DE1883787U - DEVICE FOR LOADING SLOPING SURFACES, E.G. DAMBORMS, WORKING CEILING PAVERS WITH CEILING MATERIAL. - Google Patents
DEVICE FOR LOADING SLOPING SURFACES, E.G. DAMBORMS, WORKING CEILING PAVERS WITH CEILING MATERIAL.Info
- Publication number
- DE1883787U DE1883787U DE1963ST016404 DEST016404U DE1883787U DE 1883787 U DE1883787 U DE 1883787U DE 1963ST016404 DE1963ST016404 DE 1963ST016404 DE ST016404 U DEST016404 U DE ST016404U DE 1883787 U DE1883787 U DE 1883787U
- Authority
- DE
- Germany
- Prior art keywords
- truck
- slewing crane
- paver
- winches
- ceiling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
QS r- λ η QS r- λ η
ι »λ- D ι Z.ι »λ- D ι Z.
Dipl.-Ing« Eudolf Teuteberg Dortmund, den 23.9.1963Dipl.-Ing "Eudolf Teuteberg Dortmund, September 23, 1963
Hohenfriedkergerstr» 26Hohenfriedkergerstrasse »26
Vorrichtung zum Beschicken von auf schrägen Flächen, ζ. Β· Dammböschungen, arbeitenden Deckenfertigern mit Deckenbaustoffen· Device for loading sloping surfaces, ζ. Β · Embankments, pavers working with paving materials
Das Aufbringen von vorzugsweise bituminösen Dichtungsbelägen auf die wasserseitigen Dammböschungen von Staudämmen oder Speicherbecken geschieht mit Hilfe von Deckenfertigern und nachfolgenden besonderen Verdichtungsgeräten· Diese Geräte werden mit auf der Dammkrone fahrenden V/inden an Beilen längs der Böschung auf- und abwärts bewegt·The application of preferably bituminous sealing coverings on the water-side embankments of dams or Storage basin is done with the help of pavers and The following special compacting devices · These devices are attached lengthways to axes with v / inden moving on the dam crest moves up and down the embankment
Zum Beschicken des Deckenfertigers wurde derselbe bisher zur Dammkrone aufwärtsgezogen, um dort mit Hilfe eines auf der Dammkrone fahrenden Baggers jeweils mit einem neuen Baustoffvorrat beschickt zu werden·To load the paver, it was previously pulled up to the top of the dam and there with the help of one on the top of the dam moving excavator each with a new supply of building materials to be sent
Man hat den Baustoff auch schon in speziellen Feldbahnloren auf einen luftbereiften lenkbaren Zubringerwagen im Inneren des Windenwagens geschoben, der mit Hilfe einer besonderen Seilwinde dem Deckenfertiger auf der Dammböschung entgegenfährt, um den Baustoff an diesen zu übergeben·You already have the building material inside in special light rail carts on a steerable delivery car with pneumatic tires pushed by the winch car, which with the help of a special cable winch drives towards the paver on the embankment, to hand over the building material to them
Diese bekannten Beschickungseinrichtungen verursachen jedoch sehr große Zeitverluste bei der Deckenfertigung, weil das Fassungsvermögen des Vorratsbehälters auf dem Deckenfertiger nur beschränkt ist und der Deckenfertiger deshalb zur Übernahme neuen Baustoffs sehr oft leer zur Dammkrone hinaufgezogen und zur BaustoffÜbernahme stillgesetzt werden muß. Praktische Erfahrungen haben ergeben, daß die Verlustzeiten dabei mehr als 30 io betragen· Außerdem wird die Qualität der gefertigten Decke durch die häufige Unterbrechung des Fertigungsvorganges beeinträchtigt. Der bituminöse Baustoff muß bekanntlich heiß eingebaut werden· Er erkaltet während der BaustoffÜbernahme an der Unterbrechungsstelle und verursacht beim Wiedereinsetzen derHowever, these known loading devices cause very large losses of time in the production of the ceiling because the capacity of the storage container on the paver is only limited and the paver must therefore very often be pulled up empty to the top of the dam to take over new building material and to be shut down to take over the building material. Practical experience has shown that the loss times are more than 30 io . In addition, the quality of the finished ceiling is impaired by the frequent interruptions in the production process. As is well known, the bituminous building material must be installed while hot
— 2 —- 2 -
Fertigung eine Kantsteile, die wegen der hohen Anforderungen an die Wasserdichtheit der Decke unerwünscht ist und eine sehr kostspielige Nachbehandlung verlangt·Production of an edging because of the high requirements to the waterproofness of the ceiling is undesirable and a very expensive follow-up treatment required
