DE1938728B2 - Meter for electrical work with at least one additional counter to record a performance-graded consumption - Google Patents

Meter for electrical work with at least one additional counter to record a performance-graded consumption

Info

Publication number
DE1938728B2
DE1938728B2 DE19691938728 DE1938728A DE1938728B2 DE 1938728 B2 DE1938728 B2 DE 1938728B2 DE 19691938728 DE19691938728 DE 19691938728 DE 1938728 A DE1938728 A DE 1938728A DE 1938728 B2 DE1938728 B2 DE 1938728B2
Authority
DE
Germany
Prior art keywords
consumption
power
meter
counter
performance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19691938728
Other languages
German (de)
Other versions
DE1938728A1 (en
Inventor
Guenther Dipl.-Ing. 8908 Krumbach Hessel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE19691938728 priority Critical patent/DE1938728B2/en
Publication of DE1938728A1 publication Critical patent/DE1938728A1/en
Publication of DE1938728B2 publication Critical patent/DE1938728B2/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/56Special tariff meters
    • G01R11/57Multi-rate meters
    • G01R11/58Tariff-switching devices therefor

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Electronic Switches (AREA)

Description

ger Weise die Erfüllung zweier unter sich unabhängiger Kriterien, von denen eines vom Zähler als Meßeinrichtung der elektrischen Arbeit über das damit zusammenhängende LeistungsmeSglied geliefert wird, das andere von außen dngeprägt wird. Die Umschaltung unterbleibt oder wird rückgängig gemacht, wenn eines der Kriterien entfallt (Fig.4). Zweckmäßigerweise wird das jeweils eingeschaltete Zählwerk mit bekannten Mitteln optisch gekennzeichnet (z. B. Schauzeichen). Ebenso kann der Freigabezustand des von außen kommenden Schaltkommandos mit bekannten Mitteln optisch oder akustisch angezeigt werden.ger way the fulfillment of two mutually independent Criteria, one of which is from the meter as a measuring device of electrical work over that with it coherent power meter is supplied, the other is dngpressened from the outside. the Switching does not take place or is reversed if one of the criteria does not apply (Fig. 4). It is expedient for the counter that is switched on in each case to be visually identified by known means (e.g. indicators). The release status of the switching command coming from outside can also be be indicated optically or acoustically by known means.

Bei geeigneter Ausführung des Zählers, z. B. Zähler mit Impuls-Geber-Einrichtung, können die beiden Steuervorrichtungen und die Umschalteinrichtung in einem getrennten Zusatzgerät angeordnet werden, das elektrisch mit dem Zähler verbunden ist.With a suitable design of the counter, e.g. B. Counter with pulse generator device, both can Control devices and the switching device are arranged in a separate additional device, which is electrically connected to the meter.

Hierzu 1 Blatt Zeichnungen1 sheet of drawings

Claims (2)

