DE1938728A1 - Counter for electrical work with several counters and power measuring element for switching to the 2nd and further counters depending on an external switching command - Google Patents
Counter for electrical work with several counters and power measuring element for switching to the 2nd and further counters depending on an external switching commandInfo
- Publication number
- DE1938728A1 DE1938728A1 DE19691938728 DE1938728A DE1938728A1 DE 1938728 A1 DE1938728 A1 DE 1938728A1 DE 19691938728 DE19691938728 DE 19691938728 DE 1938728 A DE1938728 A DE 1938728A DE 1938728 A1 DE1938728 A1 DE 1938728A1
- Authority
- DE
- Germany
- Prior art keywords
- counters
- counter
- switching
- measuring element
- power measuring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R11/00—Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
- G01R11/56—Special tariff meters
- G01R11/57—Multi-rate meters
- G01R11/58—Tariff-switching devices therefor
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Electronic Switches (AREA)
Description
Zähler für elektrische Arbeit mit mehreren Zählwerken und Leistungsmeßglied zur Umschaltung auf das 2. und weitere Zählwerke in Abhängigkeit von einem von außen kommenden Schaltkommando Der Verbrauch elektrischer Arbeit wird von Elektrizitätszählern bekannter Ausführung gemessen, die für verschiedene Tarifmöglichkeiten in verschiedener Weise ausgerüstet sind.Counter for electrical work with several counters and power meter for switching to the 2nd and further counters depending on one from outside coming switching command The consumption of electrical work is measured by electricity meters known execution, measured for different tariff options in different Way are equipped.
So gibt es Zähler mit 2 Zählwerken (Doppeltarifzähler), bei welchen durch ein von außen kommendes Schaltkommando (z.B. Schaltuhr, Steuerleitung, Rundsteuerung in Verbindung mit einem entsprechenden Umschaltorgan, z.B. Relais) zeitweise das eine oder das andere Zählwerk zur Wirkung gebracht wird, um den auf den beiden Zählwerken angezeigten Verbrauch in verschiedenen Zeiträumen verschieden berechnen zu können.There are meters with 2 counters (double tariff meters) where by a switching command coming from outside (e.g. timer, control line, ripple control in connection with a corresponding switching device, e.g. relay) temporarily the one or the other counter is brought into effect, around the on the two counters to be able to calculate the indicated consumption differently in different periods of time.
Es gibt weiter Zähler (mit 1 oder 2 Zählwerken), die ein Leistungsmeßglied enthalten, das meist zur (auf Null rückstellbaren) Anzeige eines in einer Ableseperiode benötigten höchsten Leistungswertes (z.B.Mittelwert einer Viertelstunde) benutzt wird, um diesen Wert am Ende der Ableseperiode abzulesen und in die Berechnung einzubeziehen, wobei unbekannt bleibt, zu welchem Zeitpunkt innerhalb der Ableseperiode diese Leistung benötigt wurde. Eine Variante dazu besteht in der bekannten Möglichkeit, das Leistungsmeßglied durch ein von außen kommendes Schaltkommando -z.B. durch Schaltuhr - zeitweise außer Betrieb zu nehmen, also die Leistung nur zeitweise zu messen. Soweit es sich dabei um Zähler mit 2 Zählwerken handelt, wird die Umschaltung von einem auf das andere Zählwerk dabei von der Leistungsmessung in der Regel nicht berührt und unterliegt einem besonderen Schaltkommando, es kann aber auch die In-oder Außerbetriebnahme der Leistungsmessung mit der Umschaltung auf das eine oder andere Zählwerk konform gehen.There are also counters (with 1 or 2 counters) that have a power meter included, mostly for the display of a (resettable to zero) in a reading period required highest power value (e.g. mean value of a quarter of an hour) is used to read this value at the end of the reading period and include it in the calculation, it remains unknown at what point in time within the reading period this power is obtained was needed. A variant of this consists in the known possibility of using the power measuring element by a switching command coming from outside - e.g. by timer - temporarily except To put into operation, i.e. to measure the performance only intermittently. As far as it goes When it comes to counters with 2 counters, the switchover from one to the other takes place As a rule, the counter is not affected by the performance measurement and is subject to it a special switching command, but it can also switch on or off the power measurement with the switchover to one or the other counter walk.
