DE1910242C - Spreaders for dredged material - Google Patents
Spreaders for dredged materialInfo
- Publication number
- DE1910242C DE1910242C DE19691910242 DE1910242A DE1910242C DE 1910242 C DE1910242 C DE 1910242C DE 19691910242 DE19691910242 DE 19691910242 DE 1910242 A DE1910242 A DE 1910242A DE 1910242 C DE1910242 C DE 1910242C
- Authority
- DE
- Germany
- Prior art keywords
- discharge
- superstructure
- booms
- spreader
- vertical axis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 230000005484 gravity Effects 0.000 description 2
- 230000036633 rest Effects 0.000 description 2
- 210000001503 Joints Anatomy 0.000 description 1
- 230000001154 acute Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000000875 corresponding Effects 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 230000035882 stress Effects 0.000 description 1
- 210000000689 upper leg Anatomy 0.000 description 1
Description
Die Erfindung bezieht sich auf einen Absetzer für Baggergut, mit einer um eine lotrechte Achse schwenkbaren Tragkonstruktion, mit der zwei um die lotrechte Achse schwenkbare Abwurfausleger verbunden sind.The invention relates to a spreader for dredged material, with a vertical axis swiveling support structure connected to the two discharge booms that can be swiveled around the vertical axis are.
Bei einem bekannten Absetzer dieser Art (deutsche Patentschrift 569 201) sind die beiden Abwurfausleger um eine von dem Unterbau hochragende Säule unabhängig voneinander drehbar gelagert. Infolgedessen muß bei der Bemessung der Tragkonstruktion dieses Absetzers der Umstand berücksichtigt werden, daß der Schwerpunkt der Konstruktion nach beliebigen Richtungen hin aus der lotrechten Drehachse der Abwurfausleger heraus wandern kann, insbesondere wenn diese einen spitzen Winkel miteinander bilden. Es ergibt sich daher vor allem, wenn die Abwurfausleger große Reichweiten haben, eine aufwendige Tragkonstruktion.In a known spreader of this type (German patent 569 201), the two discharge arms are rotatably mounted independently of one another around a column protruding from the substructure. Consequently the fact must be taken into account when dimensioning the supporting structure of this spreader be that the center of gravity of the construction in any direction out of the perpendicular The axis of rotation of the discharge boom can wander out, especially if this has an acute angle form with each other. It is therefore particularly the case when the discharge booms have large outreaches an elaborate supporting structure.
Der Erfindung liegt die Aufgabe zugrunde, einen Absetzer der genannten Art so auszubilden, daß bei allen Betriebsstellungen der schwenkbaren Teile des Absetzers der Schwerpunkt dieser Teile möglichst nahe der lotrechten Achse liegt.The invention is based on the object of designing a settling device of the type mentioned so that at the center of gravity of these parts as far as possible in all operating positions of the swiveling parts of the skip is close to the vertical axis.
Die Lösung dieser Aufgabe besteht nach der Erfindung darin, daß sich die beiden Abwurfausleger von der als drehbarer Oberbau ausgebildeten Tragkonstruktion in allen Schwenkstellungen nach entgegengesetzten Richtungen erstrecken.The solution to this problem is, according to the invention, that the two discharge booms from the supporting structure designed as a rotatable superstructure in all pivoting positions to opposite directions Directions extend.
Durch die Erfindung wird der Fortschritt erzielt, daß die Aufschüttung von Halden großer Höhe mit einem Absetzer von geringem konstruktiven Aufwand ermöglicht wird. Vor allem bei Tagebauanlagen mit Direktversturz, bei denen dem auf einer Zwischenbcrme fahrenden Absetzer das Baggergut mittels einer Bandbrücke zugeführt wird, wird erreicht, daß der Absetzer trotz großer Reichweiten der Abwurfausleger eine ausreichende Standsicherheit bei möglichst geringen Abmessungen und eine geringe Spurbreite aufweist. Dadurch können schmale Bermen befahren werden. Da sich bei dem Absetzer nach der Erfindung die beiden Abwurfausleger stets nach entgegengesetzten Richtungen erstrecken, ist es möglich, die Verteilung des Baggergutes nach einem gewünschten Verhältnis auf die beiden Abwurfausleger in besonders einfacher Weise, d. h. mittels eines allgemein üblichen verschiebbaren Sattels, vorzunehmen, um so die Verwendung eines kostspieligen Ringtellers zu vermeiden, wie er bei dem bekannten Absetzer notwendig ist.The invention makes progress that the embankment of heaps of great height with a settling is made possible with little structural effort. Especially with opencast mines with direct fall, in which the spreader moving on an intermediate deck uses the dredged material is fed to a conveyor bridge, it is achieved that the spreader despite the large reach of the discharge boom sufficient stability with the smallest possible dimensions and a low one Has track width. This means that narrow berms can be negotiated. Since the weanling according to the invention, the two discharge booms always extend in opposite directions, it is possible, the distribution of the dredged material according to a desired ratio on the two discharge booms in a particularly simple way, d. H. by means of a commonly used sliding saddle, so as to avoid the use of an expensive ring plate, as is the case with the known one Weaning is necessary.
