DE1884754U - CONCRETE ROOF WITH STORM LOCK. - Google Patents
CONCRETE ROOF WITH STORM LOCK.Info
- Publication number
- DE1884754U DE1884754U DED27072U DED0027072U DE1884754U DE 1884754 U DE1884754 U DE 1884754U DE D27072 U DED27072 U DE D27072U DE D0027072 U DED0027072 U DE D0027072U DE 1884754 U DE1884754 U DE 1884754U
- Authority
- DE
- Germany
- Prior art keywords
- storm
- concrete roof
- ribs
- lock
- attached
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D1/00—Roof covering by making use of tiles, slates, shingles, or other small roofing elements
- E04D1/34—Fastenings for attaching roof-covering elements to the supporting elements
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Finishing Walls (AREA)
Description
Dachziegelwerke lelskamp GmbH.
4235 Schermbeck /Roof tile works lelskamp GmbH.
4235 Schermbeck /
, Bet ondachst eine? spvyt'h , Concrete one? spvyt'h
Die Erfindung betrifft eine Sturmsicherung für Betondachsteine, vorzugsweise mit Seitenverfalzung und Deokwul-st, in Form einer Erhöhung oder einer Hase, die ein Loch zur Aufnahme einer .Sturmklammer hat.The invention relates to a storm protection for concrete roof tiles, preferably with side folds and Deokwul-st, in the form of an elevation or a rabbit, the has a hole to accommodate a storm clip.
Bei Tondachziegeln ist die Verwendung von Sturmklammern seit vielen Jahren bekannt,. Diese werden einersetis an den Dachlatten an die die Dachziegel angehängt werden, "befestigt, andererseits in Durchbohrungen der-Anhängenasen oder Eippen des Tondachziegels eingefügt. Die Durchbohrungen d zur Aufnähme der Sturmklammern werden bei dieser Dachziegelart in den noch plastischen Ton des fertig-, gepreßten Pormlings eingestochen. . .-With clay roof tiles the use of storm clips known for many years. These are one set the roof battens to which the roof tiles are attached, "attached, on the other hand in through-holes in the attachment lugs or ribs of the clay roof tile inserted. The through holes d for receiving the storm clips are in this Roof tile type in the still plastic tone of the finished, pressed pormlings. . .-
Bei Betondachsteinen werden. Sturmklammern bisher nicht verwendet,, weil man der Annahme ist, daß diese .Maßnahme zufolge des größeren Gewichts des einzelnen Jormlings nicht nötig sei und weil die Anbringung einer-gelochten. Halterung für die Sturmklammer wegen des bröckeligen Rohmaterials, das im wesentlichen aus Sand und Zement besteht, auf scheinbar unüberwindliche Schwierigkeiten, stößt; denn Betondachsteine können wirtschaftlich nur inFor concrete roof tiles. Storm clips not yet used ,, because one is of the assumption that this .measure due to the greater weight of the individual jormling is not necessary and because the attachment of a -perforated. Bracket for the storm clip because of the crumbly Raw material, which consists essentially of sand and cement, to seemingly insurmountable difficulties, bumps; because concrete roof tiles can only be used economically
- 2- 2nd
kontinuierlicher JLrbeitsweise hergestellt werden.continuous operation.
Erfindungsgemäß wird auf der Unterseite des Betondachsteins zweckmäßig in geringer Entfernung von der sich auf den überdeckt en Stein auf setzenden Eußrippe oder den sich aufsetzenden IPußrippen neben der Seitenverfal.zung unter dem Heckwulst eine Fase angebracht, die mit einer .. ■ Durchgangsöffnung für die Einbringung der Sturmklammer versehen ist. Die Anbringung der Sturmklammer - Hase Hf in dieser Ecke des Dachsteines hat den Vorteil, daß zugleich mit dem Stein, in dessen Fase die Sturmklamaier eingehängt ist, nicht nur der überdeckte Stein, sondern.auch der " unter dem Deckwulst der Seitenverfalzung liegende Stein verankert wird. Je nach der Zahl der ΰturmklammern er—. gibt sich ein außerordentlich fester, allen ^ütrmbeanspruchungen gewachsener Verband.According to the invention, a bevel is made on the underside of the concrete roof stone at a short distance from the Eußrippe sitting on the covered stone or the Iussrippen next to the Seitenverfal.zung under the rear bulge with a .. ■ through opening for the introduction of the Storm clip is provided. The attachment of the storm clip - Hase Hf in this corner of the roof tile has the advantage that at the same time as the stone in whose bevel the storm clip is hung, not only the covered stone, but also the stone lying under the cover bulge of the side rabbets is anchored Depending on the number of tower brackets, there is an extraordinarily strong bond that can cope with all the stresses of the tower.
Das Einbringen, eines Iioches in die für die Aufnahme; der : Sturmklammer vorgesehene Fase geschieht zweckmäßig in der Weise, daß unmittelbar nach der füllung: der die Fase bildenden Matrize im Zeitpunkt des ^eginns des Verdichtungsvorganges des Rohmaterials eine dem Iiochquerschnitt entsprechende Fad el in den Körper der Fase eingeführt wird, die im Zeitpunkt der eendigung der Verdichtung wieder herausgezogen wird. Dieaer Vorgang muß sehr schnell erfolgen, da für die Verdichtung in der Hegel nur eine Zeit-, spanne von 1-2 Sekunden zur Verfügung steht.The introduction of a hole in the for inclusion; wherein: A storm clip provided chamfer is preferably done in such a way that immediately after the filling is a view corresponding to the Iiochquerschnitt Fad el is inserted into the body of the chamfer of the chamfer-forming die at the time of ^ eginns the compression process of the raw material, which at the time of eendigung the compression is pulled out again. This process must be carried out very quickly, since only a time span of 1-2 seconds is available for the compression in the Hegel.