1 2 dem anderen Zählwerk der Spitzenverbrauch, das ist Patentansprüche: der Verbrauchsanteil während der Dauer der Überschreitung der Leistungsgrenze unter Zugrundele-1 2 the other counter is the peak consumption, that is the patent claims: the proportion of consumption during the period in which the power limit is exceeded, based on 1. Zähler für elektrische Arbeit mit mindestens gung der Differenz zwischen Augenblickswert der einem zusätzlichen Zählwerk zur Erfassung eines 5 Leistung und dem Leistungsgrenzwert, erfaßt Verbrauchs nach Leistungsstaffeln oder Lei- (Fig.2), oder es wird auf dem einen Zahlwerk der stungszonen und mit einer Zählwerk-Umschalt- Gesamtverbrauch, auf dem anderen Zählwerk aer vorrichtung, deren Steuerung durch ein auf vor- Überverbrauch erfaßt (F ig. 3;. · T . bestimmte Leistungsgrenzwerte einstellbares Lei- Es gibt weiter Maximumzahler, die em Leistungsmeßglied erfolgt, dadurch gekenn- io stungsmeßglied enthalten, welches die Leistung, die zeichnet, daß zur Steuerung der Zählwerk- dem auf einem Zählwerk angezeigten Verbrauch in Umschaltvorrichtung eine weitere, auf externe kWh entspricht, über je aufeinanderfolgende Meßpe-Befehle ansprechende Steuervorrichtung vorgese- rioden von z.B. 15min Dauer integriert und am hen ist, die mit dem Leistungsmeßglied als erste Ende einer Ableseperiode auf einem dafür bestimm-Steuervorrichtung in derartiger Wirkverbindung 15 ten und konstruierten weiteren Zählwerk nur den steht, daß die Umschaltvorrichtung nur dann be- Höchstwert der Leistung anzeigt, der in einer der tätigt und in ihrer neuen Schaltstellung nur so Meßperioden der Ableseperiode erreicht wurde,
lange gehalten wird, wie die Schaltbefehle beider Die bekannten vorstehend beschriebenen Elektrizi-Steuervorrichtungen gleichzeitig andauern. tätszähler ermöglichen nur mangelhaft kostenechte
1. Meter for electrical work with at least the difference between the instantaneous value of an additional counter for recording a 5 power and the power limit value, records consumption according to power scales or power (Fig.2), or it is on the one meter of the stungszone and with a counter-Shift total consumption, aer on the other counting device whose control ig by a detected on pre-over-consumption (F. 3 ;. · T. certain power limits adjustable LEI There are further maximum payers who em Leistungsmeßglied takes place, marked in characterized - io stungsmeßglied contain, which indicates that for controlling the meter, the consumption displayed on a meter in the switchover device corresponds to an additional external kWh, via each successive measuring commands responsive control device integrated pre-periods of eg 15min duration and am hen that with the power meter as the first end of a reading period a dedicated control device in such an operative connection and constructed further counter is only available that the switching device only displays the maximum value of the power that was only reached in one of the measuring periods of the reading period in its new switch position,
is held for a long time, as the switching commands of both the known electrical control devices described above continue at the same time. Tact counters only allow inadequate cost-realism
2. Zähler nach Anspruch 1, dadurch gekenn- ao und damit verbrauchsgerechte Tarifkonzeptionen, zeichnet, daß die beiden Steuervorrichtungen und weil mit ihnen nur die Verbrauchsverhältnisse eines die Umschaltvorrichtung als getrenntes Zusatzge- einzelnen Verbrauchers — diese zudem je nach Art rät angeordnet sind, das elektrisch mit dem Zäh- des Zählers bezüglich Leistung, Zeitpunkt und Zeitler verbunden ist und seine Gebereinrichtung im spanne mehr oder weniger unvollständig — erfaßt Zähler hat. »5 werden können. Damit entfällt weitgehend eine2. Meter according to claim 1, characterized by ao and thus consumption-based tariff concepts, draws that the two control devices and because with them only the consumption ratios of one the switching device as a separate additional individual consumer - this also depends on the type advises are arranged that electrically with the counter of the counter with regard to power, time and timer is connected and its encoder device is more or less incomplete in the span - recorded Has counter. »5 can be. This largely eliminates one wahrheitsgemäße Relation zum jeweiligen Zustandtruthful relation to the respective state (Belastungskurve) auf der Erzeugungsseite und der(Load curve) on the generation side and the wesentlich kostenbestimmende Gleichzeitigkeitsfaktor einer Vielzahl von Verbrauchern kann infolge-the cost-determining simultaneity factor of a large number of consumers can as a result Der Verbrauch elektrischer Arbeit wird von Elek- 30 dessen in den Tarifen nicht ausreichend berücksichtrizitätszählern bekannter Ausführung gemessen, die tigt werden. Der Doppeltarif zähler z.B. berücksichfür verschiedene Tarifmöglichkeiten in verschiedener tigt nicht die in der Regel während der Tagzeit auf-Weise ausgerüstet sind. tretenden Leistungsspitzen auf der Erzeugungsseite. So gibt es Zähler mit zwei Zählwerken (Doppel- Der bekannte Überverbrauchszähler schaltet bei jetarifzähler), bei welchen durch ein von außen 35 der Überschreitung einer bestimmten Leistung auf kommendes Schaltkommando (z.B. Schaltuhr, Steu- den teureren Überverbrauch um, auch wenn diese erleitung, Rundsteuerung in Verbindung mit einem Leistungpüberschreitung in eine Schwachlastzeit auf entsprechenden Umschaltorgan, z. B. Relais) zeit- der Erzeugungsseite fällt und damit die Umschaltung weise das eine oder das andere Zählwerk zur Regi- im Gegensatz zur Kostensituation steht. Der Maxistrierung gebracht wird, um den auf den beiden 40 mumzähler zeigt eine irgendwann innerhalb der Ab-Zählwerken für verschiedene Zeiträume, z.B. Tag- leseperiode beanspruchte höchste Leistung an, sagt und Nachtzeit, angezeigten Verbrauch nach ver- aber nichts darüber aus, ob diese Leistung während schiedenen Tarifen berechnen zu können. einer