Bekannt sind auch Zähler mit 2 Zählwerken und einem Leistungsmeßglied, wobei das Leistungsmeßglied nicht zur Anzeige eines höchsten Leistungs(mittel)wertes verwendet wird, sondern so auf eine entsprechende Umschalteinrichtung wirkt, daß es bei Überschreiten einer bestimmten einstellbaren Leistung das 1. Zählwerk aus- und das 2. Zählwerk statt dessen oder zusätzlich einkuppelt und bei Unterschreiten dieser bestimmten Leistung wieder auf das 1. Zählwerk ausschließlich zurückschaltet. Ein von außen kommendes Schaltkommando kommt dabei nicht zur Wirkung.Also known are counters with 2 counters and a power meter, wherein the power meter is not used to display a maximum power (mean) value is used, but acts on a corresponding switching device that if a certain adjustable power is exceeded, the 1st counter will and the 2nd counter engages instead or in addition and if the value falls below the limit this specific power switches back exclusively to the 1st counter. A switching command coming from outside does not take effect.
Je nach Ausführung des Leistungsmeßgliedes und der Umschalteinrichtung und der Verwendung von Getrieben (z.B. Differentialgetriebe) wird damit auf dem einen Zählwerk der gesamte Verbrauch erfaßt, der während der Unterschreitung einer bestimmten Leistungsgrenzestattgefunden hat, auf dem anderen Zählwerk der gesamte Verbrauch der während Überschreitung dieser Leistungsgrenze stattgefunden hat (Fig. i), oder es wird auf dem einen Zählwerk der Grundverbrauch (d. ist der gesamte Verbrauch unterhalb der Umschaltleistung), auf dem anderen Zählwerk der Uberverbrauch (d. ist der gesamte Verbrauch oberhalb der Umschaltleistung) erfaßt (Fig. 2), oder es wird auf dem einen Zählwerk der Gesamtverbrauch (ober- und unterhalb der Umschaltleistung)g auf dem anderen Zählwerk der Überverbrauch (Verbrauch unter Überschreitung der Umschaltleistung) als Anteil des Gesamtverbrauchs erfaßt (Fig. 3).Depending on the design of the power measuring element and the switching device and the use of gears (e.g. differential gears) is thus on the a counter records the entire consumption, which while falling below a certain power limit has taken place, on the other counter the entire consumption which occurred while this performance limit was exceeded has (Fig. i), or the basic consumption (i.e. the total consumption below the switching capacity), on the other counter the Overconsumption (i.e. the total consumption above the switching capacity) is recorded (Fig. 2), or the total consumption (above and below the switching capacity) g on the other counter the overconsumption (consumption under Exceeding the switching capacity) recorded as a proportion of the total consumption (Fig. 3).
Die bekannten Elektrizitätszähler-Ausrüstungskombi nationen aus Zählwerken, Leistungsmeßgliedern und Umschalteinrichtungen lassen nur begrenzte Tarifmöglichkeiten offen.The well-known combinations of electricity meters and equipment from counters, Power measuring elements and switching devices allow only limited tariff options open minded.
