DE1773049C3 - Device for adapting the gas quantities purchased from consumers connected to a gas supply network to the load curve of the gas supply company - Google Patents

Device for adapting the gas quantities purchased from consumers connected to a gas supply network to the load curve of the gas supply company

Info

Publication number
DE1773049C3
DE1773049C3 DE19681773049 DE1773049A DE1773049C3 DE 1773049 C3 DE1773049 C3 DE 1773049C3 DE 19681773049 DE19681773049 DE 19681773049 DE 1773049 A DE1773049 A DE 1773049A DE 1773049 C3 DE1773049 C3 DE 1773049C3
Authority
DE
Germany
Prior art keywords
gas supply
gas
line
adapting
load curve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19681773049
Other languages
German (de)
Other versions
DE1773049B2 (en
DE1773049A1 (en
Inventor
Anmelder Gleich
Original Assignee
Ammermann, Dietrich, Dipl-Ing, Kersten, Ernst-Gunter, Dipl -Ing , 3440 Eschwege
Filing date
Publication date
Application filed by Ammermann, Dietrich, Dipl-Ing, Kersten, Ernst-Gunter, Dipl -Ing , 3440 Eschwege filed Critical Ammermann, Dietrich, Dipl-Ing, Kersten, Ernst-Gunter, Dipl -Ing , 3440 Eschwege
Priority to DE19681773049 priority Critical patent/DE1773049C3/en
Publication of DE1773049A1 publication Critical patent/DE1773049A1/en
Publication of DE1773049B2 publication Critical patent/DE1773049B2/en
Application granted granted Critical
Publication of DE1773049C3 publication Critical patent/DE1773049C3/en
Expired legal-status Critical Current

Links

Description

Die Größe der von einem Gasversorgungsunternehmen (GVU) an Verbraucher in der Zeiteinheit lieferbaren Gasmenge ist durch die Leistungsfähigkeit der Verbraucherleitungen begrenzt. Daß die Höchstleistung vom Verbraucher dauernd abgenommen wird, kommt kaum oder nie vor. Der Verbraucher wird, falls ihm kein Anlaß zur Verhaltensänderung geboten wird, das G as abnehmen, wie und w ann es ihm paßt.The size of the gas supply company (GVU) to consumers in the unit of time The amount of gas that can be delivered is limited by the capacity of the consumer lines. That the highest performance is constantly removed by the consumer, rarely or never occurs. The consumer will, if he is given no cause to change his behavior, decrease the gas as and when it suits him.

Für die GVU ist die unterschiedliche Abnahme von Gasmengen während der Stark- und Schwachlastzeiten nachteilig, da dem GVU das Gas heute nur mit einem Leistungspreis für die höchste zeitliche Entnahme und dem Arbeitspreis je Wärme- bzw. Raumeinheit geliefert wird.For the GVU is the different consumption of gas quantities during the heavy and light load times disadvantageous, since the GVU today only offers the gas with a performance price for the highest temporal withdrawal and the labor price per heating or room unit is delivered.

Großabnehmer haben aber oft die Möglichkeit, sich in dem zeitlichen Ablauf ihres Verbrauchs der Belastungskurve des liefernden GVU's anzupassen. Dies ist für das GVU von entscheidender wirtschaftlicher Bedeutung.However, bulk buyers often have the option of checking the timing of their consumption of the Adapt the load curve of the supplying GVU. This is of decisive economic importance for the GVU Importance.

Wenn also ein Verbraucher bereit ist, sich in seinem Gasbezug der Belastungskurve des GVU's anzupassen, kann ihm hierfür ein günstigerer Tarif als im anderen Fall gewährt werden.So if a consumer is ready to adjust his gas supply to the load curve of the GVU, he can be granted a more favorable tariff for this than in the other case.

Es ist bekannt, mit dem Verbraucher zu vereinbaren, daß er in den Genuß eines niedrigeren Tarifs nur gelangt, wenn er eine bestimmte Maximalleistung während der Starklastzeiten nicht überschreitet.It is known to agree with the consumer that he will only benefit from a lower tariff when it does not exceed a certain maximum power during heavy load times.

Meßeinrichtungen zur Feststellung der maximalen Leistungshergabe innerhalb eines bestimmten Zeitabschnittes (z. B. Stunde) und der gleichzeitig in dem bestimmten Zeitabschnitt entnommenen Gasmenge sind nur mit einem Kostenaufwand zu erstellen, der die Abnahme sehr großer Gasmengen zur Voraussetzung hat.Measuring devices to determine the maximum output within a certain period of time (e.g. hour) and the amount of gas withdrawn at the same time in the specific period of time can only be created at a cost that requires the purchase of very large quantities of gas has.

Derartige aufwendigen Meßeinrichtungen überflüssig zu machen und dem Verbraucher die Überschreitung der vereinbarten, zu einem niedrigeren Tarif berechneten Maximalleistung während der Starklastzeiten von vornherein unmöglich zu machen, ist die Aufgabe der Erfindung.To make such complex measuring devices superfluous and the consumer to exceed them the agreed maximum power, calculated at a lower tariff, during heavy load times of The object of the invention is to make it impossible from the outset.