Spitzenlastzeit oder während einer Schwach-Bekannt sind auch Zähler mit zwei Zählwerken lastzeit auf der Erzeugungsseite beansprucht wurde und einem Leistungsmeßglied, wobei das Leistungs- 45 und verhindert dadurch weitgehend einen echten Komeßglied so auf eine entsprechende Umschalteinrich- stenansatz.The consumption of electrical work is not sufficiently taken into account by electricity meters in the tariffs known execution, which are taken. The double tariff meter, for example, takes into account Different tariff options in different tigt not usually during the daytime on-way are equipped. occurring power peaks on the generation side. So there are meters with two counters (double The well-known overconsumption meter switches with jet tariff meter), in which by an external 35 the exceeding of a certain performance on Incoming switching command (e.g. timer, reverse the more expensive overconsumption, even if this erleitung, ripple control in connection with a power overrun in a low load period corresponding switching device, z. B. Relay) time - the generation side drops and with it the switchover wise one or the other counter to the regi- in contrast to the cost situation. The registration is brought to the on the two 40 meter counters one at some point within the down counters for different periods of time, e.g. daily reading period, demands the highest performance, says and night time, indicated consumption after ver but nothing about whether this performance during to be able to calculate different tariffs. a peak load time or during a weak-known are also meters with two counters load time was used on the generation side and a power meter, the power 45 and thereby largely preventing a true meter so on a corresponding switching device approach. tung wirkt, daß bei Überschreiten einer bestimmten, Die technische Aufgabe stellt sich somit dahin, ineinstellbaren Leistung das erste Zählwerk aus- und nerhalb der Verbrauchsroessung beim einzelnen Verdas zweite Zählwerk statt dessen oder zusätzlich ein- braucher die Relation zwischen dessen jeweiligen kuppelt und bei Unterschreiten dieser bestimmten 50 Verbrauchsverhältnissen und den jeweiligen BeIa-Leistung wieder auf das erste Zählwerk ausschließ- stungsverhältnissen auf der Erzeugungsseite meßlich zurückgeschaltet wird (Überverbrauchs-Zähler). technisch so herzustellen, daß konstenechtere Tarif-Ein von außen kommendes Schaltkommando kommt bildungen als bisher möglich werden,
dabei nicht zur Wirkung. Diese Aufgabe wird bei einem Zähler für elektri-Je nach Ausführung des Leistungsmeßglieds und 55 sehe Arbeit mit mindestens einem zusätzlichen Zählder Umschalteinrichtung und der Verwendung von werk zur Erfassung eines Verbrauchs nach Lei-Getrieben (z. B. Differentialgetriebe) wird damit auf stungsstaffeln oder Leistungszonen unter Berücksichdem einen Zählwerk der Verbrauch erfaßt, der wäh- tigung der Verhältnisse auf der Erzeugungsseite errend der Unterschreitung einer bestimmten Lei- findungsgemäß dadurch gelöst, daß zur Steuerung stungsgrenze stattgefunden hat, auf dem anderen 60 der Zählwerk-Umschaltvorrichtung eine weitere, auf Zählwerk der Verbrauch, der während Überschrei- externe Befehle ansprechende Steuervorrichtung vortung dieser Leistungsgrenze (Überverbrauch) stattge- gesehen ist, die mit dem Leistungsmeßglied als erste funden hat (F i g. 1), oder es wird auf dem einen Steuervorrichtung in derartiger Wirkverbindung Zählwerk der Grundverbrauch, das ist der Ver- steht, daß die Umschaltvorrichtung nur dann betätigt brauch während der Unterschreitung der Leistungs- 63 und in ihrer neuen Schaltstellung nur so lange gehalgrenze zuzüglich einem Verbrauchsanteil unter Zu- ten wird, wie die Schaltbefehle beider Steuervorrichgrundelegung des Leistungsgrenzwertes während der tungen gleichzeitig andauern.
Dauer der Überschreitung der Leistungsgrenze, auf Vorraussetzung für die Umschaltung ist in neuarti-
The technical task is therefore to set the first meter outside and within the consumption rate for the individual output determined 50 consumption ratios and the respective BeIa output is measured back to the first counter exclusion ratios on the generation side (overconsumption counter). to be technically produced in such a way that more cost-effective tariff-A switching command coming from outside is possible than previously possible,
not to the effect. Depending on the design of the power measuring element and 55 see work with at least one additional counter, the switching device and the use of work to record a consumption according to Lei gears (e.g. differential gears), this task is carried out on stungsstaffeln or power zones Taking into account a counter records the consumption, which while maintaining the conditions on the generation side errend the undershoot of a certain performance in that the control has taken a performance limit, on the other 60 of the counter switchover device another, on the counter the consumption , the control device responding to this power limit (overconsumption) has taken place during overwriting, which was the first to find with the power meter (Fig. 1), or the basic consumption is counted on one control device in such an operative connection, that is the understanding that d The switching device is only actuated when the power limit is undershot and in its new switch position only as long as the salary limit plus a consumption share is below the limit, as the switching commands for both control devices of the power limit value continue simultaneously.
Duration of the exceeding of the power limit, a prerequisite for the switchover is in the novel
DE19691938728 1969-07-30 1969-07-30 Meter for electrical work with at least one additional counter to record a performance-graded consumption Withdrawn DE1938728B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19691938728 DE1938728B2 (en) 1969-07-30 1969-07-30 Meter for electrical work with at least one additional counter to record a performance-graded consumption

