des Kegels aufzunehmen hat, ist das Traggerüst mit statisch erforderlichen Streben versehen, welche in diesem Beispiel nur zum Teil eingezeichnet sind. Die Arbeitsplattform 2 rechts im Bild, welche nur mehr zum Teil sicht­ bar ist, ist an einer ringförmigen Konstruktion 7 lösbar und in der Neigung einstellbar montiert. Diese Konstruktion 7 besteht in diesem Beispiel aus einem stabilen gerundeten und zerlegba­ ren Formrohr, welches an Rollen 12, welche jeweils am unteren Ende der Stutzen 6 außen angebracht sind, im Kreis drehbar ge­ halten ist. An der Konstruktion 7 sind in Abständen Geländerstüt­ zen 8 rundherum angebracht. An diesen Geländerstützen 8 ist das Geländer 9 als Absturzsicherung lösbar befestigt, wobei aber der Zugang zur Arbeitsplattform 2 offen bleibt. Ebenfalls ist die Arbeitsplattform 2 mittels Geländerstützen 8 und Geländer 9 ab­ sturzgesichert. Das Traggerüst 1 bildet oben eine ebene Fläche und ist absturzsicher abgedeckt. Nachdem diese zentrale Plattform für den Baukran zugänglich ist und zur Arbeitsplattform 2 immer offen ist, bildet sie eine ideale Basis für die Montage- und De­ montagearbeiten. Die Arbeitsplattform 2 ist an der ringförmigen Konstruktion 7 in der Neigung verstellbar gelagert. Damit kann sie der jeweiligen Neigung der Kegelschalung angepaßt werden. Um sie in der gewünschten Neigung sicher zu halten, ist sie mittels der Abspannung 11 über die Stützen 10, welche unten an der Konstruk­ tion 7 oder an der Arbeitsplattform 2 befestigt sind, an der Kon­ struktion 7 angehängt.After the support structure 1 has to absorb a substantial part of the weight of the cone formwork and also the concrete of the cone, the support structure is provided with statically required struts, which are only partially shown in this example. The work platform 2 on the right in the picture, which is only partially visible, is detachably mounted on an annular structure 7 and adjustable in inclination. This construction 7 consists in this example of a stable rounded and zerlegba ren molded tube, which is rotatably held in a circle on rollers 12 , which are each attached to the outside at the lower end of the nozzle 6 . On the construction 7 zen 8 are attached all around at intervals. The railing 9 is releasably attached to these railing supports 8 as a fall protection, but the access to the work platform 2 remains open. The working platform 2 is also secured against falling by means of railing supports 8 and railings 9 . The supporting structure 1 forms a flat surface at the top and is covered to prevent it from falling. After this central platform is accessible to the construction crane and is always open to work platform 2 , it forms an ideal basis for the assembly and disassembly work. The working platform 2 is mounted on the ring-shaped construction 7 so as to be adjustable in inclination. So that it can be adapted to the respective inclination of the cone formwork. To hold them securely in the desired inclination, it is secured by means of the tightening means 11 via the supports 10, which tion below to 7, constructional or on the working platform 2, or construction at the Kon 7 appended.

Das Traggerüst 1 ist am Mittelturm 3 vertikal verschiebbar gehal­ ten. Damit besteht die Möglichkeit, das Traggerüst samt der Ar­ beitsplattform 2 am Boden des zu bauenden Faulbehälters zu montieren und am montierten Mittelturm mittels Baukran hochzuziehen und nach Fertigstellung des Kegels wieder mittels Baukran abzusenken und am Boden zu zerlegen.The supporting structure 1 is held vertically displaceable on the central tower 3. This makes it possible to assemble the supporting structure together with the work platform 2 on the bottom of the digester to be built and to pull it up on the assembled central tower using a construction crane and, after completion of the cone, to lower it again using a construction crane and on Disassemble floor.

Fig. 3 zeigt eine am unteren Ende einer Stütze 6 angebrachte Rol­ lenführung für die ringförmige Konstruktion 7. Die Rollenführung 12 ist jeweils am unteren Ende der Stützen 6 außen rundherum und alle in derselben Höhe angeordnet. Die Konstruktion 7 besteht in diesem Beispiel aus einem stabilem Formrohr, welches zerlegbar ist und entsprechend gerundet ist. An diesem Formrohr sind die Geländerstützen 8 lösbar befestigt. Fig. 3 shows an attached at the lower end of a support 6 Rol lenführung for the annular construction 7th The roller guide 12 is arranged at the lower end of the supports 6 all around and all at the same height. The construction 7 in this example consists of a stable molded tube which can be dismantled and is rounded accordingly. The railing supports 8 are detachably fastened to this shaped tube.