In den Abbildungen ist ein Ausführungsbeispiel der Erfindung an einem -"etonstein mit Seitenverfalzung, Deckwulst und zwei sich bei der Eindeckung,., auf den überdeckten Stein aufsetzenden Rippen dargestellt, zwischen die ein Abdichtungsstreifen zu liegen kommt. Die Erfindung kann auch In the figures is an embodiment of the invention on a - "concrete stone with side rabbets, cover bead and two at the covering,., on the covered stone attached ribs, between which a sealing strip comes to lie. The invention can also
"-rf:"-rf:
W/M?:W / M ?:
WM;.WM ;.
an anderen Modellen verwirklicht werden.can be implemented on other models.
Abbildung 1 ist ein Betondachstein mit der Unterseite nach oben gekehrt. ®e sind bezeichnet mit (1) der Betonstein, (2) die Seitenverfalzung, (3), der heckwulst, (4) die vordere Fußrippe, (5)die hintere Fußrippe, (6) die Sturmnase, (T) das loch für das Einhängen der ^turmklammer.Figure 1 is a concrete roof tile upside down. ®e are denoted by (1) the concrete block, (2) the side crimps, (3) the rear bulge, (4) the front rib, (5) the rear rib, (6) the storm nose, (T) the hole for attaching the tower bracket.
mm.mm.
ieie
.3SE?*:?.3SE? * :?
;V?i??5:; V? I ?? 5:
Wi'lWi'l
WmWm
Claims (1)
4235 Schermbeck / EJiId. -Oachziegelwerke Felskamp GmbHι
4235 Schermbeck / EJiId. -
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DED27072U DE1884754U (en) | 1963-06-27 | 1963-06-27 | CONCRETE ROOF WITH STORM LOCK. |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DED27072U DE1884754U (en) | 1963-06-27 | 1963-06-27 | CONCRETE ROOF WITH STORM LOCK. |
Publications (1)
Publication Number | Publication Date |
---|---|
DE1884754U true DE1884754U (en) | 1963-12-19 |
Family
ID=33167584
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DED27072U Expired DE1884754U (en) | 1963-06-27 | 1963-06-27 | CONCRETE ROOF WITH STORM LOCK. |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE1884754U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202015008930U1 (en) | 2015-01-18 | 2016-03-09 | Christoph Gruß | Fixation module for cover elements |
-
1963
- 1963-06-27 DE DED27072U patent/DE1884754U/en not_active Expired
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202015008930U1 (en) | 2015-01-18 | 2016-03-09 | Christoph Gruß | Fixation module for cover elements |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2618459A1 (en) | METHOD OF FASTENING FLOOR TO EMBROIDERY | |
DE3402034A1 (en) | Process for producing a façade element having a structured concrete face on a female mould | |
DE1884754U (en) | CONCRETE ROOF WITH STORM LOCK. | |
DE7419996U (en) | Retaining wall element for gardens | |
DE8028909U1 (en) | Paving stone | |
DE2224862A1 (en) | USE OF WATER-CARRIED FULL-FIBER MATS FOR WATER DRAINAGE WITH FACILITIES IN BUILDING AND CIVIL ENGINEERING | |
DE1265957B (en) | Profile strand for sealing structural joints | |
EP1091088A2 (en) | Tunnel drainage system | |
DE878212C (en) | Method and device for the production of expansion joints, in particular in concrete roadways | |
DE3210186C2 (en) | ||
DE579544C (en) | Process for the construction of tunnels, especially under urban roads | |
DE2347876A1 (en) | Wall panel with exposed stone finish - mfd by embedding widely graded stones into resin layer on sand base | |
DE657817C (en) | Earth dam for dams with an inner sealing wall made of sheet steel, sloping towards the air side of the dam | |
DE7032409U (en) | PRE-FABRICATED NETWORK FOR STABILIZING BOESCHUNGEN. | |
DE841637C (en) | Traveling formwork for the production of structures with walls arranged in the direction of travel and transversely thereto | |
DE630312C (en) | Process for the production of road surfaces | |
DE1485628C (en) | Method of making a shoe with a multi-layer bottom | |
AT271552B (en) | Tunnel body for underground railways and process for its manufacture | |
DE2939120A1 (en) | Percolated earthwork dam overflow check - involves set of layered inlay strips made on site from bituminous road material | |
DE1459248A1 (en) | Storm protection for concrete roof tiles, process for the production of storm protection and device for carrying out the process | |
DE7912176U1 (en) | Concrete body, in particular concrete block as a shield | |
DE1851235U (en) | COMPOSITE PAVING STONE. | |
DE7440129U (en) | Building element for a retaining wall | |
DE1932380U (en) | WALL PLATE. | |
DE1926119A1 (en) | Stone to protect the dike foreland |