Einer der Abwurfausleger kann in vertikaler Richtung schwenkbar angeordnet sein. Die beiden Abwurfausleger können einen durch den Oberbau durchgehenden Träger bilden.One of the discharge booms can be arranged pivotably in the vertical direction. The two Discharge booms can form a continuous beam through the superstructure.
ίο Zwei Ausführungsbeispiele eines Absetzers nach der Erfindung werden an Hand der Zeichnung erläutert. Es zeigtίο Two embodiments of a skip after of the invention are explained with reference to the drawing. It shows
F i g. 1 einen Querschnitt durch einen Tagebau mit einer Seitenansicht des Absetzers in einer ersten Ausführungsform,F i g. 1 shows a cross section through an opencast mine with a side view of the spreader in a first one Embodiment,
F i g. 2 das Absetzgerät in einer zweiten Ausführungsform in Seitenansicht und
F i g. 3 eine Draufsicht zu F i g. 1.
Ein Absetzer fährt auf einer Beimel einer HaldeF i g. 2 the stripping device in a second embodiment in side view and
F i g. 3 is a plan view of FIG. 1.
A spreader drives on a by-hand of a dump
ao zwischen einer Hochböschung 2 und einer Tiefböschung 3. Auf dem Unterbau 4 des Absetzers ist der Oberbau 5 bzw. 6 um eine lotrechte Achse 7 drehbar gelagert.ao between a high embankment 2 and a low embankment 3. On the substructure 4 of the spreader, the superstructure 5 or 6 can be rotated about a vertical axis 7 stored.
Bei dem Ausführungsbeispiel nach F i g. 1 ist derIn the embodiment according to FIG. 1 is the
as Oberbau 6 C-förmig ausgebildet. An seinem oberen Schenkel ist das Abwurfende einer Bandbrücke 8 in einem Gelenk 9 aufgehängt. Das Aufgabe-Ende der Bandbrücke 8 ruht auf einem Raupenfahrwerk 10 im Bereich eines nicht dargestellten Aufnahmegerätes, welches das Baggergut auf das Förderband der Bandbrücke 8 aufgibt.The superstructure 6 is C-shaped. At its upper Leg, the discharge end of a belt bridge 8 is suspended in a joint 9. The end of the task Belt bridge 8 rests on a crawler track 10 in the area of a recording device, not shown, which releases the dredged material onto the conveyor belt of the belt bridge 8.
Der Oberbau 5 des Absetzers trägt zwei Abwurfauslcger 13 und 14 für die Hochschüttung bzw. Tief schüttung. Beide Abwurfausleger 13, 14 erstrekken sich von dem Oberbau S aus in einander entgegengesetzten Richtungen, und zwar der Abwurfausleger 13 mit einer Neigung nach oben und der Abwurfausleger 14 mit einer Neigung nach unten. Der Abwurfausleger 13 für die Hochschüttung ist an einem von dem Oberbau 5 ausgehenden Mast 15 mehrfach aufgehängt. Er kann mittels eines an dem Mast 15 angreifenden Hubwerkes um seine Stützlager am Oberbau 5 nach oben oder unten geschwenkt werden, um die Höhe der Hochböschung 2 zu ändern.The superstructure 5 of the spreader carries two discharge booms 13 and 14 for the top and bottom heap. Both discharge booms 13, 14 extend from the superstructure S in opposite directions, namely the discharge boom 13 with an upward slope and the discharge boom 14 with a downward slope. The discharge boom 13 for the raised bed is several times on a mast 15 extending from the superstructure 5 hung up. He can by means of a lifting mechanism acting on the mast 15 around his support bearings on Superstructure 5 can be pivoted up or down in order to change the height of the high embankment 2.