Claims (2)

1. Traggerüst zur Abstützung einer Kegelschalung mit einer Arbeitsplattform zum Montieren und Demontieren dieser Kegel­ schalung, dadurch gekennzeichnet, daß das Traggerüst (1) an einem Mittelturm (3) vertikal verschiebbar gehalten ist, daß um das Traggerüst (1) rundherum eine ringförmige Konstruktion (7) rundum drehbar angeordnet ist, daß an dieser Konstruktion (7) eine Absturzsicherung (8, 9) angebracht ist, daß an der Konstruktion (7) eine in der Neigung verstellbare und absturz­ gesicherte auskragende Arbeitsplattform (2) angeordnet ist und daß diese Arbeitsplattform (2) mittels der Abspannung (11) über die Stützen (10) in der gewünschten Neigung gehalten ist.1. Support frame for supporting a cone formwork with a work platform for assembling and disassembling this cone formwork, characterized in that the support frame ( 1 ) on a central tower ( 3 ) is held vertically displaceable, that around the support structure ( 1 ) all around an annular construction ( 7 ) is arranged rotatable all around, that a fall protection ( 8 , 9 ) is attached to this construction ( 7 ), that on the construction ( 7 ) a cantilevered working platform ( 2 ) which is adjustable and secured against falling is arranged and that this working platform ( 2 ) is held in the desired inclination by means of the guying ( 11 ) over the supports ( 10 ). 2. Traggerüst mit einer Arbeitsplattform nach Anspruch 1, dadurch gekennzeichnet, daß die Arbeitsplattform (2) längenverstell­ bar gehalten ist.2. Support frame with a work platform according to claim 1, characterized in that the work platform ( 2 ) is held length-adjustable bar.
DE19600992A 1995-01-16 1996-01-14 Support frame and work platform for installation of tapered concrete roof Withdrawn DE19600992A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH11395 1995-01-16

Publications (1)

Publication Number Publication Date
DE19600992A1 true DE19600992A1 (en) 1996-07-18

Family

ID=4179557

Family Applications (2)

Application Number Title Priority Date Filing Date
DE19600992A Withdrawn DE19600992A1 (en) 1995-01-16 1996-01-14 Support frame and work platform for installation of tapered concrete roof
DE29600482U Expired - Lifetime DE29600482U1 (en) 1995-01-16 1996-01-14 Support frame and work platform for a cone formwork

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE29600482U Expired - Lifetime DE29600482U1 (en) 1995-01-16 1996-01-14 Support frame and work platform for a cone formwork

Country Status (1)

Country Link
DE (2) DE19600992A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453196A (en) * 2014-11-28 2015-03-25 中煤第六十八工程有限公司 Warehouse internal all-dimensional lifting operating platform
CN106150082A (en) * 2016-08-18 2016-11-23 上海二十冶建设有限公司 Formwork erection structure and erection method for pitched roof ridge cast-in-place structural
CN108560899A (en) * 2018-01-30 2018-09-21 高亚贵 A kind of scaffold wall-attaching base for building

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110259171B (en) * 2019-05-30 2021-04-06 郑州工程技术学院 Dome drawing repair system and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453196A (en) * 2014-11-28 2015-03-25 中煤第六十八工程有限公司 Warehouse internal all-dimensional lifting operating platform
CN106150082A (en) * 2016-08-18 2016-11-23 上海二十冶建设有限公司 Formwork erection structure and erection method for pitched roof ridge cast-in-place structural
CN106150082B (en) * 2016-08-18 2018-09-18 上海二十冶建设有限公司 Formwork erection structure and erection method for pitched roof ridge cast-in-place structural
CN108560899A (en) * 2018-01-30 2018-09-21 高亚贵 A kind of scaffold wall-attaching base for building

Also Published As

Publication number Publication date
DE29600482U1 (en) 1996-04-04

Similar Documents

Publication Publication Date Title
DE102006055306B4 (en) Support head for slab formwork
DE2350129A1 (en) DEVICE FOR ERECTING PREFERABLY ENCLOSED CONCRETE BUILDINGS
AT17062U1 (en) Mobile working scaffold
DE19600992A1 (en) Support frame and work platform for installation of tapered concrete roof
DE2537830A1 (en) FRAMEWORK
EP0930408A1 (en) Formwork for casting corbelled out concrete elements
EP1179647B1 (en) Adjustable working platform
DE3635597A1 (en) Apparatus for demolishing chimneys or the like
DE19509078A1 (en) Shuttering for overhead concrete arches
DE19858186A1 (en) Formwork for concreting cantilevered concrete components, especially caps, cornices and superstructures
EP0801188A1 (en) Overhang falsework for constructions
DE2402683C3 (en) Climbing formwork
DE102017002525A1 (en) Working platform for in particular the construction of tower segments and towers of, for example, wind turbines
DE3242570C2 (en)
DE8908734U1 (en) Tower formwork
DE202005003790U1 (en) Mobile scaffold
EP4209656B1 (en) Modular tunnel formwork device
DE2530639A1 (en) FORMWORK SCAFFOLDING FOR CEILINGS
DE19726652A1 (en) Shuttering for straight prefabricated concrete steps, with top and bottom landing
DE19506090C2 (en) Demountable stage with a space framework
DE8905773U1 (en) Gantry crane-like assembly crane for assembly and disassembly of panel formwork
DE8802061U1 (en) Formwork for the production of conical and cylindrical concrete structures
DE3237807C2 (en)
DE1174033B (en) Construction crane with a tower assembled from a number of elements
AT228974B (en) Jib crane

Legal Events

Date Code Title Description
8139 Disposal/non-payment of the annual fee