Das Beschicken des Deckenfertigers mit besonderen Feldbahnloren verlangt eine sehr schwere Portalkonstruktion des Windenwagens, um den Zugang für die Feldbahnloren zu ermöglichen und den Zubringerwagen mit seiner Winde unterzubringen. Diese Einrichtung setzt zudem voraus, daß sich die Mischanlage in gleicher Höhe wie die Dammkrone befindet. Ist dies nieht möglich, muß der Baustoff von der Aufbereitungsanlage mittels Lastkraftwagen, in heißem, einbaufertigen Zustand herbeigefahren und in die Feldbahnloren umgeladen werden. Dieser Vorgang verlangt eine Umschlagstation, die isolierte Bunker aufweisen muß, um unzulässige Abkühlung des Deckenbaustoffes beim Umschlagen soweit wie möglich zu vermeiden. Außer der Abkühlung besteht bei jedem Umschlag die G-efahr der Entmischung des Deckenbaustoffes«Loading the paver with special light rail trucks requires a very heavy portal construction of the winch car to allow access for the light rail vehicles and the feeder car to accommodate with its winch. This facility also assumes that the mixing plant is at the same height how the dam crest is located. If this is not possible, the building material must be removed from the processing plant by means of a truck, in a hot, ready-to-install condition and reloaded into the light rail trucks. This process requires a Transhipment station, which must have isolated bunkers in order to avoid impermissible Avoid cooling the ceiling material as much as possible when it is turned over. Besides cooling, everyone has Envelope the risk of segregation of the ceiling construction material "
Aufgabe der Heuerung ist es, diese Mängel zu beseitigen·The job of hiring is to eliminate these deficiencies
G-emäß der Neuerung ist auf der Dammkrone ein fahrbarer Schwenkkran vorgesehen, der die mit Deckenbaustoff beladenen lastkraftwagen mit Hinterkippeinrichtung dem auf der Dammböschung arbeitenden Deckenfertiger vorsetzt, so daß der Deckenbaustoff unmittelbar an den Bunker des Deckenfertigers übergeben werden kann, ohne daß dabei der Deckenfertiger seine Arbeit unterbrechen muß·According to the innovation, there is a mobile slewing crane on the dam crest It is planned that the trucks loaded with ceiling construction material with a rear tipping device are used for those working on the embankment Paver sets in front, so that the paving material immediately can be transferred to the paver bunker without the paver interrupting its work got to·
Der Schwenkkran ist vorzugsweise auf dem ohnehin notwendigen Windenwagen für das Einbaugerät angeordnet, so daß er kein eigenes Fahrwerk benötigt· Er befindet sich dort ständig an der für das Vorsetzen der lastkraftwagen günstigsten Stelle des G-esamtgerätes»The slewing crane is preferably arranged on the winch carriage for the built-in device, which is necessary anyway, so that it does not have Own running gear required · It is always there in the most favorable place for the forwarding of the truck of the entire device »
Durch diese Anordnung eines fahrbaren Schwenkkranes auf der Dammkrone werden Verlustzeiten des Deckenfertigers weitgehend vermieden. Die Decke kann nun in einem Zug ohne Unterbrechungen und ohne unzuverlässige Quernähte verlegt werden· Die FeId-Due to this arrangement of a mobile slewing crane on the dam crest, lost times of the paver are to a large extent avoided. The ceiling can now be laid in one go without interruptions and without unreliable transverse seams.
bahnanlage entfällt, und der Baustoff braucht nicht mehr umgeladen zu werden· Er kann nunmehr auf lastkraftwagen sehr schnell von der Aufbereitungsanlage bis zum Deekenfertiger gebracht werden, gleichgültig, in welcher Uiveauhöhe sich die Mischanlage und in welchem Abstand von der Dammkrone sich der Deckenfertiger befindet· Insgesamt ergeben sich neben der besseren Qualität der Decke sehr große Ersparnisse an Einbauzeit und damit an Kosten·There is no rail system and the building material is no longer needed To be reloaded · It can now be loaded onto trucks a lot quickly brought from the processing plant to the Deeken paver regardless of the level at which the mixing plant is located and at what distance from the dam crest the Paver is located · Overall result in addition to the better Quality of the ceiling very large savings in installation time and thus in costs
Mit Rücksicht auf die in weiten Grenzen wechselnden Zugkräfte, die die Kranwinden beim Heben und Senken des Lastkraftwagens unter ständig wechselnder Richtung der Tragseile aufzubringen haben, sind dieselben erfindungsgemäß mit Antrieben versehen, die selbsttätig in Abhängigkeit vom Lastmoment schaltende Drehzahlstufen aufweisen.In consideration of the tensile forces, which vary within wide limits, which the crane winches when lifting and lowering the truck have to be applied with constantly changing direction of the suspension ropes, the same are provided according to the invention with drives, the speed levels that switch automatically depending on the load torque exhibit.