Zur Lössung dieser Aufgabe sieht die Erfindung eine Einrichtung zur Anpassung der von an ein Gasversorgungsnetz angeschlossenen Verbrauchern während der Starklastzeiten bezogenen Gasmengen an die Belastungskurve des Gasversorgungsunternehmens vor, die dadurch gekennzeichnet ist, daß hinter dem Gaszähler in die Verbraucherleitung ein aus zwei sich verzweigenden und danach sich wieder vereinigenden Teilleitungen bestehendes Leitungsstück eingeschaltet ist und in der einen Teilleitung eine Drossel mit einer vom Abnehmer zu bestimmenden maximalen Durchlaßmenge und in der andern Teilleitung ein von einer Schaltuhr od. dgl.To achieve this object, the invention provides a device for adapting the from to a gas supply network connected consumers to the load curve during the heavy load times of the gas supply company, which is characterized in that behind the gas meter into the consumer line one of two branching and then reuniting sub-lines existing line piece is switched on and in one part line a throttle with one from the consumer to be determined maximum flow rate and in the other sub-line one of a timer or the like.

gesteuertes Magnetventil od. dgl. angeordnet ist, das während der Schwachleistungszeiten diese Teilleitung freigibt und während der Starklastzeiten sperrt.Controlled solenoid valve or the like. Is arranged that this sub-line during the low-power times releases and blocks during heavy load times.

Der Vorteil der Erfindung besteht in den außerordentlich niedrigen vorn GVU für die MeßeinrichtungenThe advantage of the invention consists in the extremely low front GVU for the measuring devices

»ο aufzuwendenden Anschaffungskosten und den niedrigen vom Verbraucher zu entrichtenden Meßkosten, die, wie üblich, dem Verbraucher zur Amortisation der Meßeinrichtungen angerechnet werden.
Die Erfindung wird im folgenden anhand der Zeichnung mit einem Ausführungsbeispiel näher erläutert.
»Ο the acquisition costs to be expended and the low measurement costs to be paid by the consumer, which, as usual, are credited to the consumer for the amortization of the measurement equipment.
The invention is explained in more detail below with reference to the drawing with an exemplary embodiment.

Hinter dem in der Verbraucherleitung angeordneten und die an den Verbraucher gelieferte Gasmenge messenden Zähler 6 ist in die Verbraucherleitung ein aus sich verzweigenden und danach sich wieder vereinigenden Teilleitungen t und 2 bestehendes Leitungsstück mit den beiden Hosenteilen 3 und 4 eingeschaltet. In dem oberen Leitungszweig 1 ist ein von einer Schaltuhr 5 gesteuertes Magnetventil 7 und in dem unteren Leitungszweig 2 eine als Stauscheibe ausgebildete auswechselbare Durchflußdrossel 8 mit einem als Wellrohr ausgeführten Paßstück 9 eingeschaltet.Behind the arranged in the consumer line and the amount of gas delivered to the consumer measuring counter 6 is in the consumer line a branching out and then reuniting Partial lines t and 2 existing line piece with the two trousers parts 3 and 4 switched on. By doing The upper branch 1 is a solenoid valve 7 controlled by a timer 5 and in the lower one Line branch 2 designed as a baffle plate replaceable flow restrictor 8 with a Corrugated pipe executed fitting piece 9 switched on.

Während der Starklastzeiten, z. B. von 7 bis 9 Uhr, von 10 bis 12.30 Uhr und von 17 bis 20 Uhr wird über die Schaltuhr das Magnetventil 7 geschlossen und für die Dauer der Schwachlastzeiten geöffnet.During heavy load times, e.g. B. from 7 a.m. to 9 a.m., from 10 a.m. to 12.30 p.m. and from 5 p.m. to 8 p.m. Timer the solenoid valve 7 is closed and opened for the duration of the low load times.

Den Durchflußquerschnitt der Drossel 8 wählt der Abnehmer entsprechend der während der Starklastzeit benötigten Höchstleistung. Der Abnehmer kann demnach während der Starklastzeiten nur das Gas entnehmen, das die von ihm gewählte Durchflußdrossel maximal durchläßt.The customer selects the flow cross-section of the throttle 8 in accordance with the during the heavy load period required maximum performance. The customer can only use the gas during heavy load times refer to the maximum permeability of the flow restrictor selected by him.

Das GVU kann Verbrauchern, die in dieser Weise ihren Verbrauch während der Starklastzeiten begrenzen, einen Preis für die Leistung anbieten, die dem Durchlaß der Durchflußdrossel in der Zeiteinheit entspricht und der um so niedriger ist, je kleiner die vom Verbraucher gewählte Leistung während der Starklastzeit ist.The GVU can provide consumers who limit their consumption in this way during heavy load times, Offer a price for the performance that the flow restrictor allows in a unit of time and which is lower, the lower the power selected by the consumer during the heavy load period is.