Erfindungsgemäß wird ein Zähler für elektrische Arbeit in neuartiger Weise ausgerüstet mit 2 und mehr Zählwerken, einem Leistungsmeßglied und einer geeigneten Umscllalteinrichtung, die so zusammenwirken, daß bei Überschreiten einer bestimmten einstellbaren Leistung eine Umschaltung vom ersten auf das zweite oder eines der weiteren Zählwerk vorbereitet wird, die aber erst zur Ausfüllrung kommt, wenn ein von außen kommendes Schaltkommando diese Umschaltung frei gibt oder durch dieses Schaltkommando die Freigabe bereits besteht. Wird das von außen kommende Schaltkommando wieder rückgängig gemacht oder wird während der Freigabe zur Umschaltung die bestimmte eingestellte Leistung wieder unterschritten, so kommt wieder das 1. Zählwerk zur Wirkung. Dabei kann das jeweils eingeschaltete Zählwerk mit bekannten Mitteln optisch gekennzeichnet werden (z.B. Schauzeichen). Ebenso kann der Freigabezustand des von außen kommenden Schaltkommandos mit bekannten Mitteln optisch oder akustisch angezeigt werden.According to the invention, an electrical work counter is novel Equipped with 2 or more counters, a power meter and a suitable one Umscllalteinrichtung that cooperate so that when a certain limit is exceeded adjustable power a switchover from the first to the second or one of the Another counter is being prepared, but this is only filled in when a switching command coming from outside enables this switchover or by this Switching command the release already exists. Is the switching command coming from outside is undone again or the specific one is used during the release for the switchover If the power falls below the set output again, the 1st counter comes back Effect. The counter that is switched on can be optically using known means marked (e.g. indicators). The release status of the external switching commands are indicated optically or acoustically by known means will.
Die Umschaltung hat somit in neuartiger Weise die Erfüllung zweier, unter sich unabhängiger, Kriterien zur Voraussetzung, von denen eines vom Zähler als Meßeinrichtung der elektrischen Arbeit über das damit zusammenhängende Leistungsmeßglied geliefert wird, das andere von außen eingeprägt wird. Die Umschaltung unterbleibt, oder wird rückgängig gemacht, wenn eines der Kriterien entfällt (Fig. 4).The switchover has the fulfillment of two, among themselves more independent, criteria required, one of which is from the meter as a measuring device for electrical work via the associated power meter is delivered, the other is imprinted from the outside. The switchover does not take place, or is reversed if one of the criteria does not apply (Fig. 4).
Bei geeigneter Ausführung des Leistungsmeßgliedes (z.B. Impuls-Geber-Eierichtung)kann das Leistungsmeßglied und die Umschalteinrichtung zum Teil in ein getrenntes Zusatzgerät angeordnet werden, das elektrisch mit dem Zähler verbunden ist.With a suitable design of the power measuring element (e.g. pulse encoder egg direction) the power measuring element and the switching device in part in a separate additional device be arranged, which is electrically connected to the counter.
Patent-Ansprüche: 9 Zähler für elektrische Arbeit, mit 2 und mehr Zählwerken, mit einstellbarem Leistungsmeßglied und Umschalteinrichtung, dadurch gekennzeichnet, daß bei Überschreitung einer eingestellten Leistung eine Umschaltung auf das 2.Patent claims: 9 counters for electrical work, with 2 and more Counters, with adjustable power meter and switching device, thereby characterized in that when a set power is exceeded, a switchover on the 2nd
oder eines der weiteren Zählwerke vorbereitet wird, die aber erst ausgeführt wird, wenn ein von außen kommendes Schaltkommando die Umschaltung freigibt, oder diese Freigabe bereits besteht. or one of the other counters is being prepared, but only after is executed when a switching command coming from outside enables the switchover, or this approval already exists.