Die neue Vorrichtung sei anhand der Zeichnung näher erläutert, die ein JLusführungsb ei spiel des Neuerungsgegenstandes in Seitenansicht darstellt·The new device will be explained in more detail with reference to the drawing, which shows a JLusführungsb ei game of the innovation in side view represents
Auf der Krone des Dammes D ist ein vorzugsweise auf Schienen oder Raupenketten fahrender Windenwagen 1 angeordnet, dessen Doppelseilwinde 2 an ihren Seilen 3 den Deekenfertiger 4 auf der Dammböschung auf- und abbewegt, um auf dieselbe einen wasserdichten Dichtungsbelag d aufzubringen· Der Deckenfertiger ist speziell für diese Aufgabe ausgerüstet· Er besitzt einen Vorratsbehälter 5 für einen Baustoffvorrat sowie Einrichtungen zum gleichmäßigen Aufbringen des Baustoffes auf das Planum und zum Verdichten desselben. Das Einbauen des Dichtungsbelages geschieht in nebeneinander liegenden Bahnen, die sich in Richtung der Dammböschung erstrecken, vorzugsweise am Fuß des Dammes beginnend und zu dessen Krone hin fortschreitend. Nach der Fertigstellung einer jeden Belagsbahn wird der Deckenfertiger 4 auf einer Rampe im Windenwagen 1 in denselben hineingezogen, worauf der Windenwagen samt dem Fertiger um eine Belagsbahnbreite auf der Dammkrone voranbewegt wird· An dem Windenwagen und am Deckenfertiger können quer zur Belagsbahn verfahrbare Seilwinden vorgesehen sein, vermittels deren Uachverdichter, vorzugsweise Ver-On the crown of the dam D, a winch truck 1, preferably traveling on rails or caterpillars, is arranged Double rope winch 2 on their ropes 3 open the Deeken paver 4 up and down the embankment in order to apply a waterproof sealing layer d · The paver is specially equipped for this task · It has a storage container 5 for a supply of building materials and facilities for evenly applying the building material to the subgrade and compacting it. The sealing lining is installed in adjacent tracks that extend in the direction of the embankment, preferably starting at the foot of the dam and progressing towards its crown. After completion the paver 4 is on each pavement track a ramp in the winch wagon 1 pulled into the same, whereupon the winch wagon including the paver by the width of a covering track The dam crest is moved forward · Cable winches that can be moved across the track can be provided on the winch carriage and on the paver be, by means of their auxiliary compressors, preferably
dichtungswalzen, im Bereich der vom Deckenfertiger eingebauten Belagsbahnen auf- und abbewegt werden, um diese naehzuverdichten und zu glätten·sealing rollers, in the area of the paver installed Covering strips are moved up and down in order to densify them and to smooth
Auf dem Windenwagen t ist ein Schwenkkran 6 angeordnet, der die auf der Dammkrone heranfahrenden, mit einbaufertigem Deckenbaustoff beladenen Lastkraftwagen anhebt, in die Arbeitsbahn des Deckenfertigers schwenkt, dort auf das Böschungsplanum absenkt unet auf demselben beliebig weit abwärts zum Deckenfertiger leitet, bis sich der Lastkraftwagen mit seiner nach hinten kippbaren Pritsche an den Deckenfertiger anlegt· Durch Anheben der Hinterkippeinrichtung des Lastkraftwagens wird nunmehr, wie auf der Zeichnung dargestellt, der Baustoff in den Vorratsbehälter 5 des Deckenfertigers geschüttet. Dabei schiebt der Deckenfertiger den Lastkraftwagen in .Arbeitsrichtung voran, so daß er seine Einbauarbeit auch während der Baustoffübergäbe nicht zu unterbrechen braucht· Der entleerte Lastkraftwagen wird vom Schwenkkran beschleunigt auf der Böschung nach oben gezogen, angehoben und auf derselben oder der anderen Seite des Windenwagens wieder auf die Dammkrone abgesetzt· Das Aufsetzen des beladenen Lastkraftwagens auf die Dammböschung wird wesentlich vereinfacht, wenn das Gehänge 7, vermittels dessen der Lastkraftwagen mit den Seilen des Schwenkkranes verbunden wird, so angeordnet und ausgebildet ist, daß der Lastkraftwagen mit Bezug auf seine Längsachse beim Anheben etwa eine der Neigung der Dammböschung entsprechende !Schräglage einnimmt, wie auf der Zeichnung gestrichelt angedeutet· Der Schwenkkran ist mit doppelten Tragseilen ausgerüstet, so daß der am Kran hängende Lastkraftwagen keine Drehbewegungen auszuführen vermag, sondern mit seiner Längsachse in der Ebene des Kranauslegers