Der Abwurfausleger 14 für die Ticfschüttung ist starr an dem Oberbau 5 befestigt.The discharge boom 14 for the ticfill is rigidly attached to the superstructure 5.
Zur Verteilung des von dem Förderband der Bandbrücke 8 abgeworfenen Baggergutes auf die beiden Bänder der Abwurfausleger 13 und 14 dient ein Sattel 16, dessen Kante quer zu den Abwurfauslegern 13 und 14 liegt und die lotrechte Achse 7 schneidet. Der Sattel 16 überbrückt den Zwischenraum zwischen den einander zugekehrten Umlenktrommeln der Bänder in den Abwurfauslegern 13 und 14.To distribute the dredged material thrown from the conveyor belt of the belt bridge 8 between the two Bands of the discharge booms 13 and 14 is a saddle 16, the edge of which is transverse to the discharge booms 13 and 14 and the vertical axis 7 intersects. The saddle 16 bridges the space between the facing pulleys of the belts in the discharge booms 13 and 14.
Demgemäß wird das von der Bandbrücke 8 kommende Baggergut auf die beiden Abwurfausleger verteilt, so daß gleichzeitig die Hochböschung 2 und die Tiefböschung 3 beschickt werden. Der gesamte von der Bandbrücke 8 kommende Fördergutstrom kann aber auch dem Abwurfausleger 13 für die Hochschüttung oder dem Abwurfausleger 14 für die Tiefschüttung übergeben werden, wenn das Fördergut nicht in einem bestimmten Verhältnis auf beide Abwurfausleger 13, 14 verteilt werden soll.Accordingly, the dredged material coming from the belt bridge 8 is distributed to the two discharge booms, so that the high slope 2 and the low slope 3 are charged at the same time. The whole of the conveyor bridge 8 coming conveyed material flow can also the discharge boom 13 for the high pile or the discharge boom 14 for the deep discharge when the conveyed should not be distributed in a certain ratio to both discharge booms 13, 14.
Das Ausführungsbeispiel des Absetzers nach F i g. 2 und 3 unterscheidet sich von dem nach F i g. 1 dadurch, daß der Oberbau 6 nicht C-förmig ist, sondern ein die lotrechte Achse 7 umschließendes Ge-The embodiment of the spreader according to FIG. 2 and 3 differs from that according to FIG. 1 in that the superstructure 6 is not C-shaped, but a structure surrounding the vertical axis 7
rust bildet. Die Bandbrücke 8 stützt sich hierbei auf die Oberseite des Oberbaues 6 mit einem Ringkörper 18, der auf dem Oberbau 6 mittels einer Kugel- oder Rollenbahn um die lotrechte Achse 7 schwenkbar gelagert ist. An dem Ringkörper 18 ist die Bandbrücke 8 mit Hilfe von Gelenken 19 befestigt, die eine qi.tr zur Bandbrücke 8 liegende Achse haben. Das andere Ende der Bandbrücke 8 ruht hierbei auf dem in Fig.2 nicht dargestellten Raupenfahrwerk mittels eines Kugelgelenkes.rust forms. The belt bridge 8 is supported here the top of the superstructure 6 with an annular body 18, which is on the superstructure 6 by means of a ball or Roller conveyor mounted pivotably about the vertical axis 7 is. The band bridge 8 is attached to the ring body 18 by means of joints 19 which have a qi.tr to the belt bridge 8 lying axis. The other end of the belt bridge 8 rests here the crawler track, not shown in Figure 2 by means of a ball joint.
Das von der Bandbrücke 8 abgeworfene Gut fällt durch den Ringkörper 18 hindurch im Innern des Oberbaueso auf den Sattel 16, der das Gut auf die Bänder der Abwurfausleger 13 und 14 verteilt.The material thrown from the belt bridge 8 falls through the ring body 18 inside the Oberbaueso on the saddle 16, which distributes the material on the belts of the discharge boom 13 and 14.
Der Absetzer nach F i g. 2 und 3 unterscheidet sich von dem nach F i g. 1 ferner dadurch, daß die Abwurfausleger 13 und 14 starr miteinander verbunden sind wobei sie eine geradlinige Verlängerung voneinander bilden. Die Neigung der starr miteinander verbundenen Abwurfausleger 13, 14 kann durch emc Hubeinrichtung geändert werden.The weaners according to FIG. 2 and 3 differs from that according to FIG. 1 also in that the discharge boom 13 and 14 are rigidly connected to one another, being a straight extension of one another form. The inclination of the rigidly interconnected discharge booms 13, 14 can be adjusted by emc Lifting device can be changed.