2) Zähler nach Anspruch 1) dadurch gekennzeichnet, daß die Rückschaltung auf das erste Zählwerk erfolgt, wenn die Freigabe rückgängig gemacht oder die eingestellte Leistung wieder unterschritten wird oder diese beiden Vorgänge gleichzeitig oder in beliebiger Reihenfolge nacheinander erfolgen. 2) counter according to claim 1), characterized in that the downshift on the first counter takes place if the release is canceled or the set one Performance is again fallen below or these two processes at the same time or take place one after the other in any order.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19691938728 DE1938728B2 (en) | 1969-07-30 | 1969-07-30 | Meter for electrical work with at least one additional counter to record a performance-graded consumption |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19691938728 DE1938728B2 (en) | 1969-07-30 | 1969-07-30 | Meter for electrical work with at least one additional counter to record a performance-graded consumption |
Publications (2)
Publication Number | Publication Date |
---|---|
DE1938728A1 true DE1938728A1 (en) | 1971-02-11 |
DE1938728B2 DE1938728B2 (en) | 1974-01-24 |
Family
ID=5741367
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19691938728 Withdrawn DE1938728B2 (en) | 1969-07-30 | 1969-07-30 | Meter for electrical work with at least one additional counter to record a performance-graded consumption |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE1938728B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5315235A (en) * | 1991-09-24 | 1994-05-24 | General Electric Company | Electrical energy meter with programmable register component |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2746600C2 (en) * | 1977-10-15 | 1987-04-23 | Licentia Patent-Verwaltungs-Gmbh, 6000 Frankfurt | Tariff device for an electricity meter with counters for total consumption and excess consumption |
DE3111202A1 (en) * | 1981-03-21 | 1983-04-28 | Felten & Guilleaume Energietechnik GmbH, 5000 Köln | CIRCUIT ARRANGEMENT FOR ELECTRICAL ENERGY MEASUREMENT WITH EVALUATION OF PERFORMANCE IN THE TARIFF AREA |
-
1969
- 1969-07-30 DE DE19691938728 patent/DE1938728B2/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5315235A (en) * | 1991-09-24 | 1994-05-24 | General Electric Company | Electrical energy meter with programmable register component |
Also Published As
Publication number | Publication date |
---|---|
DE1938728B2 (en) | 1974-01-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2803156C2 (en) | Measuring device for determining a tariff value for energy consumers | |
DE1541793B1 (en) | Device for displaying the maximum consumption in power networks | |
DE2447168A1 (en) | EXCITATION CIRCUIT FOR A VISUAL REPLAY ELEMENT | |
DE1938728A1 (en) | Counter for electrical work with several counters and power measuring element for switching to the 2nd and further counters depending on an external switching command | |
DE1939165C (en) | ||
DE702275C (en) | Process and device for monitoring work that has been performed with varying degrees of intensity over time | |
DE473982C (en) | Device for displaying the Hoechstein switch-on duration of an electrical apparatus | |
DE719981C (en) | Process and device for monitoring work that has been performed with varying degrees of intensity over time | |
DE466956C (en) | Device for measuring the maximum consumption of an electrical installation | |
DE1017701B (en) | Maximum counter | |
DE587444C (en) | Device for measuring the bill consumption by an E-counter and a J-counter | |
DE516179C (en) | Electricity meter with double tariff meter | |
DE428228C (en) | Electricity meter with maximum pointer | |
DE1018992B (en) | Device for measuring the reactive load at the same time as the highest mean active load | |
DE931187C (en) | Device for quick determination of the fault location in electrical wiring systems | |
DE751809C (en) | Registration device for the counters existing at the end of the measuring sections of counting systems working in sections with relay chains | |
DE3149165A1 (en) | Method for measuring the frequency of an alternating voltage | |
DE960216C (en) | Device for determining the basic charge for electricity consumption | |
DE636571C (en) | Arrangement for integrating remote recording of continuously occurring rotary movements of a measuring device in the same direction, e.g. B. a flow meter, using zigzag curves | |
DE762998C (en) | Device for monitoring work that has been carried out at varying levels over time | |
DE712822C (en) | Measuring device with a measuring instrument that integrates the instantaneous values, such as a counter | |
AT127525B (en) | Telemetry equipment. | |
DE747359C (en) | Measuring device driven by two measuring units | |
CH669472A5 (en) | ||
DE2638975C2 (en) | Maximum power monitor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
BHJ | Nonpayment of the annual fee |