verbleibt· Die Doppelseile des Schwenkkranes erlauben es, sicherheitstechnisch den fahrer des Lastkraftwagens während des gesamten Beschickvorganges zum Bedienen der Hinterkippeinrichtung und zum Steuern des Wagens auf dem Führer stand des Lastkraftwagens zu belassen· Auf diese Weise ist ein schnelles, störungsfreies Beschicken des Deckenfertigers während des Betriebes desselben gewährleistet»On the winch carriage t a slewing crane 6 is arranged, which the approaching on the dam crest, with ready-to-install ceiling construction material lifts the loaded truck, swivels it into the work path of the paver, and lowers it there onto the slope subgrade unet leads on the same as far down as desired to the paver, until the truck with its backward-tipping platform leans against the paver · By lifting the rear tipping device of the truck is now, as shown in the drawing, the building material in the storage container 5 of the Paver poured. The paver pushes the truck in .Working direction so that he does his paving work not to be interrupted even during the building material transfer needs · The empty truck is accelerated by the slewing crane pulled up on the embankment, lifted and on the same or the other side of the winch truck again on the Dam crest removed · Placing the loaded truck on the embankment is much easier if the hanger 7, by means of which the truck is connected to the ropes of the slewing crane, is so arranged and designed, that the truck with respect to its longitudinal axis when lifting approximately a slope corresponding to the slope of the embankment! occupies, as indicated by dashed lines in the drawing · The slewing crane is equipped with double suspension ropes so that the Truck hanging on the crane is not able to perform rotary movements, but with its longitudinal axis in the plane of the crane boom remains · The double ropes of the slewing crane allow the driver of the truck during the entire loading process to operate the rear tipping device and to control the car on the driver was the truck To be left in place · In this way, fast, trouble-free loading of the paver during operation is possible guaranteed »
Zur Verbesserung der Schwerpunktlage des am Schwenkkran hängenden Lastkraftwagens ist auf der nach, hinten kippbaren Pritsche ein besonderer Behälter 8 für den Baustoff befestigt, der den Baustoff auf der Pritsche einen solchen Platz einnehmen läßt, daß sein Schwerpunkt etwa mit dem Schwerpunkt des unbeladenen Wagens zusammenfällt oder senkrecht über demselben liegt. Auf diese Weise werden Gleichgewiehtsänderungen von beladenen gegenüber entladenen Wagen vermieden·To improve the center of gravity of the hanging on the slewing crane Truck is on the backward tiltable flatbed, a special container 8 for the building material attached to the Building material can occupy such a place on the bed that its center of gravity is roughly with the center of gravity of the unloaded one The car collapses or lies vertically above it. In this way there are equilibrium changes of laden versus Avoided unloaded wagons
Sie beim Bewegen des Lastkraftwagens mit dem Schwenkkran von der Winde desselben aufzubringenden Zugkräfte weisen während eines Arbeitsspiels sehr große Schwankungen auf, die Winde hat zu Beginn den beladenen lastkraftwagen senkrecht anzuheben, auf die Böschung abzusetzen und auf der Böschung abwärts fahren zu lassen· Sie hat nach der Baustoffübergabe, an den Deckenfertiger den entladenen Lastkraftwagen beschleunigt die Böschung hinaufzuziehen und anzuheben. Beim Abwärtsfahren wie auch Aufwärtsziehen des Lastkraftwagens wechselt die Hubneigung des Tragseiles und damit die Zugkraft stetig. Um dabei eine möglichst gleichmäßige Belastung des Antriebsmotors zu erreichen, sind die Kran*·* winden mit Antrieben versehen, die die Windendrehzahl und damit die Seilgeschwindigkeit selbsttätig in Abhängigkeit vom Lastmo= ment verändern. Auf diese Weise wird bei konstanter Drehzahl des Antriebsmotors das von diesem abzugebende Drehmoment konstant gehalten·When moving the truck with the slewing crane the winch of the same tensile forces to be applied during very large fluctuations during a work cycle, the winch has to lift the loaded truck vertically at the beginning to lower the embankment and let it go downhill on the embankment pulling the unloaded lorry up the embankment and lifting it faster. When driving downwards as well as pulling upwards of the truck, the lifting inclination of the suspension cable and thus the pulling force changes continuously. In order to achieve the most uniform possible Load of the drive motor, the crane * * * winches are provided with drives that automatically adjust the winch speed and thus the rope speed depending on the load mo = change ment. In this way, at a constant speed of the drive motor, the torque to be output by the drive motor becomes constant held·