Außerhalb der Starklastzeiten steht dem Abnehmer bei geöffnetem Magnetventil die volle Leistung zur Verfügung, die der Verbraucheranschluß an das Netz des GVU hergibt. Das GVU hat so die Möglichkeit, außerhalb der Stairklastzeiten die gegenüber der Starklastzeit erhöhte Leistung kostenlos oder zu einem geringen Leistungspreis an den Abnehmer herzugeben.Outside of the heavy load times, the customer has full power when the solenoid valve is open Disposal that the consumer connection to the GVU network provides. The GVU has the opportunity to outside of the stair load times, the increased power compared to the heavy load time free of charge or at one to give a low price to the customer.

Hierzu 1 Blatt Zeichnungen1 sheet of drawings

Claims (1)

Patentanspruch:Claim: Einrichtung zur Anpassung der von an ein Gasversorgungsnetz angeschlossenen Verbrauchern während der Starklastzeiten bezogenen Gasmengen an die Belastungskurve des Gasversorgungsunternehmens, dadurch gekennzeichnet, daß hinter dem Gaszähler (6) in die VerbrancherleHung ein aus zwei sich verzweigenden und danach sich wieder vereinigenden Teilleitungen bestehendes Leitungsstack eingeschaltet ist und in der einen Teilleitung (2) eine Drossel (8) mit einer vom Abnehmer zu bestimmenden maximalen Durchlaßmenge und in der anderen Teilleitung (1) ein von einer Schaltuhr (5) od. dgl. gesteuertes Magnetventil (7)od. dgl. angeordnet ist, das während der Schwachlastzeiten diese Teilleitung (1) freigibt und während der Starklastzeiten sperrt.Facility for adapting the from to a Consumers connected to the gas supply network during heavy load times Gas quantities to the load curve of the gas supply company, characterized in that that behind the gas meter (6) in the VerbrancherleHung one of two branching out and then reuniting partial lines existing line stack is switched on and in one sub-line (2) has a throttle (8) with a maximum to be determined by the consumer Flow rate and in the other sub-line (1) one of a timer (5) or. The like. Controlled Solenoid valve (7) or Like. Is arranged that releases this sub-line (1) during the off-peak times and locks during heavy load times.
DE19681773049 1968-03-25 Device for adapting the gas quantities purchased from consumers connected to a gas supply network to the load curve of the gas supply company Expired DE1773049C3 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19681773049 DE1773049C3 (en) 1968-03-25 Device for adapting the gas quantities purchased from consumers connected to a gas supply network to the load curve of the gas supply company

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19681773049 DE1773049C3 (en) 1968-03-25 Device for adapting the gas quantities purchased from consumers connected to a gas supply network to the load curve of the gas supply company

Publications (3)

Publication Number Publication Date
DE1773049A1 DE1773049A1 (en) 1971-08-26
DE1773049B2 DE1773049B2 (en) 1976-12-23
DE1773049C3 true DE1773049C3 (en) 1977-08-18

Family

ID=

Similar Documents

Publication Publication Date Title
DE2803156C2 (en) Measuring device for determining a tariff value for energy consumers
DE1773049C3 (en) Device for adapting the gas quantities purchased from consumers connected to a gas supply network to the load curve of the gas supply company
DE1773049B2 (en) DEVICE FOR ADJUSTING THE GAS QUANTITIES PURCHASED BY CONSUMERS CONNECTED TO A GAS SUPPLY NETWORK TO THE LOAD CURVE OF THE GAS SUPPLY COMPANY
DE2943081A1 (en) COLLECTIVE HEATING WITH A CIRCULATING HEATING MEDIUM
DE834760C (en) Heat quantity measuring device in heating systems with a circulation pump
EP0047483B1 (en) Process for the control of liquid-conditioning in an evaporation plant
CH637475A5 (en) Tariff meter for heat consumers
EP0220195A1 (en) Device for regulating the gas consumption
CH657465A5 (en) CASH METER.
DE4114212C1 (en) Water mains cleaner, using sudden pressure drop - has common magnetic control valve in front of branch supply pipe
AT222852B (en) Boiler link, boiler and boiler end link composed of such links
DE851132C (en) Device for recording the flow rates of consumables, in particular of liquid or gaseous substances
AT128188B (en) Device for measuring the total work of a system with several feed lines.
DE3603294A1 (en) Method and device for measuring the quantity of energy fed to one or more energy-dissipating devices
DE1938728B2 (en) Meter for electrical work with at least one additional counter to record a performance-graded consumption
DE2403076A1 (en) Heat consumption meter - for heating costs distribution, compares individual installation heat consumption with total consumption
CH636969A5 (en) Tariff device connected to an electricity meter and having a number of counting devices
DE566383C (en) Payment device to be installed in the branch line of a gas consumption system
DE898775C (en) Device for signaling or switching according to the fixed quantity measuring principle, especially tariff monitor
CH624474A5 (en) Hot-water installation with a large number of hot-water accumulators
AT139572B (en) Automatic payment device to be switched into a consumables line, which uses the blocking of the line as an obligation to pay.
DE296984C (en)
DE1295866B (en) Arrangement for measuring the amount of mass flowing through a line in the unit of time
AT237739B (en) Device for billing the consumption of a flowing medium according to a block tariff
AT263980B (en) Installation in burner systems for supplying several burners located at different locations