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19691938728 DE1938728B2 (en) 1969-07-30 1969-07-30 Meter for electrical work with at least one additional counter to record a performance-graded consumption

Publications (2)

Publication Number Publication Date
DE1938728A1 DE1938728A1 (en) 1971-02-11
DE1938728B2 true DE1938728B2 (en) 1974-01-24

Family

ID=5741367

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19691938728 Withdrawn DE1938728B2 (en) 1969-07-30 1969-07-30 Meter for electrical work with at least one additional counter to record a performance-graded consumption

Country Status (1)

Country Link
DE (1) DE1938728B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2746600A1 (en) * 1977-10-15 1979-04-19 Licentia Gmbh TARIFF DEVICE FOR AN ELECTRICITY COUNTER WITH COUNTERS FOR TOTAL CONSUMPTION AND OVER CONSUMPTION
EP0060920A2 (en) * 1981-03-21 1982-09-29 Felten & Guilleaume Energietechnik GmbH Circuit for the electrical-energy measurement with power rating in a tariff range
EP0534583A2 (en) * 1991-09-24 1993-03-31 General Electric Company Convertible energy meter

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2746600A1 (en) * 1977-10-15 1979-04-19 Licentia Gmbh TARIFF DEVICE FOR AN ELECTRICITY COUNTER WITH COUNTERS FOR TOTAL CONSUMPTION AND OVER CONSUMPTION
EP0060920A2 (en) * 1981-03-21 1982-09-29 Felten & Guilleaume Energietechnik GmbH Circuit for the electrical-energy measurement with power rating in a tariff range
EP0060920A3 (en) * 1981-03-21 1983-01-05 Felten & Guilleaume Energietechnik GmbH Circuit for the electrical-energy measurement with power rating in a tariff range
EP0534583A2 (en) * 1991-09-24 1993-03-31 General Electric Company Convertible energy meter
EP0534583A3 (en) * 1991-09-24 1993-10-13 General Electric Company Convertible energy meter

Also Published As

Publication number Publication date
DE1938728A1 (en) 1971-02-11

Similar Documents

Publication Publication Date Title
DE2515202B2 (en) DIGITAL MULTIPLE MEASURING EQUIPMENT
DE3823038A1 (en) METHOD FOR MONITORING A BATTERY
DE2165635C3 (en)
DE1541793B1 (en) Device for displaying the maximum consumption in power networks
DE2313566A1 (en) PROCEDURE FOR IMMEDIATE MEASUREMENT AND DISPLAY OF THE RELEVANT CHARGE OF AN ACCUMULATOR BATTERY AND DEVICE FOR IT
DE1938728B2 (en) Meter for electrical work with at least one additional counter to record a performance-graded consumption
DE871086C (en) Electric number comparator
DE1939165B2 (en) PERFORMANCE TARIFF SYSTEM FOR ELECTRICAL CONSUMPTION
DE2620113C3 (en) Tariff device for the continuous recording and display of a value of the electrical consumption averaged over constant time intervals
DE2745436A1 (en) TARIFF DEVICE IN CONNECTION WITH AN ELECTRICITY COUNTER AND SEVERAL METERING DEVICES
DE1018992B (en) Device for measuring the reactive load at the same time as the highest mean active load
AT128188B (en) Device for measuring the total work of a system with several feed lines.
DE3313087C2 (en)
DE2413769C3 (en) Electronic maximum guard
DE429143C (en) Arrangement for remote transmission of the display of measuring devices using auxiliary devices that periodically influence contacts
DE931187C (en) Device for quick determination of the fault location in electrical wiring systems
DE564982C (en) Procedure for the automatic shutdown of power consumers
CH669472A5 (en)
DE2730776A1 (en) ELECTRONIC MAXIMUM MOVEMENT FOR PULSE GENERATOR COUNTER
DE722152C (en) Device for monitoring the consumption of electrical energy or the like.
DE956611C (en) Maximum monitor for determining the load reductions required in electrical consumer circuits to avoid maximum excesses
CH309737A (en) Totalizer for remote counting using the pulse frequency method.
CH636970A5 (en) Tariff device connected to an electricity meter for measuring the excess consumption of electrical power
DE1498192A1 (en) Two-tariff meter
DE2247414B2 (en) METHODS OF MONITORING AND LIMITING THE CONSUMPTION OF ENERGY

Legal Events

Date Code Title Description
BHJ Nonpayment of the annual fee