Die Seilwinden sind zum Zweck des Seillängenausgleichs unterein** ander mit einem Differentialgetriebe verbunden und mit je einer automatischen Halte- und ge einer Sicherheitsbremse ausgerüstet, von denen jede für sich allein imstande ist, die volle Last zu halten·The cable winches are used for the purpose of compensating the cable length ** other connected to a differential gear and each with one equipped with automatic holding and a safety brake, each of which is able to hold the full load on its own
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1963ST016404 DE1883787U (en) | 1963-09-25 | 1963-09-25 | DEVICE FOR LOADING SLOPING SURFACES, E.G. DAMBORMS, WORKING CEILING PAVERS WITH CEILING MATERIAL. |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1963ST016404 DE1883787U (en) | 1963-09-25 | 1963-09-25 | DEVICE FOR LOADING SLOPING SURFACES, E.G. DAMBORMS, WORKING CEILING PAVERS WITH CEILING MATERIAL. |
Publications (1)
Publication Number | Publication Date |
---|---|
DE1883787U true DE1883787U (en) | 1963-11-28 |
Family
ID=33181287
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE1963ST016404 Expired DE1883787U (en) | 1963-09-25 | 1963-09-25 | DEVICE FOR LOADING SLOPING SURFACES, E.G. DAMBORMS, WORKING CEILING PAVERS WITH CEILING MATERIAL. |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE1883787U (en) |
-
1963
- 1963-09-25 DE DE1963ST016404 patent/DE1883787U/en not_active Expired
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CH628380A5 (en) | MOBILE DEVICE FOR THE CONTINUOUS REPLACEMENT OF A RAILWAY consisting of RAILS AND SILLS. | |
WO1993016945A1 (en) | Novel conveyor belt bridge for open-cast mining | |
DE2040885A1 (en) | Material feeding device, in particular a transport vehicle for feeding asphalt to an asphalting machine | |
DE3834313C2 (en) | Process and plant for the production of a ballast bed for a railway track | |
DE2628325A1 (en) | Canal bank surfacing machine supply unit - comprises mobile swivelling conveyor with closed heated space and storage container | |
AT240793B (en) | Method and apparatus for charging inclined surfaces, e.g. B. embankments, working pavers with paving materials | |
DE3430642A1 (en) | TRAVELABLE SLOPE LIFT | |
DE2302199A1 (en) | CHARGING DEVICE | |
DE1883787U (en) | DEVICE FOR LOADING SLOPING SURFACES, E.G. DAMBORMS, WORKING CEILING PAVERS WITH CEILING MATERIAL. | |
DE3200175A1 (en) | METHOD AND DEVICE FOR LOADING A TRAIN WITH PARTICLE MATERIAL | |
DE3303059C2 (en) | Inclined elevator | |
DE4213925A1 (en) | Goods waggon train for bulk goods transportation - consists of transship wagons with cantilever conveyor and movable base, and goods wagons with movable base | |
DE10005677C2 (en) | Method and device for building routes and dams | |
DE19726612C2 (en) | Process for handling building materials with trucks and transport equipment | |
EP0036977B1 (en) | Tunnel-type furnace | |
DE1928461A1 (en) | Mobile device for lifting loads | |
DE3229500A1 (en) | Connecting belt bridge for an open-cast mining machine | |
AT370799B (en) | MOBILE PLANT FOR RENOVATION | |
DE819392C (en) | Loading device, especially for underground drifting | |
DE1756048C (en) | Method for the mixing discharge of bulk material stored in elongated heaps roof-shaped in layers one on top of the other | |
DE4339833A1 (en) | Road or railway construction and removal machine | |
DE102013202071B4 (en) | Method and device for supporting and moving a semi-mobile crushing plant | |
DE1179861B (en) | Mobile back device for beltways and tracks with a back roller head | |
AT375048B (en) | RAIL-BASED TRANSPORT CARRIAGE FOR SCHUETTGUETER | |
DE19529235C2 (en) | Device for producing a spoil tip in surface mining and its use |