In jedem Fall dienen der Abwurfausleger I;< ur die Tiefschüttung und der Abwurfausleger 13 L·. ile In any case, the discharge boom I serve ; <for the deep discharge and the discharge boom 13 L ·. i le
,ien i,hr irkt, ien i, hr irkt
^g^Sdaßfürg.e^eitg Baggergut auf die Hochböschung 2 und die schung3 im Blockbetrieb der Oberbau 5,6 mn beiden Abwurfauslegem 13 und 14 nicht um ir als 180" geschwenkt zu werden braucht Das v. sich bei der C-förmigen Ausbildung des Oberbau nach Fig. 1 günstig aus, weil sein Turm 20 verr nismäßig nahe der lotrechten Achse? angeor, werden kann, so daß er nur entsprechend mat Biegebeanspruchungen ausgesetzt ist.^ g ^ Sdaßfürg.e ^ eitg Dredged material on the high embankment 2 and the schung3 in the block operation of the superstructure 5.6 mn both drop arms 13 and 14 not to ir than 180 "needs to be swiveled Das v. itself with the C-shaped design of the superstructure according to Fig. 1 cheap because its tower 20 verr nismally close to the vertical axis? angeor, can be so that it is only exposed to corresponding mat bending stresses.
Hierzu 1 Blatt Zeichnungen1 sheet of drawings
Claims (3)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19691910242 DE1910242C (en) | 1969-02-28 | Spreaders for dredged material | |
US15805A US3650415A (en) | 1969-02-28 | 1970-03-02 | Arrangement for unloading material from a dredge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19691910242 DE1910242C (en) | 1969-02-28 | Spreaders for dredged material |
Publications (2)
Publication Number | Publication Date |
---|---|
DE1910242A1 DE1910242A1 (en) | 1970-09-10 |
DE1910242C true DE1910242C (en) | 1973-06-07 |
Family
ID=
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3032559C2 (en) | Movable belt conveyors, in particular apron belt conveyors for crushing plants | |
DE4135467A1 (en) | SUSPENSION AND GUIDANCE OF A VERTICAL SUPPORT IN THE UNLOADING CHAIR OF A SHIP UNLOADER | |
DE1910242C (en) | Spreaders for dredged material | |
DE2231268A1 (en) | RECOVERY DEVICE FOR ROUND, PREFERABLY CONE-SHAPED BUMPER STACKS | |
DE10252585A1 (en) | Device to build and reclaim ring tips for bulk goods, e.g. limestone consists of turning central column with support and traveling to support platform on ring rail track, and boom dredger | |
DE1484742C3 (en) | Bucket wheel boom for a bucket wheel excavator, with a bucket wheel chute and with a conveyor belt | |
DE2815480C2 (en) | Unloading device for ships, bunkers, storage areas or the like. | |
DE2716014B2 (en) | System for unloading a ship | |
AT501128A2 (en) | DEVICE FOR UNLOADING A BULLY HOOD | |
DE2700284A1 (en) | DEVICE FOR TRANSPORTING PARTICULAR SMALL OBJECTS IN ALL DIRECTIONS | |
DE2626536A1 (en) | EQUIPMENT FOR BUILDING UP AND DISMANTLING BUMPS OR PILES | |
DE2018120A1 (en) | Trogkettenföräerer | |
DE3615118A1 (en) | Tracklaying gear | |
DE19541867C1 (en) | Device for lifting, lowering and levelling out booms of open-pit mining | |
DE605187C (en) | Mobile depositing device intended for tipping up and down goods | |
DE2807355C2 (en) | Removal device for heaps | |
DE569201C (en) | Weaners | |
DE3728804A1 (en) | CHARGER, ESPECIALLY BUCKET WHEEL EXCAVATOR | |
DE1910242B (en) | Spreaders for dredged material | |
DE3331359A1 (en) | Bucket wheel bridge unit | |
DE3506776C2 (en) | Paver for making a ballast bed for railroad tracks | |
AT215896B (en) | Mobile dismantling and charger | |
DE1910242A1 (en) | System for dumping dredged material | |
DE3511525A1 (en) | Bucket-wheel excavator | |
DE2949958A1 (en) | Crane or loading installation - has swivelling band conveyor with rigid connection to movable main support frame on two carriage units |